TS-2663-1101135 Addendum No. 3.pdf

PDF 128 KB Posted

Attached to
5X MISSION ASSURANCE SUPPORT SERVICES RECOMPETE Federal contract opportunity
Solicitation number
TS-2663-1101135
Issued by
National Aeronautics and Space Administration

About this file

This document is a Request for Proposal (RFP) Addendum No. 003 for the 5X Mission Assurance Support Services Recompete solicitation (TS-2663-1101135) issued by the Jet Propulsion Laboratory (JPL). The addendum modifies several sections of the original RFP, including mandatory qualifications, background information, personnel qualifications, and staffing requirements. Key changes include updating the minimum employee requirement to 30 bona fide employees in similar labor categories, revising the historical labor classification table, and adjusting requirements for resume submissions and staffing flexibility.

The solicitation is a small business set-aside for providing specialized technical engineering services across multiple offices, including Reliability Engineering, Mission Environmental Assurance, Quality Assurance, Electronic Parts Engineering, and System Safety Engineering. JPL plans to award two multiple-year subcontracts (Staff Augmentation and Task-Based) with a four-year base period and potential two 3-year options. The proposal due date remains April 11, 2025, at 3:00 p.m., and proposers must submit Attachment A-1 acknowledging receipt of this addendum. The North American Industry Classification System (NAICS) code is 541715 for Research and Development in Physical, Engineering, and Life Sciences.

View the file

Other files for this federal contract opportunity

Other files attached to 5X MISSION ASSURANCE SUPPORT SERVICES RECOMPETE, newest first.
File Type Posted
Question and Answers for 5X Mission Assurance Support Services Recompete R1.pdf PDF
TS-2663-1101135 Addendum No. 4.pdf PDF
5X MASS Pre-proposal Conference.pptx PPTX presentation
Question and Answers for 5X Mission Assurance Support Services Recompete.pdf PDF
TS-2663-1101135-A15R1.xlsx XLSX spreadsheet
TS-2663-1101135 Addendum No. 2.pdf PDF
TS-2663-1101135 Addendum No. 1.pdf PDF
TS-2663-1101135-A20.doc DOC document
TS-2663-1101135-B5.doc DOC document
TS-2663-1101135-B12.docx DOCX document
Staff Augmentation Subcontract Exhibit 3- Sample Subcontract Work Order.pdf PDF
Staff Augmentation Subcontract Exhibit 8- Sample Monthly Status and Cost Report.pdf PDF
Staff Augmentation Subcontract Exhibit 12 - Unescorted Access Subcontractor Badging Instructions and Requirements.docx DOCX document
Staff Augmentation Subcontract Exhibit 17 -Standard of Conduct and Procedures for Handling Subcontractor Personnel.docx DOCX document
Task-Based Subcontract Exhibit 2- Subcontract Work Order Procedure.docx DOCX document
Task-Based Subcontract Exhibit 4- Sample Weekly Summary Status Report.pdf PDF
Task-Based Subcontract Exhibit 6 - Software License Agreement for Use of JPL-Furnished Software .doc DOC document
Task-Based Subcontract Exhibit 7- Sample Monthly Status and Cost Report Summary.pdf PDF
Task-Based Subcontract Exhibit 10 - Subcontractor Personnel Travel Policy.docx DOCX document
Task-Based Subcontract Exhibit 11 - Information and Information Technology Requirements_11-22-24.docx DOCX document
Task-Based Subcontract Exhibit 12 - Unescorted Access Subcontractor Badging Instructions and Requirements.docx DOCX document
TBD-B-2.02 Task-Based Standard Subcontract 02.25.25.docx DOCX document
TBD-B-2.02 Staff Augmentation Standard Subcontract 02.25.2025.docx DOCX document
TS-2663-1101135-A15.xlsx XLSX spreadsheet
TS-2663-1101135-B4.docx DOCX document
TS-2663-1101135-B7.doc DOC document
TS-2663-1101135-B10.doc DOC document
TS-2663-1101135-B11.docx DOCX document
Staff Augmentation Subcontract Exhibit 6 - Software License Agreement for Use of JPL-Furnished Software .doc DOC document
Staff Augmentation Subcontract Exhibit 7- Sample Monthly Status and Cost Report Summary.pdf PDF
Staff Augmentation Subcontract Exhibit 13 - ELI Template Requirements.pdf PDF
Staff Augmentation Subcontract Exhibit 15 - JPL Subcontractor Environmental Safety and Health Plan Requirements.docx DOCX document
TS-2663-1101135-A1.docx DOCX document
TS-2663-1101135-A3.doc DOC document
TS-2663-1101135-A21.doc DOC document
TS-2663-1101135-A22.docx DOCX document
TS-2663-1101135-B13.doc DOC document
Staff Augmentation Subcontract Exhibit 11 - Information Security and Information Technology Requirements_11.22.2024.docx DOCX document
Task-Based Subcontract Exhibit 3- Sample Subcontract Work Order.pdf PDF
Task-Based Subcontract Exhibit 13 - ELI Template Requirements.pdf PDF
Task-Based Subcontract Exhibit 15 - JPL Subcontractor Environmental Safety and Health Plan Requirements.docx DOCX document
Task-Based Subcontract Exhibit 17 -Standard of Conduct and Procedures for Handling Subcontractor Personnel Problems.docx DOCX document
TS-2663-1101135-2.02 1.25.2025.docx DOCX document
TS-2663-1101135-A2.doc DOC document
TS-2663-1101135-A7.docx DOCX document
TS-2663-1101135-A14.docx DOCX document
TS-2663-1101135-A17.xlsx XLSX spreadsheet
TS-2663-1101135-B9.doc DOC document
TS-2663-1101135-B17.docx DOCX document
Staff Augmentation Subcontract Exhibit 1 - Staff Augmentation Subcontract - Job Classifications_10.28.24.docx DOCX document
Show all 50

5X MISSION ASSURANCE SUPPORT SERVICES RECOMPETE has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JPL 7183, R 11/12

Jet Propulsion Laboratory California Institute of Technology

4800 Oak Grove Drive Pasadena, California 91109-8099

(818) 354-4321

3/28/2025

Attention: Prospective Proposers

Subject: Request for Proposal (RFP) Addendum No. 003 to JPL RFP No. TS-

2663-1101135 for 5X MISSION ASSURANCE SUPPORT SERVICES

RECOMPETE

This addendum is provided to all proposers for clarification of the subject RFP. This addendum provides clarification of the technical/management instructions, criteria and factors, and provides Q&A.

1. Request for Proposal, TECHNICAL/MANAGEMENT PROPOSAL INSTRUCTIONS, 1.0, Mandatory Qualifications, 1.1.2, delete in its entirety and replace as follows:

1.1.2 Proposer must have had at any one time, within the last 12 months prior to the issuance date of this RFP, a minimum of 30 bona fide employees employed in labor categories of similar nature to those required by JPL. Evidence shall include payroll records specifying payroll week ending date, employee name, and job title. Documentation submitted shall be from the same single week in the past 12 months. (maximum of 30 pages)

2. Request for Proposal, TECHNICAL/MANAGEMENT PROPOSAL

INSTRUCTIONS, 2.0, Background Information, 2.7, delete Cat Z table in its entirety and replace as follows:

Labor

Classification

Contract

Start -

May

CY

CY

CY

CY

CY

CY

CY

CY

Level Future

Labor

Category

QA Inspectors

(remote, P/T)

0 1 3 3 2 1 1 1 1 SME, Sen

II, Sen I

Z

QA Engineers

(remote, P/T)

0 1 1 3 2 1 1 1 1 SME, Sen

II, Sen I

Z

Reliability

Engineers

12 24 33 48 55 37 14 12 2 SME, Sen II Z

Natural Space

Engineers

2 2 2 2 2 2 0 0 0 SME Z

Parts Engineers 0 0 8 8 6 5 4 4 3 SME, Sen

II, Sen I

Z

Radiation

Engineers

2 2 4 4 4 4 1 1 1 SME, Sen II Z

Information

Systems (WH)

10 10 12 10 11 12 12 12 11 SME - Staff Z

TOTAL 16 30 51 68 71 50 21 19 8

3. Request for Proposal, TECHNICAL/MANAGEMENT CRITERIA AND FACTORS, 1.2, Criterion T2- Personnel Qualifications, 1.2.2, Factor 2 – Qualifications of

Support Personnel, delete in its entirety and replace as follows

1.2.2 Using the table under 2.0- Background Information as a guide, provide a minimum of two (2), and a maximum of five (5), complete and current resumes for each discipline provided. In other words, no more than five (5) resumes pertaining to any one

(1) engineering discipline. Include schools attended, degrees obtained, a complete employment history, clearances for the individuals proposed, and their areas of responsibility. Provide current assignment and location of proposed personnel. Total resumes submitted for this effort must not exceed sixty (60).

4. Request for Proposal, TECHNICAL/MANAGEMENT CRITERIA AND FACTORS, 1.3, Criterion M1- Staffing & Management Plan for Category A – Staff Augmentation, 1.3.1, Factor 1 – Staffing, 1.3.1.4, delete in its entirety and replace as follows:

1.3.1.4 Prospective source may need to accommodate rapid fluctuations in staffing as dictated by project/mission needs. Describe past experience of fulfilling a need to add staff within fifteen (15) business days or less. Include any best practices on managing a large number of work orders.

5. Request for Proposal, TECHNICAL/MANAGEMENT CRITERIA AND FACTORS, 1.4, Criterion M2- Staffing & Management Plan for Category Z – Task-based Work, 1.4.1, Factor 1 – Staffing, 1.4.1.6, delete in its entirety and replace as follows:

1.4.1.6 Prospective source may need to accommodate rapid fluctuations in staffing as dictated by project/mission needs. Describe past experience of fulfilling a need to add staff within fifteen (15) business days or less. Include any best practices on managing a large number of work orders.

6. Request for Proposal, Attachments to the Solicitation, delete A-15 Cost

Elements Breakdown Form, JPL Mission Assurance Support Services (MASS) Rate Detail in its entirety and replace with JPL Mission Assurance Support Services (MASS) Rate Detail, R1.

7. Q&A for 5X Mission Assurance Support Services Recompete, dated 3/28/2025.

The RFP due date is not changed by this addendum. The date for Part I remains April 11, 2025, Local Time: 3:00 p.m.

As required by the RFP’s General Instructions, indicate receipt of this and any other addendums relative to the subject RFP. Attachment A-1 must be submitted to JPL with your proposal.

Sincerely, Tiffany Smith Subcontracts Manager tiffany.m.smith@jpl.nasa.gov mailto:tiffany.m.smith@jpl.nasa.gov