Task-Based Subcontract Exhibit 2- Subcontract Work Order Procedure.docx
DOCX document 26 KB Posted
- Attached to
- 5X MISSION ASSURANCE SUPPORT SERVICES RECOMPETE Federal contract opportunity
- Solicitation number
- TS-2663-1101135
About this file
This is a Subcontract Work Order (SWO) procedure document related to JPL's Mission Assurance Support Services (MASS) contract, defining the process for issuing and managing task-based work orders under a Labor-Hour/T&M contract structure. The document outlines requirements for new SWOs, including a 10-business-day response time from subcontractors, security clearance prerequisites, and the need for bilateral authorization from JPL's Subcontract Manager before work can begin.
The associated solicitation (TS-2663-1101135) is for JPL's 5X Mission Assurance Support Services Recompete, a small business set-aside under NAICS 541715. JPL plans to award two subcontracts to a single contractor: one for Staff Augmentation (Category A) and one for Task-Based work (Category Z). The contract will have a 4-year base period with two 3-year options. Services required include reliability engineering, quality assurance, electronic parts engineering, system safety engineering, and mechanical systems engineering support. A phase-in period is planned between award and current contract expiration, which is scheduled for this calendar year.
View the file
Other files for this federal contract opportunity
Show all 50
5X MISSION ASSURANCE SUPPORT SERVICES RECOMPETE has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBCONTRACT WORK ORDER PROCEDURE
(Labor-Hour/T&M Contract)
1.0 DEFINITION
1.1 A Subcontract Work Order (SWO) a bilateral document issued by JPL to authorize and define a subcontractor's specific effort in implementing work under the basic SWO subcontract for services.
1.2 A SWO Supplement is a bilateral document issued by JPL that modifies an active SWO. For Mission Assurance Support Services (MASS) SWO modifications, the modification number is indicated next to the date, under the CWO number.
2.0 REQUESTS FOR A NEW SWO
2.1 The cognizant Contract Technical Manager (CTM) will request additional support personnel via a job description, which includes the job title, job duties, period of performance, job classification, education and experience requirements, and any other data that may be relevant to a particular requirement. The requirement description will be provided by JPL to the Subcontractor in electronic form.
2.2 Security clearance requirements will limit the solicitation to those Subcontractor personnel with the appropriate security clearances.
2.3 The Subcontractor is required to meet this request within ten (10) business days of the requirement for additional support.
3.0 ISSUING AN SWO
3.1 SWOs will be issued on a SWO form, please see Exhibit 3, “Sample Subcontract Work Order.” All SWOs issued will:
3.1.1 Be on the selected form (as designated in the SWO subcontract) and numbered consecutively.
3.1.2 Describe the services to be provided.
3.1.3 State the work start and end dates.
EXHIBIT 2 SUBCONTRACT NO. TBD
OCTOBER 2024
4.0 AUTHORIZATION
4.1 All SWOs and modifications will be issued by the cognizant JPL Subcontract Manager.
4.2 The subcontractor will begin work only after receiving an authorized SWO executed by the Subcontracts Manager.
5.0 REIMBURSEMENT OF COSTS
5.1 In addition to the provisions of paragraphs (a) of the GENERAL PROVISIONS of this Subcontract entitled "Timekeeping and Payments," the Subcontractor shall be reimbursed for travel expenses and Other Direct Costs only as authorized in Article 2 and in each SWO issued under this Subcontract.