TS-2663-1101135-A15R1.xlsx
XLSX spreadsheet 63 KB Posted
- Attached to
- 5X MISSION ASSURANCE SUPPORT SERVICES RECOMPETE Federal contract opportunity
- Solicitation number
- TS-2663-1101135
About this file
This is a detailed labor rate pricing spreadsheet for a Mission Assurance Support Services contract solicitation at the Jet Propulsion Laboratory (JPL). The spreadsheet (TS-2663-1101135-A15R1.xlsx) outlines proposed hourly rates for multiple labor categories across two distinct contract categories: Category A (Staff Augmentation) and Category Z (Task-Based), with rates for both prime and lower-tier subcontractors. The solicitation is a small business set-aside for specialized technical engineering services, including reliability engineering, environments, electromagnetic compatibility, quality assurance, electronic parts engineering, and structural analysis.
The contract will award two subcontracts to one source, with a four-year base period and potential options for two additional three-year periods. Labor categories span various engineering disciplines such as structural analysts, quality assurance engineers, electronic parts engineers, systems safety engineers, and radiation engineers, with tiered levels from staff to subject matter expert. The spreadsheet provides detailed rate breakdowns including direct labor rates, fixed indirect expenses, and fixed profit, with different rates based on facility location (JPL vs. non-JPL) and team size. The contract is associated with NASA and has a North American Industry Classification System (NAICS) code of 541715 for research and development in physical, engineering, and life sciences.
View the file
Other files for this federal contract opportunity
Show all 50
5X MISSION ASSURANCE SUPPORT SERVICES RECOMPETE has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Tab 1 Prime Subk_Cat A
| JPL RFP xx | Attachment A-15 |
| Mission Assurance Support Services | |
| Proposed Labor, Fixed Indirect Expense and Fixed Profit Hourly Rates | |
| Prime Subcontractor | |
| Year 1 - FY 2026 - October 2025 through September 2026 |
| CATEGORY A RESOURCES: | ||||||||
| Staff Facility Location (Effort Performed at) à | JPL Facility | Non-JPL Facility | ||||||
| 1 to 20 | 21 to 50 | >50 | 1 to 20 | 21 to 50 | >50 | |||
| Labor Classification | Direct Labor | Fixed Ind | ||||||
| Expense | Fixed | |||||||
| Profit | Fixed Ind | |||||||
| Expense | Fixed | |||||||
| Profit | Fixed Ind | |||||||
| Expense | Fixed | |||||||
| Profit | Fixed Ind | |||||||
| Expense | Fixed | |||||||
| Profit | Fixed Ind | |||||||
| Expense | Fixed | |||||||
| Profit | Fixed Ind | |||||||
| Expense | Fixed |
Profit
| Min | Max | |||||||||||||
| Uncleared Staff | ||||||||||||||
| Subject Matter Expert | ||||||||||||||
| Structural Analyst | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior II | ||||||||||||||
| Structural Analyst | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Hardware Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior I | ||||||||||||||
| Structural Analyst | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Hardware Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Staff | ||||||||||||||
| Structural Analyst | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Hardware Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subject Matter Expert | ||||||||||||||
| SRE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PRE | ||||||||||||||
| PRA | ||||||||||||||
| ERE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PACKAGING THERMAL/STRUCTRURAL ANALYST | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| EMC | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Engineer II | ||||||||||||||
| SRE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PRE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PRA | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| ERE | ||||||||||||||
| PACKAGING THERMAL/STRUCTRURAL ANALYST | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| EMC | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Engineer I | ||||||||||||||
| SRE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PRE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PRA | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| ERE | ||||||||||||||
| PACKAGING THERMAL/STRUCTRURAL ANALYST | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| EMC | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer | ||||||||||||||
| SRE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PRE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| ERE | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| PACKAGING THERMAL/STRUCTRURAL ANALYST | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| EMC | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subject Matter Expert | ||||||||||||||
| Quality Assurance Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Quality Assurance Inspector | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior II | ||||||||||||||
| Quality Assurance Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Quality Assurance Inspector | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior I | ||||||||||||||
| Quality Assurance Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Quality Assurance Inspector | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer/Inspector | ||||||||||||||
| Quality Assurance Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Quality Assurance Inspector | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subject Matter Expert | ||||||||||||||
| Electronic Parts Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Radiation Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior II | ||||||||||||||
| Electronic Parts Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Radiation Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior I | ||||||||||||||
| Electronic Parts Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Radiation Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer | ||||||||||||||
| Electronic Parts Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Radiation Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subject Matter Expert | ||||||||||||||
| Systems Safety Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior II | ||||||||||||||
| Systems Safety Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior I | ||||||||||||||
| Systems Safety Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer | ||||||||||||||
| Systems Safety Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Cleared Staff | ||||||||||||||
| Subject Matter Expert | ||||||||||||||
| QA Engineer (Classified) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior II | ||||||||||||||
| QA Engineer (Classified) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Engineer I | ||||||||||||||
| QA Engineer (Classified) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subject Matter Expert |
| Sample: | ||||||||
| XYZ Labor Category | $95.27 | $104.82 | $72.20 | $7.97 | $67.42 | $7.75 | $65.38 | $7.66 |
| Category A: |
| Subcontractor personnel who perform work at JPL, regardless of work location. |
&14
Tab 1 Prime Subk_Cat Z
| JPL RFP xx | Attachment A-15 |
| Mission Assurance Support Services | |
| Proposed Labor, Fixed Indirect Expense and Fixed Profit Hourly Rates | |
| Prime Subcontractor | |
| Year 1 - FY 2026 - October 2025 through September 2026 |
| CATEGORY Z RESOURCES: | ||||||||
| Staff Facility Location (Effort Performed at) à | JPL Facility | Non-JPL Facility | ||||||
| 1 to 20 | 21 to 50 | >50 | 1 to 20 | 21 to 50 | >50 | |||
| Labor Classification | Direct Labor | Fixed Ind | ||||||
| Expense | Fixed | |||||||
| Profit | Fixed Ind | |||||||
| Expense | Fixed | |||||||
| Profit | Fixed Ind | |||||||
| Expense | Fixed | |||||||
| Profit | Fixed Ind | |||||||
| Expense | Fixed | |||||||
| Profit | Fixed Ind | |||||||
| Expense | Fixed | |||||||
| Profit | Fixed Ind | |||||||
| Expense | Fixed |
Profit
| Min | Max | |||||||||||||
| Uncleared Staff | ||||||||||||||
| Subject Matter Expert | ||||||||||||||
| REA | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| NATURAL SPACE ENVIRONMENTS (NSE) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Engineer II | ||||||||||||||
| REA | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| NATURAL SPACE ENVIRONMENTS (NSE) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Engineer I | ||||||||||||||
| REA | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| NATURAL SPACE ENVIRONMENTS (NSE) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer | ||||||||||||||
| REA | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| NATURAL SPACE ENVIRONMENTS (NSE) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subject Matter Expert | ||||||||||||||
| Quality Assurance Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Quality Assurance Inspector | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior II | ||||||||||||||
| Quality Assurance Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Quality Assurance Inspector | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior I | ||||||||||||||
| Quality Assurance Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Quality Assurance Inspector | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer/Inspector | ||||||||||||||
| Quality Assurance Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Quality Assurance Inspector | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subject Matter Expert | ||||||||||||||
| Electronic Parts Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Radiation Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior II | ||||||||||||||
| Electronic Parts Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Radiation Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior I | ||||||||||||||
| Electronic Parts Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Radiation Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Engineer | ||||||||||||||
| Electronic Parts Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Radiation Engineer | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Cleared Staff | ||||||||||||||
| Subject Matter Expert | ||||||||||||||
| QA Engineer (Classified) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior II | ||||||||||||||
| QA Engineer (Classified) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Senior Engineer I | ||||||||||||||
| QA Engineer (Classified) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Subject Matter Expert | ||||||||||||||
| REA (Classified Remote) | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| Sample: | ||||||||
| XYZ Labor Category | $95.27 | $104.82 | $72.20 | $7.97 | $67.42 | $7.75 | $65.38 | $7.66 |
| Category Z: |
| Subcontractor personnel who perform task-based and level of effort statements of work, regardless of work location. |
&14
Tab 3 Subk_Cat A
| JPL RFP xx |
| Mission Assurance Support Services |
| Proposed Labor, Fixed Indirect Expense and Fixed Profit Hourly Rates |
| Lower-tier Subcontractor 1 Staff |
| Year 1 - FY 2026 - October 2025 through September 2026 |
CATEGORY A RESOURCE
Company :
| Staff Facility Location (Effort Performed at) à | JPL Facility | Prime Subcontractor Facility | ||||
| Lower-Tier Rate | Prime Rate | Lower-Tier Rate | Prime Rate | |||
| Labor Classification | DL Rate | Fixed | ||||
| Ind Exp | Fixed | |||||
| Fee | Total | |||||
| Bill Rate (A) | Fixed | |||||
| Ind Exp (B) | Fixed | |||||
| Fee (C) | Grand Total | |||||
| Bill Rate (D) | DL Rate | Fixed | ||||
| Ind Exp | Fixed | |||||
| Fee | Total | |||||
| Bill Rate (A) | Fixed | |||||
| Ind Exp (B) | Fixed | |||||
| Fee (C) | Grand Total |
Bill Rate (D)
| Uncleared Staff | ||||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Cleared Staff |
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| Sample: | ||||||||||||||
| XYZ Labor Category | $276.61 | $17.00 | $13.21 | $306.82 | $12.00 | $15.94 | $334.76 | $276.61 | $30.43 | $13.81 | $320.85 | $12.55 | $16.67 | $350.07 |
| (A) Lower-tier billable rate to the prime. |
| (B) Prime applicable subcontract handling & related expense (if any). |
| (C) Prime applicable fixed fee. |
| (D) Final billable rate to JPL. |
Tab 3 Subk_Cat Z
| JPL RFP xx |
| Mission Assurance Support Services |
| Proposed Labor, Fixed Indirect Expense and Fixed Profit Hourly Rates |
| Lower-tier Subcontractor 1 Staff |
| Year 1 - FY 2026 - October 2025 through September 2026 |
CATEGORY Z RESOURCE
Company :
| Staff Facility Location (Effort Performed at) à | JPL Facility | Prime Subcontractor Facility | ||||
| Lower-Tier Rate | Prime Rate | Lower-Tier Rate | Prime Rate | |||
| Labor Classification | DL Rate | Fixed | ||||
| Ind Exp | Fixed | |||||
| Fee | Total | |||||
| Bill Rate (A) | Fixed | |||||
| Ind Exp (B) | Fixed | |||||
| Fee (C) | Grand Total | |||||
| Bill Rate (D) | DL Rate | Fixed | ||||
| Ind Exp | Fixed | |||||
| Fee | Total | |||||
| Bill Rate (A) | Fixed | |||||
| Ind Exp (B) | Fixed | |||||
| Fee (C) | Grand Total |
Bill Rate (D)
| Uncleared Staff | ||||||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |
| Cleared Staff |
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
| Sample: | ||||||||||||||
| XYZ Labor Category | $276.61 | $17.00 | $13.21 | $306.82 | $12.00 | $15.94 | $334.76 | $276.61 | $30.43 | $13.81 | $320.85 | $12.55 | $16.67 | $350.07 |
| (A) Lower-tier billable rate to the prime. |
| (B) Prime applicable subcontract handling & related expense (if any). |
| (C) Prime applicable fixed fee. |
| (D) Final billable rate to JPL. |
File details come from the government source that posted it. Updated .