About this file
Truman School HVAC Replacement Project - Drawings and Specifications Summary
This document consists of architectural and engineering drawings and mechanical/electrical specifications for the Expansion & Restoration of Truman Elementary School located at 33 N Plains Industrial Road, Wallingford, Connecticut 06492, prepared by New Haven Public Schools. The project scope involves a complete replacement of three rooftop HVAC units (RTU-1, RTU-2, and RTU-3) and three condensing units (CU-1, CU-2, and CU-3) on a one-for-one basis. The work includes demolition of existing equipment, installation of new Trane rooftop units with integrated controls, refrigerant piping connections, ductwork modifications, gas piping connections, electrical power connections, and lightning protection system reconnection. New equipment specifications include three Trane XETEX series rooftop units with capacities ranging from 40 to 87 nominal tons of cooling, all equipped with natural gas heating, variable frequency drives, economizers, and DDC (Direct Digital Control) BACnet connectivity integrated with the existing Connecticut Control Corp. control system.
The mechanical specifications require all work to comply with the 2021 International Building Code, International Mechanical Code, International Plumbing Code, NFPA standards, and Connecticut state amendments. All ductwork must meet SMACNA standards with maximum leakage rates for respective pressure classes; all piping must be hydrostatically tested at 200 PSIG minimum; and all systems must be balanced and commissioned by certified balancing contractors with reports submitted for engineer approval. The contractor is responsible for EPA refrigerant recovery compliance, removal and proper disposal of all hazardous materials, site restoration, temporary service provisions during construction, equipment insulation to specified R-values, vibration isolation, seismic restraints where required, and comprehensive system startup and owner training. The contractor must provide one year's guarantee on all materials and workmanship plus one year of free maintenance service, with extended five-year warranties on all compressors. All work must coordinate with the general contractor, owner, and other trades, maintain continuity of existing systems in unaffected areas, and comply with local utility company requirements and fire protection standards.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXPANSION &
RESTORATION OF THE
TRUMAN SCHOOL
33 N PLAINS INDUSTRIAL RD
WALLINGFORD, CT 06492
Tel: 203.467.4370 Web: www.iesllc.biz
IPPQXCViXe 'PIiPeeTiPI SeTXices, LLC AP IPVeITCVeF ePIiPeeTiPI FesiIP HiTO
I ' S
B
ELECTRICAL
ROOM
A
MECHANICAL OVERALL ROOF PLAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text H
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text Q
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text U
AutoCAD SHX Text P
AutoCAD SHX Text N
AutoCAD SHX Text L
AutoCAD SHX Text J
AutoCAD SHX Text M
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text J
AutoCAD SHX Text D
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text K
AutoCAD SHX Text P
AutoCAD SHX Text S
AutoCAD SHX Text R
AutoCAD SHX Text U
AutoCAD SHX Text V
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text E
AutoCAD SHX Text L.X
AutoCAD SHX Text 3.X
AutoCAD SHX Text 3.X
AutoCAD SHX Text V.X
AutoCAD SHX Text 10.1
AutoCAD SHX Text F.6
AutoCAD SHX Text 10.3
AutoCAD SHX Text 11.9
AutoCAD SHX Text 11.2
AutoCAD SHX Text 5.1
AutoCAD SHX Text
%%URTU-2
AutoCAD SHX Text
%%URTU-3
AutoCAD SHX Text
%%URTU-1
AutoCAD SHX Text
%%UCU-1
AutoCAD SHX Text
%%UCU-2
AutoCAD SHX Text
%%UCU-3
AutoCAD SHX Text G:\IES Projects\2026 Projects\Team TEM\26028 Truman School HVAC Replacement\Contract Documents\26028_M1-04.dwg Plotted by jmorin on May 21, 2026 - 9:53am Plotted by jmorin on May 21, 2026 - 9:53amjmorin on May 21, 2026 - 9:53am on May 21, 2026 - 9:53am May 21, 2026 - 9:53am
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
ISSUED:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
NEW HAVEN PUBLIC SCHOOLS
AutoCAD SHX Text 2000-12
AutoCAD SHX Text 05/21/26
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
PROJECT:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
SCALE: 1/16"= 1'-0"
AutoCAD SHX Text
MECHANICAL OVERALL ROOF PLAN
AutoCAD SHX Text M1.04
AutoCAD SHX Text 1/16"=1'-0"
AutoCAD SHX Text
TM / AK / DB
AutoCAD SHX Text
JWM
TRUMAN SCHOOL
33 N PLAINS INDUSTRIAL RD
WALLINGFORD, CT 06492
Tel: 203.467.4370 Web: www.iesllc.biz
IPPQXCViXe 'PIiPeeTiPI SeTXices, LLC AP IPVeITCVeF ePIiPeeTiPI FesiIP HiTO
I ' S
B
ELECTRICAL
ROOM
A
MECHANICAL PARTIAL DEMOLITION ROOF PLAN AREA A MECHANICAL PARTIAL ROOF PLAN AREA A
MECHANICAL DEMOLITION NOTES MECHANICAL DRAWING NOTES
AutoCAD SHX Text 36X30
AutoCAD SHX Text 36 X 30
AutoCAD SHX Text 46X40
AutoCAD SHX Text 30X36
AutoCAD SHX Text
MD3
AutoCAD SHX Text
MD4
AutoCAD SHX Text
MD1
AutoCAD SHX Text
MD1
AutoCAD SHX Text
MD4
AutoCAD SHX Text
MD3
AutoCAD SHX Text
MD3
AutoCAD SHX Text
MD3
AutoCAD SHX Text
MD2
AutoCAD SHX Text
EXISTING RTU-1
AutoCAD SHX Text
EXISTING RTU-2
AutoCAD SHX Text
EXISTING CU-1
AutoCAD SHX Text
EXISTING CU-2
AutoCAD SHX Text
MD5
AutoCAD SHX Text
MD5
AutoCAD SHX Text
DS
AutoCAD SHX Text
MD6
AutoCAD SHX Text
DS
AutoCAD SHX Text
MD6
AutoCAD SHX Text
DS
AutoCAD SHX Text
MD3
AutoCAD SHX Text
DS
AutoCAD SHX Text
MD6
AutoCAD SHX Text
MD3
AutoCAD SHX Text
MD2
AutoCAD SHX Text
MD6
AutoCAD SHX Text 38X56
AutoCAD SHX Text
EXIST GAS SUPPLY ON ROOF TO REMAIN
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text
MD7
AutoCAD SHX Text
MD7
AutoCAD SHX Text
MD8
AutoCAD SHX Text
MD8
AutoCAD SHX Text
MD2
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3.X
AutoCAD SHX Text 5.1
AutoCAD SHX Text T
AutoCAD SHX Text Q
AutoCAD SHX Text U
AutoCAD SHX Text P
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text Q
AutoCAD SHX Text U
AutoCAD SHX Text P
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3.X
AutoCAD SHX Text 5.1
AutoCAD SHX Text
%%UCU-1
AutoCAD SHX Text
%%UCU-2
AutoCAD SHX Text 48X24
AutoCAD SHX Text 48 X 24
AutoCAD SHX Text
58X32 VIF
AutoCAD SHX Text
30X36 VIF
AutoCAD SHX Text
%%URTU-1
AutoCAD SHX Text
%%URTU-2
AutoCAD SHX Text M1
AutoCAD SHX Text M1
AutoCAD SHX Text M4
AutoCAD SHX Text M4
AutoCAD SHX Text M4
AutoCAD SHX Text M4
AutoCAD SHX Text M3
AutoCAD SHX Text M2
AutoCAD SHX Text M2
AutoCAD SHX Text
DS
AutoCAD SHX Text M5
AutoCAD SHX Text M5
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text M5
AutoCAD SHX Text
DS
AutoCAD SHX Text M5
AutoCAD SHX Text
EXIST GAS SUPPLY ON ROOF
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text M6
AutoCAD SHX Text M6
AutoCAD SHX Text
CONNECT TO RTU-1 & RTU-2 AS REQUIRED.
AutoCAD SHX Text M3
AutoCAD SHX Text M3
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text G:\IES Projects\2026 Projects\Team TEM\26028 Truman School HVAC Replacement\Contract Documents\26028_M1-04A.dwg Plotted by jmorin on May 21, 2026 - 9:53am Plotted by jmorin on May 21, 2026 - 9:53amjmorin on May 21, 2026 - 9:53am on May 21, 2026 - 9:53am May 21, 2026 - 9:53am
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
ISSUED:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
NEW HAVEN PUBLIC SCHOOLS
AutoCAD SHX Text 2000-12
AutoCAD SHX Text 05/21/26
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
PROJECT:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
SCALE: 1/8"= 1'-0"
AutoCAD SHX Text M1.04A
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
TM / AK / DB
AutoCAD SHX Text
JWM
AutoCAD SHX Text
SCALE: 1/8"= 1'-0"
AutoCAD SHX Text
MECHANICAL PARTIAL DEMOLITON / NEW ROOF PLAN AREA A
AutoCAD SHX Text REMOVE AND PROPERLY DISPOSE OF EXISTING ROOFTOP UNIT, REMOVE ASSOCIATED REFRIGERANT PIPING, ACCESSORIES AND RECLAIM REFRIGERANT PER EPA REQUIREMENTS. REMOVE AND PROPERLY DISPOSE OF EXISTING CONDENSING UNIT, AND ALL ASSOCIATED REFRIGERANT PIPING BETWEEN RTU AND CU. RECLAIM REFRIGERANT PER EPA REQUIREMENTS. EXISTING EQUIPMENT RAILS TO REMAIN. EXISTING SUPPLY/RETURN DUCTWORK TO REMAIN. REMOVE SUPPLY/RETURN DUCTWORK AND ASSOCIATED DUCT ACCESSORIES. EXISTING ROOF CURB TO REMAIN. REMOVE EXISTING DUCT SMOKE DETECTOR. REMOVE EXIST GAS REGULATOR, UNION, & DIRT LEG BACK TO ISOLATION VALVE. BEFORE DEMOLITION WORK BEGINS, THE AIR BALANCER SHALL TAKE TRAVERSE READINGS OF THE SUPPLY AND RETURN CFM SETTINGS AND RECORD FOR RE-BALANCING OF NEW RTU.
AutoCAD SHX Text
MD1
AutoCAD SHX Text NEW ROOFTOP UNIT, RTU-1 TO BE SET IN PLACE ON EXISTING ROOF CURB. SECURE AS REQUIRED AND RE-BALANCE SUPPLY AND RETURN CFM TO EXISTING AIRFLOW AS PREVIOUSLY RECORDED. NEW CONDENSING UNIT, CU-3 TO BE SET IN PLACE ON EXISTING ROOF CURB. SECURE AS REQUIRED. NEW REFRIGERANT PIPING BETWEEN RTU AND CU. PROVIDE NEW VALVES AND APPURTENANCES AS REQUIRED. FOLLOW EXISTING PIPE ROUTING. PROVIDE NEW SUPPORTS, CLEVIS HANGERS AND SHEETMETAL SADDLES. CONNECT NEW SUPPLY/RETURN DUCTWORK TO RTU. TRANSITION TO FULL SIZE OF UNIT OPENING AND PROVIDE FLEXIBLE CONNECTION AND DUCT SMOKE DETECTOR AS SHOWN. REFER TO SPECIFICATION DRAWING M3.00 M3.00 FOR INSULATION REQUIREMENTS. INSTALL NEW DUCT SMOKE DETECTOR IN EXISTING DUCTWORK. REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS. COORDINATE WITH CONTROLS CONTRACTOR FOR CONNECTION TO EXISTING DDC CONTROL SYSTEM. CONNECT NEW 1 1/2"GAS TO EXIST GAS SUPPLY, PROVIDE NEW DIRT LEG, UNION & REGULATOR. CLEAN & PAINT ALL EXISTING GAS PIPING.
AutoCAD SHX Text M1
AutoCAD SHX Text
MD2
AutoCAD SHX Text
MD3
AutoCAD SHX Text
MD4
AutoCAD SHX Text
MD5
AutoCAD SHX Text M2
AutoCAD SHX Text M3
AutoCAD SHX Text M4
AutoCAD SHX Text
MD6
AutoCAD SHX Text
MD7
AutoCAD SHX Text M5
AutoCAD SHX Text M6
MD8
TRUMAN SCHOOL
33 N PLAINS INDUSTRIAL RD
WALLINGFORD, CT 06492
Tel: 203.467.4370 Web: www.iesllc.biz
IPPQXCViXe 'PIiPeeTiPI SeTXices, LLC AP IPVeITCVeF ePIiPeeTiPI FesiIP HiTO
I ' S
B
ELECTRICAL
ROOM
A
MECHANICAL PARTIAL DEMOLITION ROOF PLAN AREA B MECHANICAL PARTIAL ROOF PLAN AREA B
MECHANICAL DEMOLITION NOTES MECHANICAL DRAWING NOTES
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text J
AutoCAD SHX Text D
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text F.6
AutoCAD SHX Text
MD1
AutoCAD SHX Text
MD5
AutoCAD SHX Text
MD4
AutoCAD SHX Text
MD3
AutoCAD SHX Text
MD4
AutoCAD SHX Text 42 X 24
AutoCAD SHX Text 42 X 24
AutoCAD SHX Text
MD2
AutoCAD SHX Text 42X24
AutoCAD SHX Text
MD3
AutoCAD SHX Text
MD3
AutoCAD SHX Text 42X24
AutoCAD SHX Text
EXISTING RTU
AutoCAD SHX Text
EXISTING CU
AutoCAD SHX Text
DS
AutoCAD SHX Text
MD6
AutoCAD SHX Text
DS
AutoCAD SHX Text
MD6
AutoCAD SHX Text
EXISTING GAS SUPPLY ON ROOF TO REMAIN
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text
MD7
AutoCAD SHX Text
MD2
AutoCAD SHX Text
MD8
AutoCAD SHX Text L
AutoCAD SHX Text N
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text M
AutoCAD SHX Text J
AutoCAD SHX Text D
AutoCAD SHX Text F
AutoCAD SHX Text G
AutoCAD SHX Text K
AutoCAD SHX Text
AutoCAD SHX Text F.6
AutoCAD SHX Text
%%UCU-3
AutoCAD SHX Text
%%URTU-3
AutoCAD SHX Text 42 X 24
AutoCAD SHX Text 42 X 24
AutoCAD SHX Text 42X24
AutoCAD SHX Text 42X24
AutoCAD SHX Text M1
AutoCAD SHX Text M2
AutoCAD SHX Text M3
AutoCAD SHX Text M3
AutoCAD SHX Text M4
AutoCAD SHX Text M4
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text M5
AutoCAD SHX Text M5
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
REF
AutoCAD SHX Text
EXISTING GAS SUPPLY ON ROOF
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text G
AutoCAD SHX Text M6
AutoCAD SHX Text
CONNECT TO NEW RTU AS REQUIRED.
AutoCAD SHX Text G:\IES Projects\2026 Projects\Team TEM\26028 Truman School HVAC Replacement\Contract Documents\26028_M1-04B.dwg Plotted by jmorin on May 21, 2026 - 9:53am Plotted by jmorin on May 21, 2026 - 9:53amjmorin on May 21, 2026 - 9:53am on May 21, 2026 - 9:53am May 21, 2026 - 9:53am
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
ISSUED:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
NEW HAVEN PUBLIC SCHOOLS
AutoCAD SHX Text 2000-12
AutoCAD SHX Text 05/21/26
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
PROJECT:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
KEY PLAN
AutoCAD SHX Text
NORTH
AutoCAD SHX Text
PROJECT
AutoCAD SHX Text
MECHANICAL PARTIAL DEMOLITON / NEW ROOF PLAN AREA B
AutoCAD SHX Text M1.04B
AutoCAD SHX Text 1/8"=1'-0"
AutoCAD SHX Text
TM / AK / DB
AutoCAD SHX Text
SCALE: 1/8"= 1'-0"
AutoCAD SHX Text
JWM
AutoCAD SHX Text
SCALE: 1/8"= 1'-0"
AutoCAD SHX Text REMOVE AND PROPERLY DISPOSE OF EXISTING ROOFTOP UNIT, RTU-3. RECLAIM REFRIGERANT PER EPA REQUIREMENTS. REMOVE AND PROPERLY DISPOSE OF EXISTING CONDENSING UNIT, CU-3, AND ALL ASSOCIATED REFRIGERANT PIPING BETWEEN RTU AND CU. RECLAIM REFRIGERANT PER EPA REQUIREMENTS. EXISTING EQUIPMENT RAILS TO REMAIN. EXISTING SUPPLY/RETURN DUCTWORK TO REMAIN. REMOVE EXISTING SUPPLY/RETURN DUCTWORK. EXISTING ROOF CURB TO REMAIN. REMOVE EXISTING DUCT SMOKE DETECTOR. REMOVE EXIST GAS REGULATOR, UNION & DIRT LEG BACK TO ISOLATION VALVE. BEFORE DEMOLITION WORK BEGINS, THE AIR BALANCER SHALL TAKE TRAVERSE READINGS OF THE SUPPLY AND RETURN CFM SETTINGS AND RECORD FOR RE-BALANCING OF NEW RTU.
AutoCAD SHX Text
MD1
AutoCAD SHX Text NEW ROOFTOP UNIT, RTU-1 TO BE SET IN PLACE ON EXISTING ROOF CURB. SECURE AS REQUIRED AND RE-BALANCE SUPPLY AND RETURN CFM TO EXISTING AIRFLOW AS PREVIOUSLY RECORDED. NEW CONDENSING UNIT, CU-3 TO BE SET IN PLACE ON EXISTING SUPPORTS. SECURE AS REQUIRED. CONNECT NEW REFRIGERANT PIPING BETWEEN RTU AND CU. PROVIDE NEW VALVES AND APPURTENANCES AS REQUIRED. FOLLOW EXISTING PIPE ROUTING. PROVIDE NEW SUPPORTS, CLEVIS HANGERS AND SHEETMETAL SADDLES. CONNECT NEW SUPPLY/RETURN DUCTWORK TO RTU. TRANSITION TO FULL SIZE OF UNIT OPENING AND PROVIDE FLEXIBLE CONNECTION. REFER TO SPECIFICATION DRAWING M3.00 FOR DUCT INSULATION REQUIREMENTS. M3.00 FOR DUCT INSULATION REQUIREMENTS. FOR DUCT INSULATION REQUIREMENTS. INSTALL NEW DUCT SMOKE DETECTOR IN EXISTING DUCTWORK. REFER TO ELECTRICAL DRAWINGS FOR POWER REQUIREMENTS. COORDINATE WITH CONTROLS CONTRACTOR FOR CONNECTION TO EXISTING DDC CONTROL SYSTEM. CONNECT NEW 1 1/2"GAS TO EXIST GAS SUPPLY, PROVIDE NEW DIRT LEG, UNION & REGULATOR. CLEAN & PAINT ALL EXISTING GAS PIPING.
AutoCAD SHX Text M1
AutoCAD SHX Text
MD2
AutoCAD SHX Text
MD3
AutoCAD SHX Text
MD4
AutoCAD SHX Text
MD5
AutoCAD SHX Text M2
AutoCAD SHX Text M3
AutoCAD SHX Text M4
AutoCAD SHX Text
MD6
AutoCAD SHX Text M5
AutoCAD SHX Text
MD7
AutoCAD SHX Text M6
MD8
TRUMAN SCHOOL
33 N PLAINS INDUSTRIAL RD
WALLINGFORD, CT 06492
Tel: 203.467.4370 Web: www.iesllc.biz
IPPQXCViXe 'PIiPeeTiPI SeTXices, LLC AP IPVeITCVeF ePIiPeeTiPI FesiIP HiTO
I ' SABBREVIATIONS
MECHANICAL DEMOLITION NOTES
MECHANICAL LEGEND
MECHANICAL GENERAL NOTES
AIR COOLED CONDENSING UNIT SCHEDULE
ROOF MOUNTED A/C CONDENSING UNIT ROOF TOP UNIT DETAIL
ROOF TOP UNIT SCHEDULE
DETAIL OF HVAC ROOFTOP GAS CONNECTIONS & GAS PIPING SUPPORTS
SEQUENCE OF OPERATION
AutoCAD SHX Text G:\IES Projects\2026 Projects\Team TEM\26028 Truman School HVAC Replacement\Contract Documents\26028_M2-00.dwg Plotted by jmorin on May 21, 2026 - 9:53am Plotted by jmorin on May 21, 2026 - 9:53amjmorin on May 21, 2026 - 9:53am on May 21, 2026 - 9:53am May 21, 2026 - 9:53am
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
ISSUED:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
NEW HAVEN PUBLIC SCHOOLS
AutoCAD SHX Text 2000-12
AutoCAD SHX Text 05/21/26
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
PROJECT:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
AFF
AutoCAD SHX Text
AIR HANDLING UNIT
AutoCAD SHX Text
AHU
AutoCAD SHX Text
AMBIENT
AutoCAD SHX Text
AMB
AutoCAD SHX Text
AMPERE (AMP, AMPS)
AutoCAD SHX Text
AMP
AutoCAD SHX Text
BALANCE
AutoCAD SHX Text
BAL
AutoCAD SHX Text
BRITISH THERMAL UNIT
AutoCAD SHX Text
BTU
AutoCAD SHX Text
CAPACITY
AutoCAD SHX Text
CAP
AutoCAD SHX Text
CUBIC FEET PER MINUTE
AutoCAD SHX Text
CFM
AutoCAD SHX Text
CHILLED WATER SUPPLY
AutoCAD SHX Text
CHWS
AutoCAD SHX Text
CHILLED WATER RETURN
AutoCAD SHX Text
CHWR
AutoCAD SHX Text
COOLING
AutoCAD SHX Text
CLG
AutoCAD SHX Text
CONDENSING UNIT
AutoCAD SHX Text
CU
AutoCAD SHX Text
ENTERING AIR TEMPERATURE
AutoCAD SHX Text
EAT
AutoCAD SHX Text
EXHAUST FAN
AutoCAD SHX Text
EF
AutoCAD SHX Text
EXTERNAL STATIC PRESSURE
AutoCAD SHX Text
ESP
AutoCAD SHX Text
EXPANSION TANK
AutoCAD SHX Text
ET
AutoCAD SHX Text
ENTERING WATER TEMPERATURE
AutoCAD SHX Text
EWT
AutoCAD SHX Text
EXHAUST
AutoCAD SHX Text
EXH
AutoCAD SHX Text
DEGREES FAHRENHEIT
AutoCAD SHX Text
%%DF
AutoCAD SHX Text
FLEXIBLE CONNECTION
AutoCAD SHX Text
FC
AutoCAD SHX Text
FEET PER MINUTE
AutoCAD SHX Text
FPM
AutoCAD SHX Text
FEET
AutoCAD SHX Text
FT
AutoCAD SHX Text
FIN TUBE RADIATION
AutoCAD SHX Text
FTR
AutoCAD SHX Text
GALLONS PER HOUR
AutoCAD SHX Text
GPH
AutoCAD SHX Text
GALLONS PER MINUTE
AutoCAD SHX Text
GPM
AutoCAD SHX Text
HOT WATER COIL
AutoCAD SHX Text
HWC
AutoCAD SHX Text
HORSE POWER
AutoCAD SHX Text
HP
AutoCAD SHX Text
HEATING RETURN (HOT WATER)
AutoCAD SHX Text
HTR
AutoCAD SHX Text
HEATING SUPPLY (HOT WATER)
AutoCAD SHX Text
HTS
AutoCAD SHX Text
HEATING
AutoCAD SHX Text
HTG
AutoCAD SHX Text
FREQUENCY
AutoCAD SHX Text Hz
AutoCAD SHX Text
INCH
AutoCAD SHX Text
IN.
AutoCAD SHX Text
INCHES WATER GAUGE
AutoCAD SHX Text
IN. WG
AutoCAD SHX Text
LEAVING AIR TEMPERATURE
AutoCAD SHX Text
LAT
AutoCAD SHX Text
POUNDS
AutoCAD SHX Text
LBS
AutoCAD SHX Text
LEAVING WATER TEMPERATURE
AutoCAD SHX Text
LWT
AutoCAD SHX Text
BTU PER HOUR (THOUSAND)
AutoCAD SHX Text
MBH
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
OUTSIDE AIR
AutoCAD SHX Text O.A.
AutoCAD SHX Text
OPEN END DUCT
AutoCAD SHX Text
OED
AutoCAD SHX Text
PUMP
AutoCAD SHX Text P-1
AutoCAD SHX Text
PRESSURE DROP
AutoCAD SHX Text
PD
AutoCAD SHX Text
PHASE
AutoCAD SHX Text
PH
AutoCAD SHX Text
POUNDS PER SQUARE INCH
AutoCAD SHX Text
PSI
AutoCAD SHX Text
REGISTER DIFFUSER GRILLE
AutoCAD SHX Text
RDG
AutoCAD SHX Text
RETURN
AutoCAD SHX Text
RET
AutoCAD SHX Text
RELATIVE HUMIDITY
AutoCAD SHX Text
RH
AutoCAD SHX Text
ROTATIONS PER MINUTE
AutoCAD SHX Text
RPM
AutoCAD SHX Text
SQUARE FEET
AutoCAD SHX Text
SQ.FT.
AutoCAD SHX Text
SUPPLY
AutoCAD SHX Text
SUP
AutoCAD SHX Text
TEMPERATURE & PRESSURE RELIEF VALVE
AutoCAD SHX Text T&P
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
TYP
AutoCAD SHX Text
UNIT HEATER
AutoCAD SHX Text
UH
AutoCAD SHX Text
UNLESS OTHERWISE NOTED
AutoCAD SHX Text
UON
AutoCAD SHX Text
VOLUME DAMPER
AutoCAD SHX Text
VD
AutoCAD SHX Text
VERIFY IN FIELD
AutoCAD SHX Text
VIF
AutoCAD SHX Text
WET BULB
AutoCAD SHX Text
WB
AutoCAD SHX Text
HUMIDIFIER
AutoCAD SHX Text H-1
AutoCAD SHX Text
POUNDS PER HOUR
AutoCAD SHX Text
LBS/HR
AutoCAD SHX Text
SUMP PUMP
AutoCAD SHX Text
SP-1
AutoCAD SHX Text
WORKING PRESSURE
AutoCAD SHX Text
WP
AutoCAD SHX Text
ZONE CONTROLLER
AutoCAD SHX Text
ZC
AutoCAD SHX Text
ZONE VALVE
AutoCAD SHX Text
ZV
AutoCAD SHX Text
AIR FLOW DIRECTION INDICATOR - RETURN
AutoCAD SHX Text
AIR FLOW DIRECTION INDICATOR - SUPPLY
AutoCAD SHX Text M
AutoCAD SHX Text
FOS
AutoCAD SHX Text
FOR
AutoCAD SHX Text
FUEL OIL RETURN
AutoCAD SHX Text
FUEL OIL SUPPLY
AutoCAD SHX Text
CHWR
AutoCAD SHX Text
CHWS
AutoCAD SHX Text
CHILLED WATER SUPPLY
AutoCAD SHX Text
CHILLED WATER RETURN
AutoCAD SHX Text
1. THE MECHANICAL CONTRACTOR SHALL REMOVE ALL MECHANICAL THE MECHANICAL CONTRACTOR SHALL REMOVE ALL MECHANICAL EQUIPMENT, ACCESSORIES, CONTROLS AND ASSOCIATED PIPING AS SHOWN OR INDICATED ON THE DRAWINGS. 2. NO EQUIPMENT OR DEVICES THAT HAVE BEEN DISCONNECTED AND OR NO EQUIPMENT OR DEVICES THAT HAVE BEEN DISCONNECTED AND OR ABANDONED SHALL REMAIN. 3. THE MECHANICAL CONTRACTOR SHALL VISIT THE SITE AND BECOME THE MECHANICAL CONTRACTOR SHALL VISIT THE SITE AND BECOME FAMILIAR WITH THE EXISTING SYSTEMS AND CONDITIONS IN AREAS OF RENOVATION. 4. ANY SYSTEMS OR EQUIPMENT TO REMAIN ACTIVE DURING RENOVATION ANY SYSTEMS OR EQUIPMENT TO REMAIN ACTIVE DURING RENOVATION SHALL BE KEPT IN OPERATION BY PROVIDING TEMPORARY CONNECTIONS AS REQUIRED UNTIL NEW SYSTEMS ARE INSTALLED AND OPERATIONAL. 5. THE MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE OWNER, THE MECHANICAL CONTRACTOR SHALL COORDINATE WITH THE OWNER, CM, AND OR GENERAL CONTRACTOR ANY AND ALL PHASING OF THE MECHANICAL DEMOLITION WORK IN ORDER TO SATISFY THE CONSTRUCTION SCHEDULE AND OWNERS OCCUPANCY REQUIREMENTS. 6. ANY MECHANICAL EQUIPMENT TO BE REMOVED AND REUSED OR ANY MECHANICAL EQUIPMENT TO BE REMOVED AND REUSED OR TURNED OVER TO THE OWNER, AT OWNERS REQUEST, OR AS INDICATED ON THE DRAWINGS SHALL BE CAREFULLY REMOVED AND STORED TO PREVENT DAMAGE. 7. THE MECHANICAL CONTRACTOR SHALL ALSO REVIEW THE THE MECHANICAL CONTRACTOR SHALL ALSO REVIEW THE ARCHITECTURAL DEMOLITION DRAWINGS AS PART OF THIS CONTRACT FOR ADDITIONAL INFORMATION AND REQUIREMENTS. 8. ALL SERVICE INTERRUPTIONS SHALL BE COORDINATED AND APPROVED ALL SERVICE INTERRUPTIONS SHALL BE COORDINATED AND APPROVED WITH THE OWNER IN ADVANCE PRIOR TO COMMENCEMENT OF ANY WORK. 9. THE MECHANICAL CONTRACTOR SHALL COORDINATE HIS DEMOLITION THE MECHANICAL CONTRACTOR SHALL COORDINATE HIS DEMOLITION WORK WITH THAT OF OTHER TRADES IN ORDER TO AVOID CONFLICTS.
AutoCAD SHX Text
CONNECT TO EXISTING
AutoCAD SHX Text
OR
AutoCAD SHX Text
PIPE EXPANSION FITTING (AT BLDG. EXP.JOINTS)
AutoCAD SHX Text
PIPE DROP
AutoCAD SHX Text
PIPE RISE
AutoCAD SHX Text
PIPE ANCHOR
AutoCAD SHX Text
PLUGGED OR CAPPED PIPE
AutoCAD SHX Text PIPE GUIDE or SLEEVE
AutoCAD SHX Text
GAS PRESSURE REGULATOR
AutoCAD SHX Text
TEMPERATURE GAUGE
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text
STRAINER - 'Y' TYPE
AutoCAD SHX Text
UNION
AutoCAD SHX Text
BALANCING VALVE
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
3-WAY VALVE (MOTORIZED)
AutoCAD SHX Text
SOLENOID VALVE
AutoCAD SHX Text
GAS VALVE (BALL OR PLUG)
AutoCAD SHX Text
HOSE BIBB (H.B.)
AutoCAD SHX Text
TEMPERATURE & PRESSURE RELIEF VALVE (T&P)
AutoCAD SHX Text
CIRCULATOR PUMP
AutoCAD SHX Text
REFRIGERANT SUCTION LINE
AutoCAD SHX Text
RLL
AutoCAD SHX Text
RSL
AutoCAD SHX Text
HOT WATER RETURN - HEATING
AutoCAD SHX Text
CONDENSATE WASTE
AutoCAD SHX Text
HOT WATER SUPPLY - HEATING
AutoCAD SHX Text
HTS
AutoCAD SHX Text
CD
AutoCAD SHX Text
HTR
AutoCAD SHX Text
REFRIGERANT LIQUID LINE
AutoCAD SHX Text
DIRECTION OF FLOW
AutoCAD SHX Text
PIPE DOWN
AutoCAD SHX Text
GAS (NATURAL OR LPG)
AutoCAD SHX Text G
AutoCAD SHX Text
LINEAR SLOT DIFFUSER/BAR GRILLE - SUPPLY
AutoCAD SHX Text
GRILLE/REGISTER - RETURN
AutoCAD SHX Text
GRILLE/REGISTER - EXHAUST
AutoCAD SHX Text
SIDEWALL GRILLE/REGISTER - SUPPLY/RETURN/EXHAUST
AutoCAD SHX Text
DUCT RISER - RETURN/EXHAUST
AutoCAD SHX Text
DUCT DROP - RETURN/EXHAUST
AutoCAD SHX Text
DUCT RISER - SUPPLY/COMBUSTION AIR
AutoCAD SHX Text
DUCT DROP - SUPPLY/COMBUSTION AIR
AutoCAD SHX Text T
AutoCAD SHX Text
THERMOSTAT
AutoCAD SHX Text
VOLUME DAMPER
AutoCAD SHX Text
MOTORIZED DAMPER
AutoCAD SHX Text
DUCTLESS SPLIT 4-WAY CASSETTE
AutoCAD SHX Text
REDUCER
AutoCAD SHX Text
EXISTING TO BE REMOVED
AutoCAD SHX Text
DIFFUSER/GRILLE - SUPPLY
AutoCAD SHX Text
ROUND DUCT DN
AutoCAD SHX Text
ROUND DUCT UP
AutoCAD SHX Text
EXHAUST FAN
AutoCAD SHX Text
1. THESE GENERAL NOTES ARE APPLICABLE TO ALL MECHANICAL DRAWINGS. THESE GENERAL NOTES ARE APPLICABLE TO ALL MECHANICAL DRAWINGS. 2. DRAWINGS ARE DIAGRAMMATIC AND SHOW GENERAL INTENT OF WORK. DRAWINGS ARE DIAGRAMMATIC AND SHOW GENERAL INTENT OF WORK. SEE DETAILS, SCHEDULES AND SPECIFICATIONS FOR ADDITIONAL INFORMATION. 3. MECHANICAL CONTRACTOR MUST REVIEW DRAWINGS OF THE OTHER MECHANICAL CONTRACTOR MUST REVIEW DRAWINGS OF THE OTHER TRADES AS PART OF THIS CONTRACT FOR ADDITIONAL WORK REQUIRED AND OR COORDINATION OF HIS WORK FOR OPERATIONS OR CONNECTIONS TO OTHER SYSTEMS.
AutoCAD SHX Text
FIRE DAMPER
AutoCAD SHX Text
FD
AutoCAD SHX Text
COMPRESSED AIR
AutoCAD SHX Text A
AutoCAD SHX Text
FIRE DAMPER
AutoCAD SHX Text
MECHANICAL NOTES, LEGENDS, DETAILS & SCHEDULES
AutoCAD SHX Text M2.00
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
TM / AK / DB
AutoCAD SHX Text
JWM
AutoCAD SHX Text NOTES: : 1. PROVIDE WITH 15A CONVENIENCE OUTLET PROVIDE WITH 15A CONVENIENCE OUTLET 2. PROVIDE WITH NON-FUSED DISCONNECT SWITCH PROVIDE WITH NON-FUSED DISCONNECT SWITCH 3. INTERLOCK WITH RTUINTERLOCK WITH RTU
AutoCAD SHX Text
TAG
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
MODEL NUMBER
AutoCAD SHX Text
NOMINAL CAPACITY
AutoCAD SHX Text
SYSTEM SERVED
AutoCAD SHX Text
LOCATION
AutoCAD SHX Text
REFRIGERANT
AutoCAD SHX Text
COOLING CAPACITY TOTAL MBH
AutoCAD SHX Text
SUCTION TEMP (DEG F°)
AutoCAD SHX Text
QTY. OF COMPRESSORS
AutoCAD SHX Text
AMBIENT AIR TEMP (DEG F°)
AutoCAD SHX Text
CONTROL
AutoCAD SHX Text
ELECTRICAL VOLT-PH-HZ
AutoCAD SHX Text
MCA
AutoCAD SHX Text
MOCP
AutoCAD SHX Text
WEIGHT LBS.
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
ACCU-1
AutoCAD SHX Text
TRANE
AutoCAD SHX Text
INTELLICORE 20-120
AutoCAD SHX Text
AutoCAD SHX Text
RTU-1
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 454B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
0 DEF F LOW AMBIENT
AutoCAD SHX Text 1460/3/60
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1-3
AutoCAD SHX Text
ACCU-2
AutoCAD SHX Text
TRANE
AutoCAD SHX Text
INTELLICORE 20-120
AutoCAD SHX Text
AutoCAD SHX Text
RTU-2
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 454B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
0 DEF F LOW AMBIENT
AutoCAD SHX Text 460/3/60
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1-3
AutoCAD SHX Text
ACCU-3
AutoCAD SHX Text
TRANE
AutoCAD SHX Text
INTELLICORE 20-120
AutoCAD SHX Text
AutoCAD SHX Text
RTU-3
AutoCAD SHX Text
ROOF
AutoCAD SHX Text 454B
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
0 DEF F LOW AMBIENT
AutoCAD SHX Text 460/3/60
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1-3
AutoCAD SHX Text
ROOF
AutoCAD SHX Text
FUSED DISCONNECT SWITCH BY DIVISION 16
AutoCAD SHX Text 6"X6"X8" HIGH COPPER PITCH POCKET WITH WITH CAP. SOLDER ALL JOINTS FOR A WATERTIGHT INSTALLATION.
AutoCAD SHX Text
ROOF FLASHING
AutoCAD SHX Text
CANT STRIP
AutoCAD SHX Text
SERVICE VALVES
AutoCAD SHX Text
CONDENSING UNIT
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
TO ELEC. PANEL
AutoCAD SHX Text
%%URTU
AutoCAD SHX Text
ROOF DECK
AutoCAD SHX Text
WEATHERPROOF UNIT DISCONNECT
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
CONNECT NEW SUPPLY DUCTWORK TO EXISTING. SIZE AS SHOWN ON PLANS
AutoCAD SHX Text
EXISTING ROOF CURB
AutoCAD SHX Text
EXISTING EQUIPMENT SUPPORTS
AutoCAD SHX Text
EXTEND NEW REFRIGERANT PIPING TO RTU
AutoCAD SHX Text
EXTEND NEW REFRIGERANT PIPING TO REMOTE CONDENSING UNIT
AutoCAD SHX Text
DUCT SMOKE DETECTOR SEE DRAWINGS FOR LOCATION. (TYP.)
AutoCAD SHX Text
FLEX. CONN. (TYP.)
AutoCAD SHX Text
CONNECT NEW RETURN DUCTWORK TO EXISTING. SIZE AS SHOWN ON PLANS
AutoCAD SHX Text
UTILIZE EXISTING EQUIPMENT SUPPORTS. SECURE AS REQUIRED.
AutoCAD SHX Text NOTES: : 1. PROVIDE FACTORY MOUNTED VFD'S FOR SUPPLY FAN AND POWER EXHAUST FAN. PROVIDE FACTORY MOUNTED VFD'S FOR SUPPLY FAN AND POWER EXHAUST FAN. 2. PROVIDE WITH SUPPLY AIR BACK DRAFT DAMPER. PROVIDE WITH SUPPLY AIR BACK DRAFT DAMPER. 3. PROVIDE WITH OUTSIDE AIR MOTORIZED DAMPER. MODULATING PROVIDE WITH OUTSIDE AIR MOTORIZED DAMPER. MODULATING 4. PROVIDE WITH EXHAUST AIR MOTORIZED DAMPER. MODULATING PROVIDE WITH EXHAUST AIR MOTORIZED DAMPER. MODULATING 5. RTU SHALL BE PRE-WIRED WITH SINGLE POINT POWER CONNECTION INCLUDING FAN CIRCUITRY AND RTU SHALL BE PRE-WIRED WITH SINGLE POINT POWER CONNECTION INCLUDING FAN CIRCUITRY AND 120V LIGHT/RECEPTACLE CIRCUIT WITH TRANSFORMER. 6. PROVIDE STAINLESS STEEL DRAIN PANS. PROVIDE STAINLESS STEEL DRAIN PANS. 7. PROVIDE DDC BACNET CONTROLS AND UPDATE GRAPHICS PROVIDE DDC BACNET CONTROLS AND UPDATE GRAPHICS 8. CONNECT TO EXIST DDC SYSTEM. CONNECT TO EXIST DDC SYSTEM. 9. PROVIDE WITH ECONOMIZER. PROVIDE WITH ECONOMIZER. 10. RTU-1, RTU-2 & RTU-3 SHALL BE ALL ALUMINUM DOUBLE WALL CONSTRUCTION. RTU-1, RTU-2 & RTU-3 SHALL BE ALL ALUMINUM DOUBLE WALL CONSTRUCTION.
AutoCAD SHX Text
TAG
AutoCAD SHX Text
MANUFACTURER
AutoCAD SHX Text
MODEL
AutoCAD SHX Text
SUPPLY FAN TYPE/(FAN QTY)
AutoCAD SHX Text
CFM
AutoCAD SHX Text
TOTAL HP
AutoCAD SHX Text
ESP IN. WG
AutoCAD SHX Text
EXHAUST FAN TYPE/(FAN QTY)
AutoCAD SHX Text
CFM
AutoCAD SHX Text
TOTAL HP
AutoCAD SHX Text
ESP IN. WG
AutoCAD SHX Text
NOM. TONS COOLING
AutoCAD SHX Text
COOLING CAPACITY TOTAL MBH
AutoCAD SHX Text
COOLING CAPACITY SENS. MBH
AutoCAD SHX Text
FPM
AutoCAD SHX Text
APD
AutoCAD SHX Text
LAT DB/WB
AutoCAD SHX Text
EAT DB/WB
AutoCAD SHX Text
HEATING SOURCE
AutoCAD SHX Text
HEATING CAPACITY MBH INPUT
AutoCAD SHX Text
HEATING CAPACITY MBH OUTPUT
AutoCAD SHX Text
FILTERS-QTY./ SIZE/MERV RATING
AutoCAD SHX Text
OPERATING WEIGHT LBS.
AutoCAD SHX Text
ELECTRICAL DATA VOLT-PH-MCA-MOCP
AutoCAD SHX Text
NOTES
AutoCAD SHX Text
RTU-1
AutoCAD SHX Text
TRANE (XETEX)
AutoCAD SHX Text
XAH-21500-RT-RC-CD-HI
AutoCAD SHX Text
AF PLENUM/ (4)
AutoCAD SHX Text 21,500
AutoCAD SHX Text
AutoCAD SHX Text 1.2
AutoCAD SHX Text
AF PLENUM/ (2)
AutoCAD SHX Text 21,500
AutoCAD SHX Text
AutoCAD SHX Text 1.0
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 628,8
AutoCAD SHX Text
AutoCAD SHX Text 0.88
AutoCAD SHX Text 52/51.8
AutoCAD SHX Text 80/67
AutoCAD SHX Text
NAT GAS
AutoCAD SHX Text 847.6
AutoCAD SHX Text 686.5
AutoCAD SHX Text 12/24X24X2/8
AutoCAD SHX Text 12,800
AutoCAD SHX Text 480-3-67.9-80
AutoCAD SHX Text 1-10
AutoCAD SHX Text
RTU-2
AutoCAD SHX Text
TRANE (XETEX)
AutoCAD SHX Text
XAH-13000-RT-RC-CD-HI
AutoCAD SHX Text
AF PLENUM/ (2)
AutoCAD SHX Text 13,000
AutoCAD SHX Text
AutoCAD SHX Text 1.2
AutoCAD SHX Text
AF PLENUM/ (2)
AutoCAD SHX Text 13,000
AutoCAD SHX Text
AutoCAD SHX Text 1.2
AutoCAD SHX Text
AutoCAD SHX Text 519.8
AutoCAD SHX Text 315.5
AutoCAD SHX Text
AutoCAD SHX Text 0.52
AutoCAD SHX Text 56/55
AutoCAD SHX Text 80/67
AutoCAD SHX Text
NAT GAS
AutoCAD SHX Text 849.5
AutoCAD SHX Text
AutoCAD SHX Text 19/20X24X2/8
AutoCAD SHX Text
AutoCAD SHX Text 480-3-42-50
AutoCAD SHX Text 1-10
AutoCAD SHX Text
RTU-3
AutoCAD SHX Text
TRANE (XETEX)
AutoCAD SHX Text
XAH-16000-RT-RC-CD-HI
AutoCAD SHX Text
AF PLENUM/ (3)
AutoCAD SHX Text 16,000
AutoCAD SHX Text
AutoCAD SHX Text 0.76
AutoCAD SHX Text
AF PLENUM/ (2)
AutoCAD SHX Text 16,000
AutoCAD SHX Text
AutoCAD SHX Text 0.5
AutoCAD SHX Text
AutoCAD SHX Text 635.8
AutoCAD SHX Text 386.5
AutoCAD SHX Text
AutoCAD SHX Text 0.53
AutoCAD SHX Text 56/55
AutoCAD SHX Text 80/67
AutoCAD SHX Text
NAT GAS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 9/24X24X2/8
AutoCAD SHX Text 10,400
AutoCAD SHX Text 480-3-45.9-50
AutoCAD SHX Text 1-10
AutoCAD SHX Text
GAS VALVE WITH TEST PORT
AutoCAD SHX Text SCHEDULE 40, PVC CONDENSATE DRAIN PIPING WITH TRAP AND CLEANOUT PLUG, PROVIDED AND INSTALLED BY THE PLUMBING CONTRACTOR.
AutoCAD SHX Text
GAS PIPING RUN ON ROOF, PROVIDED AND INSTALLED BY THE PLUMBING CONTRACTOR.
AutoCAD SHX Text
ROOF STRUCTURE
AutoCAD SHX Text NEW ROOF TOP UNIT, PROVIDED AND INSTALLED BY THE MECHANICAL CONTRACTOR. REFER TO MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
AutoCAD SHX Text
DIRT LEG, 6"MINIMUM WITH END CAP (TYP.)
AutoCAD SHX Text N.T.S.
AutoCAD SHX Text NOTES: 1. ALL GAS PIPING ABOVE ROOF SHALL BE PAINTED WITH 2 COATS OF RUST INHIBITIVE PAINT. (UNLESS SPECIFIED AS GALVANIZED). 2. COORDINATE LOCATION OF GAS CONNECTION WITH EQUIPMENT LOCATION AND MECHANICAL CONTRACTOR IN THE FIELD.
AutoCAD SHX Text
UNION (TYP.)
AutoCAD SHX Text
PRE-ENGINEERED PIPE SUPPORTS (TYP.)
AutoCAD SHX Text GAS REGULATOR, PROVIDED AND INSTALLED BY THE PLUMBING CONTRACTOR, COORDINATE PRESSURE OUTLET OF REGULATOR WITH EXISTING AVAILABLE GAS PRESSURE AND RTU REQUIRED GAS PRESSURE.
GENERAL PROVIDE ALL TEMPERATURE, OPERATION AND SAFETY AND CONTROLS, LOW VOLTAGE CONTROL WIRING, HARDWARE, SOFTWARE AND ACCESSORIES NECESSARY TO ACHIEVE A FULLY OPERATIONAL HVAC CONTROL SYSTEM. CONNECT TO EXISTING DDC CONTROL SYSTEM BY "CONNECTICUT CONTROL CORP." POWER WIRING SHALL BE PROVIDED BY THE ELECTRICAL CONTRACTOR. RTU-1,2,3 1. ROOF TOP UNIT SHALL RUN CONTINUOUSLY SUBJECT TO SAFETY DEVICES. ROOF TOP UNIT SHALL RUN CONTINUOUSLY SUBJECT TO SAFETY DEVICES. 2. AT ANY TIME THE UNIT IS OFF THE OUTSIDE AIR DAMPER SHALL CLOSE VIA SPRING RETURN ACTUATOR DX COOLING AT ANY TIME THE UNIT IS OFF THE OUTSIDE AIR DAMPER SHALL CLOSE VIA SPRING RETURN ACTUATOR DX COOLING SHALL NOT OPERATE. 3. IF SUPPLY FAN FAILURE IS DEDICATED BY THE DDC SYSTEM AFTER AN ADJUSTABLE TIME DELAY, THE DDC SYSTEM IF SUPPLY FAN FAILURE IS DEDICATED BY THE DDC SYSTEM AFTER AN ADJUSTABLE TIME DELAY, THE DDC SYSTEM WILL SHUT THE ROOF TOP UNIT DOWN AND REPORT ROOF TOP UNIT FAILURE ALARM. 4. TEMPERATURE CONTROL: TEMPERATURE CONTROL: THE DDC SHALL RESET THE DISCHARGE TEMPERATURE SET POINT TO MAINTAIN SPACE TEMPERATURE AT SET POINT. THE DDC SYSTEM SHALL STAGE DX COOLING, MODULATE HOT GAS BYPASS AND MIXED AIR SET POINT IN SEQUENCE TO MAINTAIN THE DISCHARGE TEMPERATURE SET POINT, DURING PRESSURE SENSOR MOUNTED IN SUPPLY AIR DUCTWORK, THE DDC SYSTEM SHALL SEND A SIGNAL TO THE VFD TO MODULATE THE FAN SPEED AS REQUIRED TO MAINTAIN THE SET POINT AT THE PRESSURE SENSOR. ECONOMIZER MODE THE MIXED AIR DAMPER SHALL MODULATE TO MAINTAIN A MIXED AIR SET POINT. THE GAS VALVE SHALL MODULATE TO MAINTAIN THE DISCHARGE TEMPERATURE SET POINT. ECONOMIZER MODE SHALL BE ENABLED WHENEVER THE OUTDOOR AIR DEWPOINT IS BELOW 50°/ADJUSTABLE5. SAFETY: SAFETY: ON SIGNAL FROM FREEZE-STAT WITH MANUAL RESET, OUTSIDE AIR DAMPER SHALL CLOSE, SUPPLY FAN SHUT DOWN, DDC SYSTEM SHALL INDICATE ALARM CONDITION, ON SIGNAL FROM SMOKE DETECTORS WITH MANUAL RESET, OUTSIDE AIR DAMPER SHALL CLOSE, SUPPLY FAN SHALL SHUTDOWN AND DDC SYSTEM SHALL INDICATE ALARM CONDITION. THE DIRTY FILTER CONDITION ON EACH FILTER BANK SHALL BE REPORTED TO THE BAS. 6. THE ROOFTOP UNIT SUPPLY AIR FAN SHALL BE CONTROLLED BY DDC SYSTEM.THE ROOFTOP UNIT SUPPLY AIR FAN SHALL BE CONTROLLED BY DDC SYSTEM.
TRUMAN SCHOOL
33 N PLAINS INDUSTRIAL RD
WALLINGFORD, CT 06492
Tel: 203.467.4370 Web: www.iesllc.biz
IPPQXCViXe 'PIiPeeTiPI SeTXices, LLC AP IPVeITCVeF ePIiPeeTiPI FesiIP HiTO
I ' S
MECHANICAL (HVAC) SPECIFICATIONS
AutoCAD SHX Text G:\IES Projects\2026 Projects\Team TEM\26028 Truman School HVAC Replacement\Contract Documents\26028_M3-00.dwg Plotted by jmorin on May 21, 2026 - 9:53am Plotted by jmorin on May 21, 2026 - 9:53amjmorin on May 21, 2026 - 9:53am on May 21, 2026 - 9:53am May 21, 2026 - 9:53am
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
PROJECT NUMBER:
AutoCAD SHX Text
ISSUED:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NOTES:
AutoCAD SHX Text
NEW HAVEN PUBLIC SCHOOLS
AutoCAD SHX Text 2000-12
AutoCAD SHX Text 05/21/26
AutoCAD SHX Text
SHEET:
AutoCAD SHX Text
SHEET TITLE:
AutoCAD SHX Text
PROJECT:
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
REV.
AutoCAD SHX Text
DATE
AutoCAD SHX Text INSTALLATIONS SLEEVES PROVIDE NO. 22 GA. GALVANIZED IRON SLEEVES EXTENDED THROUGH CONSTRUCTION AT ALL PENETRATIONS THROUGH CEILINGS, WALLS AND PARTITIONS. FOR INSULATED PIPING THE SLEEVE IS TO BE SIZED TO ALLOW INSULATION TO PASS THROUGH SLEEVE, PROVIDE 1/2 INCH SPACE BETWEEN PIPE AND/OR INSULATION AND SLEEVE. FIRE SEAL ALL SLEEVES IN ACCORDANCE WITH BUILDING CODE AND APPLICABLE SECTIONS OF THE NFPA. EXPANSION ANCHORS SUSPEND HANGERS FROM EXPANSION ANCHORS IN SOLID CONCRETE SLABS SIMILAR TO HILTI HDI. PROVIDE HANGER IN PLACE WITH DOUBLE NUTS. PROVIDE PROTECTION SHIELDS IN INSULATED PIPING. INSTALL HANGERS OVER INSULATION AND SHIELDS. WHERE OVERHEAD CONSTRUCTION DOES NOT PERMIT FASTENING HANGER RODS IN REQUIRED LOCATIONS, PROVIDE ADDITIONAL STEEL FRAMING AS REQUIRED AND REVIEWED. HANGERS AND SUPPORTING PIPE HANGING AND SUPPORTING - PIPING SHALL NOT BE SUPPORTED BY OTHER PIPING, BUT SHALL BE SUPPORTED WITH PIPE HANGERS SUITABLE FOR THE SIZE OF PIPE AND PROPER STRENGTH AND QUALITY AT PROPER INTERVALS SO THAT THE PIPING CANNOT BE MOVED ACCIDENTALLY FROM THE INSTALLED POSITION AS FOLLOWS: PROVIDE CLEVIS HANGERS AT CENTER OF CENTER SPACING AT CENTER OF CENTER SPACING (UNLESS OTHERWISE NOTED) 1/2 INCH PIPE OR TUBING 6 FEET 6 FEET 3/4 INCH OR 1 INCH PIPE OR TUBING 8 FEET 8 FEET 1-1/4 INCH OR LARGER (HORIZONTAL) 10 FEET 10 FEET 1-1/4 INCH OR LARGER (VERTICAL) EVERY FLOOR LEVEL EVERY FLOOR LEVEL DUCT HANGING AND SUPPORTING - DUCTWORK SHALL NOT BE SUPPORTED BY OTHER DUCTWORK OR PIPING, BUT SHALL BE SUPPORTED WITH HANGERS OF TYPE AND AT SPACING AS PER SMACNA STANDARDS. VIBRATION AND SEISMIC CONTROL QUIET OPERATION - ALL WORK SHALL OPERATE UNDER ALL CONDITIONS OF LOAD WITHOUT - ALL WORK SHALL OPERATE UNDER ALL CONDITIONS OF LOAD WITHOUT ANY SOUND OR VIBRATION WHICH IS OBJECTIONABLE IN THE OPINION OF THE ENGINEER. IN CASE OF MOVING MACHINERY, SOUND OR VIBRATION NOTICEABLE OUTSIDE OF ROOM IN WHICH IT IS INSTALLED, OR ANNOYING INSIDE ITS OWN ROOM, WILL BE CONSIDERED OBJECTIONABLE BY THE ENGINEER AND SHALL BE REMEDIED IN APPROVED MANNER BY THE CONTRACTOR AT HIS EXPENSE. PROVIDE FLEXIBLE PIPE CONNECTIONS AT ALL PIPING CONNECTED TO MOVING EQUIPMENT. PROVIDE FLEXIBLE DUCT CONNECTIONS AT ALL DUCTWORK CONNECTED TO MOVING EQUIPMENT. FLEXIBLE CONNECTIONS SHALL BE 29 OZ. NEOPRENE COATED FIBERGLASS, 6" WIDE. BURNING PROPERTIES SHALL CONFORM TO NFPA 90A. FASTEN TO DUCTWORK PER MANUFACTURER'S RECOMMENDATIONS. FABRIC SHALL NOT BE STRESSED OTHER THAN BY AIR PRESSURE. ALLOW AT LEAST ONE INCH SLACK TO INSURE THAT NO VIBRATION IS TRANSMITTED. PROVIDE VIBRATION ISOLATION SPRINGS OR PADS AT MOUNTING AND SUPPORTS FOR ALL EQUIPMENT CAPABLE OF TRANSMITTING VIBRATIONS. SEISMIC RESTRAINTS SEISMIC RESTRAINTS DESIGNED AND CONSTRUCTED FOR LATERAL FORCES IN ANY DIRECTION SHALL BE PROVIDED FOR ALL MECHANICAL EQUIPMENT IN ACCORDANCE WITH THE STATE BUILDING CODE. SEISMIC RESTRAINTS SHALL NOT BE REQUIRED FOR THE FOLLOWING: 1. PIPING IN BOILER AND MECHANICAL ROOMS LESS THAN 1-1/4 INCH INSIDE DIAMETER. PIPING IN BOILER AND MECHANICAL ROOMS LESS THAN 1-1/4 INCH INSIDE DIAMETER. 2. ALL OTHER PIPING LESS THAN 2-1/2 INCH INSIDE DIAMETER. ALL OTHER PIPING LESS THAN 2-1/2 INCH INSIDE DIAMETER. 3. RECTANGULAR AIR-HANDLING DUCTS LESS THAN 6 SQUARE FEET IN CROSS-SECTIONAL RECTANGULAR AIR-HANDLING DUCTS LESS THAN 6 SQUARE FEET IN CROSS-SECTIONAL AREA. 4. ROUND AIR-HANDLING DUCTS LESS THAN 28 INCHES IN DIAMETER. ROUND AIR-HANDLING DUCTS LESS THAN 28 INCHES IN DIAMETER. 5. PIPING SUSPENDED BY INDIVIDUAL HANGERS 12 INCHES OR LESS IN LENGTH FROM PIPING SUSPENDED BY INDIVIDUAL HANGERS 12 INCHES OR LESS IN LENGTH FROM THE TOP OF THE PIPE TO THE BOTTOM OF THE SUPPORT FOR THE HANGER. 6. DUCTS SUSPENDED BY HANGERS 12 INCHES OR LESS IN LENGTH FROM THE TOP OF DUCTS SUSPENDED BY HANGERS 12 INCHES OR LESS IN LENGTH FROM THE TOP OF THE DUCT TO THE BOTTOM OF THE SUPPORT FOR THE HANGER. SEISMIC RESTRAINT FOR DUCTWORK; PROVIDE REQUIRED BRACING MATERIAL. DUCTWORK SHALL BE SUPPORTED AND BRACED TO RESIST ALL DIRECTIONAL (TRANSVERSE, LONGITUDINAL AND VERTICAL) FORCES EQUAL TO 10 PERCENT OF THE WEIGHT OF THE DUCT SYSTEM. IDENTIFICATION ALL IDENTIFICATION LABELING IS TO COMPLY WITH ASME A13.1 ALL PIPING IS TO BE LABELED WITH INDICATIONS OF SERVICE AND DIRECTION OF FLOW. ALL DUCTWORK IS TO BE LABELED WITH INDICATIONS OF SERVICE, DIRECTION OF FLOW AND ASSOCIATED SYSTEM DESIGNATION. ALL EQUIPMENT IS TO HAVE PERMANENT LABELS INDICATING EQUIPMENT DESIGNATION. PIPING INSTALLATION SIZES AND APPROXIMATE LOCATION OF PIPING SYSTEMS ARE SHOWN ON THE DRAWINGS. CHECK CAREFULLY WITH THE ARCHITECTURAL DRAWINGS, DRAWINGS SHOWING WORK OF OTHER TRADES, AND EXISTING FIELD CONDITIONS TO MAKE SURE THAT THERE WILL BE NO CONFLICT BETWEEN THESE TRADES AND THE PIPING SYSTEMS. PIPES SHALL BE OFFSET AS REQUIRED TO CLEAR STRUCTURAL MEMBERS AND EXISTING FIELD CONDITIONS. PIPING TO BE INSTALLED WITH PROPER PITCH TO LOW POINTS. PROVIDE DRAIN VALVES AT ALL LOW POINTS AND AIR VENTS AT ALL HIGH POINTS OF THE PIPING SYSTEM. INSTALL PIPING TO ALLOW FOR PIPE EXPANSION. DUCT INSTALLATION SIZES AND APPROXIMATE LOCATION OF ALL DUCTS ARE SHOWN ON THE DRAWINGS. CHECK CAREFULLY WITH THE ARCHITECTURAL DRAWINGS, DRAWINGS SHOWING WORK OF OTHER TRADES, AND EXISTING FIELD CONDITIONS TO MAKE SURE THAT THERE WILL BE NO CONFLICT BETWEEN THESE TRADES AND THE DUCTS. DUCTS SHALL BE OFFSET AS REQUIRED TO CLEAR STRUCTURAL MEMBERS AND EXISTING FIELD CONDITIONS; IF NECESSARY, THE DIMENSIONS OF THE DUCT MAY BE ALTERED PROVIDED THE CROSS-SECTIONAL AREA IS IN NO CASE REDUCED. FIELD QUALITY CONTROL PERFORM THE FOLLOWING FIELD TESTS AND INSPECTIONS ACCORDING TO SMACNA'S "HVAC AIR DUCT LEAKAGE TEST MANUAL" AND PREPARE TEST REPORTS: DISASSEMBLE, REASSEMBLE AND SEAL SEGMENTS OF SYSTEMS TO ACCOMMODATE LEAKAGE TESTING AND FOR COMPLIANCE WITH TEST REQUIREMENTS. CONDUCT TESTS AT STATIC PRESSURES EQUAL TO MAXIMUM DESIGN PRESSURE OF SYSTEM OR SECTION BEING TESTED. IF PRESSURE CLASSES ARE NOT INDICATED, TEST ENTIRE SYSTEM AT MAXIMUM SYSTEM DESIGN PRESSURE. DO NOT PRESSURIZE SYSTEMS ABOVE MAXIMUM DESIGN OPERATING PRESSURE. GIVE SEVEN DAYS ADVANCE NOTICE FOR TESTING. MAXIMUM ALLOWABLE LEAKAGE: COMPLY WITH REQUIREMENTS FOR LEAKAGE CLASS 3 FOR ROUND AND FLAT-OVAL DUCTS, LEAKAGE CLASS 12 FOR RECTANGULAR DUCTS IN PRESSURE CLASSES LOWER THAN AND EQUAL TO 2-INCH WG (500 PA) (BOTH POSITIVE AND NEGATIVE PRESSURES), AND LEAKAGE CLASS 6 FOR PRESSURE CLASSES FROM 2- TO 10- WG (500 TO 2500 PA). REMAKE LEAKING JOINTS AND RETEST UNTIL LEAKAGE IS EQUAL TO OR LESS THAN MAXIMUM ALLOWABLE. MATERIALS DISSIMILAR METALS WHENEVER DISSIMILAR PIPING MATERIALS ARE CONNECTED THE TWO SHALL BE SEPARATED WITH AN 'INSULATION' CONNECTION (DIELECTRIC) FITTING. PIPING STEAM & CONDENSATE RETURN PIPING STANDARD WEIGHT, SCHEDULE 40, OPEN HEARTH STEEL, NATIONAL OR EQUAL. FITTINGS FOR STEEL PIPE SHALL BE AS FOLLOWS: GENERALLY, BUTT WELDING FITTINGS OVER TWO INCHES SHALL BE USED AND EITHER SOCKET-WELD OR SCREWED FOR TWO INCHES AND UNDER. WELDING FITTINGS SHALL BE STANDARD FORGED STEEL WITH CHAMFERED ENDS. ALL BRANCHES SHALL BE WELDED WITH EITHER WELDOLETE OR TEES.
AutoCAD SHX Text HOT WATER HEATING PIPING TYPE L COPPER TUBING WITH SWEAT FITTINGS WITH 95-5 SOLDER OR STANDARD WEIGHT, SCHEDULE 40, OPEN HEARTH STEEL, NATIONAL OR EQUAL. FITTINGS FOR STEEL PIPE SHALL BE AS FOLLOWS: GENERALLY, BUTT WELDING FITTINGS OVER TWO INCHES SHALL BE USED AND EITHER SOCKET-WELD OR SCREWED FOR TWO INCHES AND UNDER. WELDING FITTINGS SHALL BE STANDARD FORGED STEEL WITH CHAMFERED ENDS. ALL BRANCHES SHALL BE WELDED WITH EITHER WELDOLETE OR TEES, OR MATCH EXISTING MATERIALS. CHILLED WATER PIPING TYPE L COPPER TUBING WITH SWEAT FITTINGS WITH 95-5 SOLDER OR STANDARD WEIGHT, SCHEDULE 40, OPEN HEARTH STEEL, NATIONAL OR EQUAL. FITTINGS FOR STEEL PIPE SHALL BE AS FOLLOWS: GENERALLY, BUTT WELDING FITTINGS OVER TWO INCHES SHALL BE USED AND EITHER SOCKET-WELD OR SCREWED FOR TWO INCHES AND UNDER. WELDING FITTINGS SHALL BE STANDARD FORGED STEEL WITH CHAMFERED ENDS. ALL BRANCHES SHALL BE WELDED WITH EITHER WELDOLETE OR TEES, OR MATCH EXISTING MATERIALS. CONDENSER WATER PIPING TYPE L COPPER TUBING WITH SWEAT FITTINGS WITH 95-5 SOLDER OR PVC (EXCEPT IF LOCATED IN A SPACE USED AS AN AIR PLENUM) OR MATCH EXISTING MATERIALS. CONDENSATION DRAIN PIPING TYPE DWV COPPER TUBING WITH DWV SWEAT FITTINGS OR PVC (EXCEPT IF LOCATED IN A SPACE USED AS AN AIR PLENUM) REFRIGERANT PIPING TYPE ACR SERVICE COPPER TUBING MEETING ASTM B280: HARD DRAWN (ANY SIZE) OR SOFT DRAWN (1-5/8" ID OR SMALLER), OR AS PER MANUFACTURER'S RECOMMENDATIONS. NATURAL GAS PIPING ABOVE GROUND UP TO 2-INCH: ASTM A53 SCHEDULE 40 BLACK STEEL, TYPE E OR S, GRADE B, THREADED ENDS. FITTINGS SHALL BE ASTM B16.3 CLASS 150. BLACK MALLEABLE-IRON THREADED FITTINGS. ABOVE GROUND UP TO 2 1/2-INCH AND LARGER: ASTM A53 SCHEDULE 40 BLACK STEEL, TYPE E OR S, GRADE B, PLAIN END FOR WELDING. FITTINGS SHALL BE WROUGHT STEEL, BUTT WELDING FITTINGS PREPARATION: CUT PIPE AND TUBING ENDS SQUARE, REMOVE BURRS AND REAM TO ORIGINAL BORE. CLEAN JOINT SURFACES PRIOR TO ASSEMBLY. WIPE OFF EXCESS JOINING COMPOUNDS AND FLUX RESIDUE. SCREWED: USE AMERICAN STANDARD TAPER PIPE THREADS CUT SHARP AND TRUE AND SUITABLE FOR NORMAL ENGAGEMENT. SCREW THREADED ITEMS UP CLOSE TO SHOULDERS WITH NOT MORE THAN THREE INCOMPLETE THREADS EXPOSED. DO NOT USE LAMP WICK, CORD, WOOL OR OTHER "WICKING" MATERIALS. REPAIR LEAKS WITH NEW MATERIALS, DO NOT PEEN OR CAULK. "TEFLON" PIPE JOINT TAPE OR JOINT COMPOUNDS COMPOSED OF RED LEAD AND GRAPHITE GROUND IN LINSEED OIL WILL BE PERMITTED, APPLIED TO MALE THREADS ONLY. PIPE INSULATION THE FOLLOWING PIPING SYSTEMS ARE TO BE INSULATED: STEAM SUPPLY PIPING STEAM CONDENSATE RETURN PIPING WITHIN 10'-0” OF THE FLOOR OF THE FLOOR HEATING HOT WATER SUPPLY AND RETURN PIPING CHILLED WATER SUPPLY AND RETURN PIPING CONDENSATION DRAIN PIPING REFRIGERANT SUCTION LINE PIPING HOT WATER & STEAM HEATING AND CHILLED WATER PIPING INSULATION INSULATE WITH RIGID PREFORMED FIBERGLASS WITH AP-T PLUS JACKET, SCHULLER MICRO-LOK OR EQUAL. INSULATION THICKNESS SHALL BE 1" THICK FOR BELOW 1 ½” OR OR SMALLER PIPING, 1-1/2" THICK FOR 2" TO 3" PIPING AND 2" THICK FOR PIPING 4" AND LARGER. PROVIDE ZESTON COVERS ON ALL FITTINGS. CONDENSATE DRAIN PIPING INSULATION INSULATE WITH 1/2" THICK HEAVY DENSITY FIBERGLASS 25 ASJ WITH VAPOR BARRIER AND LAP ADHESIVE JACKET. INSULATION ON FITTINGS SHALL BE FIBERGLASS WITH PRE-MOLDED JACKET. REFRIGERANT PIPING INSULATION INSULATE SUCTION LINE AND LIQUID WITH ARMAFLEX INSULATION. MINIMUM INSULATION THICKNESS SHALL BE 1". VALVES AND SPECIALTIES BALANCING FITTINGS PROVIDE “B & G” CIRCUIT SETTER BALANCING FITTINGS ON ALL WATER SYSTEMS WHENEVER B & G” CIRCUIT SETTER BALANCING FITTINGS ON ALL WATER SYSTEMS WHENEVER CIRCUIT SETTER BALANCING FITTINGS ON ALL WATER SYSTEMS WHENEVER REQUIRED FOR BALANCING OF SYSTEMS. HOT AND CHILLED WATER VALVES BALL TYPE VALVES TO BE JAMESBURY, CLINCHER, OR APOLLO GATE TYPE VALVES TO BE MILWAUKEE #F-2885M (FLANGED) OS&Y TYPE VALVES TO BE IRON BODY, BRONZE MOUNTED OR (SCREWED), BRONZE, RISING STEM. CHECK VALVES TO BE CRANE/JENKINS VALVES. NATURAL GAS REGULATORS CAST IRON OR ALUMINUM BODY, ZINC PLATED STEEL SPRINGS, NITRILE RUBBER SEAT DISC, ALUMINUM ORIFICE, SINGLE PORT. COORDINATE REGULATOR INCOMING PRESSURE WITH NEW EQUIPMENT OPERATING PRESSURE. OUTLET GAS PRESSURE TO NEW EQUIPMENT SHALL BE WITHIN EQUIPMENT OPERATING RANGE. THERMOMETERS SHALL BE TRERICE UNIVERSAL ANGLE TYPE #L80732, SOLID LIQUID FILLED, 4 ½” DIAL DIAL SIZE. FURNISH WITH SEPARABLE SOCKET WITH 2" EXTENSION NECK. STEAM SPECIALTIES ALL STEAM TRAPS AND SPECIALTIES TO BE B & G OR SARCO. DUCTWORK SHEET METAL DUCTWORK ALL DUCTWORK SHALL BE CONSTRUCTED OF #1 QUALITY SHEETS OF GALVANIZED STEEL FREE OF CRACKS OR BLEMISHES. WHEN PITTSBURGING OR SNAP LOCKING A JOINT, THE GALVANIZED STEEL SHALL NOT BE CHIPPED OFF. ALL PARTS OF THE SHEET METAL DUCT SYSTEM SHALL BE OF THE GAGE, CONSTRUCTION, HANGING METHOD, AND INSTALLED IN STRICT ACCORDANCE WITH THE CURRENT EDITION OF THE SMACNA STANDARDS, INCLUDING DUCT LEAKAGE REQUIREMENTS. FLEXIBLE DUCTWORK FLEXIBLE DUCTS TO BE INSULATED TYPE; UL 181, CLASS 1, 2-PLY VINYL FILM SUPPORTED BY HELICALLY WOUND, SPRING-STEEL WIRE WITH FIBROUS-GLASS INSULATION AND POLYETHYLENE VAPOR BARRIER FILM. THE LENGTH OF FLEXIBLE DUCT IS NOT TO EXCEED 12'-0”. FLEXIBLE DUCT MAY ONLY BE USED ON THE SUPPLY AIR SIDE OF LOW . FLEXIBLE DUCT MAY ONLY BE USED ON THE SUPPLY AIR SIDE OF LOW PRESSURE DUCT SYSTEMS. MOISTURE LADEN AIR DUCTWORK DUCTWORK WHICH CONVEYS AIR WITH A HIGH MOISTURE CONTENT, SUCH AS SHOWER EXHAUST AIR, SHALL BE CONSTRUCTED OF ALUMINUM SHEET MATERIAL MEETING SMACNA STANDARDS. DUCT INSULATION SOUND (ACOUSTIC) INSULATION PROVIDE INTERNAL SOUND INSULATION IN ALL DUCTS WITHIN 10'-0” OF THE DISCHARGE OF THE DISCHARGE OF AN AIR HANDLING UNIT AND WHERE INDICATED ON THE DRAWINGS. THE DUCTWORK SHALL BE LINED WITH JOHNS MANVILLE PERMACOTE LINACOUSTIC. THICKNESS, UNLESS SPECIFIED OTHERWISE, SHALL BE 1". LINER SHALL BE APPLIED TO DUCT IN STRICT ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS AND SMACNA GUIDELINES, LATEST EDITION. WHERE SOUND INSULATION IS INDICATED, DUCTWORK SIZES DENOTED ARE THE INSIDE DIMENSIONS AFTER THE INSULATION HAS BEEN INSTALLED. THERMAL INSULATION COVER ALL CONCEALED UNLINED SUPPLY AIR AND OUTSIDE AIR DUCTWORK WITH FIBERGLASS DUCT WRAP HAVING A MIN. R-6, EQUAL TO JOHNS MANVILLE R-SERIES MICROLITE WITH F.R.G. VAPOR BARRIER. ALL SUPPLY DUCTS, LOCATED IN ATTIC SHALL BE INSULATED TO MINIMUM R-8. COVER ALL EXPOSED UNLINED SUPPLY AIR AND OUTSIDE AIR DUCTWORK WITH RIGID FIBERGLASS BOARD INSULATION HAVING MIN. R-6. PROVIDE ALL TAPE, MASTICS, SEALANTS, MOUNTING PINS, AND ETC. TO INSTALL INSULATION AS RECOMMENDED BY THE MANUFACTURER.
AutoCAD SHX Text GENERAL SCOPE THE GENERAL SCOPE OF THE HVAC WORK IS TO REMOVE EXISTING SYSTEMS, MODIFY THE EXISTING SYSTEMS, AND PROVIDE NEW SYSTEMS AS INDICATED ON THESE DOCUMENTS THE WORK TO BE DONE UNDER THIS DIVISION OF THE SPECIFICATIONS INCLUDE THE FURNISHING OF ALL EQUIPMENT, SUPPLIES, LABOR, SUPERVISION AND ALL MATERIALS NOT SPECIFICALLY MENTIONED BUT NECESSARY OR REQUIRED TO PROVIDE COMPLETE AND FULLY OPERATIONAL HVAC SYSTEMS. IT IS THE INTENTION OF THE SPECIFICATIONS AND DRAWINGS TO CALL FOR FINISHED WORK, TESTED AND READY FOR OPERATION. IT IS THE INTENT THAT ALL MECHANICAL WORK AND MATERIALS NECESSARY TO COMPLETE THE ENTIRE PROJECT IN ACCORDANCE WITH THE CONTRACT PLANS AND SPECIFICATIONS, WHETHER SPECIFICALLY MENTIONED HERE OR NOT, SHALL BE FURNISHED. ALL WORK AND MATERIALS NECESSARY TO FULFILL THIS INTENT SHALL BE SUPPLIED UNDER THE MECHANICAL SPECIFICATIONS WITHOUT ADDITIONAL COST TO THE OWNER. DEFINITIONS 'FURNISH' OR 'PROVIDE' - TO FURNISH, ERECT, INSTALL AND CONNECT UP COMPLETE AND - TO FURNISH, ERECT, INSTALL AND CONNECT UP COMPLETE AND READY FOR OPERATION PARTICULAR WORK REFERRED TO, UNLESS SPECIFICALLY INDICATED OR SPECIFIED OTHERWISE. 'WORK' - LABOR, MATERIALS, EQUIPMENT, APPARATUS, CONTROLS, ACCESSORIES AND ALL - LABOR, MATERIALS, EQUIPMENT, APPARATUS, CONTROLS, ACCESSORIES AND ALL OTHER ITEMS CUSTOMARILY FURNISHED AND/OR REQUIRED FOR PROPER AND COMPLETE INSTALLATION OF WORK. 'EXPOSED' - NOT INSTALLED UNDERGROUND OR 'CONCEALED' AS DEFINED ABOVE. - NOT INSTALLED UNDERGROUND OR 'CONCEALED' AS DEFINED ABOVE. 'INDICATE' OR 'SHOWN' - AS INDICATED OR SHOWN ON DRAWINGS OR SPECIFIED WITH - AS INDICATED OR SHOWN ON DRAWINGS OR SPECIFIED WITH SPECIFICATIONS. 'PIPING' - PIPE, FITTINGS, FLANGES, VALVES, CONTROLS, HANGERS, TRAPS, DRAINS, - PIPE, FITTINGS, FLANGES, VALVES, CONTROLS, HANGERS, TRAPS, DRAINS, INSULATION AND ITEMS CUSTOMARILY OR REQUIRED IN CONNECTION WITH OR RELATING TO SUCH PIPING. 'SUPPLY' - TO PURCHASE, PRODUCE, ACQUIRE AND DELIVER COMPLETE WITH ALL RELATED - TO PURCHASE, PRODUCE, ACQUIRE AND DELIVER COMPLETE WITH ALL RELATED ITEMS. 'INSTALL' - TO ERECT, MOUNT AND CONNECT UP COMPLETE WITH ALL RELATED - TO ERECT, MOUNT AND CONNECT UP COMPLETE WITH ALL RELATED ACCESSORIES. 'NOTED' - AS INDICATED ON DRAWINGS AND/OR SPECIFIED. - AS INDICATED ON DRAWINGS AND/OR SPECIFIED. CODES, RULES, PERMITS AND FEES THIS CONTRACTOR SHALL GIVE ALL NECESSARY NOTICES, OBTAIN ALL PERMITS AND PAY ALL STATE AND LOCAL TAXES, FEES AND OTHER COSTS IN CONNECTION WITH HIS WORK; FILE ALL NECESSARY PLANS, PREPARE ALL DOCUMENTS AND OBTAIN ALL NECESSARY APPROVALS OF ALL STATE AND LOCAL DEPARTMENTS HAVING JURISDICTION; OBTAIN ALL REQUIRED CERTIFICATES OF INSPECTION FOR HIS WORK AND DELIVERY OF SAME TO THE OWNER BEFORE REQUEST FOR ACCEPTANCE AND FINAL PAYMENT FOR THE WORK. THIS CONTRACTOR SHALL INCLUDE IN THE WORK, WITHOUT EXTRA COST TO THE OWNER, ANY LABOR, MATERIALS, SERVICES, APPARATUS, DRAWINGS (IN ADDITION TO CONTRACT DRAWINGS AND DOCUMENTS), IN ORDER TO COMPLY WITH ALL APPLICABLE LAWS, ORDINANCES, RULES AND REGULATIONS WHETHER OR NOT SHOWN ON THE DRAWINGS AND/OR SPECIFIED. THIS CONTRACTOR SHALL PERFORM AND FILE ALL TESTS IN ACCORDANCE WITH THE CURRENT REGULATIONS OF THE STATE AND LOCAL AUTHORITIES. HE SHALL FURNISH AND INSTALL SIGNS REQUIRED BY THE STATE AND LOCAL AUTHORITIES.