Trower_Ave_Paving_Technical_Specifications.pdf
PDF 961 KB Posted
- Solicitation number
- 2026-IFB - PC-057
- Issued by
- Napa County, California
About this file
This is a Technical Specifications document prepared by the City of Napa Public Works Department for the Trower Avenue Paving project (City Project No. 33ST27PW03), extending from Linda Vista Avenue to Solano Avenue. The project encompasses comprehensive street reconstruction including traffic control, earthwork, removal of existing facilities, installation of aggregate base, and asphalt paving. The specifications are designed for use in conjunction with the State of California Department of Transportation Standard Specifications and Plans (latest edition), the City of Napa Standard Specifications and Standard Plans (dated January 2022), and applicable labor surcharge and equipment rental rates in effect at the time of work completion. Sealed bids are due by 3:00 p.m. on Thursday, December 10, 2026, through electronic submission via https://procurement.opengov.com/portal/cityofnapa. The contract specifications establish detailed requirements for all work phases, from permits and utility potholing through final paving and infrastructure adjustment.
The technical specifications establish comprehensive pricing and performance requirements with payment structured as lump sum prices for traffic control, potholing, clearing and grubbing, and landscaping restoration, while unit prices are established for concrete removal, cold planing, paving fabric installation, and hot mix asphalt placement. Specific material requirements include Class 2 aggregate base with 95 percent minimum compaction, TenCate Mirafi MPV500 paving fabric (or authorized equivalent), and Grade PG 64-16 hot mix asphalt in multiple lifts (3/8-inch leveling course, 1/2-inch wearing course). The project incorporates extensive traffic management protocols including lane closure restrictions (9:00 a.m. to 3:00 p.m. unless authorized), mandatory two changeable message signs, pedestrian control plans, and coordination requirements with local emergency services, schools, and utility providers. All potholing, utility adjustments, and damage repairs caused by contractor activities are the contractor's responsibility at no additional cost to the City, with particular emphasis on protecting existing irrigation systems, maintaining emergency vehicle access, and preserving adjacent private property improvements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PUBLIC WORKS DEPARTMENT
NAPA, CALIFORNIA
Attachment B
Technical Specifications
FOR
Trower Avenue Paving – Linda Vista Avenue to Solano Avenue
City Project No. 33ST27PW03
For use in connection with the Standard Specifications of the State of California Department of Transportation, latest Edition and the Standard Plans of the State of California Department of Transportation, latest Edition (unless otherwise noted in these Specifications), the City of Napa Standard Specifications and Standard Plans dated January 2022, including any supplemental updates thereto, and the Labor Surcharge and Equipment Rental Rates in effect on the date the work is accomplished.
City of Napa Public Works Contract Documents Form 4.2 (2024-2-13) Trower Avenue Paving – Linda Vista Ave to Solano Ave TOC City Project No. 33ST27PW03 Page i
TABLE OF CONTENTS
Part 1 – General Part 2 – Traffic Control
2.01 Temporary Traffic Control Devices
2.02 Construction Area Signs
2.03 Maintaining Traffic
2.04 Lane Closure Requirements and Conditions
2.06 Temporary Pavement Delineation
Part 3 – Earthwork
3.01 Dust Control
3.02 Clearing, Grubbing, and Landscape Restoration
3.03 Earthwork
3.04 Finishing Work
Part 4 – Existing Facilities
4.01 General
4.02 Potholing
4.03 Concrete Removal
4.04 Removal of Traffic Stripes and Pavement Markings
4.05 Removal of Pavement Markers
4.06 Adjust Frames and Covers to Grade
Part 5 – Subbases and Bases
5.01 Aggregate Base
Part 6 – Surfacing and Pavements
6.01 Cold Plane
6.02 Paving Fabric
6.03 Hot Mix Asphalt (HMA)
6.04 Hot Mix Asphalt (HMA) Plug
Part 7 – Miscellaneous Construction
7.01 Miscellaneous Concrete Construction
7.02 PCC Curb Ramp
Part 8 – Incidental Construction – NOT USED Part 9 – Signs, Markers and Markings
9.01 Pavement Markers
9.02 Street Signs
9.04 Thermoplastic Traffic Stripes and Pavement Markings
9.06 Green Pavement Markings
Part 10 – Signals, Lighting, and Electrical Systems – NOT USED Part 11 – Drainage Facilities – NOT USED Part 12 – Water Facilities – NOT USED Part 13 – Landscape
13.01 Tree Removal
Part 14 – Buildings and Structures – NOT USED Appendix A – City of Napa Holiday Calendar(s) Appendix B – City of Napa Temporary Traffic Control Guidelines
Trower Avenue Paving – Linda Vista Ave to Solano Ave TECHNICAL SPECIFICATION City Project No. 33ST27PW03 Page 1
TECHNICAL SPECIFICATIONS
Part 1 – General
1.01 Order of Work
Contractor shall follow the sequence of activities as set forth herein.
(1) Permits, Fees, and City Business License. Contractor shall obtain and paid for all necessary permits required for the Work. The cost thereof will be included in the Contract price paid for Control of Work, and no additional compensation will be allowed therefor.
(2) Notice of Excavation. Contractor shall comply with all applicable requirements in
Government Code §§ 4216 et seq., which are incorporated by reference herein.
(3) Project Notification. Contractor shall notify residents and/or property owners and/or business at least 48 hours in advance of the upcoming Work and any additional notices in accordance with the requirements in the section titled “Construction Area Signs” of the Specifications.
(4) Traffic and Pedestrian Control Plan. Contractor shall implement approved traffic control plan in accordance with the requirements in the section titled “Traffic Control” of the Specifications. The cost thereof will be included in the Contract prices paid for Traffic Control, and no additional compensation will be allowed therefor.
(5) Potholing. Contractor shall know and comply with the requirements of the sections titled, “Notice of Excavation” and “Potholing,” of the Contract Documents. While a representative sample of the utilities crossing the project have been potholed and may be shown on the plans, Contractor shall pothole five days prior to beginning any excavation all buried utilities and other man-made objects at new concrete and street slope modification locations, check for conflicts, and provide the pothole data and written notice of any suspected conflicts between existing and proposed facilities prior to beginning any excavation. Said pothole data and written notice shall be provided to the Engineer not less than 14 working days prior to beginning any such excavation. For longer facilities such as buried pipelines, Contractor shall pothole at several locations, adequate in the opinion of the Engineer, to determine or verify the type, profile, size, and material of the facility. The cost thereof will be included in the Contract prices paid for Potholing, and no additional compensation will be allowed therefor.
(6) Remaining Work. Contractor shall perform remaining Work in accordance with the Project
Plans and these Specifications. Nonconflicting work in subsequent stages may proceed concurrently with the work in preceding stages, provided satisfactory progress is maintained in the preceding stages of construction.
Part 2 – Traffic Control
2.01 Temporary Traffic Control Devices
Flagging, signs, and all other traffic control devices furnished, installed, maintained, and removed when no longer required shall conform to the provisions in Section 12, "Temporary Traffic Control," of the Standard Specifications and these Specifications.
Category 1 traffic control devices are defined as those devices that are small and lightweight (less than 45 kg) and have been in common use for many years. The devices shall be known to be crashworthy by crash testing, crash testing of similar devices, or years of demonstrable safe
City Project No. 33ST27PW03 Page 2 performance. Category 1 traffic control devices include traffic cones, plastic drums, portable delineators, and channelizes.
If requested by the Engineer, the Contractor shall provide written self-certification for crashworthiness of Category 1 traffic control devices. Self-certification shall be provided by the manufacturer or the Contractor and shall include the following: date, Federal Aid number (if applicable), expenditure authorization, district, county, route, and kilometer post of project limits;
company name of certifying vendor, street address, city, state and zip code; printed name, signature and title of certifying person; and an indication of which Category 1 traffic control devices will be used on the project. The Contractor may obtain a standard form for self-certification from the Engineer.
Category 2 traffic control devices are defined as those items that are small and lightweight (less than 45 kg), that are not expected to produce significant vehicular velocity change but may otherwise be potentially hazardous. Category 2 traffic control devices include: barricades and portable sign supports.
If requested by the Engineer, the Contractor shall provide a written list of Category 2 devices to be used on the project at least five days prior to beginning any work using the devices. For each type of device, the list shall indicate the FHWA acceptance letter number and the name of the manufacturer.
MEASUREMENT AND PAYMENT – The Contract lump sum price for Traffic Control includes full compensation for providing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in this section, including providing self-certification for crashworthiness of Category 1 traffic control devices and for providing a list of Category 2 devices used on the project and labeling Category 2 devices as specified, complete in place, as described in the Contract and these Technical Specifications, as directed by the Engineer, and no additional compensation will be allowed therefor.
2.02 Construction Area Signs
Construction area signs shall be furnished, installed, maintained, and removed when no longer required in conformance with the provisions in the section titled, "Temporary Traffic Control," of these Specifications.
Contractor shall know and comply with the requirements of the section titled, "Prequalified and Tested Signing and Delineation Materials," of these Technical Specifications. Type II retroreflective sheeting shall not be used on construction area sign panels. Sign substrates for stationary mounted construction area signs may be fabricated from fiberglass reinforced plastic as specified under "Prequalified and Tested Signing and Delineation Materials" of these Technical Specifications.
Excavations required to install construction area signs shall be performed by hand methods without the use of power equipment, except that power equipment may be used if it is determined there are no utility facilities in the area of the proposed post holes.
Certain signs may be required to be covered during the progress of the work. Signs that are no longer required or that convey inaccurate information to the public shall be immediately covered, removed, or the information shall be corrected. Covers for construction area signs shall be of sufficient size and density to completely block out the complete face of the signs. The retroreflective face of the covered signs shall not be visible either during the day or at night. Covers shall be fastened securely so that the signs remain covered during inclement weather. Covers shall be replaced when they no longer cover the signs properly.
Contractor shall provide two notifications to the residents and/or businesses, with the first being at least 48 hours (excluding weekends and holidays) in advance of the construction start date and the second being at least 48 hours in advance of performing any grinding or paving activities at the site. The Engineer must approve the notification before distribution. The notification form to be provided to residents and property owners shall be submitted to the City for review and approval.
City Project No. 33ST27PW03 Page 3
Contractor shall know and comply with the requirements of the section titled “Submittals,” of these Special Conditions.
Street parking may be restricted as necessary to facilitate construction activity. “No Parking” signs, as required, shall be placed by Contractor 48 hours in advance of the parking restriction. “No Parking” signs shall have the following information:
“Tow Away, No Parking
Date of Restriction
Time of Restriction
Construction Zone
“Vehicles in Violation Subject to Tow at Owner’s Expense”
“Napa Police Department: 707-257-9223"
CVC 22658 (1); CVC 22651 (L)
“No Parking” signs shall have red letters on a white background. “No Parking” signs shall be spaced no more than 30 feet apart. The City can provide “No Parking” signs at the Contractor’s request.
Contractor will not be allowed to restrict parking in all areas of the project for the entire duration of the project to facilitate their work. The placement of “No Parking” signs shall be conducted in a manner that reasonably reflects the location of the work at any given time during the project.
If changeable message signs (CMS) are included as part of the project, the following security measures shall be implemented to the maximum extent possible:
• Contractor shall remove all hardware designed for composing and controlling messages on the CMS.
• Contractor shall ensure all CMS hardware boxes are fully locked and secure with a padlock and key approved by the City. Control box security implements shall include, but not be limited to, one or more padlock(s) secured to a heavy-duty hasp or lock and chain.
Contractor shall maintain or update information contained on the signs daily.
The cost of furnishing, installing, maintaining, and removing signs, sign covers, lights, flares, temporary railing, barricades, flagmen, guards, and all construction area traffic control devises will be borne by the Contractor.
MEASUREMENT AND PAYMENT – The Contract lump sum price for Traffic Control includes full compensation for providing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in this section, complete in place, as described in the Contract and these Technical Specifications, as directed by the Engineer, and no additional compensation will be allowed therefor.
2.03 Maintaining Traffic
Contractor shall know and comply with the requirements of Sections 7-1.03, "Public Convenience," and 12-4, “Maintaining Traffic,” of the Standard Specifications and these Specifications. Nothing in these Specifications will be construed as relieving the Contractor from the responsibilities specified in the Standard Specifications.
Contractor shall furnish and erect Standard W20-1 “Road Work Ahead” and Standard G20-2 “End Road Work” signs to provide advance warning to the traffic at the job site. W20-1 and G20-2 signs shall also be installed along all side streets entering the work area. Contractor shall submit a Traffic Control Plan that includes the exact locations of the signs.
City Project No. 33ST27PW03 Page 4
Prior to saw cutting of existing curb, gutter, sidewalk, driveway, and asphalt concrete for removal and up to the time the new improvements are opened to the public, Contractor shall erect and maintain necessary signs and barricades as required in these Specifications.
Lane closures shall conform to the provisions in the section "Traffic Control System for Lane Closure" of these Specifications. The term closure, as used herein, is defined as the closure of a traffic lane or lanes, including ramp or connector lanes, within a single traffic control system. Bicycle traffic shall be maintained per these Specifications.
No work that would require a lane closure will be performed unless otherwise authorized by the Engineer. Lane closures shall conform to the provisions in the section "Traffic Control System for Lane Closure" of these Specifications. The term closure, as used herein, is defined as the closure of a traffic lane or lanes, including ramp or connector lanes, within a single traffic control system.
Bicycle traffic shall be maintained per these Specifications. Bicyclist shall not be led into direct conflicts with mainline traffic, work site vehicles, or equipment moving through or around the TTC zone. Bicycle traffic shall be maintained per CA MUTCD Section 6D.101(CA) Specifications.
Contractor shall provide for the safe and orderly movement of traffic at all times during construction.
On all streets, one lane in each direction shall be maintained at all times. Temporary street closures or providing only one lane for both directions may be authorized by the Engineer provided adequate circulation is maintained and/or adequate flagmen and signage satisfactory. Any lane closures shall be limited to the hours of 9:00 AM to 3:00 PM unless authorized by the Engineer.
No street closures will be allowed unless directed by the Engineer. If the Contractor desires a street closure, the Contractor shall submit a written request, accompanied with a traffic control plan, to the Engineer for review and approval. The request shall state the reason, locations, and times for the closure, and shall be submitted a minimum of five working days prior to the request.
Engineer will authorize or deny the request within three working days after the receipt of the request. If the street closure request is authorized, then the Contractor shall notify the Police and Fire Department of the City, the Division of Forestry, local ambulance services, the V.I.N.E. Bus Service, Napa Garbage Service, Napa Valley Unified School District Transportation Department, and the U.S. Post Office in writing, 48 hours in advance of all street closures and keep the Fire Department posted at all times regarding available access to the streets. Contractor shall also notify United Parcel Service (UPS), Federal Express, and other mail delivery services of planned street closures and the current schedule.
No vehicular detours will be allowed.
Access for emergency vehicles shall be provided at all times including fire apparatus access.
Temporary lane closures, barricades, construction equipment, material storage, or other work shall not obstruct required emergency vehicle access. Fire protection equipment and appurtenances, including fire hydrants, fire department connections (FDCs), and other Fire Department access features shall remain readily visible, accessible, unobstructed, and available for use throughout construction. If any such equipment or appurtenance will be temporarily unavailable, obstructed, or placed out of service as a result of the work, the Fire Department shall be notified in advance and the outage or impairment coordinated with Fire prior to the affected work occurring. Any repairs due to damage caused by emergency vehicle usage during the periods of street closure shall be paid for as extra work.
Contractor shall furnish, install, maintain, and remove barricades, lights and signs as required, and shall provide flagmen and other facilities to safeguard adequately the general public, local pedestrian and vehicle traffic, and the work as may be deemed necessary by the Engineer during working and non-working hours.
Contractor shall furnish, maintain, and install two changeable message signs for use on the project at a minimum. The signs shall be placed at locations designated by the Engineer and relocated at the Engineer’s discretion at no additional cost to the City. The changeable message boards shall
City Project No. 33ST27PW03 Page 5 not be Wi-Fi/Bluetooth enabled. The changeable message boards shall at a minimum follow the guidelines listed:
1. Display messages that consist of no more than two phases (pages), with each phase consisting of no more than three lines of text that shall be understood by itself regardless of the sequence in which it is displayed.
2. The minimum time that an individual phase (page) is displayed should be based on 1 second per word or 2 seconds per unit of information, whichever produces a lesser value.
The display time for a phase should never be less than 2 seconds.
3. The maximum cycle time of a two-phase message should be 8 seconds.
4. No more than three units of information should be displayed on a phase(page) of a message.
Contractor shall ensure that boxes are locked and secured. The Contractor shall provide additional locking mechanisms to secure the boxes and remove the keyboards in the control box at end of each construction workday, if possible, and as directed by the Engineer. The changeable message boards shall adhere to the current Caltrans guidelines found here: https://dot.ca.gov/-/media/dot-media/programs/traffic-operations/documents/mobility/cms-guidelines-april-2021.pdf.
Traffic signs, flashing lights, lighted arrow boards, barricades, temporary railings, and other traffic safety devices used to control traffic shall conform to the requirements of the section titled, “Temporary Traffic Control,” of these Specifications and the current edition of the Manual of Uniform Traffic Control Devices (including the California Supplement). Flashing lights shall be provided on each barricade. The Contractor shall inspect all safety devices at the beginning of each workday.
Contractor shall take extra care to minimize disruption to the adjacent residences/businesses during the progress of work. The Contractor shall provide access to all residences and/or businesses at all times during the progress of the work. It may be necessary to provide and place steel plating in order to provide access for vehicular traffic. The Contractor shall phase the work to ensure that access to each residence and business is provided at all times. Commercial driveways shall be provided with at least 10 feet wide of unobstructed opening at all times, except as outlined below.
Subject to the notification of property owners and authorized in advance by the Engineer in writing, temporary closure of driveways may be allowed per these Specifications. However, unless a driveway is being reconstructed, a driveway shall not remain closed outside of the hours of work as specified in the section titled, “Authorized Working Days and Times” of the Special Conditions unless otherwise authorized by the Engineer. If a property has more than one driveway, no more than one driveway closure will be allowed at any time unless otherwise authorized by the Engineer.
In the case of driveway reconstruction, a driveway shall not remain closed or inaccessible for more than five continuous working days (beginning on a Monday), to allow for demolition, preparation, PCC installation and, unless otherwise authorized by the Engineer. Prior to closure of driveways, the Contractor shall coordinate and notify the property owner or resident at least twice of such closure. Closure notices shall be given to the property owner and/or resident 24 hours and one hour prior to each closure. A copy of the closure notice shall be furnished to the Engineer for review and approval prior to each closure.
Contractor shall file, with the Engineer and Police Department, the name and telephone number of company representative (provide minimum two contacts) to be notified after normal working hours and on weekends, in case of emergency. This information shall be provided at the preconstruction conference. If a preconstruction conference is not held, it shall be provided to the Engineer prior to the start of work.
Contractor shall submit, prior to or at the preconstruction conference, a Traffic Control Plan (TCP) which conforms to all requirements of the Standard Specifications, these Specifications, and the City’s Temporary Traffic Control Plan Guidelines (Appendix B). The TCP shall be prepared by a company/Contractor who is knowledgeable (trained and/or certified) in proper preparation of traffic https://dot.ca.gov/-/media/dot-media/programs/traffic-operations/documents/mobility/cms-guidelines-april-2021.pdf https://dot.ca.gov/-/media/dot-media/programs/traffic-operations/documents/mobility/cms-guidelines-april-2021.pdf
City Project No. 33ST27PW03 Page 6 control plans. This TCP shall include all lane closures, construction area signs, flag protection, changeable message signs, detours, and parking prohibitions. TCPs shall conform to the most current edition of the “California Manual on Uniform Traffic Control Devices”. No work will commence prior to the submittal and approval of a satisfactory traffic control plan. A TCP will not be deemed satisfactory unless it conforms to the requirements of the aforementioned manual.
More than one TCP may be required for different phases of the work, and each traffic control plan shall conform to the requirements of these Specifications and the Standard Specifications.
Contractor shall provide pedestrians with reasonably safe, convenient, and accessible paths that replicate as nearly as practical the most desirable characteristics of the existing sidewalks or footpaths. The Contractor shall submit a Pedestrian Control Plan (PCP) for the review and approval of the Engineer at the time of the submittal of the Traffic Control Plan. The PCP shall provide a safe path of travel for pedestrians within the construction site and shall provide access to the corner ramps during construction. The Contractor shall provide the appropriate safety barriers, including water barriers, required when directing pedestrians into the roadway. The PCP shall follow requirements set forth in the most recent CA MUTCD including the use of water barriers and other approved safety devices for the protection of pedestrians. Pedestrians shall not be detoured more than two (2) blocks or over weekends or holidays unless approved by the Engineer.
At the end of each working day, if a difference in excess of 0.17-foot exists between the elevation of the existing pavement and the elevation of any excavation within eight (8) feet of the traveled way, material shall be placed and compacted against the vertical cuts adjacent to the traveled way.
During excavation activities, native material may be used for this purpose. The material shall be placed to the level of the elevation of the top of the existing pavement and tapered at a slope of 4:1 or flatter to the bottom of the excavation. In the case of PCC curb ramps, there shall be no difference between the elevation of the existing bottom of ramp and the elevation of the existing pavement; ADA compliance shall be maintained for areas open to the public.
MEASUREMENT AND PAYMENT – The Contract lump sum price for Traffic Control includes full compensation for providing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in this section, including preparation of traffic control & pedestrian control plan, the placement of material on a 4:1 slope, regardless of the number of times it is required, and subsequent removing or reshaping of the material to the lines and grades shown on the plans, complete in place, as described in the Contract and these Specifications, as directed by the Engineer, and no additional compensation will be allowed therefor.
The Contract unit price paid for each Changeable Message Board Signs includes full compensation for providing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in this section, complete in place, as described in the Contract and these Specifications, as directed by the Engineer, and no additional compensation will be allowed therefor.
2.04 Lane Closure Requirements and Conditions
Lane closures, if authorized by the Engineer, shall conform to the provisions in the section titled, "Maintaining Traffic," of these Specifications.
The term closure, as used herein, is defined as the closure of a traffic lane or lanes, including ramp or connector lanes, within a single traffic control system.
LANE CLOSURE SCHEDULE
By noon Monday, the Contractor shall submit a written schedule of planned closures accompanied by a Traffic Control Plan for the following week period, defined as Friday noon through the following Friday noon.
The Closure Schedule shall show the locations and times when the proposed closures are to be in effect. Closure Schedules submitted to the Engineer with incomplete, unintelligible, or inaccurate
City Project No. 33ST27PW03 Page 7 information will be returned for correction and resubmittal. Contractor will be notified of disapproved closures or closures that require coordination with other parties as a condition of approval.
Amendments to the Closure Schedule, including adding additional closures, shall be submitted to the Engineer, in writing, at least three working days in advance of a planned closure. Approval of amendments to the Closure Schedule will be at the discretion of the Engineer.
No lane closures will be allowed overnight.
MEASUREMENT AND PAYMENT – The Contract lump sum price for Traffic Control includes full compensation for providing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in this section, complete in place, as described in the Contract and these Technical Specifications, as directed by the Engineer, and no additional compensation will be allowed therefor.
2.05 Traffic Control System for Lane Closure
A traffic control system for lane closures, if authorized by the Engineer, will consist of closing traffic lanes and the provision of traffic detours, including but not limited to, furnishing, installing, maintaining and removal (when no longer required) of traffic control devices in accordance with the provisions of the sections titled “Prequalified and Tested Signing and Delineation Materials,” of the Special Conditions and “Maintaining Traffic” and “Construction Area Signs,” and these Specifications.
The provisions in this section will not relieve the Contractor from the responsibility to provide such additional devices or take such measures as may be necessary to comply with the provisions in the section titled “Safety Precautions and Programs,” of the General Conditions and the Special Conditions.
The adjustment provisions in Section 4-1.05, "Changes and Extra Work," of the Standard Specifications shall not apply to the item of traffic control. Adjustments in compensation for traffic control will be made on a force account basis as provided in Section 9-1.04, "Force Account," of the Standard Specifications for increased work and estimated on the same basis in the case of decreased traffic control required by changes ordered by the Engineer to pre-approved traffic control plans.
The cost of furnishing, installing, maintaining, and removing signs, sign covers, lights, flares, temporary railing, barricades, flagmen, guards, and all construction area traffic control devises will be borne by the Contractor.
MEASUREMENT AND PAYMENT – The Contract lump sum price paid for Traffic Control includes full compensation for furnishing all labor (including flagging and signs), material, tools, equipment, and incidentals, and for doing all the work involved in conforming to the provisions of this Section, including but not limited to placing, removing, storing, maintaining, moving to new locations, replacing, and disposing of the components of the traffic control system, complete in place, as described in the Contract and these Specifications, as directed by the Engineer, and no additional compensation will be allowed therefor.
2.06 Temporary Pavement Delineation
Temporary pavement delineation shall be furnished, placed, maintained, and removed in conformance with the provisions in Section 12-6, "Temporary Pavement Delineation," of the Standard Specifications and these Specifications. Nothing in these Specifications will be construed as reducing the minimum standards specified in the California Manual on Uniform Traffic Control Devices for Streets and Highways published by the Department or as relieving the Contractor from the responsibilities specified in the section titled, “Safety Precautions and Programs,” of the General Conditions and the Special Conditions. Under this section, pavement delineation shall also include pavement legends and crosswalks.
City Project No. 33ST27PW03 Page 8
Whenever the work causes obliteration of pavement delineation, or when no pavement delineation existed prior to the Contractor’s activities but said activities alter the typical pattern of traffic, temporary or permanent pavement delineation shall be in place prior to opening the traveled way to public traffic. Laneline, centerline, and crosswalk pavement delineation shall be provided at all times for traveled ways open to public traffic. Contractor shall provide for pavement delineation when traffic is allowed on aggregate base.
The temporary reflective pavement markers shall be placed in conformance with the manufacturer's instructions and shall be cemented to the surfacing with the adhesive recommended by the manufacturer, except epoxy adhesive shall not be used to place the pavement markers in areas where removal of the pavement markers will be required. For temporary pavement delineation of stop bars and crosswalks, the Contractor shall use reflective striping tape only.
MEASUREMENT AND PAYMENT – The Contract lump sum price paid for Traffic Control includes full compensation for furnishing all labor (including flagging costs), material, tools, equipment, and incidentals, and for doing all the work involved in conforming to the provisions of this Section, including but not limited to placing, removing, storing, maintaining, moving to new locations, replacing, and disposing of the components of the traffic control system, complete in place, as described in the Contract and these Specifications, as directed by the Engineer, and no additional compensation will be allowed therefor.
Part 3 – Earthwork
3.01 Dust Control
Contractor shall know and comply with the General Conditions and Special Conditions for Project Site Conditions and Maintenance and the provisions in section 1.10.02 "Water Pollution Control," of the City Standard Specifications.
Contractor shall be familiar with and comply with all monitoring, reporting, notifications, and control requirements of agencies having jurisdiction over air quality.
Contractor shall prevent the formation of an airborne dust nuisance by watering work areas as required until the project is completed and accepted. The amount of water used shall not be excessive to cause soil carry-over or wash-off outside the boundaries of the working area. If soil wash-off occurs, the Contractor shall immediately notify the Engineer and identify the area where wash-off occurred. Contractor shall provide polyethylene sheeting to place underneath and over any stockpiled soil, unless otherwise directed by the Engineer. The stockpile shall be covered daily after completion of work. The sheeting shall be adequately weighted or secured to keep the sheeting in place during non-work periods.
MEASUREMENT AND PAYMENT – The Contract lump sum price for Water Pollution Control includes full compensation for providing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in this section, complete in place, as described in the Contract and these Specifications, as directed by the Engineer, and no additional compensation will be allowed therefor.
3.02 Clearing, Grubbing, and Landscape Restoration
Contractor shall know and comply with the requirements of Section 17-2, “Clearing and Grubbing,” of the Standard Specifications and the sections titled, “Project Site and Nearby Property Protections” of the Special Conditions.
Clearing and grubbing includes the removal and disposal of all vegetation, objectionable material including vines, logs, upturned stumps, downed trees, concrete, masonry, loose rocks and debris, and other items within the construction areas in order to perform the work. Within the limits of clearing, the areas below the natural ground surface shall be grubbed to a depth necessary to remove all roots, buried logs and all other objectionable material. In areas where PCC will be placed, objectionable material shall be removed to firm undisturbed mineral soil only.
City Project No. 33ST27PW03 Page 9
Landscape restoration includes the removal, relocation, replacement, height adjustment, and disposal of landscaping and irrigation equipment within the construction areas, as shown on the Plans and as directed by the Engineer. The Contractor shall salvage (reuse or return items to the property owner) existing landscaping materials, including turf, to the greatest extent possible.
All existing vegetation, highway facilities, and private property that have not been identified for removal or relocation, shall be protected from injury or damage. In the event that existing vegetation and/or facilities to remain are damaged by the Contractor’s activities, the Contractor shall replace the damaged items in kind and to the satisfaction of the property owner and the Engineer. Such items may include, but are not limited to, the reconnection of landscape electrical and/or irrigation to function as did prior to the Contractor’s activities.
Tree branches extending from private property over the public right of way shall only be removed per the Engineer’s direction. Trees to be removed less than 6-inches DBH (Diameter at Breast Height), as marked by the Engineer, will be included in this section. Tree diameters are measured at approximately 4.5 feet above existing grade, further described as DBH.
Construction and/or demolition debris, including but not limited to vegetative matter, trees, roots, chips, etc., shall be hauled off site and disposed of by the Contractor at the end of each workday.
Nothing herein will be construed as relieving the Contractor of the Contractor’s responsibility for final cleanup of the highway. Contractor shall know and comply with the requirements of the section titled, “Finishing Work,” of these Specifications.
MEASUREMENT AND PAYMENT – The Contract lump sum price for Clearing, Grubbing, and Landscape Restoration includes full compensation for providing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in this section, including the removal of trees less than 6 inches DBH complete in place, as described in the Contract and these Specifications, as directed by the Engineer, and no additional compensation will be allowed therefor.
3.03 Earthwork
Contractor shall know and comply with the requirements of Section 19, "Earthwork," of the Standard Specifications and the section titled “Existing Facilities” and “Finishing Work,” of these Specifications.
Upon the Engineer’s approval of the subgrade, placement of the aggregate base material may proceed.
Contractor shall know and comply with the requirements of the section titled, “Project Site Conditions and Maintenance,” of the General Conditions or Special Conditions. All surplus excavated material will become the Contractor’s property and shall be disposed of accordingly.
MEASUREMENT AND PAYMENT – The Contract lump sum price for Cold Plane includes full compensation for providing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in this section, complete in place, as described in the Contract and these Specifications, as directed by the Engineer, and no additional compensation will be allowed therefor.
3.04 Finishing Work
Finishing Work includes performing finishing activities after completing all other construction activities.
Clean out sewers, culverts, and other drainage facilities and appurtenant structures constructed under the Contract.
Topsoil for filling and conform grading between the curb and sidewalk and filling, conform grading, and shaping behind the curb, sidewalk, and within the project area shall consist of 50% loam and
City Project No. 33ST27PW03 Page 10
50% nitrogen fortified redwood sawdust or approved equal and be free from deleterious substances such as litter, refuse, toxic waste, stones larger than 1 inch in size, coarse sand, heavy or stiff clay, brush, sticks, grasses, roots, noxious weed seed, weeds, and other substances detrimental to plant, animal, and human health. Graded surfaces shall not contain slopes greater than 2:1.
The Contractor shall test all repaired and/or replaced irrigation systems. Once complete, the Contractor shall demonstrate to the Engineer that the repaired and/or replaced facilities operate properly.
Contractor shall not bury sewer clean outs, water meters, culverts, and other drainage facilities and appurtenant structures while backfilling topsoil.
Do not stockpile material on finished pavement or allow material to drift across pavement. Clean finished pavement of dirt and foreign material. Cleanup of the roadway of all construction debris at the end of each workday shall be included as part of this section.
MEASUREMENT AND PAYMENT – The Contract lump sum price for Clearing, Grubbing, and Landscape Restoration includes full compensation for providing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in this section, complete in place, as described in the Contract and these Specifications, as directed by the Engineer, and no additional compensation will be allowed therefor.
Part 4 – Existing Facilities
4.01 General
Contractor shall know and comply with the requirements of Project disposal.
Performing work on existing facilities includes abandoning, adjusting, modifying, obliterating, reconstructing, relaying, relocating, remodeling, removing, repairing, resetting, or salvaging a facility.
Do not perform work on existing facility until the facility is no longer needed.
Reconstructed facilities must comply with the design of and be equal to the best parts of the existing facilities.
Reconstruction work must comply with the specifications for new work of similar materials.
If during work activities damage occurs to a facility or a portion of the facility to remain in place, or to materials to be salvaged or incorporated into the work, the Contractor shall repair or replace it.
The repair or replacement must be equal or better in quality than the original portion.
4.02 Potholing
Contractor shall know and comply with the requirements of the current edition of the USA North’s California Excavation Manual, and the sections titled, “Property and Facility Preservation” and “Order of Work,” of these Specifications.
For bidding purposes, the Contractor shall assume that each parcel is served with by a water lateral, sewer lateral and gas lateral. The Contractor shall confirm the location of each lateral in the field and shall pothole all identified laterals to determine the depth and identify any conflicts, prior to commencing paving activities.
Storm sewer, sanitary sewer, water, gas mains and communications duct banks are known to exist underneath the pavement within the project limits. The Contractor shall be responsible to pothole these underground utilities to confirm grinding, pavement removal and digout excavations can be completed with sufficient clearance to not disturb existing utility lines. Any damage caused to underground utilities shall be repaired by the Contractor at their expense, with no additional costs to the City.
City Project No. 33ST27PW03 Page 11
At the Contractor’s option, potholing shall be either performed by hand digging or by vacuum excavation.
Hand digging will be performed by excavating a pothole by manual means with handheld, non-mechanical equipment such as a shovel or hand auger.
Vacuum excavation will consist of air or water pressure to break up the soil and a vacuum device to collect the spoils. The Contractor shall determine if air or water vacuum excavation will be used dependent upon specific site and environmental characteristics. Soil types such as heavy clay may require water vacuum excavation. Air vacuum excavators shall be utilized if mud from water vacuum excavators cannot be disposed of properly. Air vacuum excavators shall be used if damage to utilities, such as cutting through cables, could occur with the use of water vacuum excavators. USA North and all facility owners shall be notified prior to start of work if vacuum excavation method is to be used.
1. Air: Air vacuum excavators shall utilize a high velocity air stream to penetrate, expand, and break up the soil. The loosened particles of soil and rock shall be removed from the excavation through the use of a vacuum.
2. Water: Water vacuum excavation systems shall excavate the pothole using high pressure water to reduce and loosen the soil. The wet soil and mud slurry shall be removed to a spoil tank using a vacuum.
Contractor shall notify the appropriate regional notification center for operators of subsurface installations at least two working days, but not more than fourteen (14) calendar days, prior to commencing excavation or other work close to any underground pipeline, conduit, duct, wire, or other structure.
The regional notification centers include, but are not limited to, the following:
Notification Center Telephone Number
Underground Service Alert Northern California
(USA)
1-800-642-2444
1-800-227-2600
Potholes shall be sawcut round with a maximum size of twelve (12) inches in diameter unless otherwise directed by the Engineer.
The construction drawings shall be compared to locate paint marks to determine if all existing utilities shown on the drawings have been identified in the field. If the drawings and located paint marks do not match, additional potholing shall be completed to determine accurate locations.
If the locate paint marks have improperly designated the location of a facility, and the facility is exposed during potholing, the facility owner and the Engineer shall be notified. The entity that exposed the facility shall document the horizontal and vertical location of the facility and communicate the information to the facility owner. If a utility cannot be located through potholing used in conjunction with construction drawings and locate marks, the facility owner and the Engineer shall be contacted.
Conditions requiring potholing:
1. Open-Cut and Roadway Excavations: Potholing shall be completed to expose existing utilities, including mains and service lines, when open cut excavations are within tolerance zone of the marked utility. The tolerance zone, also known as the “approximate location”, is a strip of land equal to the width of the underground utility plus twenty-four (24) inches on each side.
2. Trenchless Installation Methods: For trenchless activities with a bore path that parallels a utility (mains and service lines) within three (3) feet, potholing shall be completed at the beginning and the end of each bore and every fifty (50) feet along the route. For trenchless activities with a bore path that parallels a utility (mains and service lines) within five (5) feet, City Project No. 33ST27PW03 Page 12 potholing is required at the beginning and end of the bore and every two hundred (200) feet along the route. Potholing shall be completed for all utilities, mains, and service lines) crossing the path of trenchless activities.
3. Congested Utilities: In congested areas having several facilities in close proximity and/or are crossing each other, locations have greater potential to be less accurate. Potholing shall be utilized for excavations near congested utility areas.
Facilities exposed during potholing shall be protected throughout the project. Utilities that are rendered unsupported due to potholing shall be temporarily supported by shoring or other means.
The utility shall be protected from heavy and sharp items falling into the excavation that could damage or cut the facility.
Potholes shall be restored by the end of the workday after the utility has been located, or as otherwise directed by the Engineer. Potholes shall be backfilled with a slurry cement backfill conforming to Sections 19-3.02E, “Slurry Cement Backfill,” and 19-3.03F, “Culvert Bedding” of the Standard Specifications, unless otherwise directed by the Engineer. All potholes located in asphalt concrete shall have the edges tack oiled and permanently paved to match the existing asphalt concrete thickness (minimum 4”). The Contractor shall know and comply with the requirements of the sections titled, “Hot Mix Asphalt (HMA),” of these Specifications. The repair of potholes in concrete driveways and sidewalks requires the removal and replacement of the concrete to score lines unless otherwise authorized by the Engineer. The Contractor shall know and comply with the requirements of the section titled, “Miscellaneous Concrete Construction,” of these Specifications.
Contractor shall pothole five days prior to beginning any excavation all buried utilities and other man-made objects throughout the proposed work area of work, check for conflicts, and provide all pothole data and written notice of any suspected conflicts between existing and proposed facilities.
Said pothole data and written notice shall be provided to the Engineer not less than 14 working days prior to beginning any such excavation.
MEASUREMENT AND PAYMENT – The Contract lump sum price for Potholing includes full compensation for providing all labor, materials, tools, equipment, and incidentals and for doing all the work involved in this section, complete in place, as described in the Contract and these Specifications, as directed by the Engineer, and no additional compensation will be allowed therefor.
4.03 Concrete Removal
Work associated with concrete removal includes the removal and disposal of all concrete including curb, gutter, driveway, sidewalk, cross gutter, asphalt concrete, sidewalk & curb/gutter for new curb ramps, and other PCC to the subgrade depth as shown in the plans and as directed by the Engineer.
It is the Contractor’s responsibility to take appropriate care to locate/pothole existing utilities.
Utilities as represented on the plans are approximate in horizontal location and unknown in vertical depth. The Contractor shall know and comply with the requirements of the section titled, “Potholing,” of these Specifications.
The Engineer will mark out the limits of the concrete to be removed and replaced.
The planter strip, between curb and sidewalk, may have homeowner improvements, such as irrigation, concrete flatwork, masonry work, mailboxes, and/or landscaping (i.e. decorative rock, brick, ground cover, etc.). The Contractor shall protect these improvements in place unless otherwise directed by the Engineer. Concrete flatwork shall be disposed of by the Contractor and masonry work shall be salvaged and given to the homeowner. When these improvements physically conflict with the work, the Contractor will be responsible for the removal and replacement of the improvements in kind, including mailbox, unless otherwise directed by the Engineer.
Contractor shall notify the Engineer in the event that these improvements will need to be removed.
City Project No. 33ST27PW03 Page 13
To protect all parties’ interests, the Contractor shall work with the homeowner to test all irrigation systems, in the presence of the property owner and/or the Engineer, prior to beginning demolition.
If the homeowner is not available for the testing, the Contractor shall receive a verbal confirmation from the property owner on the working state of the irrigation. The Contractor is responsible to maintain the integrity of private property. The Contractor will be responsible to replace any damaged landscaping or irrigation on private property and within the public right-of-way.
Utility identification symbols, typically “S” for sanitary sewer and/or “W” for water, may exist on some curbs. The Contractor shall reference mark these symbols prior to removal of the curb and gutter and stamp a new symbol at the location of the original symbol or the where the utility line has been identified. A new symbol shall be stamped where the underlying utilities are identified, 1/8” minimum depth, into the curing PCC, of a plain font that is easily read with a letter height of approximately 3” placed on top and face of curb.
Where curb, gutter, curb ramp, and cross gutter are to be removed, the adjacent asphalt concrete shall be sawcut to a neat line and the entire section width shall also be removed to the subgrade depth as shown on the plans.