The file's text, extracted by GovTribe without its formatting.
13 MARCH 24
PERFORMANCE WORK STATEMENT
Base Tree Removal and Trimming
GENERAL DESCRIPTION:
The contractor shall provide all materials, labor, supervision, and equipment to remove trees at the locations indicated below. All work shall conform to specifications outlined in this Statement of Work (SOW). All tree and shrub removal will include, stump grinding to 8 inches below surface, as well as removal, chipping and hauling of all wood, debris, and brush.
DESCRIPTION OF WORK: FY24 BASE Tree Removal & Trimming (One-time)
Project No.
| Travis AFB/B803 |
| The Contractor shall remove all shrubs located in front of BLDG 803. They are located next to the front entrance of the building, by the reserved parking spots. |
| Travis AFB/B575 |
| The tall tree on the SFS Dog Kennel side of B575 has a branch extending over into the hazmat yard which results in debris accumulating and creating a fire hazard. As this yard contains extremely flammable materials, the Contractor shall remove the overhanging branch to decrease fire risk. |
| Travis AFB/B179 |
| 5 trees that need to be trimmed along the west and north walls of the compound. |
| 4 |
| Travis AFB/B836 |
| 3 Trees/plants have overgrown near the south side of the building at the pavilion/break area. The Contractor shall trim the plants/trees to prevent further damage to both personal and Government vehicles. |
| Travis AFB/B250 |
| The Contractor shall remove trees that are too close to Bldg 250 and touching a gas meter. |
| Travis AFB/B50 |
| . The OG has two mid-sized trees in front of the building which need to be trimmed off. The Contractor shall not cut them down. |
| 7 |
| Travis AFB/B50 |
| One extremely large either Pine or Redwood tree between building 50 and 51 needs to be trimmed back |
| 8 |
| Travis AFB/B237 |
| The Contractor shall trim four trees around Building 237 that are growing into or over the gutters. |
| 10 |
| Travis AFB/B235 |
| 1 TREE |
| 11 |
| Travis AFB/B237 |
| 3 TREES |
| 12 |
| Travis AFB/B240 |
| 1 TREE |
| 13 |
| Travis AFB/B241 |
| 1 TREE |
| 14 |
| Travis AFB/B250 |
| 1 TREE |
| 16 |
| Travis AFB/B400 |
| 1 TREE |
| 17 |
| Travis AFB/B447 |
| 1 TREE |
| 18 |
| Travis AFB/B50 |
| 2 TREES |
| 19 |
| Travis AFB/B570 |
| 1 TREE |
| 20 |
| Travis AFB/B575 |
| 1 TREE |
| 21 |
| Travis AFB/B665 |
| 1 TREE |
| 22 |
| Travis AFB/B724 |
| 1 TREE |
| 23 |
| Travis AFB/B7690 |
| 2 TREES |
| 24 |
| Travis AFB/B7763 |
| 1 TREE |
| 25 |
| Travis AFB/B925 |
| 2 TREES |
| 26 |
| Travis AFB/B99278 |
| 1 TREE |
| 27 |
| Travis AFB/BTRAVIS WATER SYSTEM ANNEX SITE 1 |
| 1 TREE |
| 28 |
| Travis AFB/B1350 |
| 1 TREE |
| 29 |
| Travis AFB/B1353 |
| 1 TREE |
| 30 |
| Travis AFB/B525 |
| 2 X-Large and 1 Large Downed Tree Removed |
| 31 |
| Travis AFB/B243 |
| Large Downed Tree Removal |
| 32 |
| Travis AFB/North Gate Old Officer Housing |
| Large Downed Tree Removal |
| 33 |
| Travis AFB/Fisher Park |
| Medium Downed Tree Removal |
| 34 |
| Travis AFB/B1212 |
| 5 Medium trees removal. High priority bird strike hazard identified as nesting area too close to runway by USDA/60 AMW SEF. The Contractor shall remove these trees to lower probability of bird strikes |
| 35 |
| Travis AFB/Behind CATM Range |
| Removal of 11 trees (2 Small, 5 Medium, 4 Large) high priority bird strike hazard Identified as nesting area too close to runway by USDA/60 AMW SEF. The Contractor shall remove these trees to lower probability of bird strikes |
| 36 |
| Travis AFB/Behind Hangar on Taxiway. On Ragsdale St. between Building 891and 864. |
| Removal of 20 large trees, high priority bird strike hazard Identified as nesting area too close to runway by USDA/60 AMW SEF. The Contractor shall remove these trees to lower probability of bird strikes |
| 37 |
| Travis AFB/ Behind Hangar on Taxiway. On Ragsdale St. between Building 891and 864. |
| Removal of 4 medium trees, high priority bird strike hazard Identified as nesting area too close to runway by USDA/60 AMW SEF. The Contractor shall remove these trees to lower probability of bird strikes |
| 38 |
| Travis AFB/Pasture north of hot ramps |
| Removal of 2 large trees, high priority bird strike hazard Identified as nesting area too close to runway by USDA/60 AMW SEF. The Contractor shall remove these trees to lower probability of bird strikes. |
| 39 |
| Travis AFB/Adjacent to South Gate |
| Removal of 4 trees (3 Large and 1 Medium) high priority bird strike hazard Identified as nesting area too close to runway by USDA/60 AMW SEF. The Contractor shall remove these trees to lower probability of bird strikes |
| 40 |
| Travis AFB/ old wastewater treatment plant/EOD range. Perimeter Road near building 1150. |
| Removal of trees in Area of 40 Small and Medium trees, Identified as nesting area too close to runway by USDA/60 AMW SEF. The Contractor shall remove these trees to lower probability of bird strikes |
| 41 |
| Travis AFB/ old wastewater treatment plant. Perimeter Road between building 1150 and EOD Range. |
| Removal of trees in area of 100 large trees, Identified as nesting area too close to runway by USDA/60 AMW SEF. The Contractor shall remove these trees to lower probability of bird strikes |
| 42 |
| Travis AFB/ old wastewater treatment plant, just off Perimeter Road at the entrance to the EOD Range. |
| 50 medium, Removal of trees in area, 50 medium trees, Identified as nesting area too close to runway by USDA/60 AMW SEF. The Contractor shall remove these trees to lower probability of bird strikes. |
| 43 |
| Travis AFB/ old wastewater treatment plant. Just off Perimeter Road at the entrance to the EOD Range. |
| 50 small, Removal of trees in area of 50 small trees, Identified as nesting area too close to runway by USDA/60 AMW SEF. The Contractor shall remove these trees to lower probability of bird strikes. |
| 44 |
| Travis AFB/ old wastewater treatment plant. Just off Perimeter Road at the entrance to the EOD Range. |
| 7 medium, Removal of tree, Identified as nesting area too close to runway by USDA/60 AMW SEF. The Contractor shall remove these trees to lower probability of bird strikes. |
| 45 |
| Travis AFB/ old wastewater treatment plant. Just off Perimeter Road at the entrance to the EOD Range. |
| 4 small, Removal of tree, Identified as nesting area too close to runway by USDA/60 AMW SEF. The Contractor shall remove these trees to lower probability of bird strikes |
ADDITIONAL REQUIREMENTS:
1. All work shall be performed during the hours of operation from 0800-1600 Monday through Friday excluding federal holidays. All debris shall be removed by the contractor and grounds, sidewalks, parking lots, and streets will be kept in a neat/orderly condition.
2. Prior to tree removal, the Contractor will receive an Environmental Safety brief from the Environmental Protection Specialist (CEIE) and any issue that may arise from the instruction of the brief shall be reported immediately to the project POC.
3. The Contractor is responsible for any damage done to the grounds, such as ruts in grass or damage to structures. Damages shall be repaired before completion of work.
4. It is the contractor’s responsibility to comply with the local laws, codes, and regulations in the performance of the requirements of the SOW.
5. The Contractor shall field verify all trees measurement and any other requirements before the start of work.
6. All trees identified as removal shall be stump grinded.
7. Trees identified as removal (stump grind) within a non-irrigated lawn shall be grinded down 8 inches below the grounds surface and back filled with dirt and compacted to match existing ground grade. Trees identified for stump grind within an irrigated lawn must be grinded down 8 inches below the grounds surface and back filled with dirt and lay sod to match existing ground grade.
8. Trees identified as trim must be trimmed 8 feet up and around from the ground and 14 feet from any road. Trees that touch a building must be trimmed 3 feet clearance from the building. Palm trees are to be trimmed up to the first 90-degree limb, leaving no drooping limbs.
9. All stumps shall be grinded down 8 inches below the surface of the ground.
10. Wood chips shall be hauled off site that are in the interior of the base. Wood chips at the Union Creek location will be spread out, not leaving mounds of wood chips.
11. Materials storage and clean up. Clean up and removal of all debris must be accomplished at the end of each day’s work.
12. Working conditions: Contractor shall perform work in such a manner as to cause minimum interference to facility and surrounding areas utilities:
13. Approved staging area for parking vehicles overnight will be in the parking lot directly west of fuel tanks on Hangar Ave.