This document is a Performance Work Statement (PWS) for a one-time project to remove and trim trees at various locations on Travis Air Force Base.
The PWS provides a detailed description of the work required, including removing trees in three size categories (small, medium, and large), trimming trees up to 14 feet from the ground and 3 feet from buildings, grinding stumps 8 inches below ground, and hauling away all debris. The work must be completed by June 27, 2024, and the contractor must coordinate with the Environmental Protection Specialist prior to starting. Approved staging areas are provided. The PWS is accompanied by a federal contract opportunity for the required tree trimming and removal services, with a solicitation number of FA442724Q0081. The contracting agency is the Department of the Air Force, Air Mobility Command.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Combo Tree Trimming Amendment 4.pdf | ||
| Combo Tree Trimming Amendment 3.pdf | ||
| Combo Tree Trimming Services Amendment 2.pdf | ||
| Combo Tree Trimming Services Amendment 1.pdf | ||
| Tree Trimming and Removal - PWS (Final).docx | DOCX document | |
| Combo Tree Trimming Services.pdf | ||
| Grounds Maintenance Map PRIDE.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
21 JUNE 24
PERFORMANCE WORK STATEMENT
Base Tree Removal and Trimming
Amendment 2
GENERAL DESCRIPTION:
The contractor shall provide all materials, labor, supervision, and equipment to remove trees at the locations indicated below. All work shall conform to specifications outlined in this Statement of Work (SOW). All tree and shrub removal will include, stump grinding to 8 inches below surface, as well as removal, chipping and hauling of all wood, debris, and brush.
Tree estimates are as follows:
3" - 24” - Small 24" - 36” - Medium 36" - 42” - Large Greater than 42" – Extra Large
DESCRIPTION OF WORK: FY24 BASE Tree Removal & Trimming (One-time)
Project
No.
Location/Building # Description Qty
2 Travis AFB/B50 Trim -2 medium trees front of building 2
3 Travis AFB/B50 Removal – 2 large trees between building 50 and 51
4 Travis AFB/B50 Trim – 1 large tree off roof and make neat
30 Travis AFB/B525 Removal – 2 down tree front of building 1 X-Lg over 90in, 1 Lg 42 In
31 Travis AFB/B525 Removal – 1 down tree front of building 1 Lg
32 Travis AFB/B525 Removal – 1 tree rear side of building and debris 2 Sm 8-12 in limbs
ADDITIONAL REQUIREMENTS:
1. All work shall be performed every day during the hours of operation from 0800-1600. All work must be completed by 27 June 24. All debris shall be removed by the contractor and grounds, sidewalks, parking lots, and streets will be kept in a neat/orderly condition.
2. Prior to tree removal, the Contractor will receive an Environmental Safety brief from the Environmental Protection Specialist (CEIE) and any issue that may arise from the instruction of the brief shall be reported immediately to the project POC.
3. All trees identified as removal shall be stump grinded.
4. Trees identified as removal (stump grind) within a non-irrigated lawn shall be grinded down 8 inches below the grounds surface and back filled with dirt and compacted to match existing ground grade.
Trees identified for stump grind within an irrigated lawn must be grinded down 8 inches below the grounds surface and back filled with dirt and lay sod to match existing ground grade.
5. Trees identified as trim must be trimmed 8 feet up and around from the ground and 14 feet from any road. Trees that touch a building must be trimmed 3 feet clearance from the building. Palm trees are to be trimmed up to the first 90-degree limb, leaving no drooping limbs.
21 JUNE 24
PERFORMANCE WORK STATEMENT
Base Tree Removal and Trimming
Amendment 2
6. All stumps shall be grinded down 8 inches below the surface of the ground.
7. Wood chips shall be hauled off site that are in the interior of the base.
8. Approved staging area for parking vehicles overnight will be in the parking lot directly west of fuel tanks on Hangar Ave.