DRAFT PWS_Bremerhaven Longshoring_4.17.2025.pdf
PDF 1007 KB Posted
- Solicitation number
- TRANSCOM25R011
About this file
This Performance Work Statement (PWS) details Longshoring and Warehousing Services (L&WS) for the 950th Transportation Company at the Port of Bremerhaven, Germany, to be executed by the Military Surface Deployment and Distribution Command (MSDDC). The contract requires comprehensive port support services including loading and discharging military cargo across multiple vessel types, handling various cargo categories (vehicles, containers, breakbulk, hazardous materials), and performing terminal operations such as cargo inspection, staging, warehousing, and documentation.
The PWS specifies rigorous requirements for contractor performance, including maintaining high operational tempo, working 24/7, handling cargo weighing up to 150,000 lbs, providing contact maintenance teams, operating material handling equipment, and adhering to strict safety, security, and environmental protocols. Key operational capabilities include simultaneous work on multiple vessel decks, managing diverse cargo types, providing ramps and specialized lifting equipment, conducting cargo preparation, and supporting deployment and redeployment missions. The contract will be executed at the Port of Bremerhaven in the Federal Republic of Germany, with services compensated through a detailed Schedule of Rates covering commodity-specific handling, labor, equipment rental, and additional service charges.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFI_Cover Letter_Bremerhaven Longshoring and Warehousing.pdf | ||
| Attachment 1_Market Research Survey_Bremerhaven Longshoring and Warehousing.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT
LONGSHORING & WAREHOUSING
SERVICES (L&WS)
PORT OF BREMERHAVEN
FEDERAL REPUBLIC OF GERMANY (FRG)
950th Transportation Company
Port of Bremerhaven
Bremerhaven, Germany
Date: as of 4-11-2025
Longshoring and Warehousing Services
TABLE OF CONTENTS
Section Topic Page
1 Background & Scope 2
2 General Security Requirements 3
3 General Safety Requirements 6
4 General Contract Administration 9
5 Contractor General Requirements 22
6 Port - Terminal Specific Requirements 39
Performance Requirements Summary Table 54
Appendix A Regulations, Publications, & Forms 55
Appendix B Glossary of Terms 64
Appendix C Payment, Ordering, & Invoicing Instructions 76
Appendix D List of Acronyms & Abbreviations 80
Appendix E Foreign Entity Vetting 84
1. BACKGROUND & SCOPE
1.1 Background. The Military Surface Deployment and Distribution Command (MSDDC), headquartered at Scott AFB, IL, is an operational-level Army force designated by the Secretary of the Army (SECARMY) as the Army Service Component Command (ASCC) of the United
States Transportation Command (USTRANSCOM) and a major subordinate command of Army
Material Command (AMC). MSDDC is responsible for providing coordination worldwide for origin to destination surface traffic management support; coordinates surface and multimodal transportation contracted functions for all Department of Defense (DoD) (and other U.S.
Government (USG) entities, as authorized, and designated multinational and interagency elements). Since its establishment in 1965, MSDDC has played a vital role in our nation’s defense by providing support to the warfighter to every war, major contingency, training exercise and humanitarian relief operations where our Military forces are needed and deployed.
1.2 Scope of Service. Provide Longshoring & Warehousing Services (L&WS), in connection with the import and export of U.S. Government (USG), Defense Transportation System (DTS) sponsored cargo. All tasks shall be completed per requirements stated throughout the
Performance Work Statement (PWS) and in a manner consistent with efficiency, safety, and customer service in mind.
1.2.1. Longshoring & Warehousing Services will cover the full spectrum of all seaport terminal services, in support of vessel loading & discharge operations. L&WS shall include, but are not limited to, the capability to meet/exceed USG military timelines for cargo reception/disposition, meeting vessel/port schedules, working simultaneously in/out gating USG cargo, staging and draying cargo to/from multiple vessel(s)/deck(s), and providing warehousing as described within this PWS. Required services shall be performed within the 950th Transportation Company’s (TC)
Area of Operations (AOO) for performance 24 hours a day, seven (7) days per week, and 365 days per year for which the USG will compensate the Contractor by applicable commodity rates as designated by the Schedule of Rates (SOR).
1.2.1.1 L&WS will cover the full spectrum of managing all seaport terminal operations and U.S.
Military cargo (e.g. vehicles & trailers (wheeled & tracked), shipping containers, breakbulk, priority, sensitive, hazardous, and/or rotary/fixed wing aircraft) transitioning through the Port of
Bremerhaven, Federal Republic of Germany (FRG).
1.2.1.2 Operational tasks shall include, but are not limited to, performing terminal services that will facilitate handling heavy and large Military vehicles (operable and/or inoperable) up to
150,000 lbs. (68,038.9 kg.) in dead weight in size and in fluctuating quantities of cargo. L&WS are required to support Stevedoring and Tally & Checker contracted services on all types of vessels, commercial truck, and railcar (loading and discharging), staging, warehousing, housekeeping, port facility support, and the safekeeping/storage of excess dunnage and tiedown materials.
2. GENERAL SECURITY REQUIREMENTS
2.1 General security requirements of the Contractor defined within this section. Additional duties and requirements specific to the particular terminal(s) within the scope of this contract are further defined in Section 6 – Port - Terminal Specific Requirements, specifically Section 6.2 –
Additional Security.
2.2 The overall classification of work associated with this contract is UNCLASSIFIED.
Personnel assigned to this contract will not require access to Non-Secure Internet Protocol
Router Network (NIPRNet) applications or UNCLASSIFIED Government systems; therefore, are not authorized to obtain a Common Access Card (CAC) or Alternative Smart Card Logon
(ASCL) tokens.
2.3 Ground Rules and Constraints
2.3.1 Personnel Screening. The Contractor shall ensure all employees (to include any
Subcontractors) working with or on this contract meet USG guidelines regarding foreign national employment by screening all employees for indications of criminal, terrorism, or threat-related activity or alliances detrimental to the United States of America (USA).
2.3.1.1 The Contractor shall not employ any person under this contract who is associated to or convicted of any of these suspicions or offenses presents any unfavorable behaviors, or is simultaneously an employee of the USG. Employees or subcontracted employees refusing screening shall result in denial of applicant’s employment associated to this contract. If employment or continued employment of any Contractor employee/subcontractor is prejudicial to the interests or endangers the security of the USG, the Contractor shall make the necessary changes to remove those employees/subcontractors from interacting or engaging with US personnel.
2.3.2 Completed Screening. Once the screening process is completed, the results will be submitted to the 950th TC for review/vetting through the 598th Transportation Brigade S-2 to ensure investigative and clearance requirements were obtained before the contracted start date of the contract. Any further derogatory information found may result in access denied. Screening will be completed prior to any badge issuance. Screening maintains compliance with enhanced force protection measures through document examination, verification, biographical, and security interviews. Applicants denied access due to derogatory information may file an appeal to the Contracting Officer (CO) and 598th for review.
2.3.2.1 Persons Excluded from the Premises. The Contractor shall not allow any person(s) banned by any authority from the premises to have access to terminal facilities, equipment, or other material related to Government operations.
2.3.3 Persons with Restricted Duties. The Contractor shall not allow a person restricted by any authority from certain equipment or areas to operate that equipment or enter areas as designated by the Contracting Officer’s Representative (COR).
2.3.4 The Contractor personnel shall read and comply with applicable the DoD security regulations, policies, and procedures for access to installations and facilities.
2.3.4.1 The Contractor shall comply with all requirements associated with Installation Access
Control. The Government is not liable for any costs associated with performance delays due solely to the Contractor’s failure to comply with the applicable Port, Facility or Installation
Access Control processing requirements.
2.3.4.2 Upon termination or completion of this contract, the Contractor shall surrender all
Government supplies, materials, and equipment to the COR. In addition, the Contractor shall turn in any security badges issued to the COR on the last day of the contract or upon any termination/reassignment of a contract employee.
2.3.5 Derogatory Information. If the Government notifies the Contractor that employment of any Contractor employee is prejudicial to the interests or endangers the security of the United
States of America, the Contractor shall remove and bar that person from Military operations.
This includes security deviations/incidents and credible derogatory information on contract members during the course of the contract period. The Contractor receiving award of this contract shall make any changes necessary in the appointment(s).
2.3.5.1 The Contractor’s personnel will immediately be escorted off the premises. The
Contractor shall ensure the roles/privileges assigned to Contractor employees on the Government computing platforms are limited to the roles/privileges essential to that individual’s performance of his/her assignments. These roles/privileges can be limited or revoked by the Government for any reason.
2.3.6 Operations Security (OPSEC). Information provided during the course of performance shall only be released to personnel/entities who are providing specific services in support of the contract. The Contractor shall implement appropriate safeguards to mitigate against the release of said information to third parties external to the transportation and logistics enterprise without prior permission. The Government and the Contractor shall operate in concert to sanitize transportation related information in order to provide only the most basic elements required to satisfy the requested service. In any case where there is uncertainty or ambiguity with regard to
OPSEC protocols, the Contractor shall consult the COR and/or CO for resolution.
2.3.7 Threat Related Incidents. Persons employed by the Government will report threat-related incidents, behavioral indicators, and other matters of Counterintelligence (CI) interest specified in AR 381-12, Chapter 3, to the Facility Security Officer, the nearest Military CI
Office, the Federal Bureau of Investigation, or the Defense Counterintelligence and Security
Agency.
2.3.8 Vendor Threat Mitigation. The Contractors shall submit a semi-annual report to the CO for each first-tier foreign transportation service provider, operating as a separate legal entity, contracting directly with Contractor or its commonly owned legal affiliate, which has employees who may have physical contact with USG shipments in the ordinary course of contract performance. See Appendix E for further instruction for this requirement. Compensation for services defined in this paragraph are included in all commodity rates established in the SOR.
2.3.9 Vehicle Identification. The Contractor shall obtain port/pier access clearance for any vehicles used in performance of this contract. The Contractor shall submit a comprehensive list of vehicles required for the duration of this contract. That list shall be provided to the 950th TC
COR/Security Manager within two (2) calendar days of contract award date. The list shall identify vehicle type, license plate, and owner/company name.
2.3.9.1 Personal Owned Vehicles (POV) shall not be authorized entry in and around USG cargo unless identified as an “official” vehicle critical to the Contractor work. When submission of a new vehicle is necessary, only substitutions are acceptable to maintain a reasonable number of cleared vehicles authorized entry. The USG reserves the right to deny any Contractor vehicle for any reason at their discretion.
2.3.10 Security Regulation Guidance. Security Regulation Guidance found athttps://www.esd.whs.mil/Directives/issuances/dodi/. From that page, select the “DoD
Issuances” drop down menu, then select “DoD Instructions, ” and search “Security” in the key words box to find instructions and guidance regarding Security Regulations.
2.4 Privacy Information. The Contractor and COR/Alternate Contracting Officer’s
Representative (ACOR) must ensure all personnel information collected, maintained, used, or disseminated is relevant and necessary to accomplish the contract. Contractor will collect information to the greatest extent practicable directly from and inform the individual of the reason collection of the information is required; authority for collection; who and for what purpose; whether disclosure is mandatory or voluntary; and the impact of not providing the information. Contractor and COR/ACOR will establish appropriate administrative, technical, and physical safeguards for protection of paper and documentation involved to ensure security of records and prevent compromise or misuse during storage, transfer, or use, including transiting authorized alternative worksites. Privacy information collected must comply with host nation, DoD and Army Privacy Act regulations, whichever is more stringent.
2.5 Badges. All Contractor personnel (permanent, temporary, or subcontracted) hired directly or indirectly by the Contractor performing work under this contract shall have in their possession, and display when required, a current Workers Identification Badge issued by the Port of Bremerhaven. The Contractor shall ensure all personnel are in compliance with this requirement.
2.6 Cybersecurity. The services designated under this contract are “operationally critical support” as defined in Defense Federal Acquisition Regulation Supplement (DFARS) 252-204-
7012, Safeguarding Covered Defense Information and Cyber Incident Reporting.
3. GENERAL SAFETY REQUIREMENTS
3.1 General Safety Requirements of the Contractor are defined within this section.
Additional duties and requirements specific to the Port of Bremerhaven within the scope of this contract are further defined in Section 6 – Port - Terminal Specific Requirements and Section 6.3
– Additional Safety Requirements. Federal Acquisition Regulation (FAR) 52.236-13(a) and
Alternate 1(f) apply unless otherwise specified.
3.2 Enforcing and Monitoring Safety. The Contractor shall comply with, enforce, and monitor applicable USG safety and fire regulations. The COR will log any discrepancies within the defined quality performance process. The Contactor shall establish and maintain an effective and comprehensive safety program. The Contractor shall acquire, maintain, and require the use of safety equipment, personal protective equipment (PPE) (29 CFR 1917.91-95/1918.101-106), and devices necessary to protect employees at all times while working Military Operation at the
Port of Bremerhaven on all vessel(s) laden with military vehicle/equipment.
3.2.1 Safety Program Manager. The Contractor shall provide as part of its management staff a dedicated Safety Program Manager (SPM) and/or alternants as needed for each operation. The
Contractor shall ensure the SPM is assessable and on site to observe all USG Operations.
Contractor personnel, to include subcontractors, shall ensure the Contractor’s safety practices are monitored, damage/injury is investigated, and make corrections when deviations or departures from safety are observed.
3.2.2 Accident Prevention/Safety Program. The Contractor shall provide to the COR within two (2) calendar days of contract award date their written plan for Accident prevention/safety program for port/terminal operations at the Port of Bremerhaven per FAR 52.236-13, Accident
Prevention and DA Pamphlet (PAM) 385-10.
3.2.3 Safety Stop. The USG reserves the right to call “safety stop” of the Contractor’s operations when/if the Safety Officer, COR, or other USG representative observes or reports unsafe practices, safety infractions or safety violation(s); where harm to life, damage to property, or unsafe practices are present/possible. The COR shall inform the contractor to “stop work” directing the contractor to “stand-by”. The Contractor’s operations shall not resume until all practices, infraction, or violations have been addressed and corrected and/or revises their methods of operation to correct the safety issue and brings together all personnel for a safety briefing to the Safety Officer or their representative satisfaction. The USG will not compensate the Contractor for any time spent on “stand-by” or lost time incurred due to safety violation/infraction. The USG may hold the Contractor liable for any costs incurred to the USG resulting from operations halted due to the Contractor’s unsafe practice or violation, and all safety violation/infraction shall be documented.
3.2.4 Safe Working Load, Lift trucks, and Cranes. The Contractor shall adhere to local authority, German Occupational Safety and Health Act (ArbSchG), and DoD standards for “safe working load” for all Contractor Furnished Equipment (CFE) & Material Handling Equipment
(MHE) to include all cranes (ship or shore). The Contractor shall adhere to all safety requirements when lifting cargo. The Contractor shall ensure all CFE/MHE driver/operators are
Powered Industrial Truck (PIT) certified FRG equivalency. Only trained and competent operators shall be permitted to operate a powered industrial truck. All PIT operators must be trained and certified by their organizations [29 CFR 1910.178(l)] or and have in their possession a PIT card. The PIT card shall designate all CFE/MHE that driver/operator are trained to operate
[29 CFR 1910.178(l)(6)]. Crane Operators shall be certified to meet ArbSchG or Occupational
Safety and Health Administration (OSHA) standards [29 CFR 1926.1427].
3.2.5 Personal Protective Equipment (PPE) Safety/Hazard Analysis. The Contractor shall ensure all Contractor personnel, to include its Subcontractors, have and wear proper PPE. The
Contractor shall provide the COR with a Safety/Hazard analysis that defines the proper PPE required to be used and/or worn when engaged in terminal or port operations. The safety/hazard analysis shall be provided to the COR within two (2) calendar days of contract award. The COR and Safety Officer will monitor, and report PPE usage based on the Safety/Hazard analysis. The
Contractor shall provide the COR within two (2) calendar days a new/updated Safety/Hazard analysis if/when changes in operational scope occur.
3.3 Contractor Safety Briefings. The Contractor shall conduct and document safety briefings for all workers by name prior to all vessel/terminal service/operations and at each shift change. The Contractor shall provide a mandatory safety briefing to new personnel as they are added. The Contractor shall conduct safety briefings with the presence of a MSDDC USG representative. The COR or MSDDC Safety Officer may also participate in these briefings. The job Safety/Hazard analysis should be the basis for safety brief content. The Contractor shall conduct safety briefings in the English language and the language understood by the labor/workers.
3.4 USG Safety Briefing. The USG, at its discretion, may conduct additional safety briefings when necessary and per local Commander’s guidance. The USG’s safety briefing may include information from above or other necessary Command-related information or additional safety concerns. Compensation (unless for safety violation) for the Contractor’s labor shall be placed on stand-by time and compensated per Schedule 2 of the SOR. No compensations shall be made to the Contractor for safety stop/violations.
3.5 Reporting Accidents, Injuries and Damage
3.5.1 Reportable Accident, Injuries or Damage Reporting. The USG requires reporting of any situations that result in injury or death to any personnel or damage to USG cargo or commercial property. The Contractor shall immediately notify the COR of any incident and/or accident that results in injury or death to any personnel or damage to USG cargo or commercial property during or arising from performance under this contract. The Contractor shall submit accident investigation reports to the COR and USG Safety Officer as mandated in Reporting
Timeline Requirements listed below.
3.5.1.1 The Contractor shall submit documentation to the COR verifying the qualifications and task training for each employee involved in the incident/accident.
3.5.1.2 The Contractor shall submit all maintenance records for CFE/MHE involved in any accident or incident involving injury.
3.5.1.3 The Contractor shall assist the USG during any incident and/or accident investigation.
3.5.2 Preserve Critical Evidence. The Contractor shall secure the accident location and preserve critical evidence. The Contractor shall allow USG personnel access to the location, all evidence, and all Contractor-employee witnesses, to include operators involved in the accident.
The Contractor shall ensure that operations do not resume until cleared by the COR, MSDDC
Safety Officer, and local authorities.
3.5.3 Reporting Timelines and Requirements
3.5.3.1 Within 8 Hours: Accident Information required from Contractor of incident if severe damage to equipment, hospitalization of employees, or loss of life:
• Date and time of incident
• Location of incident
• Brief synopsis of the accident, to include injured personnel, equipment damaged, and description of activity during the incident
• Supervisor name and contact information
• List of employees involved and/or who witnessed the incident
• Extent of injuries and if medical treatment was administered
3.5.3.2 Within 24 hours: Accident Information required from Contractor:
• Information from 3.5.3.1
• Status of injured personnel
• Pictures of affected equipment
• Training certificates/licenses for personnel involved in incident
• Maintenance records of equipment involved in incidents
3.5.3.3 Within 30 Calendar Days (or sooner if investigation is complete) Accident
Information required from Contractor:
• Findings identifying the root cause(s) of the accident
• Corrective actions taken to prevent recurrence
• Follow-on status of any injuries from 24-hour status
• Final incident report from Contractor’s safety representative to COR
3.6 Posted Speed Limits. The Contractor shall enforce all posted port speed limits for all vehicle traffic per local port directives. The U.S. Government (USG) establishes the following vehicle speed limits for military vessel/terminal operations at all piers, terminals, and ports, unless otherwise specified:
• Inside Vessels, on Vessel Ramps, and/or Docks/Piers: 5 mph (walking speed)
• Staging Areas: 10 mph
• Roadways to/from Staging Areas to Vessels: 10 mph
• CFE/MHE 10 mph / on vessels 5 mph
3.7 Vehicle Safety. During all operations, the Contractor shall not leave any vehicle (military or commercial) unattended when the engine is running or if breaks are not operational.
3.7.1 Military vehicles/trailers with air braking systems that have been determined to be inoperable (i.e., air system have been compromised, brakes have been caged or considered freewheeling) shall not be left unattended. Vehicles in this condition must be labeled clearly on all sides “NO BRAKES.” Vehicles parked in staging lots shall have all wheels or tracks chocked blocked and trailers shall remain attached to its prime mover or, if orphaned, have hand brakes set or wheels chocked blocked.
3.7.2 Fire Extinguisher & First Aid Kit. The Contractor shall provide and ensure all
CFE/MHE used in military operation shall have mounted fire extinguishers and First Aid Kits with an up-to-date inspection sticker/documentation and inspected monthly.
3.8 Vessel Safety. During vessel operations, the Contractor shall not let vehicles remain idle across watertight door areas. Maintain only one vehicle at a time, moving on vessel ramps, and test vehicle brakes before moving any vehicle.
3.8.1 The Contractor shall provide ramp guards stationed at all vessel ramps in use to direct traffic, monitor foot traffic, and alert personnel when vehicles are traversing ramps. All ramp guards shall have whistles and flashlights in addition to PPE. Compensation for services defined in this paragraph are included in all commodity rates established in the SOR.
4. GENERAL CONTRACT ADMINISTRATION
4.1 General contract administration defined within this section and additional administrative requirements specific to the particular terminal(s) within the scope of this contract are further defined in Section 6.4 (Additional Administrative).
4.1.1 Port Licensing and Permits. The Contractor or its named Subcontractor shall possess a valid and current Business License (BL) issued by Port of Bremerhaven, as well as a work permit issued by the Federal Republic of Germany (FRG) as evidence that the Contractor or its named Subcontractor(s) has legal right to work in/at the Port of Bremerhaven. The Contractor shall provide documentation/copies (Prime and Subcontractor(s)) to the CO for record within two (2) calendar days from the date the contract was awarded.
4.1.1.1 Subcontractors. The Contractor shall require all Subcontractors, including subcontracted laborers, to comply with all applicable regulatory requirements of this contract. The Contractor shall include a clause in each applicable subcontract to require Subcontractor's cooperation and assistance in accident reporting and investigation.
**NOTE: Subsequent references to the Contractor shall imply it acting as the “prime” and their
“employees”, or “Subcontracted laborers”, or others acting on behalf of the prime Contractor unless otherwise specified.
4.1.2 Union Agreements and Port Tariffs. The Contractor shall submit copies within two (2) calendar days of contract award date to the CO/COR the most current version of the Collective
Bargaining Agreement (CBA), for Union of Docker of Germany, United Services Trade Union
“Ver.di” and the current published port tariff for the Port of Bremerhaven. The Contractor shall also furnish updated information about specific changes to union contracts, wage increases, local work rules, and CBAs as well as new port tariffs affecting USG cargo vessel operations in accordance with (IAW) the performance of this contract as they become available.
4.1.2.1 Port Services/Tariffs. the Contractor shall, on behalf of the USG, be responsible for all cargo handling costs related to the handling and movement of USG cargo through the Port of
Bremerhaven. The Contractor shall include those charge/fees in all commodity rates.
4.1.2.2 Tax, Duty, Customs Fee, Excise Fee/Tax, Inspection Fee, or Bond. The USG will not pay for or reimburse the Contractor for taxes, Customs duties, and similar charges for which no services are received, ordered, or exempt from. The USG will only pay port handling charges/fees where the USG has requested and received those services. The Contractor will not include such taxes, duties, customs fee, free time, excise fee/tax, inspection fee, bond, or the like in any of its rates. If the Contractor pays a tax, duty, customs fee, excise fee/tax, inspection fee, bond, or the like for which the USG is exempt, the Contractor is not entitled to reimbursement.
Further, the USG will not reimburse the Contractor for port staging/storage free time.
4.1.3 Contract Managers. The Contractor shall provide a Contract Manager(s) and at least two (2) alternates as part of their supervision who shall be responsible for the performance level of all services rendered. The Contractor shall provide telephone numbers for each of the contract manager(s) and their alternates where these individuals may be contacted during and after duty hours. The contract manager(s) shall have demonstrated experience in directing and managing longshoring and longshoring operations. The contract manager(s) and their alternates must be able to understand, read, write, speak, and translate the English language and/or other languages understood by its subcontracted labor/workers as necessary.
4.1.3.1 Contract manager(s) and alternates shall have full authority to act and make financial decision on behalf of the Contractor on all matters pertaining to the performance of services under this contract.
4.1.4 Multiple Work Sites. During the performance of this contract, the Contractor shall work simultaneous longshoring operations, to include but not limited to, working multiple vessels and multiple decks simultaneously, performing terminal services (loading/discharging) commercial trucks and rail service, and staging & call forwarding cargo. The Contractor shall have their contract manager(s) or alternates present in the staging area, dock/pier side, and onboard the vessel, accessible to the COR at all times. At any other time (i.e. outside terminal/vessel operations), the contract manager or their designated alternate(s) shall be available to the COR by telephone.
4.1.4.1 The contract manager or their designated alternate shall meet as necessary with the COR to discuss contract performance or other problem areas or issues.
4.1.4.2 The Contractor shall not replace/remove the contract manager or alternates without informing the COR.
4.2 Ordering Services. The Contractor and COR/OO shall mutually agree upon service ordering procedures, including daily cut-off time(s) for all Stevedoring and Related Terminal
Services (S&RTS) Task Orders. Procedures for ordering services shall be provided within two
(2) calendar days of contract award date. Unless local labor agreements prevail, the USG shall order services no later than (NLT) 1200hrs for 0800hrs start times for the next day or 1200hrs for
1800hrs start times for the same day. Example: Order services on Monday at 1200hrs for
Tuesday morning 0800hrs start time; Monday start times shall be ordered on Friday.
4.2.1 Task Ordering Template (TOT). All S&RTS performed IAW this PWS will be ordered using a Task Order (TO) system. The USG will provide an official Task Ordering Template
(TOT) to the Contractor within two (2) calendar days after the contract award date. The TOT will be assigned a TO number by SDDC G8 to be valid. The TO is the official authorization for the Contractor to provide services. The TO will then be issued by an appointed Ordering Officer
(OO) to the Contractor IAW Appendix C, Payment, Ordering, and Invoice Instructions. All work performed prior to an issued numbered TO may result in non-payment of work performed.
4.2.2 Task Orders. All services shall be identified by the COR and conveyed to an appointed
OO. The OO will develop an “initial TO” as soon as practicable and prior to all start dates & time for all S&RTS ordered. The OO will provide an “initial TO” (ordering template). The initial
TO will identify all commodity, man-hour, miscellaneous materials or associated services agreed upon between the COR and the Contractor.
4.2.2.1 TO for Vessel will be separated by “upload” and/or “discharge” for all known vessel work, whereas all Terminal work shall be ordered by the day or by Documented Week
(DocWeek) (Sunday thru Saturday). Any work performed prior to the OO issuing a numbered
TO will be at the expense of the Contractor.
4.2.2.2 The Contractor has the sole responsibility to order all labor for the required TO work in sufficient quantities and classes to meet the agreed upon productively levels and completion timelines. Should the Contractor mis-judge commodity work completion timeline and advise the
COR/OO to order services for the next day and commodity work completes prior to next day’s start time, the Contractor shall be liable for all personnel, labor guarantees, and MHE at its expense.
4.2.3 Cancellation of Services. The Contractor and the COR/OO shall agree to set cut off times on or before which the USG may cancel ordered services free of charge and without penalty/liability of any kind. Procedures for ordering services shall be provided within two (2) calendar days of contract award date. Unless local labor agreements prevail, the USG shall cancel services NLT 1500hrs for 0800hrs start times for the next day. The Contractor shall be responsible for canceling its labor when notification is given; no compensation is applicable when services ordered are cancelled prior to the set cancellation cut off time(s). The Government will not compensate the Contractors for CFE/MHE.
4.2.3.1 The COR/OO or their designated representative will notify the Contractor verbally of cancelled services by telephone, written email/memo, or other communications, stating that services are to be canceled. When service is ordered and then canceled on the day services are scheduled to commence, the USG will compensate the Contractor based on the established labor agreement.
4.2.4 Verbal Request. During any operation, the COR may also verbally identify additional labor, services, or CFE/MHE needed to the Contractor when necessitated by the mission/operation and will issue a signed written request. The Contractor shall present those written request to the OO within 24 hours of completing the mission/operation for reconciliation.
4.2.5 Reconciliation and Validation. The goal of the 950th TC is to reconcile, complete, and process the Contractor’s invoice and close all TO’s within 21 calendar days of the completion of each task order. The COR/OO shall determine, and the Contractor shall agree to reconcile and settle all TO’s within a set timeline and provide an invoice to the COR for payment. The
Contractors failure to reconcile TO’s within the below perimeters will result with the USG finalizing TO’s based on its documented evidence of the Contractors performance, and the
Contractor shall agree/accept the USG’s “final TO” for invoicing.
4.2.5.1 The COR, OO, and the Contractor shall reconcile all S&RTS within seven (7) calendar days of completing the work, reviewing all supporting documentation (logbook, tally sheets, and time sheets, and written request) for (vessel or DocWeek) ordered services. The COR will provide the Contractor with the MSDDC Form MT 288, capturing all commodity, detention, standby, Extra Labor (XL) for each class of labor, and Equipment Rental (EQR) time used in conjunction with commodity work. The Contractor and COR shall agree by signing (digital or wet signature) the MT 288.
4.2.5.2 Once reconciled, the OO will within seven (7) calendar days or when practicable after large operations finalize each TO accounting for actual Contractor performance per MT 288.
The OO will submit a “final task order” to MSDDC G8 for validation. Once validated and dated, the OO will forward the validated TO to the Contractor, and the Contractor shall then invoice the
USG. The Contractor shall submit their invoice for payment to the COR for validations/certification. If information on the invoice is found not match the TO or MT288, the
COR will return the invoice back to the Contractor to correct. Otherwise, the COR will validate and certify the Contractor’s invoice and submit to G8 within seven (7) calendar days for payment processing.
**NOTE** Any invoice summited that is dated prior to “G8 validation date” will be returned.
G8 will not process invoices for payment dated prior to its validation date and will return invoice to the COR. The Contractor will have to re-issue a corrected invoice for processing/payment.
The USG shall not be liable for accrued interest payments to the Contractor.
4.3 Out-of-Pocket (OOP) Expenses. OOP expenses involve the reimbursement of the actual invoiced cost made by the Contractor to a third-party vendor, supplier, subcontractor or port tariff for additional supplies, materials, facility support services, or other services sourced on behalf of the USG.
4.3.1 Vendor Invoice or Receipt. The Contractor shall substantiate all OOP expenses by submitting the paid vendor invoice and itemized receipts to the COR/OO at reconciliation. OOP expenses will be ordered and reimbursed only for mission related services, supplies, or materials identified by the COR/OO and ordered by written request to be added to or pre-ordered on the task ordering template.
4.3.1.1 Items purchased/rented shall be identified on the TO template (MISC. Tab) form by the
OO and certified as necessary by the COR. The Contractor’s invoice for miscellaneous expenses shall detail each service or supply, the rate per unit, number of units, and total extended price, accompanied by the vendor(s) receipt/invoice as substantiating documentation. The USG will not reimburse for any miscellaneous OOP expenses without all substantiating documentation
(vendor itemized receipt/invoice) attached. For miscellaneous supplies and durable goods not listed under a specific SOR, compensation shall be at reimbursement OOP expense.
4.3.2 Three (3) Written Estimates. The Contractor shall provide to the COR/OO three (3) written estimates for all additional services, materials, supplies, or rental equipment prior to the purchase or its rental for COR/OO approval. OOP expenses do not include expenses inherent to performing S&RTS commodity work. OOP expenses are for the purpose of purchasing as needed new supplies or non-durable goods on behalf of the USG.
4.3.2.1 The Contractor shall obtain written approval from COR/OO prior to the purchase of all goods and services considered. The COR shall seek CO approval for all OOP expenses exceeding $3,500.00.
4.3.2.2 The Contractor shall provide 3PL/subcontracted services that include, but are not limited to, agricultural vehicle or container pressure-washing services, pest and vegetation control, security services, vehicle or aviation fuel service, and specialized rental equipment. The USG will reimburse the Contractor for actual cost (vendor invoice or receipts required) and for any transportation, surcharges, and/or expenses associated with furnishing ordered materials, equipment, supplies, and/or subcontracted services.
4.3.2.3 The USG may source specialized materials or subcontracted vendors to support mission readiness at its discretion, for the Contractor to procure those materials or services on its behalf.
4.4 Training and Contingency Operations. The Government reserves the right to conduct training or, in contingency, all or part of port/vessel operations with Department of Defense
(DoD) personnel. During scheduled training or unscheduled contingency port/vessel operations, the Government may elect to load or discharge any vessel or perform any related longshoring or longshoring operation. During these scheduled trainings or contingency events, the Government may utilize Military personnel for loading and discharging the entire vessel or part thereof, or may conduct routine terminal or other port/vessel operations or any part of those operations thereof. Unless services are otherwise ordered, the Contractor shall not receive any compensation for cargo handling operations conducted by the DoD during these scheduled trainings or contingency events, however, compensation for Contractor provided equipment or other facility support shall be paid at established rates in the SOR.
4.4.1 The Government will inform the Contractor when such scheduled trainings or contingency operations are known, but NLT 48 hours prior to the event. During these trainings or contingency special operations events, the Government may request the Contractor to provide in part or normal longshoring services, as determined by the COR/OO. The COR will also determine classes of labor and equipment to support those designated DoD operations. Unless full commodity work is provided, the Government will compensate the Contractor for any labor and equipment ordered at man-hour and equipment rental (EQR) rates established in Schedules 2 and 4 of the SOR.
4.5 Commodity Operations. Government cargo is divided into four general commodity categories: containers, vehicles, aircraft, and breakbulk. Each category further is classified by weight and method of handling and is priced as follows. Please refer to Appendix B – Glossary of Terms.
• Commodity 40 – Breakbulk items shall be priced in MTON’s
• Commodity 44 – Containers less than twenty foot in length shall be priced as each (EA)
(i.e. ISUs, Bicons, Tricons, Quadcons)
• Commodity 45 – Containers 20’and 40’in length or multiple knuckled containers configured into Twenty-Foot Units (TEU’s) priced as each (EA).
• Commodity 60, 61, and 67 – Vehicles and trailers classified by weight, shall be priced as each (EA) or (by the unit)
4.5.1 Commodity Rates. The Contractor shall provide an all-encompassing commodity rate for each commodity type listed above and for each commodity schedule listed in the SOR (see
Appendix B), e.g., all commodity rates shall include all of the below but not limited to the following: (see requirements throughout the PWS)
• Management, Supervision, Safety Manager, Environmental Compliance Officer, or other non-subcontracted personnel
• All planning activities
• Administrative and contract data and requested reports for all provided services
• All classes of longshoremen labor, skilled labor, skilled drivers, crane operator, gearman, and mechanics (not all-inclusive personnel list)
• Contractor Furnished Equipment (CFE), Material Handling equipment (MHE), and its driver/operator, gear, mechanics tools (manual & air), shop equipment, rigging, spreader bars, slings, wire rope, hooks, shackles, straps, Military style slave cables & tow bars
(assorted sizes), and ramps
• Ground transportation (i.e., trucks, van, buses, contact maintenance vehicle (jump truck), and tow-vehicles)
• Materials and miscellaneous supplies (PPE, safety devises, dunnage, POL, fuel, and hazardous collection and/or cleanup supplies)
• Lashing & unlashing for all commercial truck and rail service
• Cargo accountability, cargo inspections, cargo and lashing inspections for railcar lashing inspections/movement
• Cargo management (i.e., towing, stacking, stripping, contact maintenance, and safety/environmental)
• Housekeeping (e.g., yards, lots, warehouse, and facilities)
• Staging areas/yards, staging setup, cargo management (i.e., space, cargo consolidation, frustrated)
• Port handling/tariff costs related to cargo handling and movement.
4.5.2 Pricing. Pricing shall be by the “individual piece/unit EACH (EA)” or “Per Measurement
Ton (MTON)”.
• Breakbulk, or other cargo not otherwise specified above, MTON, commodity code 40
• Containers (less than TEU’s) in commodity code 44
• Containers (20’ to 40’) non-explosive commodity 45
• Wheeled & tracked vehicles based on their weight, commodity codes 60, 61, & 67 combination of weight and the method of move EA
4.5.3 Measurement Ton Calculations. The USG will calculate MTON using cargo dimensional data; Length (L) multiplied by Width (W), multiplied by Height (H), divided by
1,728 inches (”) (cubic inches in one cubic foot), divided by 40 cubic feet, equals MTON amount. Example: Dimensional measurements are (L) 240”, (W) 96”, and (H) 96”. This would look like 240”, multiplied by 96”, multiplied by 96”, equals 2,211,840 cubic inches. Then, 2,211,840 cubic inches divided by 1,728”, divided by 40 cubic feet, equals 32 MTONs (rounded to two decimal points).
4.6 Detention Time
4.6.1 Detention. Labor Detention is defined as time lost due to work stoppage or interruption of work during commodity operation.
4.6.1.1 When detention occurs during a commodity operation, the Contractor shall absorb each detention period of fifteen minutes or less. The Government will compensate the Contractor at detention rates (Schedule 3A) for labor, including checkers and CFE/MHE operators, for detention in excess of fifteen minutes including the first fifteen minutes thereof and each minute thereafter. The USG will not compensate detention time on/for Contractor CFE/MHE.
4.6.1.2 Detention time (may also be called stand-by time) is used to compensate the Contractor for work stoppage during commodity operations. Examples of this include, but are not limited to, changes in operational plans (i.e. change to staging or stow plans would cause stoppage or delays). Should the USG change planned work, have to halt commodity work, or alter other plans during a commodity operation, the COR will notify the Contractor of that change. The
Contractor shall immediately notify the COR that work has stopped and make an effort to continue working where work is available. The Contractor shall redirect or shift their labor and
CFE/MHE to other locations to reduce stoppage where detention time may result. If there is lost time at the fault of the Contractor, they shall be liable for lost time and their labor shall remain on commodity. The COR shall be notified of all work stoppage.
4.6.1.3 The Government will not compensate the Contractor for detention of any class of labor not required for commodity operations when dependent upon other classes of labor performing a commodity service. This includes all classes of general labor, checkers and supervision needed for commodity service for vessel services. For example, loading a vessel is inclusive of services such as draying (maintenance, ground guides, and drivers) the cargo from its staging area through tally and checkers, stowing it aboard the vessel, and completely securing the cargo.
General labor, drivers, checkers, lashers, and supervision conducting commodity operations of loading the vessel are dependent upon each other under commodity rates. Drivers or lashers performing services during vessel load may wait for others to perform or complete their services.
No class of labor is authorized detention while others are present and performing commodity work.
4.7 Extra Labor (XL). The Contractor shall provide, at the discretion of the COR/OO, labor and CFE/MHE for miscellaneous or terminal services within the scope and intent of this contract. Unless services are occasioned by fault or negligence of the Contractor, the Contractor shall be compensated at the XL/EQR rates established in Schedule 2 and 4 of the SOR. The
Government will not compensate the Contractor for detention or standby time that occurs during ordered XL operations.
4.7.1 Miscellaneous services include, but are not limited to, the following:
• Carpentry work in excess of normal lashing, blocking, & bracing
• Welding & burning
• Re-handling, removing and shifting of cargo (Military or commercial)
• Building or dismantling of sheathing and nailed floors
• Handling of ships' stores & materials
• Assisting Government personnel for terminal services, exercise, and contingency operation.
• Other miscellaneous terminal/warehousing operations
4.7.2 When performing XL services, the Contractor shall furnish all gear and necessary
CFE/MHE (operator included) required performing the requested service. Labor (Schedule 2) and Equipment rental (Schedule 4) rates of the SOR rates shall apply.
4.8 Overtime. Overtime is defined as time/hours worked beyond scheduled workday. For example, if normal or regular workday hours are from 0600 - 1400, Monday through Friday, and operational requirements require that labor worked past the scheduled workday, the hours worked after the workday/week may include overtime differential. This may also include meal hours, weekends, and holidays. Overtime compensation shall be calculated time past the scheduled workday shift and shall be determined IAW local established overtime laws (as applicable).
4.8.1 Ordered Overtime. The Contractor shall, when requested by the COR, provide labor for requested overtime work (include weekends and holidays). Compensation for overtime work shall include the regular hourly rate (Schedule 2 of the SOR) plus the overtime differential rate
(Schedule 3C of the SOR) (base pay + OT differential rate). Overtime pay shall be rounded to the nearest 5-minute increment.
4.9 Shift Differentials. When work is performed in 2nd or 3rd shift(s), the Contractor shall be compensated IAW the applicable shift differential rates set forth in Schedules 3B of the SOR.
Shift differential compensation shall be the calculated time past established regular workday shift and shall be determined IAW local established laws (as applicable).
4.10 Start Time. The Contractor shall be flexible for work start times. The Government will discuss vessel work at each planning meeting, where an established workday start time is established. Start times that start later than regular working hours shall include established differential rates and shall not include overtime until full regular workday hours are met.
4.10.1 The Contractor shall obtain COR written pre-approval to work in all conditions specified under detention, extra labor, or overtime.
4.11 Equipment Rental (EQR) Rates. All EQR rates listed in Schedule 4 of the SOR shall be billable by the hour or day. Daily equipment rates shall imply 24 hours of use with appropriate operators changed as needed. Rental of equipment not listed in the SOR is subject to the same conditions as above and reimbursed at OOP expense; all equipment used are subject to written approval by the COR. EQR rates applies to equipment owned by the Contractor and used/billed during XL operations. For commodity operations, the Contractor equipment used is inclusive of the commodity activity rate (i.e. vessel).
4.11.1 Contractor Equipment Used for Extra Labor (XL) Situation. The Government will reimburse the Contractor for its use of equipment based on established rates in the SOR. When
Contractor equipment is used for both commodity work and XL on the same day/time, the
Government will compensate the Contractor for the actual time the equipment was used in an XL situation verified and approved by the COR.
4.12 Contract Labor Reporting. The Contractor shall provide, as requested by the COR, a daily time keeping logbook for verification of labor and services provided for each shift per day’s operations for the purpose of reconciliation. Breakout will include the description of service, total quantities of labor by class, hours worked to the nearest 5-minute interval, and significant events of the day.
4.13 Timekeeping. The Contractor shall maintain timesheets with 100% accuracy for all contractual services furnished. The timesheet shall include the following information:
• Date and time of operation
• Work was performed on daily shift or continuous shift
• Number of laborers (by class type of labor used) and hours worked
• Type, number, and hours equipment is utilized
• Times and reasons for any work stoppages (detention, standby time)
Timesheets will be verified by the COR. Compensation for services defined in this paragraph are included in all commodity rates established in the SOR.
4.13.1 Time Management. In addition to all other requirements stated elsewhere, the
Contractor shall provide the Government with:
4.13.1.1 Cost Data. The Contractor shall segregate and accumulate cost data relating to this contract for each type of operation (examples: loading and discharging vessels, extra labor, detention, equipment usage, and OOP used). The Contractor shall report this data (any format is acceptable) monthly to the COR.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .