Trailer Recert and Maint SOO Spot Buy - CONUS July 2022.docx
DOCX document 44 KB Posted
- Attached to
- Addendum to SPE601-22-D-1504 (SPE601-21-R-0302)
- Solicitation number
- SPE601-23-R-0301
- Issued by
-
Defense Logistics Agency Energy
About this file
This statement of objectives outlines requirements for the refurbishment, recertification, maintenance, and disposal preparation of compressed gas trailer equipment owned by the Defense Logistics Agency Energy. Services include inspecting trailers, recertifying gas cylinders, performing maintenance and repairs, and preparing unserviceable equipment for disposal. Recertification must be completed within 45 days, and maintenance within 30 days for chassis and 21 days for cylinders. The contractor must inspect and document equipment condition, propose repair scopes, and provide replacement parts and labor. Cylinders must meet DOT testing standards. Records and certifications are required. The agency will issue orders under this IDIQ to contractors on a fair opportunity basis. The addendum extends contract SPE601-22-D-1504 for these recurring services.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| QAPs_SPE60123R0301.pdf | ||
| SF1449_SPE60123R0301.pdf | ||
| 23R0301_ DLA Contract Text.pdf | ||
| Trl Mntce Pricing Spreadsheet.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES
11 JULY 2022
1. DESCRIPTION OF REQUIREMENT: Defense Logistics Agency Energy (DLA Energy), as the Department of Defense (DoD) Integrated Materiel Manager (IMM) for Aerospace Energy products and services, requires the refurbishment, recertification, maintenance and disposal preparation of a fleet of compressed gas tube-bank trailers, International Organization for Standardization (ISO) containers on chassis and stand-alone chassis, which are utilized for bulk compressed gas service. The Contractor shall provide all supplies, products, management, tools, equipment, and labor necessary to ensure that container fleet is brought to and or maintained to a safe, serviceable and roadworthy condition and that any equipment deemed unserviceable by DLA Energy is properly prepared and readied for disposal. Compressed gas Tube-Bank Trailers, ISO Trailers and chassis, will be referred to hereafter as equipment.
2. SCOPE: The Contractor shall inspect, refurbish, recertify and provide necessary maintenance or repair services for equipment owned by DLA Energy. Some equipment will need to be prepped for disposal. The Contractor shall be able to store equipment while awaiting service and after service is complete while it is pending transportation for filling or for disposal.
3. INSPECTIONS: The Contractor shall inspect each piece of equipment when it is delivered to Contractor’s facility to determine scope of work needed to bring or keep equipment serviceable and in roadworthy condition as required by the Department of Transportation (DOT). The Contractor shall perform the following inspection services:
3.1 Incoming Equipment Inspection: The Contractor shall inspect each piece of equipment IAW 49 CFR § 396 within 24 hours of equipment arriving at Contractors facility by utilizing the attached government DD Form 626, “Motor Vehicle Inspection (Transporting Hazardous Materials)” or equivalent to document the condition of the equipment. Equipment inspection reports shall be submitted to the DLA Energy Customer Account Specialist/Transportation Specialist (CAS) by equipment serial number via email within three days of report.
3.2 Maintenance Inspection: within fourteen working days or as otherwise specified on the assigned Delivery Order (DO) issued by the Contracting Officer (CO), the Contractor shall inspect equipment and submit to the CO a detailed list of repairs required to return the equipment to usable, serviceable and roadworthy condition. In addition to this detailed list, the Contractor shall also include digital photographs of equipment indicating the Contractor’s proposed repairs. The Contractor shall be responsible for visually inspecting all mechanical, electrical, pneumatic and structural components for damage, wear, distortion, missing parts, or other forms of failure or potential failure. The Government reserves the right to have a Government Representative inspect the equipment relative to the repairs proposed by the Contractor, prior to approval/acceptance of the Contractor’s proposal. The CO will advise the Contractor of approved repairs. The Maintenance Inspection will be the document used to track work required and approved, and will include, but not limited to, items listed in paragraphs below titled “Recertification” and “Maintenance and Refurbishment”.
3.3 The Contractor shall provide a qualified inspector that meets the requirements of 49 CFR § 396.19 and 49 CFR § 396.25. The Contractor shall perform an Annual Inspection of chassis IAW CFR § 396.21 and Appendix G to Subchapter B – “Minimum periodic inspection standards” when annual chassis inspection is expired or within one month of expiration. The Contractor shall provide a copy of the annual report to the DLA Energy CAS via email within three days of report.
4. RECERTIFICATION: Cylinders shall be recertified by an approved DOT testing method. If applicable the Contractor shall submit a copy of their DOT special permit showing the method by which the cylinder will be tested. Cylinders shall be recertified IAW all applicable regulations and requirements. The following requirements shall apply regardless of which type of testing method is used.
4.1 PRODUCT SPECIFICATION:
4.1.1 All gaseous helium used during the recertification process shall meet the requirements of MIL-PRF-27407D, Type I, Grade A, 01 Aug 2014.
4.1.2 All gaseous nitrogen used during the recertification process shall meet the requirements of MILPRF27401G, Type I, Grade A, 07 Aug 2013.
4.2 REQUIREMENTS: The following requirements shall apply regardless of which type of testing method is used.
4.2.1 The Contractor shall be a DOT certified testing facility.
4.2.2 The Contractor shall assure all records clearly identify corresponding cylinder number and equipment number. Provide a tube diagram for each piece of equipment indicating pass or fail.
4.2.3 The Contractor shall provide a continuous chart recording of pressure and time for each cylinder hydrostaticly tested.
4.2.4 When disassembly/reassembly is required, the Contractor shall document the location of cylinders on the equipment by serial number, location and equipment license number.
4.2.5 Testing of the cylinders to the required pressure by DOT and testing of the manifolds to the required pressure IAW American Society of Mechanical Engineers (ASME) Code for Pressure Piping, B31 shall be performed. Clean/filtered water shall be used for hydrostatic testing to prevent contamination of cylinders and manifolds.
4.2.6 The Contractor shall replace all burst discs in the manifold. Rupture disc heads shall be installed with a minimum torque of 40 ft-lbs.
4.2.7 After approved DOT testing method and cylinder assembly, all internal surfaces that will be in contact with the product shall be rinsed with water which meets the requirements of ASTM D 1193, Type IV or equivalent and then purged with dry, filtered nitrogen until the exiting gas reaches a maximum dew point of -80°F. Other methods to ensure cylinders are clean and dry after testing may be acceptable with prior approval of the Contracting Officer (CO).
4.2.8 The cylinders shall be filled with a helium/nitrogen gas mixture of at least 5% helium/95% Nitrogen for system leak testing. The fully assembled gas system (cylinders, valves, manifolds and safety devices) shall be pressurized to the maximum allowable working pressure with the gas mixture. All threaded joints and other potential source of leaks shall be leakchecked using a leak detector common to the industry. The Contractor shall repair all leaks and demonstrate the absence of leaks in the trailer assembly for a minimum period of 24 hours, at the maximum allowable working pressure.
4.2.9 Once the gas system has been determined to be leak free, the Contractor shall bleed down the helium/nitrogen pressure to 15-20 psig @ 70F or purge the helium/nitrogen mixture from the cylinders and replace with either helium or nitrogen blanket at 15-20 psig @ 70F. The 15-20 psig inert blanket shall be maintained on the cylinders to prevent contamination.
4.2.10 Prior to the Government inspection and final acceptance, the Contractor shall perform the following for equipment requiring recertification testing only.
4.2.10.1 Operational and visual checks of completed equipment to ensure the equipment is roadworthy and can be safely transported IAW Federal, State and local regulations.
4.2.10.2 Verify the king pin/plate and landing gear are greased and functional.
4.2.10.3 The air brake line fitting connections shall be leak checked with soap solution while the line is under full tractor supplied air pressure. No leaks are permitted. Verify functionality of glad hand connections, service brake, parking brake and emergency brake systems.
4.2.10.4 Should the Contractor discover any additional repair(s), as a result of the above inspection, the CO shall be notified in order that the cost of these repair(s) shall be included in the SERVICES-MAINTENANCE AND REFURBISHMENT contract line item.
4.2.10.5 All materials and components used as replacement material/components shall be compatible with the intended service and equivalent in design to the original. If original part “equivalency” requires the use of outdated technology, the Contractor shall propose to the CO to use replacement parts that are of newer technology. Prior approval by the CO is required before newer components are installed.
4.2.10.6 If any cylinder fails to comply with the testing requirements as specified herein, the Contractor shall provide the CO with a detailed description stating the reasons for cylinder failure and include costs to repair or replace the cylinder. All removed parts and/or hardware shall be retained until offered to the Government for inspection. The CO will review and provide preapproval to the Contractor to repair or replace the parts. The Government will make the determination of which removed components will be disposed of by the Contractor and which will be sent to DLA Disposition Services. The Contractor shall prepare for transport and the Government will arrange for the transportaton of the parts to be sent to DLA Disposition Services. The Contractor shall prepare for disposal IAW paragraph titled “Cylinder Disposal Preparation”.
5. MAINTENANCE AND REFURBISHMENT: Contractor shall complete a Maintenance Inspection and have CO approval prior to proceeding with maintenance or refurbishment tasks.
5.1 Cleaning all external surfaces of the equipment chassis/framework and paint. The Contractor shall only use an abrasive blasting procedure to remove all rust, scale, grease, oil and clean all external surfaces. All surface areas exposed to abrasive blasting shall be primed and painted within 12 hours of exposure to the environment using the following proceedures:
5.1.1 Painting of Cylinders, Cabinet and Chassis: Prepare surfaces IAW primer and finish coat manufacturer’s recommendation. When specified on the Delivery Order issued by the CO the Contractor shall prime and paint IAW MIL-PRF-23236D, dated 15 September 2009. An example meeting this requirement is Sherwin Williams Industrial and Marine Coatings DURA-PLATE 235 Multi-Purpose Epoxy. Spray paint all external metal surfaces, except brakes, suspension and operational equipment with zinc chromate primer which meets the requirements of Class C, TT-P-1757B, dated 15 May 1997. Alternatively, the Contractor may substitute an epoxy based primer that meets the requirements of MIL-DTL-53022E(1) Notice 1, dated 20 Dec 2017 when used in combination with a polyurethane finish coat that meets the requirement of MIL-DTL-64159B NOT 1, dated 16 Nov 2015 or MIL-PRF-85285E Notice 1, dated 13 Oct 2016. Other primer and finish coatings may also be utilized with prior approval of the CO. When visually inspected, the finish coating shall be a smooth, continuous, adherent film which is free of surface imperfections such as: runs, sags, blisters, orange peel, blushing, streaks, craters, blotches, brush marks, fish eyes, seediness or pinholes. Painting, lettering and marking shall be accomplished IAW 49 CFR.
5.1.1.1 Cylinders only: The color shall be identified per delivery order. The two color options are: 1) ID: 33446, Color Group: Yellow, Color Name: Tan 686A Camo, and 2) ID: 17875, Color Group: Misc., Color Name: Insignia White, ANA 511, IAW Aerospace Material Specification, AMS-STD-595 Rev. A, dated Feb 2017.
5.1.1.2 Cabinet and Chassis only: The color shall be identified per delivery order. The four color options are: 1) ID: 33446, Color Group: Yellow, Color Name: Tan 686A Camo, 2) ID: 13538, Color Group: Yellow, Color Name: DOT Highway Yellow, ANA 506, 3) ID: 24088, Color Group: Green, Color Name: Olive Drab CARC and 4) Color Group: Misc., Color Name: Insignia White, ANA 511, IAW Aerospace Material Specification, AMS-STD-595 Rev. A, dated Feb 2017.
5.2. Prior to painting, the Contractor shall repair or overhaul by: patching, re-welding, rebuilding or replacing all metal areas which are rusted or damaged. All materials shall be furnished by the Contractor. Repairing or overhauling the metal work shall include, but are not limited to the following, if required
5.2.1 Repairing or replacing hinges.
5.2.2 Straightening or replacing doors.
5.2.3 Repairing or replacing handles and locks.
5.2.4 Reinforcing or replacing weakened door sections with similar metal plates.
5.2.5 Straighten, repair or replace missing, torn, twisted or bent metal sections of trailer beds, fenders, bumpers, skirts, cabinets, brackets, eye bolts, tie downs, shackles, tow rings, pintel hook hitch and framework.
5.2.6 Repairs or replacements of metal sections by bolting, welding or riveting to be typical of the original fabrication.
5.2.7 Installing new belting material on the trailer as needed. These trailers have belting type spacers between and under cylinders retaining straps. These spacers shall be replaced with new commercial grade four-ply belting. Dimensions of new spacers shall be the same as spacers removed.
5.2 8 Reassembling of cylinders, all piping removed or renewed gas system components onto trailers.
5.2.9 Due to the age of the current DLA Energy-owned equipment and the increasing number of landing gear failures, Contractors responsible for repairing trailers shall perform a thorough inspection of all trailer landing gear assemblies in their possession. Any repairs/replacements identified during the landing gear inspections to return them to a “like new” condition shall be included with other repair/replacement items they identify in their trailer repair proposals. Areas of specific interest include, but are not limited to:
5.2.9.1 Any indication of binding gears when loading or off loading trailer.
5.2.9.2 Gear box housings shall be visually inspected for cracks and leaking seals.
5.2.9.3 Cracks in the landing gear housing welds or visibly bent landing gear.
5.2.9.4 Rust in the gear boxes due to lack of grease.
5.2.9.5 Visibly worn or broken gears.
5.2.9.6 Bent or damaged struts bracing the landing gear to the frame.
5.2.9.7 Rusted or corroded landing gear handle or worn handle to gear shaft pin.
5.2.9.8 Landing gear. Currently, DLA Energy is retrofitting field landing gear with the Landing Gear kit with heavy-duty feet - HOLLAND Heavy Duty Mark V (Part Number LGH-3A-012). Reference attachment titled “Holland Mark V Landing Gear”. Other brands that are equivalent or exceed specifications may be used.
5.2.10 General inspection, repair and maintenance include:
5.2.10.1 Repair lighting devices and reflectors
5.2.10.2 Repair flat tires or replace if un-reparable and/or re-inflate tires (If required, the Contractor shall replace tires, including the spare tire, with new 11XOOX22.5 Steel Radial Tires, or equivalent. Standard rims for these tires are up to 10 holes with steel bud.) Disposal of tires shall be included in the detail repair quote.
5.2.10.3 Repair/Replace glad hands
5.2.10.4 Service or replace brakes including trailer brake connections
5.2.10.5 Repair electrical wiring
5.2.10.6 Lubricate landing gear and fifth wheel skid plate
5.2.10.7 Replace placarding for hazardous material (UN1046 Non-Flammable Gas)
5.2.10.8 Replace and/or install license plates including return of old plates to DLA Energy
5.2.10.9 Perform any other minor repairs not previously identified
5.2.11 Maintenance and overhaul shall be completed by:
5.2.11.1 Recertification testing: within 45 calendar days of CO approval
5.2.11.2 Chassis maintenance/overhaul: within 30 calendar days of CO approval
5.2.11.3 Cylinder maintenance/overhaul: within 21 calendar days of CO approval
6. TRAILER DISPOSAL PREPARATION: When equipment is identified as excess by the Government, the Contractor shall prepare equipment for disposal. Contractor shall remove all helium pressure by evacuating and purging all tube cylinders. Contractor shall remove all labeling and placarding from equipment and have equipment readied for transportation to DLA Disposition Services.
7. ORDERING: The Government shall place orders under the Contract pursuant to the Fair Opportunity provisions of FAR 16.505(b)(1) and in accordance with the following order placement procedures:
7.1 When equipment is identified that requires recertification or maintenance and repair, the CO will consider the Contractor’s past performance [including quality, timeliness and costs], potential impact on other orders placed with the Contractor, minimum order requirements, and the Government’s estimated transportation costs for shipping the equipment from its current location to the Contractor’s facility. In addition, for equipment requiring recertification, the CO may also consider the Contractor’s unit price as shown in the Schedule. For maintenance and repairs that are to be negotiated, this amount will not be known at the time the order is placed and as such, historical prices of previous maintenance and repairs under this or the Contractor’s previous contracts, may also be used.
7.2 For recertification, the CO will issue the order based upon the Contractor being selected for the order under the Fair Opportunity provisions of the FAR. For maintenance and repair of equipment, the order will be issued after the Contractor has provided an estimate of the work to be performed and the CO has negotiated the total firm-fixed price of the order. In submitting the estimate, the Contractor shall provide digital pictures that corroborate the work that needs to be accomplished.
7.3 When offering repairs to the Contractor, the Contractor must indicate if they will accept equipment partially filled with product or without product.
8. CYLINDER DISPOSAL PREPARATION: The Government will make the determination of which removed components will be disposed of by the Contractor and which will be sent to the DLA Disposition Services for disposal. Cylinders failing to meet the requirements of Title 49 CFR or identified as excess, shall be disposed of IAW Defense Logistics Agency Instruction (DLAI) 4145.25, “Storage and Handling of Liquefied and Gaseous Compressed Gasses and Their Full and Empty Cylinders,” dated 16 Jun 00, Section 8 “Disposal of Compressed Gas Cylinders.” Government-owned cylinders designated to be in unserviceable (Condemned, Non-hazardous Scrap) condition shall be prepared for disposal. A report shall be provided by the Contractor to DLA Energy – Transportation after the work has been accomplished. Reference attachment titled “Disposal of Compressed Gas Cylinders Form”.
9. INSTALLATION OF PRESSURE GAUGE: The Contractor shall furnish and install a pressure gauge with an isolation valve, if required per Delivery Order. The pressure gauge shall have a range of no less than 0-3,000 psi and no more than 0-4,000 psi with a 4” to 5” dial on each manifold per trailer. DLA Energy will approve the Ashcroft Duragauge Pressure Gauge® Type 1377, Grade 2A (+0.5%) or equivalent. Reference attachment titled “ Ashcroft Gauge”.
10. MARKING AND TRAILER NAME PLATE:
10.1 The equipment shall be stenciled on each side and each end with the words IAW 49 CFR with 4 inches black lettering. Examples; “HELIUM, COMPRESSED”, and “HYDROGEN, COMPRESSED”.
10.2 All equipment shall include Placards IAW 49 CFR. Also, equipment designated for CONUS use shall, be stenciled with the words “DEFENSE LOGISTICS AGENCY” on each side of the container with 4 inch black lettering as specified on the assigned delivery order issued by the CO.
10.3 In addition to the existing name plate, a permanent aluminum, brass, bronze or stainless steel nameplate shall be mounted inside the rear cabinet displaying the following information:
10.3.1 Container Serial Number.
10.3.2 Record of serial numbers of all cylinders.
10.3.3 Date of test and retest pressure.
10.3.4 Name of Contractor.
10.3.5 Contract number.
10.3.6 Total nominal water volume of the trailer.
10.3.7 Maximum service pressure.
10.3.8 Date of thread and flang inspection.
10.3.9 Contractor shall replace and/or install license plates as requested by DLA Energy and return of old plates to DLA Energy in provided return envelopes or box.
11. TESTING RECORDS AND FINAL TEST REPORTS: The Contractor shall record and report the following to the CO:
11.1 The percentage of permanent expansion versus total expansion of each cylinder for each trailer hydrostatically tested.
11.2 Each cylinder passing 5/3 times the maximum allowable working pressure test shall be plainly and permanently metal stamped with the month and year of the test per CFR 49 requirements.
11.3 The Contractor shall maintain adequate records of all inspections and tests performed. The records shall provide evidence that the required inspections and tests have been performed, including part or component identification and inspection or test involved. The report shall show cylinder serial number, the test data obtained during the test and the results of the test made on each cylinder. Included shall be a statement on Contractors dated letterhead that the assembly (identified by serial number) has been visually inspected IAW the Compressed Gas Association Publication, C6 and tested and recertified IAW 49 CFR. This statement shall be signed by the Contractor's inspector and a Government Representative.
11.4 The Contractor shall prepare, sign and furnish the equipment Cleaning and Inspection certifications to the CO. These documents shall be mailed to:
| DLA Energy - Contracting Officer | |
| 1014 Billy Mitchell Blvd, Bldg. 1621 | |
| San Antonio, TX 78226 |
11.5 Contractor shall provide five digital photographs (front, back, each side and data plate) of the completed equipment. Digital photographs shall be taken before and after trailer repair or recertification. The photographs shall be electronically provided, via email, to the CO 24 hours prior to final inspection and acceptance by Government Representative.
12. APPLICABLE DOCUMENTS: The following documents are to be in compliance with the most current publication/edition on date of request.
12.1 Department of Transportation (DOT), Title 49,Code of Federal Regulations (49 CFR) Parts 100199
12.2 American Society of Mechanical Engineers (ASME) Code for Pressure Piping, B31
12.3 MIL-STD101C, Color Code for Pipelines and for Compressed Gas Cylinders, dated 26-Aug-2014
12.4 Compressed Gas Association Inc, (CGA) Publication C-1, Methods for Pressure Testing Compressed Gas Cylinders
12.5 Compressed Gas Association Inc, (CGA) Publication C6, Standards for Visual Inspection of Steel Compressed Gas Cylinders
12.6 American Society for Testing Materials, ASTM D1193-6 (2011), Standard Specification for Reagent Water
12.7 MIL-PRF-27407D, Propellant Pressurizing Agent, Helium, dated 01 Aug 2014
12.8 MIL-PRF-27401G, Propellant Pressurizing Agent, Nitrogen, dated 07-Aug-2013
13. REQUIRED DELIVERY: Depending upon the services to be performed on the equipment the required delivery date will be stated on each delivery order as proposed and awarded under the basic contract(s).
14. EQUIPMENT ACCEPTANCE: Inspection and final acceptance of equipment shall be performed by the Government Representative at the Contractor's facility. The Contractor is responsible for performing all cylinder test and inspections on manufactured cylinders as identified by DOT. The Contractor shall notify the assigned Government Representative 3 government business days prior to performing any tests/inspections in three days to permit inspection by the government.
File details come from the government source that posted it. Updated .