Trail Specificaitions.pdf

PDF 2 MB Posted

Attached to
Nez Perce-Clearwater Trail Maintenance Federal contract opportunity
Solicitation number
1284LL22Q0053
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Nez Perce-Clearwater Trail Maintenance, newest first.
File Type Posted
12844LL22Q0053 Trail Maintenance Solicitation.pdf PDF
WD 1995-0228 Revised 20220315.pdf PDF
Past Performance Sheet.docx DOCX document
Attachment x Minimum Impact Guidelines.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOD P00002-12034319P0145

Logging Out - Section 982

REMOVE

Waterbar Cleaning- Section 991.05

Remove all sediment and debris until ditch or spillway meets existing side slope (daylight) Relax all cut slopes to 60 deg. or less

Apron

12 in. minimum ditch width

Maintain sustained negative grade throughout entire drain. Remove all vegetation from structure

Loose rock, woody debris, sediment

Retain 4 – 6 in. soil sloped against bar

Minimum 4 in. depth

Woody materials will be removed from trail tread

Place soil, sod, duff, sediment, loose rock on downgrade side and compact

02272021 Drawing Clearing_limits - Section 981 & 982
02272021 Drawing Logging Out Section 982
03092021 Standard waterbar cleaning ill - edit
02272021 Drawing Standard ATV drainage dip cleaning

File details come from the government source that posted it. Updated .