This document is a pre-solicitation market survey announcement from the Federal Aviation Administration (FAA) for the purpose of applying a new roof coating system at the Tampa International Airport (TPA) Airport Surveillance Radar (ASR) facility. The FAA is seeking qualified sources to provide statements of interest in response to this announcement.

The key details are:

  • The FAA estimates the project will cost between $135K - $185K, though the Statement of Work is in draft format and subject to change.
  • The FAA's intended procurement strategy is to award a single Firm Fixed Price contract competitively to the lowest price bidder that is responsive, responsible, and presents low risk.
  • The FAA is considering setting this requirement aside for small businesses, service-disabled veteran-owned small businesses, and 8(a) certified businesses.
  • Interested vendors are requested to provide information on their capability and interest, expected programmatic approach, and a rough order of magnitude estimate.
  • Responses must be submitted by 4:00 pm Central Time on November 7, 2024.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Federal Aviation Administration August 2024 Tampa, Florida FAA ASR Roof

07 01 50 - Page 1 of 16

REHABILITATION OF EXISITING ROOFING SYSTEM

SECTION 07 01 50 - REHABILITATION OF EXISTING ROOFING SYSTEM

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Roof re-coating preparation.

2. Application of fluid-applied roof membrane and flashings over existing granule-surfaced modified bituminous membrane roofing.

B. Related Information:

1. Division 07 Section "Preconstruction Testing for Re-Roofing" for Contractor's responsibilities for performance of preconstruction testing of existing roof.

2. Division 07 Section "Preparation for Re-Roofing" for existing roofing tear-off, patching, and substrate preparation for rehabilitation of roofing membrane, patching, and substrate preparation for rehabilitation of roofing membrane.

3. Division 07 Section "Sheet Metal Flashing and Trim" for formed metal flashings and counterflashings.

1.2 ROOFING CONFERENCES

A. Roofing Rehabilitation Preinstallation Conference: Conduct conference at Project site to review methods and procedures related to roofing system.

1. Meet with Owner; Owner’s Consultant; roofing re-coating materials manufacturer's representative; roofing re-coating Installer including project manager and foreman; and installers whose work interfaces with or affects re-coating including installers of roof accessories and roof-mounted equipment requiring removal and replacement as part of the Work.

2. Review methods and procedures related to re-coating preparation, including membrane roofing system manufacturer's written instructions.

3. Procedures for salvaging and recycling of demolition and construction waste

4. Review temporary protection requirements for existing roofing system that is to remain, during and after installation.

5. Review roof drainage during each stage of re-coating and review roof drain plugging and plug removal procedures.

07 01 50 - Page 2 of 16

6. Review and finalize construction schedule, and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

7. Review base flashings, special roofing details, drainage, penetrations, equipment curbs, and condition of other construction that will affect re-coating.

8. Review HVAC shutdown and sealing of air intakes.

9. Review shutdown of fire-suppression, -protection, and -alarm and -detection systems.

10. Review procedures for asbestos removal or unexpected discovery of asbestos-containing materials.

11. Review governing regulations and requirements for insurance and certificates if applicable.

12. Review existing conditions that may require notification of Owner before proceeding.

1.3 MATERIALS OWNERSHIP

A. Demolished materials shall become Contractor's property and shall be removed from Project site.

1.4 DEFINITIONS

A. Roofing Terminology: Refer to ASTM D1079 "Standard Terminology Relating to Roofing and Waterproofing" and glossary in NRCA's "The NRCA Roofing Manual: Membrane Roof Systems" for definition of terms related to roofing work in this Section.

B. Roofing Coating Preparation: Existing roofing that is to remain and be prepared to accept restorative coating application.

C. Patching: Removal of a portion of existing membrane roofing system from deck or removal of selected components and accessories from existing membrane roofing system and replacement with compatible similar materials.

D. Remove: Detach items from existing construction and legally dispose of them off-site unless indicated to be removed and reinstalled.

E. Existing to Remain: Existing items of construction that are not indicated to be removed.

F. Construction Waste: Building and site improvement materials and other solid waste resulting from construction, remodeling, renovation, or repair operations. Construction waste includes packaging.

G. Demolition Waste: Building and site improvement materials resulting from re-roofing preparation, demolition, or selective demolition operations.

H. Disposal: Removal off-site of demolition and construction waste and subsequent sale, recycling, reuse, or deposit in landfill or incinerator acceptable to authorities having jurisdiction.

07 01 50 - Page 3 of 16

I. Recycle: Recovery of demolition or construction waste for subsequent processing in preparation for reuse.

J. Salvage: Recovery of demolition or construction waste and subsequent sale or reuse in another facility.

K. Salvage and Reuse: Recovery of demolition or construction waste and subsequent incorporation into the Work.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product specified.

B. Sustainable Design Submittals:

1. Product Test Reports: For roof coating, indicating that coated roof will comply with solar reflectance index requirement.

2. Indicate CRRC Compliance.

3. Indicate Food, Conservation, and Energy Act of 2008 Bio-based material requirement compliance.

a. Indicate type of bio-based material in product.

b. Indicate the percentage of bio-based content per unit of product.

c. Indicate relative dollar value of bio-based content product to total dollar value of product included in project.

1.6 INFORMATIONAL SUBMITTALS

A. Qualification Data: For Installer, Manufacturer, and Roofing Inspector.

1. Letter written for this Project indicating manufacturer approval of Installer to apply specified products and provide specified warranty.

B. Contractor's Product Certificate: Submit notarized certificate, indicating products intended for Work of this Section, including product names and numbers and manufacturers' names, with statement indicating that products to be provided meet the requirements of the Contract Documents.

1. Provide manufacturer's UL listing certificate for roofing system.

C. Proposed Protection Measures: Submit report, including Drawings, that indicates the measures proposed for protecting individuals and property, for environmental protection, and for dust control. Indicate proposed locations and construction of barriers.

D. Warranties: Unexecuted sample copies of special warranties.

07 01 50 - Page 4 of 16

E. Existing Conditions Photographs: Show existing conditions of adjoining construction and site improvements, including exterior and interior finish surfaces, which might be misconstrued as having been damaged by re-coating operations. Submit before Work begins.

F. Inspection Reports: Reports of Roofing Inspector. Include weather conditions, description of work performed, tests performed, defective work observed, and corrective actions required and carried out.

1. Submit report within 48 hours after inspection.

1.7 CLOSEOUT SUBMITTALS

A. Maintenance Data: To include in maintenance manuals.

B. Warranties: Executed copies of approved warranty forms.

1.8 QUALITY ASSURANCE

A. Installer Qualifications: An employer of workers trained and certified by manufacturer, including a full-time on-site supervisor with a minimum of three years' experience installing products comparable to those specified, able to communicate verbally with Contractor, and employees, and the following:

1. Qualified by the manufacturer to install manufacturer's product and furnish warranty of type specified.

B. Manufacturer Qualifications: Primary product manufacturer that is UL listed for roofing system identical to that specified for this Project with minimum five years' experience in manufacture of comparable products in successful use in similar applications, and able to furnish warranty with provisions matching specified requirements.

1. Approval of Other Manufacturers and Comparable Products: Submit the following in accordance with project substitution requirements, within time allowed for substitution review:

a. Product data, including certified independent test data indicating compliance with requirements.

b. Samples of each component.

c. Sample submittal from similar project.

d. Project references: Minimum of five installations of specified products with Owner and and Architect/Owner's Consultant contact information.

e. Sample warranty.

C. Roofing Inspector Qualifications: A technical representative of manufacturer not engaged in the sale of products and experienced in the installation and maintenance of the specified roofing system, qualified to perform roofing observation and inspection specified in Field Quality

07 01 50 - Page 5 of 16

Control Article, to determine Installer's compliance with the requirements of this Project, and approved by the manufacturer to issue warranty certification. The Roofing Inspector shall be one of the following:

1. An authorized full-time technical employee of the manufacturer.

2. An independent party certified as a Registered Roof Observer by the International Institute of Building Enclosure Consultants (formerly the Roof Consultants Institute) retained by the Contractor or the Manufacturer and approved by the Manufacturer.

1.9 FIELD CONDITIONS

A. Weather Limitations: Proceed with rehabilitation work only when existing and forecasted weather conditions permit Work to proceed without water entering into existing roofing system or building.

1. Store all materials prior to application at temperatures recommended by manufacturer.

2. Apply coatings within range of ambient and substrate temperatures recommended by manufacturer.

3. Do not apply roofing in snow, rain, fog, or mist.

B. Protect building to be rehabilitated, adjacent buildings, walkways, site improvements, exterior plantings, and landscaping from damage or soiling from rehabilitation operations.

C. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

D. Daily Protection: Coordinate installation of roofing so insulation and other components of roofing system not permanently exposed are not subjected to precipitation or left uncovered at the end of the workday or when rain is forecast.

E. Owner will occupy portions of building immediately below re-coating area. Conduct re-coating so Owner's operations will not be disrupted. Provide Owner with not less than 72 hours' notice of activities that may affect Owner's operations.

1.10 WARRANTY

A. Manufacturer's Warranty: In which manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within warranty period, as follows.

1. Form of Warranty: Tremco "Plain and Simple" warranty form.

2. Scope of Warranty: Work of this Section.

3. Warranty Period: 30 years from date of completion.

4. Inspections by Manufacturer: To occur every five years following completion.

B. Installer Warranty: Installer's warranty signed by Installer, as follows.

07 01 50 - Page 6 of 16

1. Form of Warranty: Form acceptable to Roofing Manufacturer and Owner.

2. Scope of Warranty: Work of this Section.

3. Warranty Period: 3 years from date of completion.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Basis of Design: The roof system specified in this Section is based upon products of Tremco CPG Inc, Beachwood, OH, (800) 562-2728, www.tremcoroofing.com that are named in other Part 2 articles. Provide specified products.

1. Manufacturers of comparable products: Approved by Owner's Consultant prior to bid.

B. Source Limitations: Obtain components for roofing system from same manufacturer as membrane roofing or manufacturer approved by membrane roofing manufacturer.

2.2 PERFORMANCE REQUIREMENTS

A. General Performance: Rehabilitated roofing shall withstand exposure to weather without failure or leaks due to defective manufacture or installation.

1. Accelerated Weathering: Roofing system shall withstand 5000 hours of exposure when tested according to ASTM G152, ASTM G154, or ASTM G155.

B. Material Compatibility: Provide roofing materials that are compatible with one another under conditions of service and application required, as demonstrated by roofing manufacturer based on testing and field experience.

C. Exterior Fire-Test Exposure: Roofing system exterior fire-test exposure performance following application of rehabilitation coating shall be not be less than that of the pre-rehabilitated roof performance when tested in accordance with ASTM E108, based upon manufacturer's tests of identical applications.

D. Energy Performance: Provide roof coating with initial solar reflectance index not less than 78 when calculated according to ASTM E1980, based upon testing of identical products by a qualified testing agency.

E. Energy Performance: Provide rehabilitated roofing according to one of the following when tested according to CRRC-1:

1. Three-year, aged solar reflectance of not less than 0.55 and emissivity of not less than 0.75.

F. Three-year, aged solar reflectance index of not less than 64 when calculated according to

ASTM E1980.

07 01 50 - Page 7 of 16

G. Bio-Based Content: Provide roofing rehabilitation coating materials meeting requirements of USDA Bio-based Affirmative Procurement Program, with not less than 20 percent bio-based content.

2.3 MATERIALS

A. General: Re-coating materials recommended by roofing system manufacturer for intended use and compatible with components of existing membrane roofing system.

B. Infill Materials: Where required to replace test cores and to patch existing roofing, use infill materials matching existing membrane roofing system materials, unless otherwise indicated.

C. Temporary Roof Drainage: Design and selection of materials for temporary roof drainage are responsibilities of the Contractor.

2.4 FLUID-APPLIED ROOFING MEMBRANE

A. Polyurethane Elastomeric Fluid-Applied System: Two-coat fluid-applied roofing membrane formulated for application over prepared existing roofing substrate.

1. Polyurethane Roof Coating System Base Coat: Bio-based, low-odor low-VOC two-part, for use with a compatible top coat.

a. Basis of design product: Tremco, AlphaGuard BIO Base Coat.

b. Combustion Characteristics, UL 790: Maintains combustion characteristics of existing roof system.

c. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 1 g/L.

d. Accelerated Weathering, 5000 hours, ASTM G154: Pass.

e. Hardness, Shore A, minimum, ASTM D2240: 80.

f. Solids, by volume, ASTM D2697: 100 percent.

g. Bio-Based Content, Minimum: 70 percent.

h. Minimum Thickness, Base Coat reinforced over Granular Surfaced MB: 64 mils (1.62 mm) wet.

2. Polyurethane roof coating system top coat, bio-based low-odor low-VOC two-part, for application over compatible base coat.

a. Basis of design product: Tremco, AlphaGuard BIO Top Coat.

b. Combustion Characteristics, UL790: Maintains combustion characteristics of existing roof system.

c. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 6 g/L.

07 01 50 - Page 8 of 16

d. Solar Reflectance Index (SRI), ASTM E1980: For white, not less than 103.

e. Accelerated Weathering, 5000 hours, ASTM G 154: Pass.

f. Hardness, Shore A, minimum, ASTM D2240: 81.

g. Solids, by volume, ASTM D2697: 100 percent.

h. Bio-Based Content, Minimum: 60 percent.

i. Minimum Thickness, reinforced system: 48 mils (1.22 mm) wet.

j. Minimum Thickness, Slip-Resistant Coat: 24 mils (0.60 mm) wet.

k. Color: As selected from manufacturer's standard color.

B. Primers:

1. Primer for Asphaltic and Single-Ply Membranes: Water-based, polymer-modified quick-dry low odor primer.

a. Basis of design product: Tremco, AlphaGuard WB Primer.

b. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 1 g/L.

c. Solids, by weight: 70 percent.

2. Primer for Masonry Surfaces: Two-part high-solids epoxy-penetrating low-odor primer for masonry and concrete surfaces.

a. Basis of design product: Tremco, AlphaGuard C-Prime.

b. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 0 g/L.

c. Solids, by weight: 100 percent.

3. Primer for Non-Porous Surfaces: Single-part, water based primer to promote adhesion of urethanes to metals, PVC and other non-porous surfaces.

a. Basis of design product: Tremco, AlphaGuard M-Prime.

b. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 22 g/L.

c. Nonvolatile Content, minimum, ASTM D2369: 5 percent.

d. Density at 77 deg F (25 deg C): 8.3 lb/gal (1kg/L).

4. Primer for Intercoat and Substrate Adhesion: Single-part, quick-drying primer to promote adhesion of urethane products to previous urethane coats and to other approved surfaces.

07 01 50 - Page 9 of 16

a. Basis of design product: Tremco, Geogard Primer.

b. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 100 g/L.

c. Coverage Rate, 400 sq. ft/ gal. (10 m2/ L): 4 mils (0.10 mm) wet.

C. Fluid-Applied Membrane Reinforcing Fabric:

1. Polyester Reinforcing Fabric: 100 percent stitch-bonded mildew-resistant polyester fabric intended for reinforcement of compatible fluid-applied membranes and flashings.

a. Basis of design product: Tremco, Permafab.

b. Tensile Strength, Minimum, ASTM D5034 (2-inch): MD - 110 lbs (49.8 kg);

XMD - 60 lbs (27.2 kg) avg.

c. Elongation, Minimum, ASTM D5034 (1-inch): MD - 25 percent; XMD - 100 percent.

d. Tear Strength, Minimum, ASTM D5587: MD - 20 lbs (9.0 kg) avg; XMD - 20 lbs (9.0 kg) avg.

e. Weight: 3 oz./sq. yd (102 g/sq. m).

2.5 AUXILIARY MATERIALS

A. General: Auxiliary materials recommended by roofing system manufacturer for intended use and compatible with existing roofing system and fluid-applied roofing system.

B. Seam Sealer: Waterproof seam and patching material compatible with applied coating.

1. Seam Sealer: Aromatic polyurethane sealer, single-component, high solids, moisture curing, formulated for compatibility and use with a variety of roofing and flashing substrates.

a. Basis of design product: Tremco, GEOGARD Seam Sealer.

b. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 189 g/L.

c. Tensile Strength, ASTM D412: 270 psi (1860 kPa).

d. Tear Strength, ASTM D412: 35 pli (6.13 kNm).

e. Elongation, ASTM D412: 220 percent.

f. Color: Gray.

C. Fasteners: Factory-coated steel fasteners and metal or plastic plates meeting corrosion-resistance provisions in FM 4470; designed for fastening roofing membrane components to

07 01 50 - Page 10 of 16 substrate; tested by manufacturer for required pullout strength; and acceptable to roofing system manufacturer.

D. Metal Flashing Sheet: Provide metal flashing sheet matching type, thickness, finish, and profile of existing metal flashing and trim.

E. Miscellaneous Accessories: Provide miscellaneous accessories recommended by roofing system manufacturer.

2.6 WALKWAYS

A. Fluid-Applied Walkway Top Coat, Slip-Resistant: Second top coat with broadcast slip-resistant aggregate.

1. Color: As selected for manufacturer’s standard colors.

B. Granular Roofing Surfacing: Ceramic-coated roofing granules, No. 11 screen size with 100 percent passing No. 8 (2.36-mm) sieve and 98 percent of mass retained on No. 40 (0.425-mm) sieve.

1. Basis of design product: Granular Roofing Surfacing, Colored.

2. Aggregate application rate, average: 10 - 15 lb/100 sq ft (0.5 - 0.75 k/m2).

3. Color: As selected by Architect from manufacturer's standard colors from manufacturer's standard colors.

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine existing roofing substrates, with Installer present, for compliance with requirements and for other conditions affecting application and performance of roof coatings.

1. For the record, prepare written report, endorsed by Installer, listing conditions detrimental to performance.

2. Verify compatibility of approved re-coating system with and suitability of substrates.

3. Verify that substrates are visibly dry and free of moisture.

4. Verify that roofing membrane surfaces have adequately aged to enable proper bond with re-coating system base coat.

5. Verify that existing roofing membrane is free of blisters, splits, open laps, indications of shrinkage, and puncture damage or other indications of impending roof system failure.

6. Commencing application of fluid-applied re-coating membrane indicates acceptance of surfaces and conditions.

07 01 50 - Page 11 of 16

3.2 PREPARATION

A. Protect existing roofing system that is indicated not to be rehabilitated, and adjacent portions of building and building equipment.

1. Mask surfaces to be protected. Seal joints subject to infiltration by coating materials.

2. Limit traffic and material storage to areas of existing roofing membrane that have been protected.

3. Maintain temporary protection and leave in place until replacement roofing has been completed.

B. Pollution Control: Comply with environmental regulations of authorities having jurisdiction.

Limit spread of dust and debris.

1. Remove and transport debris in a manner that will prevent spillage on adjacent surfaces and areas.

2. Remove debris from building roof by chute, hoist, or other device that will convey debris to grade.

C. Shut down air intake equipment in the vicinity of the Work in coordination with the Owner.

Cover air intake louvers before proceeding with re-coating work that could affect indoor air quality or activate smoke detectors in the ductwork.

1. Verify that rooftop utilities and service piping affected by the Work have been shut off before commencing Work.

D. Maintain roof drains in functioning condition to ensure roof drainage at end of each workday.

Prevent debris from entering or blocking roof drains and conductors. Use roof-drain plugs specifically designed for this purpose. Remove roof-drain plugs at end of each workday, when no work is taking place, or when rain is forecast.

1. Do not permit water to enter into or under existing membrane roofing system components that are to remain.

3.3 ROOFING COATING PREPARATION

A. Roofing Partial Tear-off and Patching: Refer to requirements of Division 07 Section "Preparation for Re-roofing."

B. Removal of Wet Insulation: Remove portions of roofing membrane with underlying wet insulation. Remove wet insulation, fill in tear-off areas to match existing insulation and membrane, and prepare patched membrane for roof coating application specified below.

C. Repair of Ponding Areas: Repair areas indicated as ponding areas or areas of inadequate drainage by removing roof membrane, adding additional insulation as required to provide minimum slopes to drain required by roofing rehabilitation coating manufacturer, and replace membrane with material matching existing. Submit photographic report indicating compliance.

07 01 50 - Page 12 of 16

D. Membrane Surface Preparation:

1. Remove loose granular aggregate from granular aggregate-surfaced built-up bituminous roofing with a power broom.

2. Remove blisters, ridges, buckles, roofing membrane fastener buttons projecting above the membrane, and other substrate irregularities from existing roofing membrane that would inhibit application of uniform, waterproof coating.

3. Broom clean existing substrate.

4. Substrate Cleaning: Clean substrate of contaminants such as dirt, debris, oil, and grease that can affect adhesion of coating by power washing at minimum 2,000 psi. (13,800 kPa).

a. Dispose of waste water in accordance with requirements of authorities having jurisdiction.

5. Verify that existing substrate is dry before proceeding with application of coating. Spot check substrates with an electrical capacitance moisture-detection meter.

6. Verify adhesion of new products.

E. Existing Flashing and Detail Preparation: Repair flashings, gravel stops, copings, and other roof-related sheet metal and trim elements. Reseal joints, replace loose or missing fasteners, and replace components where required to leave in a watertight condition.

1. Do not damage metal counterflashings that are to remain. Replace metal counterflashings damaged during removal with counterflashings of same metal, weight or thickness, and finish.

2. Roof Drains: Remove drain strainer and clamping ring. Grind metal surfaces down to clean, bare, metal.

F. Surface Priming: Prime surfaces to receive fluid-applied coating using coating manufacturer's recommended product for surface material. Apply at application rate recommended by manufacturer.

1. Ensure primer does not puddle and substrate has complete coverage.

2. Allow to cure completely prior to application of coating.

G. Membrane Repair: Repair membrane at locations with irregularities using seam sealer mastic and reinforcing fabric.

H. Membrane Seam Reinforcement: Reinforce membrane seams using seam sealer mastic and reinforcing fabric overlapping onto field of existing membrane not less than width required by roof coating manufacturer.

07 01 50 - Page 13 of 16

3.4 FLUID-APPLIED FLASHING APPLICATION

A. Fluid-Applied Flashing and Detail Base Coat Application: Complete base coat and fabric reinforcement at parapets, curbs, penetrations, and drains prior to application of field of fluid-applied membrane. Apply base coat in accordance with manufacturer's written instructions.

1. Apply base coat on prepared and primed surfaces and spread coating evenly. Extend coating minimum of 8 inches (200 mm) up vertical surfaces and 4 inches (100 mm) onto horizontal surfaces.

2. Back roll to achieve not less than minimum coating thickness indicated in Part 2 product listing, unless greater thickness is recommended by manufacturer. Verify thickness as work progresses.

3. Fabric Reinforcement: Embed fabric reinforcement into wet base coat. Lap adjacent flashing pieces of fabric minimum 3 inches (75 mm) along edges and 6 inches (150 mm) at end laps.

a. Roll surface of fabric reinforcing to completely embed and saturate fabric. Leave finished base coat with fabric free of pin holes, voids, or openings.

4. Fabric Reinforcement: Place fabric reinforcement onto wet base coat. Lap adjacent flashing pieces of fabric minimum 3 inches (75 mm) along edges and 6 inches (150 mm) at end laps.

a. Apply second base coat over installed fabric reinforcement and back roll to achieve not less than minimum coating thickness indicated in Part 2 product listing, unless greater thickness is recommended by manufacturer. Verify application thickness as work progresses.

5. Roof Drains: Install base coat onto surrounding membrane surface and metal drain bowl flange. Install target piece of fabric reinforcement immediately into wet base coat and roll to fully embed and saturate fabric. Reinstall clamping ring and strainer following application of top coat. Replace broken drain ring clamping bolts.

6. Allow base coat to cure prior to application of top coat.

3.5 FLUID-APPLIED MEMBRANE APPLICATION

A. Fluid-Applied Membrane Base Coat: Apply base coat to field of membrane in accordance with manufacturer's written instructions.

1. Apply base coat on prepared and primed surfaces and spread coating evenly.

2. Back roll to achieve not less than minimum coating thickness indicated in Part 2 product listing, unless greater thickness is recommended by manufacturer. Verify thickness as work progresses.

07 01 50 - Page 14 of 16

3. Fabric Reinforcement: Embed fabric reinforcement into wet base coat. Lap adjacent flashing pieces of fabric minimum 3 inches (75 mm) along edges and 6 inches (150 mm) at end laps.

a. Roll surface of fabric reinforcing to completely embed and saturate fabric. Leave finished base coat with fabric free of pin holes, voids, or openings.

b. Following curing of base coat and prior to application of top coat, sand raised or exposed edges of fabric reinforcement.

4. Fabric Reinforcement: Place fabric reinforcement onto wet base coat. Lap adjacent flashing pieces of fabric minimum 3 inches (75 mm) along edges and 6 inches (150 mm) at end laps.

a. Apply second base coat over embedded fabric reinforcement and back roll to achieve not less than minimum coating thickness indicated in Part 2 product listing, unless greater thickness is recommended by manufacturer. Verify application thickness as work progresses.

B. Top Coat Application: Apply top coat to field of membrane and flashings uniformly in a complete, continuous installation.

1. Allow base coat to cure prior to application of top coat.

2. Following curing of base coat and prior to application of top coat, sand raised or exposed edges of fabric reinforcement.

3. Prime base coat prior to application of top coat if top coat is not applied within 72 hours of the base coat application, using manufacturer's recommended primer.

4. Apply top coat extending coating up vertical surfaces and out onto horizontal surfaces.

Install top coat over field base coat and spread coating evenly.

5. Back roll to achieve not less than minimum coating thickness indicated in Part 2 product listing, unless greater thickness is recommended by manufacturer. Verify thickness as work progresses.

6. Avoid foot traffic on new fluid-applied membrane for a minimum of 24 hours.

3.6 WALKWAY INSTALLATION

A. Install walkways following application of coating. Locate as indicated, or as directed by Owner.

B. Slip-Resistant Walkway Topcoat: Apply walkway second topcoat following application and curing of top coat. Locate as indicated on Drawings.

1. Mask walkway location with tape.

07 01 50 - Page 15 of 16

2. Prime first top coat prior to application of walkway top coat if walkway top coat is not applied within 72 hours of the first top coat application, using manufacturer's recommended primer.

3. Broadcast Slip-Resistant Top Coat Aggregate in wet top coat at rate indicated in Part 2 product listing or as otherwise recommended by coating manufacturer.

a. Back roll aggregate filled top coat creating even dispersal of aggregate. Remove masking immediately.

3.7 FIELD QUALITY CONTROL

A. Roofing Inspector: Contractor shall engage a qualified roofing inspector to perform roof tests and inspections and to prepare test reports.

1. Roofing Inspector: Contractor shall engage a qualified roofing inspector for a minimum of 2 full-time days on site, per 40-hour crew week, to perform roof tests and inspections and to prepare start up, interim, and final reports. Roofing Inspector's quality assurance inspections shall comply with criteria established in Quality Control and Quality-assurance Guidelines for the Application of Membrane Roof Systems."

B. Roof Inspection: Engage roofing system manufacturer's technical personnel to inspect roofing installation, and submit report. Notify Owner’s Consultant 48 hours in advance of dates and times of inspections. Inspect work as follows:

1. Upon completion of preparation of roof coating substrate, prior to application of coating materials.

2. Following application of coating to flashings and application of base coat to field of roof.

3. Upon completion of coating but prior to re-installation of other roofing components.

C. Repair fluid-applied membrane where test inspections indicate that they do not comply with specified requirements.

D. Arrange for additional inspections, at Contractor's expense, to verify compliance of replaced or additional work with specified requirements.

3.8 DISPOSAL

A. Collect demolished materials and place in containers. Promptly dispose of demolished materials. Do not allow demolished materials to accumulate on-site.

1. Storage or sale of demolished items or materials on-site is not permitted.

B. Transport and legally dispose of demolished materials off Owner's property.

3.9 PROTECTING AND CLEANING

A. Protect roofing system from damage and wear during remainder of construction period.

07 01 50 - Page 16 of 16

B. Correct deficiencies in or remove coating that does not comply with requirements, repair substrates, and reapply coating.

C. Clean overspray and spillage from adjacent construction using cleaning agents and procedures recommended by manufacturer of affected construction.

END OF SECTION 07 01 50

07 56 00 - Page 1 of 15

FLUID-APPLIED MEMBRANE ROOFING

SECTION 07 56 00 - FLUID-APPLIED MEMBRANE ROOFING, CONCRETE DECK

PART 1 - GENERAL

1.1 SUMMARY

A. This Section includes the following:

1. Roof coating preparation including preparation of concrete deck and substrate to receive fluid-applied flashing.

2. Application of fabric-reinforced fluid-applied roof membrane and flashings to prepared existing concrete deck.

B. Related Information:

1. Division 00 Document "Existing Condition Information" for related Project information not part of the Contract Documents.

2. Division 03 Section "Maintenance of Cast-in-Place Concrete: for removal of deteriorated concrete and subsequent replacement and patching

3. Division 07 Section "Preparation for Re-Roofing" for existing roofing tearoff and substrate preparation for installation of new roofing membrane.

4. Division 07 Section "Sheet Metal Flashing and Trim" for manufactured reglets, formed metal roof flashings, expansion joints, copings, roof edge metal.

1.2 ROOFING CONFERENCES

A. Roofing Preinstallation Conference: Conduct conference at Project site. Review methods and procedures related to roofing system.

1. Meet with Owner, Owner's Consultant, roofing materials manufacturer's representative, roofing Installer including project manager and foreman, and installers whose work interfaces with or affects roofing including installers of roof accessories and roof-mounted equipment.

2. Review drawings and specifications.

3. Review methods and procedures related to roofing preparation, including membrane roofing system manufacturer's written instructions.

4. Review roof drainage during each stage of roofing and review roof drain plugging and plug removal procedures.

5. Review and finalize construction schedule, and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.

07 56 00 - Page 2 of 15

6. Review base flashings, special roofing details, drainage, penetrations, equipment curbs, and condition of other construction that will affect roofing.

7. Review HVAC shutdown and sealing of air intakes.

8. Review shutdown of fire-suppression, -protection, and -alarm and -detection systems.

9. Review governing regulations and requirements for insurance and certificates if applicable.

10. Review existing conditions that may require notification of Owner before proceeding.

1.3 DEFINITIONS

A. Roofing Terminology: Refer to ASTM D1079 "Standard Terminology Relating to Roofing and Waterproofing" and glossary in applicable edition of NRCA's "The NRCA Roofing Manual:

Membrane Roof Systems" for definition of terms related to roofing work in this Section.

B. Roofing Preparation: Existing roofing that is to remain and be prepared to accept restorative fluid-applied membrane application.

C. Patching: Removal of a portion of existing membrane roofing system from deck or removal of selected components and accessories from existing membrane roofing system and replacement with similar materials.

1.4 ACTION SUBMITTALS

A. Product Data: For each type of product specified.

B. Shop Drawings: Include plans, elevations, sections, details, and attachments to other work.

1. Base flashings and terminations.

2. Tapered insulation, including slopes.

C. Sustainable Design Submittals:

1. Product Test Reports for Solar Reflectance: For roof coating, indicating that coated roof will comply with solar reflectance index requirement.

2. Indicate Food, Conservation, and Energy Act of 2008 Bio-based material requirement compliance.

a. Indicate type of bio-based material in product.

b. Indicate the percentage of bio-based content per unit of product.

c. Indicate relative dollar value of bio-based content product to total dollar value of product included in project.

07 56 00 - Page 3 of 15

1.5 INFORMATIONAL SUBMITTALS

A. Contractor's Product Certificate: Submit notarized certificate, indicating products intended for Work of this Section, including product names and numbers and manufacturers' names, with statement indicating that products to be provided meet the requirements of the Contract Documents.

B. Qualification Data: For Installer, Manufacturer, and Roofing Inspector.

1. Letter written for this Project indicating manufacturer approval of Installer to apply specified products and provide specified warranty.

2. Certificate indicating Installer is qualified in Project jurisdiction to perform asbestos abatement.

C. Product Test Reports: Based on evaluation of comprehensive tests performed by manufacturer and witnessed by a qualified testing agency, for components of roofing system.

D. Warranties: Unexecuted sample copies of special warranties.

E. Inspection Reports: Reports of Roofing Inspector. Include weather conditions, description of work performed, tests performed, defective work observed, and corrective actions required and carried out.

1. Submit reports within 48 hours after inspection.

1.6 CLOSEOUT SUBMITTALS

A. Maintenance Data: To include in maintenance manuals.

B. Warranties: Executed copies of approved warranty forms.

1.7 QUALITY ASSURANCE

A. Installer Qualifications: An employer of workers trained and certified by manufacturer, including a full-time on-site supervisor with a minimum of three years' experience installing products comparable to those specified, able to communicate verbally with Contractor, Owner's Consultant, and employees, and the following:

1. Qualified by the manufacturer to install manufacturer's product and furnish warranty of type specified.

B. Manufacturer Qualifications: Approved manufacturer listed in this Section with minimum five years' experience in manufacture of specified products in successful use in similar applications.

1. Approval of Other Manufacturers and Comparable Products: Submit the following in accordance with project substitution requirements, within time allowed for substitution review:

07 56 00 - Page 4 of 15

a. Product data, including certified independent test data indicating compliance with requirements.

b. Samples of each component.

c. Sample submittal from similar project.

d. Project references: Minimum of five installations of specified products not less than five years old, with Owner and Owner's Consultant contact information.

e. Sample warranty.

C. Roofing Inspector Qualifications: A technical representative of manufacturer not engaged in the sale of products and experienced in the installation and maintenance of the specified roofing system, qualified to perform roofing observation and inspection specified in Field Quality Control Article, to determine Installer's compliance with the requirements of this Project, and approved by the manufacturer to issue warranty certification. The Roofing Inspector shall be one of the following:

1. An authorized full-time technical employee of the manufacturer.

2. An independent party certified as a Registered Roof Observer by the IIBEC, retained by the Contractor or the Manufacturer and approved by the Manufacturer.

D. Manufacturer's Installation Instructions: Obtain and maintain on-site manufacturer's written recommendations and instructions for installation of products.

1.8 DELIVERY, STORAGE, AND HANDLING

A. Deliver roofing materials to Project site in original containers with seals unbroken and labeled with manufacturer's name, product brand name and type, date of manufacture, approval or listing agency markings, and directions for storing and mixing with other components.

B. Handle and store roofing materials, and place equipment in a manner to avoid significant or permanent damage to deck or structural supporting members.

C. Protect materials from physical damage and from deterioration by sunlight, moisture, soiling, and other sources. Store in a dry location. Comply with manufacturer's written instructions for handling, storing, and protecting.

1.9 PROJECT / FIELD CONDITIONS

A. Protect building, adjacent buildings, walkways, site improvements, exterior plantings, and landscaping from damage or soiling from roofing operations.

B. Maintain access to existing walkways, corridors, and other adjacent occupied or used facilities.

C. Weather Limitations: Proceed with roofing work only when existing and forecasted weather conditions permit Work to proceed without water entering into existing roofing system or building.

07 56 00 - Page 5 of 15

1. Store all materials prior to application at temperatures between 60 and 90 deg. F (16 and 32 deg C).

2. Apply coatings within range of ambient and substrate temperatures recommended by manufacturer. Do not apply materials when air temperature is below 50 or above 110 deg.

F (10 or above 43 deg C).

3. Do not apply roofing in snow, rain, fog, or mist.

D. Daily Protection: Coordinate installation of roofing so insulation and other components of roofing system not permanently exposed are not subjected to precipitation or left uncovered at the end of the workday or when rain is forecast.

E. Owner will occupy portions of building immediately below roofing area. Conduct roofing so Owner's operations will not be disrupted. Provide Owner with not less than 72 hours' notice of activities that may affect Owner's operations.

1.10 WARRANTY

A. Manufacturer's Warranty: In which manufacturer agrees to repair or replace components of roofing system that fail in materials or workmanship within warranty period, as follows.

1. Form of Warranty: Tremco "Plain and Simple" warranty form.

2. Scope of Warranty: Work of this Section.

3. Warranty Period: 20 years from date of completion.

4. Inspections by Manufacturer: To occur every five years following completion.

B. Installer Warranty: Installer's warranty signed by Installer, as follows.

1. Form of Warranty: Form acceptable to Roofing Manufacturer and Owner.

2. Scope of Warranty: Work of this Section.

3. Warranty Period: 3 years from date of completion.

PART 2 - PRODUCTS

2.1 MANUFACTURERS

A. Basis of Design: The roof system specified in this Section is based upon products of Tremco CPG Inc, Beachwood, OH, (800) 562-2728, www.tremcoroofing.com that are named in other Part 2 articles. Provide specified products.

1. Manufacturers of comparable products: Approved by Owner's Consultant prior to bid.

B. Source Limitations: Obtain components for roofing system from same manufacturer as membrane roofing or manufacturer approved by membrane roofing manufacturer.

07 56 00 - Page 6 of 15

2.2 PERFORMANCE REQUIREMENTS

A. General: Provide recoated roofing membrane and base flashings that remain watertight; do not permit the passage of water; and resist specified uplift pressures, thermally induced movement, and exposure to weather without failure.

1. Accelerated Weathering: Roofing system shall withstand 2000 hours of exposure when tested according to ASTM G152, ASTM G154, or ASTM G155.

2. Impact Resistance: Roof membrane shall resist impact damage when tested according to ASTM D3746/D3746M, ASTM D4272/D4272M, or the "Resistance to Foot Traffic Test" in FM Approvals 4470.

B. Material Compatibility: Provide roofing materials that are compatible with one another under conditions of service and application required, as demonstrated by roofing manufacturer based on testing and field experience.

C. Flashings: Provide base flashings, perimeter flashings, detail flashings and component materials that comply with requirements and recommendations of the following:

1. Roof system manufacturer's construction details and recommendations.

2. NRCA Roofing Manual (Sixth Edition) for construction details and recommendations.

3. SMACNA Architectural Sheet Metal Manual (Seventh Edition) for construction details.

D. Exterior Fire-Test Exposure: ASTM E108, Class A; for application and roof slopes indicated, as determined by testing identical membrane roofing materials by a qualified testing agency.

Materials shall be identified with appropriate markings of applicable testing agency.

E. Solar Reflectance Index: Not less than 78 when calculated according to ASTM E 1980, based on testing identical products by a qualified testing agency.

F. Energy Performance: Roofing system shall have an initial solar reflectance index of not less than 0.70 and an emissivity of not less than 0.75 when tested according to CRRC-1.

G. Bio-Based Content: Provide roofing rehabilitation coating materials meeting requirements of USDA Bio-based Affirmative Procurement Program, with not less than 20 percent bio-based content.

2.3 MATERIALS

A. General: Roofing materials recommended by roofing system manufacturer for intended use and compatible with components of existing membrane roofing system.

B. FM Global Standards: Roofing, base flashings, and component materials shall be identical to materials that comply with requirements in FM Global 4470 as part of a roofing system listed or approved by FM Global for Class 1 or non-combustible construction, as applicable. Identify applicable materials with FM Global markings.

07 56 00 - Page 7 of 15

C. Temporary Roofing Materials: Selection of materials and design of temporary roofing is responsibility of Contractor.

D. General: Provide adhesive and sealant materials recommended by roofing manufacturer for intended use and compatible with roofing materials.

1. Liquid-type auxiliary materials shall comply with VOC limits of authorities having jurisdiction.

2. Adhesives and sealants that are not on the exterior side of weather barrier shall comply with the following limits for VOC content when calculated according to 40 CFR 59, Subpart D (EPA Method 24):

a. Plastic Foam Adhesives: 50 g/L.

b. Gypsum Board and Panel Adhesives: 50 g/L.

c. Multipurpose Construction Adhesives: 70 g/L.

d. Other Adhesives: 250 g/L.

e. Sealant Primers for Porous Substrates: 775 g/L.

3. Adhesives and sealants shall comply with the testing and product requirements of the California Department of Public Health's "Standard Method for the Testing and Evaluation of Volatile Organic Chemical Emissions from Indoor Sources Using Environmental Chambers."

2.4 FLUID-APPLIED ROOFING MEMBRANE

A. Polyurethane Elastomeric Fluid-Applied System: Two-coat fluid-applied roofing membrane formulated for application over prepared roof substrate.

1. Polyurethane-modified methyl methacrylate reinforced roof coating system base coat, two-part moisture-curing for use with a compatible top coat.

a. Basis of design product: Tremco, AlphaGuard PUMA Base Coat.

b. Combustion Characteristics, UL790: Maintains combustion characteristics of existing roof system .

c. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 0 g/L.

d. Tensile Strength, ASTM D5147: 175 lbf/in (31 N/mm).

e. Elongation, Reinforced, ASTM D5147: 40 percent.

f. Crack Bridging, ASTM D5147: Pass - 2 mm.

g. Hardness, Shore A, minimum, ASTM D2240: 93.

07 56 00 - Page 8 of 15

h. Minimum Thickness, Reinforced Base Coat: 80 mils (2.0 mm) wet total: Apply 40 mils (1.0 mm) wet, plus 40 mils (1.0 mm) wet over reinforcing fabric.

2. Polyurethane-modified methyl methacrylate roof coating system top coat, two-component 0 VOC, UV resistant, for application over compatible base coat.

a. Basis of design product: Tremco, AlphaGuard PUMA Top Coat.

b. Combustion Characteristics, UL 790: Maintains combustion characteristics of existing roof system.

c. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 0 g/L.

d. Tensile Strength, ASTM D5147: 175 lbf/in (30 N/mm).

e. Elongation, Reinforced, ASTM D5147: 40 percent.

f. Crack Bridging, ASTM D5147: Pass, 2 mm.

g. Hardness, Shore A, minimum, ASTM D2240: 93.

h. Solar Reflectance Index (SRI), minimum, ASTM E1980: 95.

i. Minimum Thickness: 32 mils (0.81 mm) wet over cured base coat.

B. Reinforcing Fabric:

1. Polyester Reinforcing Fabric: 100 percent stitch-bonded mildew-resistant polyester fabric intended for reinforcement of compatible fluid-applied membranes and flashings.

a. Basis of design product: Tremco, Permafab.

b. Tensile Strength, Minimum, ASTM D5034 (2-inch): MD - 110 lbs (49.8 kg);

XMD - 60 lbs (27.2 kg) avg.

c. Elongation, Minimum, ASTM D5034 (1-inch): MD - 25 percent; XMD - 100 percent.

d. Tear Strength, Minimum, ASTM D5587: MD - 20 lbs (9.0 kg) avg; XMD - 20 lbs (9.0 kg) avg.

e. Weight: 3 oz./sq. yd (102 g/sq. m).

C. Primers:

1. Primer for Non-Porous Surfaces: Single-part, water based primer to promote adhesion of urethanes to metals, PVC and other non-porous surfaces.

a. Basis of design product: Tremco, AlphaGuard M-Prime.

07 56 00 - Page 9 of 15

b. Volatile Organic Compounds (VOC), maximum, ASTM D3960: 22 g/L.

c. Nonvolatile Content, minimum, ASTM D2369: 5 percent.

d. Density at 77 deg F (25 deg C): 8.3 lb/gal (1kg/L).

2. Primer, Methyl Methacrylate: Two-component primer for concrete and metal substrates for application of PUMA coatings.

a. Basis of design product: Tremco, AlphaGuard PUMA Primer - 107.

b. Coverage Rate: 1 gal/100 sq. ft (16 mils) (0.40 mm) wet.

2.5 EXISTING CONCRETE REPAIR

A. Concrete Repair: For removal of deteriorated concrete and subsequent replacement and patching, refer to Division 07 Section "Preparation for Re-Roofing."

2.6 WALKWAY MATERIAL

A. Polyurethane-modified methyl methacrylate top coat slip resistant: second top coat, with broadcast slip resistant aggregate.

1. Basis of design product: Tremco, AlphaGuard PUMA Top Coat Slip Resistant.

2. Minimum Thickness: 16 wet mils, (0.40 mm) wet; over cured top coat.

3. Silica Sand Aggregate: 20 to 30 lb/100 sq. ft..

4. Color: As selected from manufacturer's standard colors.

PART 3 - EXECUTION

3.1 REMOVAL OF EXISTING ROOFING

A. Refer to requirements of Division 07 Section "Preparation for Re-Roofing" for removal of existing roofing and requirements for temporary roofing coordinated with work of this Section.

3.2 EXAMINATION

A. Examine roofing substrates, with Installer present, for compliance with requirements and for other conditions affecting application and performance of fluid-applied roofing.

1. For the record, prepare written report, endorsed by Installer, listing conditions detrimental to performance.

2. Verify that substrates are sound, visibly dry and free of moisture.

3. Verify that substrates have adequately cured to enable proper bond with base coat.

07 56 00 - Page 10 of 15

4. Application of fluid-applied roofing indicates acceptance of surfaces and conditions.

3.3 PREPARATION, GENERAL

A. Protect existing roofing system that is indicated not to receive fluid-applied roofing, and adjacent portions of building and building equipment.

B. Shut down air intake equipment in the vicinity of the Work in coordination with the Owner.

Cover air intake louvers before proceeding with coating work that could affect indoor air quality or activate smoke detectors in ductwork.

1. Verify that rooftop utilities and service piping affected by the Work have been shut off before commencing Work.

2. Prevent dust, vapors, gases, and odors from entering occupied building during roof installation. When shutting down or blocking air intakes, provide makeup air or additional intake air from sources away from the work area.

C. Maintain roof drains in functioning condition…