DRAWING LIST
1i
GRID / COLUMN
LINE
DESIGNATOR
EQUIPMENT NUMBER
DOOR NUMBER
Ga5xFB1
WALL TYPE
WINDOW TYPE
ROOM NAME/NUMBER
REVISION TAG
NORTH ARROW w/
TRUE NORTH
INDICATION
ROOM NAME
ELEVATION NUMBER
SECTION
INTERIOR ELEVATION
ENLARGEMENT,
DETAIL
SPOT ELEVATION
Name
Elevation
FLOOR LEVEL & NAME
PLATE NUMBER WHERE
SECTION/DETAIL IS
DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS
DRAWN
PLATE NUMBER WHERE
SECTION/DETAIL IS
DRAWN
SHEET KEYNOTE
A101
SIM
EXTERIOR ELEVATION
A101
PLATE NUMBER WHERE
SECTION/DETAIL IS
DRAWN
INDEX OF DRAWINGS
202-A101
DISCIPLINE:
G - GENERAL
C - CIVIL
L - LANDSCAPE
S - STRUCTURAL
A - ARCHITECTURE
P - PLUMBING
M - MECHANICAL
E - ELECTRICAL
T - TELECOM
Q - FOOD SERVICE
SHEET TYPE
DESIGNATOR
VICINITY MAP
PROJECT TEAMBUILDING SUMMARY
PROJECT INFORMATION
GENERAL:
ALL WORK COORDINATED THROUGH BRAD PETROVIC AT VAMC - JOHN COCHRAN (ST. LOUIS) ENGINEERING DEPARTMENT. A FULL PHASING PLAN WILL BE COORDINATED WITH REGARDS TO NIGHTTIME AND WEEKEND WORK SCHEDULES AND SHUTDOWNS. EACH OF THE FOLLOWING TASKS SHOULD BE COMPLETED INDEPENDENTLY OF OTHERS - START-TO-FINISH
WITHOUT DELAY TO WORK ON ANOTHER TASK.
BUILDING 1 - 01-AC-03 REPLACEMENT:
ALL DUCT AND PIPING TO BE SHOP-FABRICATED PRIOR TO DELIVERY TO SITE. PREPARE FOR CONTINGENCY PIPE SECTIONS AND CONNECTIONS IN FIELD OF 12 INCHES IN LENGTH OR LESS. INTERSTITIAL SPACE ALLOWS FOR UNIT TO BE TRANSPORTED TO MECHANICAL ROOM IN COMPONENTS THAT FIT THROUGH A STANDARD 3'-0" X 7'-0" DOORWAY. VERIFY AND COORDINATE
EQUIPMENT COMPONENT PATHWAYS THROUGH LEVEL 3 INTERSTITIAL SPACE.
BUILDING 1 - 01-AC-17 AND CHILLER REPLACEMENT:
WORK TO BE ACCOMPLISHED IN MONTHS OF APRIL-MAY OR SEPT-OCT. INSTALL AS MUCH OF THE NEW STEAM & CHILLED WATER SYSTEM (PUMPS, PIPING, ACCESSORIES) AS POSSIBLE PRIOR TO DEMOLITION OF EXISTING CHILLER AND AIR HANDLER TO MINIMIZE EQUIPMENT DOWN-TIME. NEW CHILLER SUPPORTS TO BE PRE-FABRICATED AND MANUFACTURER PROVIDED WITH SEISMIC PRE-APPROVAL RATINGS. DELIVER NEW CHILLER AND REMOVE EXISTING ROOFTOP CONDENSER ON SAME DAY AND CRANE USE. PROVIDE AIR HANDLER THAT CAN BE TRANSPORTED TO MECHANICAL ROOM IN COMPONENTS THAT FIT THROUGH A STANDARD 3'-0" X 7'-0" DOORWAY. VERIFY AND COORDINATE EQUIPMENT COMPONENT PATHWAYS THROUGH LEVEL 3
INTERSTITIAL SPACE.
BUILDING 1 - 01-ITAC-03&06 & 01-ITCU-03&06 NETWORK RACK COOLING UNITS REPLACEMENT:
REMOVE NETWORK RACK COOLING SYSTEM #6 FIRST (NOT IN OPERATION) WITHOUT INTERRUPTING NETWORK CONNECTIVITY TO UNIT #3 (IN OPERATION). COORDINATE SWITCH-OVER OF NETWORK CONNECTION TO NEW UNIT BEFORE REPLACEMENT OF OF REDUNDANT RACKS TO MAINTAIN CONSTANT NETWORK OPERATION THROUGHOUT CONSTRUCTION PROCESS. PROVIDE CONTROL CONDUIT AND WIRING SCOPE OF WORK PRIOR TO DEMOLITION OF EXISTING SYSTEMS TO MINIMIZE TIME TO GET
FULLY REDUNDANT RACK SYSTEMS WITH BAS SYSTEM INTEGRATION AS SHOWN IN DRAWINGS.
BUILDING 1 - 01-RAH-1A&B HEAT WHEEL REPLACEMENT:
PRE-FABRICATE AS MANY DUCTWORK COMPONENTS AS POSSIBLE PRIOR TO EXISITING SYSTEM DEMOLITION TO MINIMIZE AC-1 DOWN-TIME. PRIOR TO REMOVAL OF OUTDOOR AIR DUCT FROM E-WHEEL, COVER LOUVER OPENING WITH FILTER FABRIC.
COMPONENTS CAN BE TRANSPORTED TO MECHANICAL ROOM IN PARTS THAT FIT THROUGH A STANDARD 3'-0" X 7'-0" DOORWAY.
VERIFY AND COORDINATE EQUIPMENT COMPONENT PATHWAYS THROUGH LEVEL 3 INTERSTITIAL SPACE.
BLDG 3 03-AC-01 REPLACEMENT:
PRE-FABRICATE NEW AHU TO BE READY TO RECEIVE CHILLED WATER AND STEAM PIPING CONNECTIONS PRIOR TO DELIVERY TO SITE. DELIVER NEW AHU AND REMOVE (DECOMMISSION) EXISTING ROOFTOP AHU ON SAME DAY AND CRANE USE.
BLDG 8 08-VAU-B1 REPLACEMENT:
PROVIDE UNIT THAT CAN BE TRANSPORTED TO THE BASEMENT THROUGH THE BOILER BUILDING. BASEMENT STAIR OPENING IS
LIMITED TO A 3'-0" OPENING.
BLDG 8 08-AC-M3 REPLACEMENT:
EQUIPMENT AND SYSTEM COMPONENTS TO BE CRANE LIFTED TO THE CHILLER PLANT ROOF AND TRANSPORTED THROUGH POP-OUT WINDOW ADJACENT TO EXISTING UNIT. PROVIDE UNIT WITH COMPONENTS THAT CAN BE TRANSPORTED THROUGH A
4'-0" X 4'-0" WINDOW OPENING.
ANNOTATION DRAWING SYMBOLSGENERAL NOTES
PROJECT NAME: REPLACE OBSOLETE AND FAILING AIR CONDITIONING UNITS VA ST. LOUIS HEALTH CARE SYSTEM
PROJECT NUMBER: 657-19-113JC
PROJECT LOCATION: JOHN COCHRAN DIVISION - VA ST. LOUIS HEALTH CARE SYSTEM
PROJECT PURPOSE/USE: REPLACE OBSOLETE AND FAILING AIR CONDITIONING UNITS
BUILDING NUMBER
1. THESE DRAWINGS SHALL BE USED ONLY FOR THIS SPECIFIC PROJECT/SITE LOCATION. THESE DRAWINGS ARE A COMPOSITE SET OF CONTRACT DOCUMENTS AND SHALL NOT BE SEPARATED FOR DISTRIBUTION. THE GC SHALL REVIEW
ALL DRAWINGS AND PROVIDE/DISTRIBUTE THE ENTIRE SET TO EACH SUBCONTRACTOR.
2. THE GC SHALL VISIT THE SITE TO INSPECT EXISTING CONDITIONS AND VERIFY WORK BEING PERFORMED BEFORE
SUBMITTING COST QUOTATIONS FOR WORK.
3. NOTIFY THE ARCHITECT PROMPTLY OF ANY ERRORS, OMISSIONS, INCONSISTENCIES, DISCREPANCIES AND CONFLICTS WITHIN THE CONTRACT DOCUMENTS AND ITS ASSOCIATED FIELD/PROJECT CONDITIONS SO THAT A RESOLUTION CAN BE
PROVIDED PRIOR TO CONTINUING WITH WORK.
4. DO NOT SCALE THE DRAWINGS. REQUEST ANY MISSING DIMENSIONS FROM THE ARCHITECT
5. ALL WORK PERFORMED SHALL BE IN STRICT COMPLIANCE WITH GOVERNING FEDERAL, STATE AND LOCAL BUILDING CODE REQUIREMENTS, SHALL BE EXECUTED IN ACCORDANCE WITH ACCEPTED INDUSTRY STANDARDS, AND SHALL CONFORM TO SPECIFIC REGULATIONS AS MANDATED BY THE OWNER, THE ARCHITECT, AND THE AUTHORITIES HAVING JURISDICTION.
THE GENERAL CONTRACTOR IS RESPONSIBLE FOR ANY FEES ASSOCIATED WITH PROCURING SUCH PERMITS AND CERTIFICATES AND SHALL FURNISH COPIES OF PERMITS, INSPECTIONS, AND CERTIFICATES TO THE OWNER.
6. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK TO MINIMIZE DISRUPTION OF ANY EXISTING TENANTS OR BUILDING OPERATIONS. THE GENERAL CONTRACTOR SHALL TAKE ADEQUATE PRECAUTIONS TO PROTECT BUILDING OCCUPANTS, MATERIALS, AND EXISTING CONSTRUCTION THROUGHOUT ALL PHASES OF CONSTRUCTION. DAMAGE TO EXISTING-TO-REMAIN CONSTRUCTION OR EQUIPMENT SHALL BE RESTORED TO ORIGINAL CONDITION AT THE
CONTRACTOR'S EXPENSE.
7. THE GENERAL CONTRACTOR SHALL REMOVE ALL TRASH AND DEBRIS FROM THE JOB SITE ON A DAILY BASIS.
8. ANY REQUESTS FOR SUBSTITUTIONS OF ANY SPECIFIED ITEM ARE TO BE SUBMITTED TO THE ARCHITECT IN WRITING AND WILL BE CONSIDERED ONLY IF THE ALTERNATE PROPOSED IS PROVEN TO BE ADVANTAGEOUS TO THE OWNER WITH
RESPECT TO DELIVERY DATE, QUALITY, OR COST.
9. THE MEANS AND METHODS OF CONSTRUCTION, AND TEMPORARY STRUCTURES AND FACILITIES, ARE THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE ARCHITECT DOES NOT ASSUME ANY RESPONSIBILITY FOR THE CONTRACTOR'S
MEANS AND METHODS OR FOR TEMPORARY STRUCTURES.
10. DEMOLITION OF EXISTING STRUCTURES IS THE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE CONTRACTOR SHALL
EMPLOY ENGINEERING EXPERTISE AS NEEDED TO ASSIST IN DEMOLITION.
11. JOB SITE SAFETY AND SECURITY ARE THE SOLE RESPONSIBILITY OF THE GENERAL CONTRACTOR. THE GENERAL CONTRACTOR SHALL CONSULT WITH LOCAL FIRE AUTHORITIES TO ASCERTAIN REQUIREMENTS FOR FIRE SUPPRESSION AND SAFETY DURING CONSTRUCTION. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR MEETING OSHA
REGULATIONS DURING CONSTRUCTION.
12. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR STORAGE AND PROTECTION OF BUILDING MATERIALS, AND INSTALLED CONSTRUCTION, FROM INCLEMENT WEATHER, THEFT, AND OTHER HAZARDS. THE GC SHALL FOLLOW ALL MANUFACTURER'S RECOMMENDATIONS FOR STORAGE OF MATERIALS. PARTIALLY COMPLETED WALLS SHALL BE COVERED TO PROTECT FROM WATER INTRUSION. DAMAGE, INCLUDING BUT NOT LIMITED TO MOLD, RESULTING FROM WATER INTRUSION DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE.
A101
A101
PLAN NORTH
SHEET NUMBER
WITHIN SERIES
ARCHITECT:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Rebecca Olson, AIA ACHA rebecca.olsen@romanykconsulting.com
855.424.3838 x302
602.430.1265 cell
MECHANICAL ENGINEER:
Romanyk Consulting Corp.
3308 Preston Road, Suite 350-164 Plano, Texas 75093
Scott Thraen, PE Scott.Thraen@RomanykConsulting.com
855.424.3838 x312
402.981.8882 cell
ELECTRICAL ENGINEER:
IMEG Corp.
15 Sunnen Drive, Suite 104 St. Louis, Missouri 63143
Zachary W. Carter, P.E., LEED BD+C Zachary.W.Carter@imegcorp.com
314.951.2529
OWNER:
St. Louis John Cochran VAHCS 915 N Grand Blvd.
St. Louis, MO 63016
Contact Name: Brad Petrovic, COR bradley.petrovic@va.gov
314.652.4100 x58724 Contracting Officer: Cedric Graham
PHASING NOTES:
DEDUCT BID ALTERNATES:
1. BUILDING 1 AC-3 REPLACEMENTS NOT INCLUDED IN SCOPE OF PROJECT.
2. NO REPLACEMENT OF ELECTRICAL PLANELS OR CONDUCTORS.
3. NO REMOVAL OF AC-17 SURGE TANK.
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1 of Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
NOT FOR
PERMITTING OR
CONSTRUCTION
A/E:Consultant:
U.S. Department of Veterans Affairs
Spinklered
B
IM
/V
IS
N
A E
S e rv ic e s
A ir H a n d lin g U n it s /A
E S e rv ic e s
A H
U M
E P
.r v t
/2
/2
:5 :2
P
M
COVER SHEET
ST DW
SPRINKLERED
ST. LOUIS, MO
APRIL 29, 2020
ST. LOUIS,
MO
GI100
657-19-113JC
PROJECT NUMBER - 657-19-113JC
OBLIGATION NUMBER - RCC #657C90258
TASK ORDER NUMBER - RCC 36C25519N0287
REPLACE OBSOLETE AND FAILING AIR CONDITIONING UNITS
CONSTRUCTION DOCUMENTS REPLACE OBSOLETE AND FAILING
AIR CONDITIONING UNITS
CONSTRUCTION DOCUMENTS
APRIL 29, 2020
GENERAL
GI100 COVER SHEET
CIVIL - SITE
CS100 SITE PLAN
ARCHITECTURAL
AE100 ARCHITECTURAL ENLARGED PLANS - BLDG. 03, ROOF
AE101 ARCHITECTURAL ENLARGED PLANS - BLDG. 01, LEVEL 03 & ROOF
AE102 ARCHITECTURAL REFLECTED CELING PLANS - BLDG. 03,08, LEVELS 01 & 02
AE200 ARCHITECTURAL DETAILS
MECHANICAL
M-001 MECHANICAL SYMBOLS, NOTES, AND ABBREVIATIONS
MD100 MECHANICAL DEMOLITION ENLARGED PLANS - BLDG. 01, LEVEL 00
MD101 MECHANICAL DEMOLITION ENLARGED PLANS - BLDG. 01, LEVEL 03 AND BLDG. 03, LEVEL 02
MD102 MECHANICAL DEMOLITION ENLARGED PLANS - BLDG. 01, LEVEL 03 & ROOF
MD103 MECHANICAL DEMOLITION ENLARGED PLANS - BLDG. 08
MH100 MECHANICAL HVAC ENLARGED PLANS - BLDG. 01, LEVEL 03 AND BLDG. 03, LEVEL 02
MH101 MECHANICAL HVAC ENLARGED PLANS - BLDG. 01, LEVEL 03 & ROOF
MH102 MECHANICAL HVAC ENLARGED PLANS - BLDG. 08
MH200 MECHANICAL HVAC SECTIONS AND 3D VIEWS - BLDG. 01, AC-1
MH201 MECHANICAL HVAC SECTIONS AND 3D VIEWS - BLDG. 01, AC-3
MH202 MECHANICAL HVAC SECTIONS AND 3D VIEWS - BLDG. 01, AC-1 HEAT WHEEL
MH203 MECHANICAL HVAC SECTIONS AND 3D VIEWS - BLDG. 08, AC-1, VAU-1
MH300 MECHANICAL HVAC DETAILS
MH301 MECHANICAL HVAC DETAILS
MH400 MECHANICAL HVAC SCHEDULES
MI100 MECHANICAL EQUIPMENT CONTROL DIAGRAMS
MI101 MECHANICAL EQUIPMENT CONTROL DIAGRAMS
MP100 MECHANICAL PIPING ENLARGED PLANS - BLDG. 01, LEVEL 00
MP101 MECHANICAL PIPING ENLARGED PLANS - BLDG. 01, LEVEL 03 AND BLDG. 03, LEVEL 02
MP102 MECHANICAL PIPING ENLARGED PLANS - BLDG. 01, LEVEL 03 & ROOF
MP103 MECHANICAL PIPING ENLARGED PLANS - BLDG. 08
MP200 MECHANICAL PIPING DETAILS
MP201 MECHANICAL PIPING DETAILS
MP202 MECHANICAL PIPING DETAILS
MP203 MECHANICAL PIPING DETAILS
MP300 MECHANICAL PIPING SCHEDULES
ELECTRICAL
E-001 ELECTRICAL SYMBOLS, NOTES, AND ABBREVIATIONS
ED100 ELECTRICAL DEMOLITION ENLARGED PLANS - BLDG. 01, LEVEL 00
ED101 ELECTRICAL DEMOLITION ENLARGED PLANS - BLDG. 01, LEVEL 03 AND BLDG. 03, LEVEL 02
ED102 ELECTRICAL DEMOLITION ENLARGED PLANS - BLDG. 01, LEVEL 03 & ROOF
ED103 ELECTRICAL DEMOLITION ENLARGED PLANS - BLDG. 03
ED104 ELECTRICAL DEMOLITION ENLARGED PLANS - BLDG. 08
EP100 ELECTRICAL ENLARGED PLANS - BLDG. 01, LEVEL 00
EP101 ELECTRICAL ENLARGED PLANS - BLDG. 01, LEVEL 03
EP102 ELECTRICAL ENLARGED PLANS - BLDG. 01, LEVEL 03 & ROOF
EP103 ELECTRICAL ENLARGED PLANS - BLDG. 03, LEVEL 02 & ROOF
EP104 ELECTRICAL ENLARGED PLANS - BLDG. 08
EP200 ELECTRICAL SCHEDULES
EP201 ELECTRICAL DETAILS
Grand total: 45
VA ST. LOUIS HEALTH CARE SYSTEM, JOHN COCHRAN DIVISION
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02Revisions: Date: 04/29/2020
Phase
CONTRACT DOCUMENTS FOR
BIDDING
NOT FOR
PERMITTING OR
CONSTRUCTION
T
BUILDING SCHEDULE
1 MAIN HOSPITAL & CLINICAL ADDITION
1A EMERGENCY GENERATOR VAULT
1B EMERGENCY GENERATOR VAULT
EDUCATION, MEDICAL MEDIA,
CHAPEL & RESEARCH
2T METHADONE CLINIC
2T2 OATP CLINIC
3 IRM & RESEARCH
4 NON-VA CARE / AFGE
5T OEF/OIF
6 RESEARCH
6A RESEARCH
7 RESEARCH
7A RESEARCH
8 BOILER PLANT
8A CHILLER PLANT
8B EMERGENCY GENERATOR
10 FLAG POLE
11 GAS METER HOUSE
12 WET SALT STORAGE
14 GARAGE
16 ENGINEERING / TRANSITION CARE TEAM
24 WASTE STORAGE FACILITY
DEC DECON TRAILER
1T MODULAR BUILDING
RESTAURANT VACANT
BLDG.
14 3
DELMAR AVE.
ENRIGHT AVE.
S P
R
IN
G S
T
AMEREN MISSOURI
SUBSTATION
8A 7
8B
7A
6A
BELL AVE.
1A
G R
A N
D B
L V
D
2T
5T
2T2
1T
DEC
1B
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1 of Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Spinklered
PLAN NORTH
B
IM
/V
IS
N
A E
S e rv ic e s
A ir H a n d lin g U n it s /A
E S e rv ic e s
A H
U M
E P
.r v t
/2
/2
:5 :2
P
M
SITE PLAN
ST DW
CONSTRUCTION DOCUMENTS 657-19-113JC
CS100
REPLACE OBSOLETE AND FAILING
AIR CONDITIONING UNITS
ST. LOUIS, MO
APRIL 29, 2020
ST. LOUIS,
MO
SPRINKLERED
1" = 50'-0"1
SITE PLAN
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
0' 50' 100'25'
Graphic Scale : 1" = 50'-0"
Revisions: Date: 04/29/2020
Phase
CONTRACT DOCUMENTS FOR
BIDDING
Phase
CONTRACT DOCUMENTS FOR
BIDDING
NOT FOR
ROOF(EX)
AREA OF ROOFING
TO BE REMOVED.
DEMO EXISTING HVAC
EQUIPMENT AND CURB
180"
15' - 0"
ROOF(EX)
AE200
Typ.
EXISTING MOBILE GUARDRAIL TO
REMAIN. MAINTAIN IN CURRENT
LOCATION FOR FALL PROTECTION
TO MEET OSHA REQUIREMENTS
180"
15' - 0"
PATCH AND REPAIR ROOF IN
THE WORK AREA INDICATED
DASHED LINES INDICATE NEW
CURB UNDER HVAC EQUIPMENT
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1 of Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Spinklered
KEY PLAN
B
IM
/V
IS
N
A E
S e rv ic e s
A ir H a n d lin g U n it s /A
E S e rv ic e s
A H
U .r v t
/2
/2
:1
:3
A
M
ARCHITECTURAL ENLARGED PLANS - BLDG. 03,
ROOF
GC EM
CONSTRUCTION DOCUMENTS 657-19-113JC
AE100
REPLACE OBSOLETE AND FAILING
AIR CONDITIONING UNITS
ST. LOUIS, MO
APRIL 29, 2020
ST. LOUIS,
MO
SPRINKLERED
1/4" = 1'-0"
ENLARGED ARCHITECTURAL DEMOLITION PLAN - BUILDING 03 AC-1 ROOF
1/4" = 1'-0"
ENLARGED ARCHITECTURAL PLAN - BUILDING 03 AC-1 ROOF
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02Revisions: Date: 04/29/2020
Phase
CONTRACT DOCUMENTS FOR
BIDDING
NOT FOR
ROOF(EX)
AREA OF ROOF TO BE REMOVED
AND PATCHED
REMOVE EXISTING RAIL SUPPORTS
REMOVE EXISTING HVAC UNIT, CURB AND ALL
ASSOCIATED CONNECTIONS AND EQUIPMENT.
EXISTING STEAM RELIEF PIPE
PENETRATION TO BE RELOCATED. PATCH
EXISTING ROOF PENETRATION.
AREA OF ROOF TO BE
REMOVED AND PATCHED.
36"
3' - 0" REMOVE PORTION OF ROOF
TO PREP FOR NEW PIPE PENTRATION
AND HOOD.
DEMO ROOF AREA FOR LOCATION OF
NEW STEAM PIPE. VERFIY LOCATION WITH
MECHANICAL SHEET INFORMATION.
36"
3' - 0"
36"
3' - 0"
" 240"
20' - 0"
ROOF(EX)
AE200
Typ.
AE200
Typ.
36"
3' - 0"
AREA OF NEW ROOF INSTALLATION
TO MATCH EXISTING.
NEW CURB UNDER NEW
HVAC EQUIPMENT
NEW SEISMICALLY RATED RAIL
SYSTEM FOR HVAC EQUIPMENT
PROVIDED BY MANUFACTURER
NEW PIPE PENETRATION
HOOD. PROVIDE FLASHING
PER MANUFACTURER'S
RECOMMENDATIONS.
NEW STEAM PIPE LOCATION.
VERIFY LOCATION WITH
MECHANICAL SHEETS.
PATCH ROOF WHERE OLD
STEAM PIPE WAS REMOVED
36"
3' - 0"
36"
3' - 0"
AE200
Typ.
AE200
Typ.
240"
20' - 0"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1 of Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Spinklered
KEY PLAN
B
IM
/V
IS
N
A E
S e rv ic e s
A ir H a n d lin g U n it s /A
E S e rv ic e s
A H
U .r v t
/2
/2
:1
:3
A
M
ARCHITECTURAL ENLARGED PLANS - BLDG. 01,
LEVEL 03 & ROOF
GC EM
CONSTRUCTION DOCUMENTS 657-19-113JC
AE101
REPLACE OBSOLETE AND FAILING
AIR CONDITIONING UNITS
ST. LOUIS, MO
APRIL 29, 2020
ST. LOUIS,
MO
SPRINKLERED
1/4" = 1'-0"
ENLARGED ARCHITECTURAL DEMOLITION PLAN - BUILDING 01 - AC-17 ROOF
1/4" = 1'-0"
ENLARGED ARCHITECTURAL PLAN - BUILDING 01 - AC-17 ROOF
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02Revisions: Date: 04/29/2020
Phase
CONTRACT DOCUMENTS FOR
BIDDING
NOT FOR
OFFICE
REMOVE EXISTING 2X4 CEILING AND GRID
DURING HVAC WORK. REPLACE EXISTING
2X4 CEILING WHEN HVAC WORK IS
COMPLETE WITH NEW 2X4 LAY-IN
CEILING AND GRID AT THE SAME HEIGHT
AS THE ORIGINAL CEILING.
AREA OF WORK
SALVAGE AND
REUSE LIGHT
FIXTURES,TYP.
OFFICE
REMOVE EXISTING 2X4 CEILING AND
GRID DURING HVAC WORK. REPLACE
2X4 CEILING AND GRID WHEN HVAC
WORK IS COMPLETE WITH NEW LAY-IN
2X4 CEILING TILES AT THE SAME HEIGHT
AS ORIGINAL CEILING. REPLACE GRID IF
NECESSARY.
AREA OF WORK
SALVAGE AND REUSE
LIGHT FIXTURES (TYP.)
COMPUTER TRAINING
CLOSET
115A
REMOVE EXISTING 2X4 CEILING AND
GRID DURING HVAC WORK. REPLACE
EXISTING 2X4 CEILING AND GRID WHEN
HVAC WORK IS COMPLETE WITH NEW
2X4 LAY-IN CEILING TILES AT THE SAME
HEIGHT AS ORIGINAL CEILING. REPLACE
GRID IF NECESSARY.
AREA OF WORK
SALVAGE AND REUSE
LIGHT FIXTURES, TYP.
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1 of Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Spinklered
KEY PLAN
3PLAN NORTH
B
IM
/V
IS
N
A E
S e rv ic e s
A ir H a n d lin g U n it s /A
E S e rv ic e s
A H
U .r v t
/2
/2
:1
:3
A
M
ARCHITECTURAL REFLECTED CELING PLANS -
BLDG. 03,08, LEVELS 01 & 02
GC EM
CONSTRUCTION DOCUMENTS 657-19-113JC
AE102
REPLACE OBSOLETE AND FAILING
AIR CONDITIONING UNITS
ST. LOUIS, MO
APRIL 29, 2020
ST. LOUIS,
MO
SPRINKLERED
1/8" = 1'-0"
ENLARGED RCP - BUILDING 08 - LEVEL 01
1/8" = 1'-0"
ENLARGED RCP - BUILDING 08 - LEVEL 02
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
1/8" = 1'-0"
ENLARGED REFLECTED CEILING PLAN BUILDING 03 - LEVEL 01
Revisions: Date: 04/29/2020
Phase
CONTRACT DOCUMENTS FOR
BIDDING
NOT FOR
CLOSED - BEST FOR NEW
CONSTRUCTION WITH CONSISTENT
SIZED CURB
1 PIECE - BEST FOR CONSISTENT
SIZED CURBS WITH EXISTING
EQUIPMENT
2 PIECES - BEST FOR
CONSISTENT SIZED CURBS WITH
EXISTING EQUIPMENT
4 PIECES - BEST FOR VARIABLE
SIZED CURBS FOR MAXIMUM
ADJUSTMENT
CUSTOM CURB FLASHING CONFIGURATIONS
T-JOINT COVER
(SEE NOTE 7 AND 8)
NOTES:
1. REFER TO FIRESTONE OR VA APPROVED EQUAL WEBSITE FOR
MOST CURRENT INFORMATION.
2. ULTRAPLY TPO CUSTOM CURB FLASHING COMES IN CUSTOM
SIZES TO FIT SPECIFIC CURB SIZES (SEE CHART TO LEFT).
3. REFER TO UT-LS-1 AND UT-LS-2 FOR WELD WIDTH.
4. BONDING ADHESIVE REQUIRED BETWEEN CURB AND CUSTOM
CURB FLASHING.
5. WHEN REINFORCEMENT OF TPO MEMBRANE IS EXPOSED, REFER
TO UT-LS-14 FOR CUT EDGE SEALANT APPLICATION.
6. T-JOINT COVERS REQUIRED AT ALL VERTICAL TRANSITIONS ON
NON-FACTORY WELDS FOR ALL MEMBRANE THICKNESSES.
7. T-JOINT COVERS REQUIRED AT ALL 60 MIL REINFORCED
MEMBRANE OVERLAPS.
8. ULTRAPLY TPO FLASHING (UNSUPPORTED) (4" x 4" MIN. WITH
ROUNDED CORNERS) MAY BE USED IN LIEU OF T-JOINT COVER.
ULTRAPLY TPO CUSTOM
CURB FLASHING
(SEE NOTES 3, 4, AND 5)
CURB
T-JOINT COVER
(SEE NOTES 6 AND 8)
ULTRAPLY TPO FIELD MEMBRANE
TREATED 2x4 NAILER
SS GASKETED FAST, 12" OC MAX
INSUL MET CURB - SIZE
HEIGHT FOR 8" MIN ABOVE
ROOF W/2" TOP RETURN
FLASHING & METAL GAUGE
TO SUPPORT RTU
(RE:MECH)
1-1/2" RIGID INSUL
1-1/4" SS ROOF NAILS, 12" OC MAX
ALUM COUNTERFLASHING WITH
MIN 4" FACE & DRIP RETURN
TPO CURB FLASHING (RE:D3/A124)
TPO BONDING ADHESIVE
ROOF MANUF FAST & SEAM PLATE, 12" OC
2" MIN WELDED SPLICE
NEW TPO ROOF MEMBRANE AROUND THE
NEW CURB AND HVAC UNIT.
R-30 RIGID INSULATION, OR MATCH EXISTING
THICKNESS AT THIS LOCATION.
REPAIR/REPLACE SECTIONS OF METAL DECK AS NEEDED
TO INSTALL NEW HVAC CURB
ROOF OPENING, RE:MECH
SEALING MATERIAL -
MUST BE CONTINUOUS
ON TOP OF THE CURB
1/2"
MIN1"
BASE OF UNIT EXTENDS 1/2" MIN BEYOND TOP OF CURB
RTU - FLANGE EXTENDS 1" MIN BELOW TOP OF CURB
8" MIN
VERIFY
NEW PERIMETER BENT STEEL PLATE AROUND OPENING
INTERPLY REQUIRED FOR
15 & 20 YEAR SYSTEMS
MODIFIED BITUMEN GRANULE
SURFACED CAP SHEET
SUBSTRATE
FIRESTONE OR VA APPROVED EQUAL
INSULATION
FIRESTONE OR VA APPROVED EQUAL
INSULATION
COVERBOARD (AS REQUIRED) BASE AND INTERPLY
SHEETS AS REQUIRED FOR
DESIRED WARRANTY
[2 m m
M
IN
[76 mm]
3" MIN
[76 mm]
3" MIN
METAL COUNTERFLASHING BY
OTHERS; 3" [76mm] MIN FACE
GASKETED FASTENERS BY OTHERS
12" [304mm] O.C. MAX
R.T.U.
FASTEN 8" [203mm] O.C.
MODIFIED BITUMEN GRANULE
SURFACED CAP SHEET
NOTES:
1. REFER TO FIRESTONE OR VA APPROVED EQUAL
WEBSITE FOR MOST CURRENT INFORMATION.
2. WOOD NAILERS MUST BE INSTALLED WITH SUITABLE
FASTENERS TO MEET APPLICABLE BUILDING CODES
(200 LBS PER LINEAR FOOT MIN IN ANY GIVEN
DIRECTION).
3. ALL SHEET METAL IS TO BE INSTALLED PER SMACNA
GUIDELINES.
4. GRANULES MUST BE EMBEDDED WHEN THERMALLY
FUSING GRANULE SURFACED CAP SHEET.
5. FLASHING LAPS MUST BE OFFSET FROM FIELD LAPS
BY A MINIMUM OF 12" [305mm].
6. WHEN POSSIBLE, MECHANICAL UNITS SHOULD NOT
BE SET UNTIL THE ROOF MEMBRANE AND FLASHING
HAVE BEEN INSTALLED.
INTERPLY REQUIRED FOR
15 & 20 YEAR SYSTEMS
BASE AND INTERPLY SHEETS
AS REQUIRED FOR DESIRED
WARRANTY
MODIFIED BITUMEN
GRANULE SURFACED
CAP SHEET
MODIFIED BITUMEN GRANULE
SURFACED CAP SHEET
HIGH-DOMED, CAPPED,
GASKETED FASTENERS
AS REQUIRED
FIRESTONE OR VA APPROVED EQUAL INSULATION
COVERBOARD (AS REQUIRED)
FIRESTONE OR VA APPROVED EQUAL INSULATION
FIRESTONE OR VA APPROVED EQUAL INSULATION
COVERBOARD (AS REQUIRED)
FIRESTONE OR VA APPROVED EQUAL INSULATION
GASKET
SET BOLT IN SEALANT
SHEET METAL COVER
SUBSTRATE
FASTEN 8" [203 mm] O.C.
3" [76 mm] MIN
3" [76 mm] MIN
[2 m m
M
IN
NOTES:
1. REFER TO FIRESTONE OR VA APPROVED EQUAL WEBSITE FOR MOST CURRENT
INFORMATION.
2. WOOD NAILERS MUST BE INSTALLED WITH SUITABLE FASTENERS TO MEET APPLICABLE
BUILDING CODES (200 LBS PER LINEAR FOOT MIN IN ANY GIVEN DIRECTION).
3. ALL SHEET METAL IS TO BE INSTALLED PER SMACNA GUIDELINES.
4. GRANULES MUST BE EMBEDDED WHEN THERMALLY FUSING GRANULE SURFACED CAP
SHEET.
5. FLASHING LAPS MUST BE OFFSET FROM FIELD LAPS BY A MINIMUM OF 12" [305 mm]
SHEET-METAL SLEEVE
APPROPRIATE HIGH TEMPERATURE
SEALANT (SEE NOTE 2)
SHEET-METAL RAIN COLLAR
OVERLAPPING FLASHING
COLLAR BY 3" TO 4"
STAINLESS STEEL CLAMPING RING
TREATED WOOD BLOCKING
ROOF DECK
SPECIFIED COVER BOARD
SPECIFIED INSULATION
SPECIFIED BUR MEMBRANE
TWO-PLY STRIPPING
4" MIN. FLANGE SET IN ASPHALT
CEMENT AND MECHANICALLY
FASTENED 3" OC
BATTEN INSULATION
MASTIC SEAL AT PERIMETER
EXISTING INSULATED
METAL LINER (SEE NOTE 3 )
HOT STACK
NOTES:
1. PRIME ALL METAL SURFACES THAT WILL COME INTO CONTACT WITH THE SPECIFIED ADHESIVE.
2. WHEN HOT STACK SERVICE TEMPERATURE EXCEEDS 400 DEGREES, WELD OR SOLDER RAIN COLLAR TO PIPE IN LIEU OF
INSTALLING SEALANT.
3. THE CLEARANCE REQUIRED BETWEEN THE HOT PIPE AND INSULATED METAL LINER WILL DEPEND ON THE TEMPERATURE
OF THE MATERIAL HANDLED BY THE STACK.
8" MIN
[200mm]
WOOD NAILER SECURED TO DECK WITH
APPROPRIATE FASTENERS, 2 ROWS
STAGGERED EACH ROW 24'' OC SPECIFIED BUR MEMBRANE
INSULATION
ROOF DECK AS SPECIFIED
GRAVEL SURFACING
TWO-PLY STRIPPING
FLANGE SET IN SPECIFIED ASPHALT
CEMENT, MECHANICALLY FASTENED 3''
OC, PRIME METALFLANGE BEFORE
STRIPPING
SLOPE PIPES DOWN AND
AWAY FROM HOOD
FASTENERS 8'' OC
SHEET METAL COLLAR
SEAL
INSULATE INSIDE OF
METAL WORK
SHEET METAL HOOD
CROSS BREAK OR
SLOPE FOR DRAINAGE
METAL
SCREW
SEAL
ENCLOSURE DETAIL
ASPHALT CEMENT SEAL
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1 of Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Spinklered
NOT TO SCALE
B
IM
/V
IS
N
A E
S e rv ic e s
A ir H a n d lin g U n it s /A
E S e rv ic e s
A H
U .r v t
/2
/2
:1
:3
A
M
ARCHITECTURAL DETAILS
GC EM
CONSTRUCTION DOCUMENTS 657-19-113JC
AE200
REPLACE OBSOLETE AND FAILING
AIR CONDITIONING UNITS
ST. LOUIS, MO
APRIL 29, 2020
ST. LOUIS,
MO
SPRINKLERED
NTS
CURB FLASHING WITH TPO ROOF
NTS
ROOF TYPICAL EQUIP CURB WITH TPO ROOF
NTS
EQUIPMENT CURB W/MODIFIED BITUMEN ROOF
NTS
EQUIPMENT SUPPORT CURB W/MODIFIED BITUMEN ROOF
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
NTS
PIPE PENETRATION DETAIL
NTS
PIPE HOOD PENETRATION DETAIL
Revisions: Date: 04/29/2020
Phase
CONTRACT DOCUMENTS FOR
BIDDING
NOT FOR
MECHANICAL NOTES
WEATHER DESIGN DATA
38.8 N
LATITUDE
95.5° F Db SUMMER 76.8° F Wb SUMMER 6.6° F Db WINTER
EXTREME OUTDOOR DESIGN CONDITIONS
(FOR EQUIPMENT PERFORMANCE
RATINGS AND FREEZE PROTECTION)
90.4 W
LONGITUDE
564 FEET
ABOVE SEA LEVEL
OUTDOOR DESIGN
TEMPERATURES
99.9° F Db SUMMER
0.7° F Db WINTER
SITE GEOGRAPHIC LOCATION DATA:
VAMC ST. LOUIS JOHN COCHRAN
SEISMIC DESIGN REQUIREMENTS
OCCUPANCY:
SDS =
SD1 =
SEISMICITY:
RISK CATEGORY:
SEISMIC DESIGN CAT., SDS:
SEISMIC DESIGN CAT., SD1:
SEISMIC IMPORTANCE FACTOR:
HOSPITAL WITH SURGERY - IBC 1604
CRITICAL FACILITY VA H-18-8, TABLE 5
0.423 VA H-18-8
0.164 VA H-18-8
MOD. HIGH VA H-18-8
IV IBC TABLE 1604.5
D IBC TABLE 1613.3.5
D IBC TABLE 1613.3.5
1.5 ASCE 7-10, TABLE 1.5-2
PRESCRIBED REQUIREMENTS:
H-18-8, 4.2:
H-18-8 MECHANICAL:
SMACNA SEISMIC RESTRAINTS GUIDELINES:
EQUIPMENT REQUIRED TO HAVE "SPECIAL
SEISMIC CERTIFICATION"
SPECIAL SEISMIC CERTIFICATION (ASCE 7, 13.2.2)
FOR AHU, CHILLER, COOLING TOWER, CTRL
PANEL.
(COMPLIANCE REQUIRED BY VA HVAC DESIGN
MANUAL)
DATA SOURCE: VA HVAC DESIGN GUIDE
*SEE SPECIFICATIONS SECTION 13 05 41 FOR ADDITIONAL SEISMIC DESIGN REQUIREMENTS.
MH100
MH100
DRAWING SYMBOLS
01-SF-3
08-TU-1-1
DETAIL NUMBER (VIEW # ON SHEET SHOWN)
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED
EQUIPMENT ABBREVIATION (SUPPLY FAN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
EQUIPMENT ABBREVIATION (TERMINAL UNIT)
SERVED BY (AIR HANDLER UNIT NO. 1)
DRAWING NUMBER ON SHEET SHOWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
SECTION NUMBER (VIEW # ON SHEET SHOWN)
DRAWING NUMBER ON SHEET SHOWN
ITEM NUMBER (SUPPLY FAN NO. 1)
LIMIT OF DEMOLITION
SUPPLY DUCT UP
EXHAUST DUCT UP
CEILING SUPPLY DIFFUSER/GRILLE (SQUARE 4-WAY):
DIFFUSER/GRILLE TYPE
BALANCED FLOW RATE
• REFER TO AIR DEVICE SCHEDULE (SUPPLY)
SUPPLY TOP REGISTER OR GRILLE (WALL MOUNT)
EXHAUST OR RETURN CEILING REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM
REGISTER OR GRILLE (WALL MOUNT)
EXHAUST OR RETURN REGISTER OR
TOP GRILLE (WALL MOUNT)
CONNECT NEW DUCT TO EXISTING DUCT
D
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
R
RETURN DUCT UP
SUPPLY DUCT DOWN
EXHAUST DUCT DOWN
RETURN DUCT DOWN
FC
10"x8" <OR> 10"x8"SA
FLEXIBLE CONNECTION (FC) - EQUIPMENT,
VIBRATION, OR SEISMIC
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS. VANE SYMBOL ARE NOT
SHOWN ON PLANS)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
DUCT LABELING NOTE:
• INSIDE DIMENSIONS: WIDTH x DEPTH
• SA = SUPPLY AIR
• RA = RETURN AIR
• OA = OUTSIDE AIR SUPPLY
• EA = EXHAUST AIR
EXISTING DUCT TO REMAIN
VD
MANUAL VOLUME DAMPER
EXISTING DUCT TO BE REMOVED
10"x8"(EX) <OR> 10"x8"SA(EX)
10"x8"
HVAC SYMBOLS
NEW DUCT
CEILING RETURN/EXHAUST GRILLE:
DIFFUSER/GRILLE TYPE
BALANCED FLOW RATE
• REFER TO AIR DEVICE SCHEDULE (RETURN)
SD-14
470 CFM
REDUCER OR INCREASER
DIRECTION OF FLOW
SIDE CONNECTION
BOTTOM CONNECTION, 45° OR 90°
TOP CONNECTION, 45° OR 90°
DIRECTION OF PIPE PITCH (DOWN)
UNION
RISE OR DROP IN PIPE
CAPPED OUTLET
PRESSURE GAGE
THERMOMETER
PIPE UP
PIPE DOWN
CONDENSATE PUMP DISCHARGE
LOW PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
SANITARY WASTE
REFRIGERANT PIPING
DRAIN LINE
MPS
MPR
LPS
LPR
PC
SAN
REF
D
NEW PIPE
EXISTING PIPE TO BE REMOVED
EXISTING PIPE TO REMAIN (?=SIZE/TYPE, EX=EXISTING)
PIPING SYMBOLS
CHILLED WATER SUPPLYCHS
CHILLED WATER RETURNCHR
?" (EX)
FIRE PROTECTION (WET)FP
HIGH PRESSURE STEAM CONDENSATE RETURN
HIGH PRESSURE STEAM (60 PSIG AND GREATER)HPS
HPR
BALL VALVE
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC BALANCING CONTROL VALVE
PRESSURE SAFETY VALVE
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
WYE STRAINER (WITH BALL VALVE &
HOSE CONNECTION)
FLEXIBLE CONNECTION
CIRCUIT SETTER VALVE
PRESSURE REDUCING VALVE (PRV)
WYE STRAINER WITH VALVED DRAIN AND
QUICK-COUPLE HOSE CONNECTOR
PIPING (VALVE) SYMBOLS
1. CONTRACTOR SHALL BE RESPONSIBLE FOR PROVIDING A COMPLETE HEATING, VENTILATING, PLUMBING AND COOLING
SYSTEM WHICH MEETS ALL GOVERNING CODES AND IN ACCORDANCE WITH THE CONTRACT DOCUMENTS.
2. ALL WORK SHALL COMPLY WITH THE REQUIREMENTS OF: THE INTERNATIONAL MECHANICAL CODE (IMC), THE NATIONAL FIRE
PROTECTION ASSOCIATION (NFPA), AND UNDERWRITER'S LABORATORIES (U.L.).
3. WORK SHALL CONFORM TO THE STANDARDS OF THE ASSOCIATION OF HEATING, REFRIGERATING, AND AIR CONDITIONING ENGINEERS (ASHRAE), SHEET METAL AND AIR CONDITIONING CONTRACTORS NATIONAL ASSOCIATION (SMACNA), AND THE
ASSOCIATED AIR BALANCE COUNCIL (AABC).
4. THE CONTRACTOR SHALL PAY FOR ALL FEES, PERMITS, AND CHARGES AS REQUIRED TO FURNISH AN APPROVED
INSTALLATION.
5. MECHANICAL WORK SHALL BE GUARANTEED FOR A PERIOD OF ONE YEAR FROM THE DATE OF FINAL ACCEPTANCE.
6. CONTRACTOR SHALL ELECTRONICALLY SUBMIT FOR REVIEW OF ALL EQUIPMENT, DEVICES, AND MATERIALS USED FOR THE JOB. ALLOW A MINIMUM OF 14 DAYS REVIEW TIME FOR SCHEDULING PURPOSES. WHEN REQUESTED, SUBMIT ANY PRODUCT
SAMPLES TO ARCHITECT FOR REVIEW.
7. PROPOSED "OR EQUAL" PRODUCT SUBSTITUTIONS MUST BE SUBMITTED IN WRITING FOR APPROVAL AND MUST BE APPROVED
IN WRITING BY THE CONTRACTING OFFICER'S REPRESENTATIVE (COR).
8. PROVIDE ACCESS PANELS IN DUCTS, WALLS, AND CEILINGS AS REQUIRED TO ACCESS AND MAINTAIN DAMPERS, VALVES, AND OTHER ENCLOSED ITEMS. COORDINATE LOCATION OF ALL ACCESS PANELS WITH ENGINEER THROUGH SHOP DRAWING
PROCESS.
9. TOTAL STATIC PRESSURE NOTED IN THE SCHEDULES INCLUDES DUCT SYSTEM, TERMINAL UNITS, FILTERS, COILS, ETC. LOSS
FOR FILTERS SHALL BE FOR FILTERS AT 50% LOADING.
10. SEISMIC PROVISIONS - REFER TO SEISMIC DESIGN REQUIREMENTS TABLE.
11. ALL PRESSURES LISTED ARE GAGE PRESSURE UNLESS OTHERWISE NOTED.
COORDINATION REQUIREMENTS:
12. THE CONTRACTOR IS REQUIRED TO VISIT THE SITE AND BECOME FAMILIAR WITH EXISTING CONDITIONS PRIOR TO SUBMITTING
A BID.
13. THE DRAWINGS MAY NOT SHOW ALL EXISTING ITEMS OR CONDITIONS. CONTRACTOR SHALL NOT RECEIVE EXTRA PAYMENT FOR REQUIREMENTS WHICH CAN BE INFERRED THROUGH OBSERVATION OF EXISTING CONDITIONS. WHERE EXISTING CONDITIONS ARE ENCOUNTERED WHICH MAY VARY SIGNIFICANTLY FROM THOSE INDICATED IN THE DRAWINGS, NOTIFY THE
DESIGNER BEFORE PROCEEDING WITH WORK.
14. CONTRACTOR SHALL FIELD VERIFY BY MEASUREMENTS THE EXACT LOCATION OF EQUIPMENT, DUCTWORK, PIPING, STRUCTURE, AND OTHER CONDITIONS WHICH WILL AFFECT INSTALLATION. CONTRACTOR SHALL LOCATE EQUIPMENT AND ROUTE DUCTWORK AND PIPING TO AVOID CONFLICTS AND IN REFERENCES WITH EXISTING FIELD CONDITIONS.
15. PRIOR TO ANY INSTALLATION, CLOSELY COORDINATE ALL MECHANICAL WORK WITH PLUMBING, ELECTRICAL, FIRE PROTECTION, ARCHITECTURAL AND STRUCTURAL WORK. CONTRACTOR TO ENSURE ALL EQUIPMENT AND SERVICES WILL FIT IN AVAILABLE SPACES ALLOWING CEILING HEIGHTS INDICATED ON ARCHITECTURAL PLANS. INSTALL EQUIPMENT SO AS TO PROVIDE CLEARANCES SHOWN ON DRAWINGS AND AS RECOMMENDED BY MANUFACTURER FOR AIRFLOW, SERVICE, MAINTENANCE, AND FILTER REMOVAL AS APPLICABLE.
16. COORDINATE DUCT, PIPING, AND EQUIPMENT LOCATIONS WITH ELECTRICAL PANEL LOCATIONS. DO NOT PASS ANY MECHANICAL OR PLUMBING ITEMS DIRECTLY OVER ELECTRICAL PANELS. SEE ELECTRICAL DRAWINGS FOR EXACT PANEL
LOCATIONS.
17. CEILING DIFFUSER AND REGISTER LOCATIONS ARE APPROXIMATE ONLY. EXACT LOCATIONS TO BE DETERMINED BY EXISTING CONDITIONS. COORDINATE EXHAUST BRICK VENT MOUNTING HEIGHTS AND LOCATIONS WITH ARCHITECTURAL CEILING
HEIGHTS.
18. ALL CUTTING AND PATCHING SHALL BE COORDINATED WITH THE GENERAL CONTRACTOR. ALL PATCHING SHALL RESTORE
EACH DAMAGED SURFACE TO ITS ORIGINAL FINISH.
DUCTWORK:
19. ALL AIR DISTRIBUTION SYSTEMS SHALL BE TESTED AND BALANCED IN ACCORDANCE WITH AABC REQUIREMENTS TO WITHIN FIVE PERCENT (5%) OF THE VALUES SHOWN ON THE DRAWINGS. A COMPLETED ELECTRONIC VERSION OF CERTIFIED TEST AND BALANCE (TAB) REPORT SHALL BE GIVEN TO THE ENGINEER FOR REVIEW PRIOR TO PROJECT CLOSE OUT.
20. THE FIRST FIGURE OF DUCT SIZE INDICATES DIMENSION OF FACE SHOWN OR INDICATED. DUCT SIZES ARE NET INSIDE
DIMENSIONS.
21. LOW-PRESSURE DUCT RUNOUTS TO DIFFUSERS AND REGISTERS TO BE AS NOTED UNLESS OTHERWISE INDICATED ON PLANS.
CONTRACTOR TO PROVIDE A TRANSITION AT NECK OF EACH TERMINAL DEVICE.
22. WHERE BRANCH TAPS OCCUR, PROVIDE INDIVIDUAL SPIN-IN FITTINGS WITH MANUAL VOLUME DAMPERS FOR BALANCING. DO NOT USE E-TYPE WITH AIR SCOOP/EXTRACTOR. ADDITIONALLY, PROVIDE OPPOSED-BLADE VOLUME DAMPERS AT EACH AIR
TERMINAL DEVICE.
23. SUPPLY DUCT LOCATED IN UNCONDITIONED SPACE IS TO BE EXTERNALLY INSULATED WITH 1-1/2" THICK, 1LB. DENSITY, FLEXIBLE, FACTORY-REINFORCED GLASS FIBER BLANKET WITH FOIL-FACED VAPOR BARRIER JACKET. SEAL ALL SEAMS, RIPS, TEARS, STAPLES, ETC. IN VAPOR BARRIER WITH VAPOR BARRIER MASTIC EMBEDDED WITH FIBERGLASS MESH CLOTH.
PRESSURE-SENSITIVE ADHESIVE NOT ALLOWED. REFER TO SPECIFICATION FOR CONDITIONED SPACE INSULATION.
24. ALL DUCT DIMENSIONS SHOWN ON DRAWINGS ARE INSIDE CLEAR. ALLOWANCE MUST BE MADE IN SHEET METAL SIZE WHERE
DUCT LINER IS SPECIFIED.
25. PROVIDE STANDARD METAL-EDGED FLEXIBLE DUCT CONNECTORS BETWEEN AIR HANDLERS AND FANS AND CONNECTING DUCTWORK. CONNECTORS SHALL BE CONSTRUCTED AS FOLLOWS: FLEXIBLE CONNECTOR OF FLAME-RETARDANT OR NONCOMBUSTIBLE FABRICS, COATINGS AND ADHESIVES COMPLYING WITH UL 181, CLASS 1. FACTORY-FABRICATED STRIP OF FABRIC 3-1/2 INCHES WIDE ATTACHED TO 2 STRIPS OF 3-3/4 INCH WIDE, 24-GAUGE GALVANIZED SHEET STEEL OR 0.032 INCH ALUMINUM SHEETS. SELECT METAL COMPATIBLE WITH CONNECTED DUCT SYSTEM, FOLD AND CRIMP METAL EDGE SHEETS ONTO FABRIC AS ILLUSTRATED IN LATEST EDITION OF SMACNA HVAC DUCT CONSTRUCTION STANDARDS. PROVIDE FLAT- BRAIDED GROUNDING STRAP 3/4 INCH WIDE OF SUFFICIENT LENGTH TO ALLOW FREE MOVEMENT OF THE CONNECTOR FABRIC, BRAIDED STRAP SHALL BE COPPER OR STAINLESS STEEL, SECURELY BONDED ELECTRICALLY TO DUCT AND TO
EQUIPMENT TO MAINTAIN CONTINUOUS GROUND ACROSS THE CONNECTOR.
26. SUPPORT ALL DUCTWORK WITH SUITABLE SHEARED GALVANIZED METAL OF 1” X 1/8” STEEL BAND IRON HANGERS ON EACH SIDE OF DUCT. SPACE HANGER MAXIMUM 8 FEET ALONG DUCT AND SECURE HANGER TO STRUCTURE AS REQUIRED.
PIPING:
27. PROVIDE REFRIGERANT PIPING INSTALLED PER THE MANUFACTURER’S INSTRUCTIONS. COORDINATE WITH SPECIFICATIONS.
28. FOR TYPICAL STEAM AND WATER PIPING CONNECTIONS TO EQUIPMENT, SEE STANDARD EQUIPMENT DETAILS.
29. WATER PIPE CONNECTIONS TO AIR HEATING AND COOLING COILS SHALL BE MADE TO PROVIDE COUNTER FLOW BETWEEN
WATER AND AIR.
30. PROVIDE PIPING LABELS AND TAGS PER SPECIFICATION SECTIONS.
TERMINAL UNIT WITHOUT REHEAT COIL
MECHANICAL EQUIPMENT
HEATING COIL (STEAM)
MECHANICAL EQUIPMENT (IN GENERAL) - DEMOLITION
MECHANICAL EQUIPMENT (IN GENERAL) - NEW
COIL (HEATING OR COOLING, IF APPLICABLE)
MANUFACTURER'S RECOMMENDED
MAINTENANCE/OPERATIONAL CLEARANCE
KEYNOTE SYMBOL ON SHEET
KEYNOTE DESIGNATIONS
KEYNOTES
THIS IS AN EXAMPLE OF WHAT KEYNOTE 3 COULD BE. IT
MIGHT BE THE FIRST KEYNOTE ON A SHEET. IT MIGHT ALSO
SHOW ON MULTIPLE SHEETS.
THIS IS AN EXAMPLE OF WHAT KEYNOTE 7 COULD BE. IT
MIGHT ALSO SHOW ON MULTIPLE SHEETS.
THIS IS AN EXAMPLE OF WHAT KEYNOTE 22 COULD BE. IT
MIGHT ALSO SHOW ON MULTIPLE SHEETS.
KEYNOTE NUMBER (ON SHEET)
KEYNOTE DESCRIPTION
NOTE:
KEYNOTES RESIDE ON A 'MASTER' SCHEDULE FOR DEMOLITION AND NEW WORK.
THIS IS FURTHER BROKEN DOWN BY SHEET. ALL KEYNOTES MAY NOT PERTAIN
TO EACH SHEET, THEREFORE:
• ONLY KEYNOTES ON THE SHEET WILL BE LISTED IN THE KEYNOTE LEGEND.
• KEYNOTE MAY NOT BEGIN AT "1" FOR A SHEET.
• KEYNOTES MAY SKIP NUMBERS, BUT WILL LIST IN NUMERICAL ORDER FOR
THAT SHEET.
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1 of Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Spinklered
B
IM
/V
IS
N
A E
S e rv ic e s
A ir H a n d lin g U n it s /A
E S e rv ic e s
A H
U M
E P
.r v t
/2
/2
:5 :2
P
M
MECHANICAL SYMBOLS, NOTES, AND
ABBREVIATIONS
ST DW
CONSTRUCTION DOCUMENTS 657-19-113JC
M-001
REPLACE OBSOLETE AND FAILING
AIR CONDITIONING UNITS
ST. LOUIS, MO
APRIL 29, 2020
ST. LOUIS,
MO
SPRINKLERED
ABBREVIATIONS
K - - - - - - - - - - - - - - - - - - - - - - - - - -
KG KILOGRAM
KPa KILOPASCAL
KW KILOWATT
L - - - - - - - - - - - - - - - - - - - - - - - - - -
LAT LEAVING AIR TEMPERATURE
LF LINEAR FOOT (FEET)
LPR LOW PRESSURE RETURN (STEAM CONDENSATE)
LPS LOW PRESSURE STEAM
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M - - - - - - - - - - - - - - - - - - - - - - - - - -
MAX MAXIMUM
MBH 1,000 BTUH
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MPR MEDIUM PRESSURE RETURN (STEAM CONDENSATE)
MPS MEDIUM PRESSURE STEAM
MVD MANUAL VOLUME DAMPER
N - - - - - - - - - - - - - - - - - - - - - - - - - -
N/A NOT APPLICABLE
NC NORMALLY CLOSED
NO NORMALLY OPEN
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
O - - - - - - - - - - - - - - - - - - - - - - - - - -
OA OUTSIDE AIR
OAD OUTDOOR AIR DAMPER
P - - - - - - - - - - - - - - - - - - - - - - - - - -
P PUMP
PC PUMPED CONDENSATE
PD PRESSURE DROP
PF PRE-FILTER
PSI POUNDS PER SQUARE INCH
PSIG POUNDS PER SQUARE INCH – GAGE
R - - - - - - - - - - - - - - - - - - - - - - - - - -
RA RETURN AIR
RAD RETURN AIR DAMPER
RC REHEAT COIL
RF RETURN FAN
RG RETURN GRILLE
RPM REVOLUTIONS PER MINUTE
RTU ROOF TOP UNIT
S - - - - - - - - - - - - - - - - - - - - - - - - - -
SA SUPPLY AIR
SAD SUPPLY AIR DIFFUSER
SF SUPPLY FAN
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
ST STEAM TRAP
SV STEAM PRESSURE REDUCING VALVE
T - - - - - - - - - - - - - - - - - - - - - - - - - -
TAB TESTING, ADJUSTING, BALANCE
V - - - - - - - - - - - - - - - - - - - - - - - - - -
V VALVE
VD VOLUME DAMPER (MANUAL OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VI VIBRATION ISOLATOR
VSD VARIABLE SPEED DRIVE
W - - - - - - - - - - - - - - - - - - - - - - - - - -
Wb WET-BULB (TEMPERATURE)
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
ABBREVIATIONS
A - - - - - - - - - - - - - - - - - - - - - - - - - -
ACCH AIR COOLED CHILLER
AFF ABOVE FINISHED FLOOR
AFMS AIR FLOW MEASURING STATION
AHU AIR-HANDLING UNIT
AMP AMPERE
AP ACCESS PANEL
ASHRAE AMERICAN SOCIETY OF HEATING REFRIGERATION
AIR CONDITIONING ENGINEERS
B - - - - - - - - - - - - - - - - - - - - - - - - - -
BHP BRAKE HORSEPOWER
BOB BOTTOM OF BEAM
BOD BOTTOM OF DUCT
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C - - - - - - - - - - - - - - - - - - - - - - - - - -
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCCD COOLING COIL CONDENSATE DRAIN
CD CEILING DIFFUSER
CFM CUBIC FEET PER MINUTE
CG CEILING GRILLE
CHP CHILLED WATER PUMP
CHR CHILLED WATER RETURN
CHS CHILLED WATER SUPPLY
CP CONDENSATE PUMP
CU CONDENSING UNIT
DB DECIBELS
Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DEMO DEMOLISH
DIA DIAMETER
DPS DIFFERENTIAL PRESSURE SENSOR
DPT DEW POINT TEMPERATURE
E - - - - - - - - - - - - - - - - - - - - - - - - - -
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F - - - - - - - - - - - - - - - - - - - - - - - - - -
F FAHRENHEIT
FPM FEET PER MINUTE
FT FEET
FT-WC FEET OF WATER COLUMN
FV FACE VELOCITY
G - - - - - - - - - - - - - - - - - - - - - - - - - -
GPM GALLONS PER MINUTE
H - - - - - - - - - - - - - - - - - - - - - - - - - -
HC HEATING COIL
HP HORSEPOWER
HPR HIGH PRESSURE RETURN (STEAM CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HR HOUR
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HZ HERTZ
I - - - - - - - - - - - - - - - - - - - - - - - - - -
IN INCHES
IN-HG INCHES OF MERCURY
IN-LB INCH-POUND
IN-WC INCH WATER COLUMN
IN-WG INCH WATER GAUGE
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02Revisions: Date: 04/29/2020
Phase
CONTRACT DOCUMENTS FOR
BIDDING
NOT FOR
LEGEND
KEYNOTES
GENERAL NOTES
OUTSIDE SPACE ABOVE
TELEPHONE SWITCHGEAR
A001
SERVER ROOM
A001A
PHONE ROOM
A001L
MECHANICAL ROOM
A002A
SERVER ROOM
A001A
1 1
01-ITCU-6(EX)01-ITCU-3(EX)
01-ITAC-3(EX)
01-ITAC-6(EX)
A R
E A
W E
LL
AREA WELL
(TYP.)
(TYP.)
NO SCOPE OF WORK ASSOCIATED
WITH THIS AREA
SCOPE OF WORK AREA AS
DESIGNATED/NOTED
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1 of Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Spinklered
KEY PLAN
3PLAN NORTH
B
IM
/V
IS
N
A E
S e rv ic e s
A ir H a n d lin g U n it s /A
E S e rv ic e s
A H
U M
E P
.r v t
/2
/2
:5 :2
P
M
MECHANICAL DEMOLITION ENLARGED PLANS -
BLDG. 01, LEVEL 00
ST DW
CONSTRUCTION DOCUMENTS 657-19-113JC
MD100
REPLACE OBSOLETE AND FAILING
AIR CONDITIONING UNITS
ST. LOUIS, MO
APRIL 29, 2020
ST. LOUIS,
MO
SPRINKLERED
1/4" = 1'-0"1
ENLARGED MECHANICAL DEMOLITION PLAN -
BUILDING 01 - LEVEL 00 (TELEPHONE AREA)
1 EXISTING IT RACK AIR CONDITIONERS, CONDENSING UNITS AND
ALL ASSOCIATED REFRIGERANT PIPING TO BE REMOVED.
2 EXISTING RACK AIR CONDITIONERS AND ALL REFRIGERANT
PIPING TO BE REMOVED.
3 CUT CONDENSATE PIPING SERVING IT RACK UNITS AT CEILING
AND CAP FOR REUSE.
33 EXISTING EXTERIOR WALL PIPE PENETRATION SLEEVES TO
REMAIN FOR REUSE.
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
1. SEQUENCE REMOVAL AND REPLACEMENT OF IT RACK
COOLING SYSTEMS TO KEEP ESSENTIAL TELEPHONE
SERVICES IN SERVICE THROUGHOUT CONSTRUCTION.
COORDINATE SEQUENCING AND SCHEDULING WITH
PROJECT MANAGER AND GENERAL CONTRACTOR.
COORDINATE ELECTRICAL LOADS AND SOURCES WITH
NEAREST AVAILABLE PLUGS/PANELS. SEE COVER SHEET
FOR ADDITIONAL PHASING NOTES.
Revisions: Date: 04/29/2020
Phase
CONTRACT DOCUMENTS FOR
BIDDING
NOT FOR
GENERAL NOTES
01-ERW-1(EX)
96"x78"
"x
"x
40"x40"
40"x38"
"x
MECHANICAL ROOM
D302C
MECHANICAL ROOM
D302B
STAIR 06
S306
18"x14"(EX)
L P
S
C H
S
C H
R
L P
S
C H
S
C H
R
V(EX)
SAN(EX)
"x
E X
"x
E X
12"x12"(EX)12"x12"(EX)
"x
E X
"x
E X
01-AC-3(EX)
01-EF-19(EX)
S A
N (E
X
V (E
X
-R
F- 3(
E X
"x
"x
"x
"x
"x
-A
C -3
(E X
REF(EX)
REF(EX)
R E
F (E
X
R E
F (E
X
MD101
MD101
EXISTING 1 1/4" CWS
EXISTING 1 1/4" CWR
V(EX)
EXISTING 2" MPS
EXISTING 2" MPR
REMOVE
EXISTING OA
PRE-FILTER BANK 47
MECHANICAL ROOM
D303
REMOVE
EXISTING RA
PRE-FILTER BANK
03-AC-1(EX)
37 38
NO SCOPE OF WORK ASSOCIATED
WITH THIS AREA
SCOPE OF WORK AREA AS
DESIGNATED/NOTED
LEVEL 03 LEVEL 03LEVEL 03 LEVEL 03
12"x12"(EX)
12"x12" RA(EX)
01-EF-19(EX)
"x
"(E
X)
12"x12" RA(EX)
01-AC-3(EX)16"x12"
"x
18"x14"
12"x12"
12"x12"
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1 of Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Spinklered
KEY PLAN
3PLAN NORTH
B
IM
/V
IS
N
A E
S e rv ic e s
A ir H a n d lin g U n it s /A
E S e rv ic e s
A H
U M
E P
.r v t
/2
/2
:5 :2
P
M
MECHANICAL DEMOLITION ENLARGED PLANS -
BLDG. 01, LEVEL 03 AND BLDG. 03, LEVEL 02
ST DW
CONSTRUCTION DOCUMENTS 657-19-113JC
MD101
REPLACE OBSOLETE AND FAILING
AIR CONDITIONING UNITS
ST. LOUIS, MO
APRIL 29, 2020
ST. LOUIS,
MO
SPRINKLERED
1/4" = 1'-0"1
ENLARGED MECHANICAL DEMOLITION PLAN -
BUILDING 01 - AC-3 AND AC-1 ENERGY RECOVERY WHEEL LEVEL 03 INTERSTITIAL
1/4" = 1'-0"2
ENLARGED MECHANICAL DEMOLITION PLAN -
BUILDING 03 - AC-1 ROOF
15 SUNNEN DR SUITE 104
SAINT LOUIS, MO 63143
314.645.1132 FAX: 314.645.1173
www.imegcorp.com # 17002665.02
1. PROVIDE TEMPORARY COOLING FOR OFFICES SERVED BY
01-AC-3(EX). COORDINATE ELECTRICAL PLUG LOCATIONS
AND LOADS WITH PROJECT MANAGER AND GENERAL
CONTRACTOR. SEE COVER SHEET FOR PHASING NOTES.
2. PROVIDE TEMPORARY COOLING FOR OFFICES AND
CRITICAL SPACES SERVED BY 03-AC-1(EX). COORDINATE
COOLING REQUIREMENTS, ESSENTIAL COMMUNICATION
SYSTEM REQUIREMENTS AND ELECTRICAL PLUG
LOCATIONS/LOADS WITH PROJECT MANAGER AND
GENERAL CONTRACTOR. SEE COVER SHEET FOR PHASING
NOTES.
3. COORDINATE SHUT-DOWN OF 01-AC-1 WITH PROJECT
MANAGER AND GENERAL CONTRACTOR TO REPLACE
EXISTING ENERGY WHEEL AND DUCTWORK. SEE COVER
SHEET FOR PHASING NOTES.
4. COORDINATE 01-AC-3(EX) SHUT-DOWN SCHEDULE WITH
PROJECT MANAGER AND GENERAL CONTRACTOR. SEE
COVER SHEET FOR PHASING NOTES.
1/2" = 1'-0"
MECHANICAL SECTION - BUILDING 01 - AC-3 LOOKING SOUTH - DEMOLITION
10 DEMO EXISTING DUCTWORK TO POINT SHOWN. PREPARE
REMAINING DUCTWORK FOR NEW CONNECTION.
11 EXISTING PIPING NOT IN SCOPE OF WORK SHOWN FOR
REFERENCE ONLY.
12 APPROXIMATE LOCATION OF EXISTING CONTROL AND
ELECTRICAL PANELS TO BE REMOVED. COORDINATE WORK
WITH ELECTRICAL CONTRACTOR.
13 DEMOLISH EXISTING MPS/MPR AND CWS/CWR SERVING
01-AC-3 TO POINT SHOWN. PREPARE REMAINING PIPING FOR
NEW CONNECTION. EXISTING ISOLTION VALVES ARE LOCATED
IN 3RD FLOOR INTERSTITIAL SPACE. COORDINATE SHUT-DOWN
OF EXISTING SYSTEMS SERVED BY ISOLATION VALVES.
14 EXISTING TCP-AC-03 CONTROL PANEL AND ASSOCIATED
WIRING TO BE REMOVED AND DISCARDED.
15 REMOVE AND DISPOSE OF 01-AC-03 AND ALL ASSOCIATED
ACCESSORIES AND CONTROLS, INCLUDING: FAN, COILS, DUCT,
PIPING, TO LIMITS OF ROOM. AFTER REMOVAL OF
DUCT/PIPING, PROTECT OPENINGS UNTIL REPLACEMENT
PRODUCTS ARE READY TO BE CONNECTED TO EXISTING
SYSTEMS. REMOVE (3) EXISTING HOUSEKEEPTING PADS
ASSOCIATED WITH EXISTING 01-AC-03.
34 REMOVE AND DISPOSE OF INLINE RETURN AIR FAN, RF-3.
35 REMOVE EXISTING RF-3.
37 REMOVE AND DISPOSE OF ROOFTOP UNIT WHEN NEW UNIT IS
READY TO BE SET IN PLACE. CAP AND SEAL CWS/CHR, STEAM
PIPING AND DUCTWORK WHILE UNIT IS BEING SET IN PLACE.
SEE ARCHITECTURAL PLANS FOR ROOF WORK AND CEILING
WORK BELOW.
38 REMOVE ASSOCIATED PNEUMATIC CONTROL BOX AND
COMPONENTS SERVING 03-AC-1(EX). EXISTING CONTROL
PANEL LOCATED IN BASEMENT TECHNOLOGY ROOM B06.
39 EXISTING ENERGY WHEEL, CONTROLS, DUCTWORK AND
ASSOCIATED COMPONENTS TO BE REMOVED TO POINTS
INDICATED.
47 EXISTING HOUSEKEEPING PAD TO REMAIN.
49 EXISTING REFRIGERATION LINES TO REMAIN.
50 EXISTING IN-LINE FANS, DUCTWORK, AND ASSOCIATED
CONTROLS TO REMAIN.
67 HAZARDOUS MATERIALS REPORT INDICATES A TAN ASBESTOS
CONTAINING SEALANT TO BE PRESENT ON THE EXISTING
SYSTEM'S DUCTWORK. REFER TO REPORT FOR SPECIAL
DEMOLITION PROCEEDURES.
Revisions: Date: 04/29/2020
Phase
CONTRACT DOCUMENTS FOR
BIDDING
NOT FOR
GENERAL NOTES
01-CU-17(EX)
MH200
MH200
EXISTING OUTDOOR AIR INTAKE
HOOD TO REMAIN AND BE
REUSED.
EXISTING ROOF ACCESS
DOOR TO REMAIN.
45 46
EXISTING ROOF DEMO
AREA
01-AC-17(EX)
MH200
MH200
MH200
MH200
28"ø SA
18"ø
16"ø SA
MECHANICAL ROOM AC-17
D303A
18"ø
01-CH-1(EX)
EXISTING MPS/R PIPING
TO EXISTING UNIT HEATER
IN ADJACENT SPACE. PIPING
TO REMAIN
EXISTING MPS/R PIPING
TO REMAIN
(TYP.)
EF-17(EX)
REMOVE
EXISTING 2"
CONDENSATE
REMOVE EXISTING
3/4" STEAM
CONDENSATE
MP203
DEMOILTION
PIPING
DIAGRAM
NO SCOPE OF WORK ASSOCIATED
WITH THIS AREA
SCOPE OF WORK AREA AS
DESIGNATED/NOTED
G ra p h ic S ca le
/2
0"
G ra p h ic S ca le
/3 2"
0"
' G ra p h ic S ca le
/1 6"
0"
' G ra p h ic
S ca le
/8
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
/8
0"
' G ra p h ic
S ca le
/2
0"
G ra p h ic S ca le
/4
0"
G ra p h ic S ca le
0"
Romanyk Consulting Focusing on what matters
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
F
U.S. Department of Veterans Affairs
E
D
C
B
A
F
E
D
C
B
A
910 7 6 5 4 3 2 1
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
8910 7 6 5 4 3 2 1 of Romanyk Consulting Corp. www.romanykconsulting.com 3308 Preston Road, Suite 350-164, Plano, Texas 75093
A/E:Consultant:
Spinklered
KEY PLAN
3PLAN NORTH
B
IM
/V
IS
N
A E
S e rv ic e s
A ir H a n d…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .