36C25520R0096_1.docx

DOCX document 23 KB Posted

Attached to
Z2DA--657-19-113JC, FCA-REPLACE OBSOLETE AND FAILING AIR CONDITIONING UNITS
Solicitation number
36C25520R0096
Issued by

View the file

Other files

File Type Posted
TP09 Final Drawings.pdf PDF
TP09 Final Specifications - (658 Pages).pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contract Opportunity Special Notice

PRODUCT SERVICE CODE

SUBJECT

CONTRACTING OFFICE'S

ZIP-CODE

SOLICITATION NUMBER

ARCHIVE

DAYS AFTER THE RESPONSE DATE

RECOVERY ACT FUNDS

NAICS CODE

CONTRACTING OFFICE

ADDRESS

POINT OF CONTACT

(POC Information Automatically Filled from User Profile Unless Entered)

DESCRIPTION

See Attachment

AGENCY'S URL

URL DESCRIPTION

AGENCY CONTACT'S EMAIL

ADDRESS

EMAIL DESCRIPTION

GENERAL INFORMATION

ADDITIONAL INFORMATION

* = Required Field Contract Opportunity Special Notice

Z2DA

657-19-113JC, FCA-REPLACE OBSOLETE AND FAILING AIR

CONDITIONING UNITS

66048 36C25520R0096 N 238220 Department of Veterans Affairs Network Contracting Office (NCO) 15 3450 S 4th Street Trafficway Leavenworth KS 66048 Contract Specialist Cedric Graham Cedric.Graham@va.gov 913-946-1141

FBO NCO15 MATOC SUBCONTRACTING

SPECIAL NOTICE

THIS INFORMATION IS POSTED FOR SUBCONTRACTING OPPORTUNITIES ONLY. PROPOSALS WILL NOT BE CONSIDERED FROM ANY FIRMS OTHER THAN THE SIX (6) PREVIOUSLY SELECTED NCO15 MATOC CONTRACTORS ONLY. NO SOLICITATION DOCUMENT WILL BE POSTED FOR THIS REQUIREMENT. THIS NOTICE IS PROVIDED FOR INFORMATIONAL PURPOSES ONLY. THEREFORE, FAR 5.203 DOES NOT APPLY. IDIQ TASK ORDER FOR THE (657-19-113JC Replace obsolete failing AHU’s Bldg 1, 3, and 8). The attached project requirements specs and drawing are provided for informational purposes only.

THE SIX (6) NCO15 MATOC CONTRACTORS AND CURRENT CONTRACT NUMERS ARE LISTED BELOW:

Vendor Name
IDIQ Contract Number
Company POC
Contact number
BKM Construction
VA255-17-D-0103
Brent Motley bmotley@bkmconstructionllc.com admin@bkmconstructionllc.com
(913) 297-4900
LJBCO Group LLC
VA255-17-D-0137
Lonnie Wilson/

Richie Sanders / Ashley Galetti lwilson@kutfconstruction.com richie@ljbco.net / Ashley@ljbco.net 816 291-0580 / 816 550-4557 / 816-802-6394

Utility Systems Solution, Inc
VA255-17-D-0139
Addison Sander

asander@us2inc.com

(214) 504-2975

Floyd Construction Corporation
VA255-17-D-0140
Tarrance C. Floyd

tfloyd1@floydconst.com

(316) 648-4529

Jett’s Specialty Construction, LLC
VA255-17-D-0141
Jeffrey Jett

jjett@jettsspecialty.com

(270) 564-0351

Won Freedom Construction, LLC
VA255-17-D-0142
Mitch Dallas - mitchd@wonfreedom.com

Joe Vazquez - joev@vazquezcc.com

(816) 914-0641 (816) 569-6869

VA St. Louis Health Care System Statement of Work 657-19-113JC Replace Obsolete and Failing Air Conditioning Units 16 June 2020 Purpose of Project:

The VA St. Louis Health Care System, John Cochran Division, will remove and replace obsolete and failing air conditioning units:

· Building 1 – Remove and replace AC1 heat wheel

· Building 1 – Remove and replace AC3

· Building 1 – Remove and replace AC17, chiller and associated steam piping

· Building 1 – Remove and replace the Liebert unit serving the OIT closet/phone room in the basement

· Building 3 – Remove and replace main air handler unit equipped with a chilled water coil and a steam preheat coil

· Building 8 – Remove and replace 100% outdoor air handling unit in the basement with steam heating coil and replace make up air unit in the ceiling space. In addition, all duct work shall be cleaned, replace, or repaired. (Ductwork is currently internally insulated)

Work includes, but is not limited to, general construction, alterations, mechanical and electrical work, utility systems, necessary demolition and removal of existing structures, associated appurtenances and certain other items necessary completion. All work shall be performed in accordance with solicitation/contract terms and conditions, specifications and drawings, and all applicable VA and local codes. Contractor shall furnish all supervision, tools, labor, materials, equipment, transportation and testing necessary.

See attached document: TP09 Final Specifications - (658 Pages).

See attached document: TP09 Final Drawings.

File details come from the government source that posted it. Updated .