TOWP_Bus_Charger_Install_RFB (002).pdf
PDF 8 MB Posted
- Attached to
- Electric Bus Charger Installation
- Solicitation number
- 2025-TOWP-TR-01
- Issued by
- Gilpin County, Colorado
About this file
This is a Request for Bids (RFB) issued by the Town of Winter Park, Colorado, for the installation of electric bus charging infrastructure. The project involves installing two new ChargePoint Express Plus Electric bus chargers and accompanying infrastructure, with bids due on Friday, February 28th, 2025, by 4:00 P.M. The bid opening is scheduled for Wednesday, January 29th at 8:00 am at Winter Park Town Hall. The anticipated Notice to Proceed date is Friday, March 21st, 2025, with construction to be completed prior to Wednesday, October 1st, 2025. The project will be awarded on a lump sum basis, with a maximum contract time of approximately 8 months.
The RFB specifies that the installation will include two ChargePoint Express Plus Power Block Enclosures, two 250 Amp ChargePoint Express Plus Dual Dispensers, two cable management kits, and ten ChargePoint Express Plus Power Modules (40kW each). The project requires underground service wiring and conduit installation, with the contractor responsible for all labor, materials, equipment, and services necessary for complete project execution. The bid documents indicate that the project will be funded through the Town of Winter Park and requires compliance with local building and electrical codes. Bidders must provide detailed qualifications, including staff resumes, proposed scope of work, project schedule, subcontractor information, and previous experience with similar projects.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Addendum 3 ChargePoint Quote.pdf | ||
| Addendum 4 As-Built Documents .pdf | ||
| Addendum 1 Facility Walkthrough .pdf | ||
| Addendum 2 Facility Technical Diagrams.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR BIDS
To be provided to the
TOWN OF WINTER PARK
For the installation of
Bus Charging Infrastructure
January 29th, 2025
Electric Bus Charger Installation
Bid Invitation Page 2
PART 1 - REQUEST FOR BIDS
A. Project: Electric Bus Charger Installation
B. Project Description:
Installation of two new ChargePoint Electric bus chargers and accompanying infrastructure.
C. Submittal Date and Location:
Due Date for Bids: Friday, February 28th, 2025, by 4:00 P.M.
Submit one copy of the bid electronically to: Djardee@wpgov.com
D. Bid Opening:
Time: 8:00 am Date: Wednesday, January 29th at 8:00am Location: Winter Park Town Hall, 50 Vasquez Road/PO Box 3327 Winter Park, CO 80482
E. Basis of Bids: Lump Sum
F. Number of Days Bids to be Held Open: 30 days
G. Amount of Liquidated Damages: N/A
H. Anticipated Date of Notice to Proceed: Friday, March 21st, 2025
I. Contract Time: Construction shall be completed prior to Wednesday, October 1st, 2025.
J. Specifications: Per attached Site Design Drawings, labeled Exhibit A.
K. Measurement and Payment: Payment will be a lump sum.
L. Construction Contract / Bid Form: The construction contract, bid form and other related documents are attached.
Any questions concerning this Request for Bids shall be directed BY E-MAIL ONLY to:
Djardee@wpgov.com
PART 2 - INSTRUCTIONS TO BIDDERS
mailto:Djardee@wpgov.com mailto:Djardee@wpgov.com
Bid Invitation Page 3
2.1 A "Bid" is a responsive, conforming, unconditional, complete, legible, and properly executed offer by a Bidder on the form supplied by the Town to provide the work specified in the Request for Bids for the compensation specified.
2.2 Bids shall be clearly marked with the work name, contact person, mailing address, and telephone number of the Bidder.
2.3 It shall be the responsibility of the Bidder to ensure that the Bid is in proper form and in the Town's possession by or before the time and date designated in the Request. Bids will not be accepted after the designated time and date. Any Bid received late will be returned to the Bidder unopened, if possible.
2.4 If a mistake is made or discovered during or after the Bid review, the Town reserves the right to determine which party made the mistake and whether the mistake is material and, after these determinations, the Town, in its sole reasonable discretion, shall decide whether to accept or reject the Bid. No advantage shall be taken by any party of manifest clerical errors or omissions in any Bid or the Contract Documents. Bidders shall notify the Town immediately of any errors or omissions that are encountered.
2.5 Any interlineation, alteration, or erasure shall be initialed by the Bidder. On the Bid, the price of each item shall be stated in numerals and words; in case of conflict, the words shall control. In the case of conflict between the indicated sum of any addition of figures and the correct sum, the correct sum shall control.
2.6 The Town shall not reimburse any Bidder for any cost incurred in preparing a Bid or attending equipment demonstrations, inspections, pre-bid conferences, or interviews.
2.7 Any amplification, clarification, explanation, interpretation, or correction of a Bid shall be made only by written addendum, and a copy of the addendum shall be mailed or delivered to each person receiving a Request for Bids. The Town is not responsible for any amplification, clarification, explanation, or interpretation or correction of a Bid not contained in written addenda.
2.8 Bids by corporations shall be executed in the corporate name by the president or a vice-president
(or a corporate officer accompanied by evidence of authority to sign), and the corporate seal shall be affixed and attested by the secretary or an assistant secretary. The corporate address and state of incorporation shall be shown. Bids submitted by partnerships shall be executed in the partnership name and signed by a partner, and the legal address of the partnership shall be shown. Bids submitted by limited liability companies shall be executed in the company's name and signed by a member, and the legal address of the company shall be shown. Names and titles shall be typed or printed below each signature.
2.9 The following information shall be submitted with the Bid:
2.9.1. The names and resumes of staff personnel who will be assigned to the work.
2.9.2 A complete proposed scope of work and schedule, including any alternatives that can be identified. The Bidder is expected to review the work site prior to submittal of the Bid.
2.9.3 The names and addresses of any subcontractors who will be retained for the work.
2.9.4 A list of the Bidder's previous experience on construction of similar projects.
Bid Invitation Page 4
2.10 The submission of a Bid shall be conclusive evidence and a legal admission that the Bidder: (1) has no questions, complaints, or objections in connection with the Contract Documents, subject to any requests made by the Bidder for amplification, clarification, explanation, interpretation, or correction; (2) has no questions, complaints, or objections as to the completeness, sufficiency, scope, or detail of the Bid; and (3) has full knowledge of the scope, nature, quality, and quantity of the equipment to be provided, the performance criteria, the requirements of the Contract Documents, the site and conditions of delivery, the Winter Park Municipal Code, and other applicable law.
2.11 The contract will be awarded to the lowest responsible and responsive Bidder complying with the terms and conditions, guidelines, and specifications presented in the Bid Request and these Instructions to Bidders. The Town reserves the right to determine, in its sole reasonable discretion, whether any Bid meets the needs or purposes intended and is within the approved budget. The Town does not base its award on prices alone. Also to be considered are: quality of product; past experience with the Bidder or any subcontractors, consultants, products or suppliers; qualifications of the Bidder and/or subcontractors or suppliers; services offered;
warranties; maintenance considerations; long-range costs; delivery; and similar conditions.
2.12. The Town reserves the right to conduct such investigations as it deems necessary to assist in the evaluation of any Bid to establish the experience, responsibility, reliability, references, reputation, qualifications, or financial ability of any Bidder, manufacturer or supplier. The purpose of such investigation is to satisfy the Town that the Bidder has the experience, resources, and commercial reputation necessary to supply the specified equipment and to perform the necessary warranty and product support in accordance with the Contract Documents in the prescribed manner and time.
2.13. The Town reserves the right, if it deems such action to be in its best interests, to reject any and all Bids or to waive any irregularities or informalities therein. Any incomplete, false, or misleading information provided by any Bidder shall be grounds for rejection of the Bid. If Bids are rejected, the Town further reserves the right to investigate and accept the next best Bid in order of ranking, or to reject all Bids and re-solicit for additional Bids.
2.14. No Bid shall include federal excise taxes or state or local sales or use taxes.
2.15. In the event of any claim, suit, or demand which may result from any Bid, or the award of any contract as a result of submission of a Bid, Colorado law shall govern any such claim, suit, or demand and the rights and duties of the parties.
2.16. The Bid, including all required documents, shall be submitted using the enclosed forms. The
Summary and Bid Schedule shall be used for submitting the fees, and the completed forms shall be submitted in a separate sealed envelope. The Bidder shall also include with the Bid Schedule a breakdown of tasks that shows name, position, hours, and costs for each task.
2.17. Copies of the Contract Documents are available online at www.wpgov.com.
2.18. All parts not specifically mentioned which are necessary in order to provide a complete unit, shall be included in the Bid. Any item listed as "Standard" in the manufacturer's published specification, furnished by the Bidder, is assumed to be included in the Bid. Any variations shall be outlined in writing, noting cost factors where applicable.
2.19. Bids shall be in accordance with the specifications contained in the attached Contract Documents.
Should any requirement in the specifications not be included in manufacturer's specification http://www.wpgov.com/
Bid Invitation Page 5 sheets, the Bidder shall include with its Bid a statement of compliance. Failure to do so shall be grounds for disqualification of the Bid.
2.20. Each Bid shall include a statement of standard warranty of the manufacturer.
2.21 Any Bid received as a result of this request is prepared at the Bidder’s expense and becomes
Town property and is therefore a public record upon opening by the Town. No Bid may be withdrawn for a period of 60 days after the deadline for Bids.
PART 3 - BID FORM
Bid Invitation Page 6
The undersigned offers and agrees to furnish all items, upon which the prices are quoted, at the price set opposite each item, if this Bid is accepted within sixty (60) days of the due date. The undersigned also agrees to make delivery, or render service, within ten (10) days of receipt of the Notice to Proceed. The undersigned certifies that no federal, state, or local tax is included in the quoted prices and that none will be added.
Bidder acknowledges receipt of the following Addenda (if necessary):
(initial)
Name of Bidder: ____________________________
Address: _____________________________
Telephone Number: _____________________________
PART 4 - BID SUMMARY
Total Base Price: $ _________________________________________________________
______________________________________________________________________ (in words)
BIDDER:
By: _________________________________
STATE OF COLORADO )
) ss.
COUNTY OF___________________)
The foregoing instrument was subscribed, sworn to and acknowledged before me this ___ day of ___________________, 2025, by __________________________, as ___________________ of ____________________________________________.
My commission expires:
(S E A L) ______________________________________
Notary Public
Bid Invitation Page 7
PART 5 - BID SCHEDULE
To: __________________________
Work: Electric Bus Charger Installation
BID: Pursuant to the request for bids for the above-named work and being familiar with all contractual requirements, therefore, the undersigned Bidder hereby proposes to furnish all labor, materials, tools, supplies, equipment, plant, transportation, services, and all other things necessary for the completion of the contractual work. All other work to complete the work but not specifically itemized shall also be included as incidental to the work cost. Contractor also agrees to pay all taxes and patent documents, within the time of completion of the contractual work and pay all taxes and patent costs, and perform the work in accordance with the time of completion set forth herein, for and in consideration of the following unit and lump sum prices:
Complete Bid Tabulation Form below
By: ________________________________
) ss.
COUNTY OF _________________ )
The foregoing instrument was subscribed, sworn to and acknowledged before me this ___ day of ___________________, 2025, by __________________________, as _________________ of
My commission expires:
(S E A L) ____________________________________
Task Quantity Unit of Measure Rate Total Cost Scope of Work 1
Bid Invitation Page 8
PART 6 - BIDDER’S QUALIFICATION STATEMENT – NA if company previously bid a project in the last two years
A Statement showing the qualifications of Bidder shall be a prerequisite to the Bidder being awarded the Contract. The qualification statement is intended to assure the Town that a high degree of overall workmanship can be expected, and that the Work will be completed within the time limits contained in the Contract Documents.
All items on the statement must be answered in full and submitted with the Bid. The qualification statement will be reviewed by the Town after all Bids have been received and opened and prior to award.
The Bidder shall answer and furnish the following items for review:
1. Name of Bidder._________________________________________________________
2. Permanent address and phone number of Bidder.
3. Date company was organized.
4. If a corporation, where incorporated.
5. Number of years engaged in contracting business under present firm or trade name.
6. Certified copy of financial statement prepared during current fiscal year as prepared for bank or bonding company.
1. List of current jobs new under contract, indicating client and telephone number, size, type of job and percentage of completion of each and date of completion. (Use additional sheets if necessary).
8. List of projects of this size and complexity completed within the last three (3) years along with contract amount, client’s name and address.
Bid Invitation Page 9
9. Have you ever failed to complete any work awarded to you? If so, when, where, and why?
10. Have you ever defaulted on a contract? If so, when, where, and why?
11. List your major equipment available for this contract.
By: ________________________________
) ss.
COUNTY OF ____________ )
The foregoing instrument was subscribed, sworn to and acknowledged before me this ___ day of ___________________, 2025, by __________________________, as _________________ of
My commission expires:
(S E A L) ____________________________________
Bid Invitation Page 10
PART 7 – CONSTRUCTION CONTRACT
THIS CONSTRUCTION CONTRACT (the "Contract") is made and entered into this _____ day of ____________, 2025, by and between the Town of Winter Park, 50 Vasquez Road, P.O. Box 3327, Winter Park, CO 80482, a Colorado home rule municipality (the "Town"), and __________________________, an independent contractor with a principal place of business at __________________________________ ("Contractor") (collectively the "Parties").
For the consideration hereinafter set forth, the receipt and sufficiency of which are hereby acknowledged, the Parties agree as follows:
I. SCOPE OF WORK
Contractor shall furnish all labor and materials required for the complete and prompt execution and performance of all duties, obligations, and responsibilities which are described or reasonably implied from the Scope of Work set forth in Exhibit A, attached hereto and incorporated herein by this reference. No change to the Scope of Work, including any additional compensation, shall be effective or paid unless authorized by written amendment executed by the Town.
II. TERM AND TERMINATION
A. Contractor shall complete the Scope of Work on or before October 1st, 2025.
B. This Contract shall terminate when all the work described in the Scope of Work is completed to the Town's satisfaction (final acceptance), or upon the Town's providing Contractor with seven (7) days advance written notice, whichever occurs first; provided that the indemnification and warranty provisions of this Contract shall survive termination.
III. COMPENSATION
Upon final acceptance by the Town of the work set forth in the Scope of Work, the Town shall pay Contractor an amount not to exceed __________________ dollars ($________.00) (the "Contract Price"), subject to the requirements of C.R.S. § 38-26-107. If Contractor completes the Scope of Work for a lesser amount than the Contract Price, Contractor shall be paid the lesser amount.
IV. INDEPENDENT CONTRACTOR
Contractor is an independent contractor. Notwithstanding any other provision of this Contract, all personnel assigned by Contractor to perform work under the terms of this Contract shall be, and remain at all times, employees or agents of Contractor for all purposes. Contractor shall make no representation that it is a Town employee for any purposes.
V. RESPONSIBILITY
Contractor hereby warrants that it is qualified to assume the responsibilities and render the services described herein and has all requisite corporate authority and licenses in good standing. The services performed by Contractor shall be in accordance with generally accepted professional practices and the level of competency presently maintained by others in the same or similar type of work, and in compliance with applicable laws, ordinances, rules and regulations. The Town's review, approval or acceptance of, or payment for any work shall not be construed as a waiver of any rights under this Contract or any cause of action arising out of the performance of this Contract.
Bid Invitation Page 11
VI. OWNERSHIP
Any materials, items, and work specified in the Scope of Work, and any and all related documentation and materials provided or developed by Contractor shall be exclusively owned by the Town. Contractor expressly acknowledges and agrees that all work performed under the Scope of Work constitutes a "work made for hire." To the extent, if at all, that it does not constitute a "work made for hire," Contractor hereby transfers, sells, and assigns to the Town all of its right, title, and interest in such work. The Town may, with respect to all or any portion of such work, use, publish, display, reproduce, distribute, destroy, alter, retouch, modify, adapt, translate, or change such work without providing notice to or receiving consent from Contractor.
VII. INSURANCE
A. Contractor agrees to procure and maintain, at its own cost, a policy or policies of insurance sufficient to insure against all liability, claims, demands, and other obligations assumed by Contractor pursuant to this Agreement. At a minimum, Contractor shall procure and maintain, and shall cause any subcontractor to procure and maintain, the insurance coverages listed below, with forms and insurers acceptable to the Town.
1. Worker's Compensation insurance as required by law.
2. Commercial General Liability insurance with minimum combined single limits of $1,000,000 each occurrence and $2,000,000 general aggregate. The policy shall be applicable to all premises and operations, and shall include coverage for bodily injury, broad form property damage, personal injury (including coverage for contractual and employee acts), blanket contractual, products, and completed operations. The policy shall contain a severability of interest’s provision, and shall include the Town and the Town's officers, employees, and contractors as additional insureds. No additional insured endorsement shall contain any exclusion for bodily injury or property damage arising from completed operations.
B. Such insurance shall be in addition to any other insurance requirements imposed by law.
The coverages afforded under the policies shall not be canceled, terminated or materially changed without at least 30 days prior written notice to the Town. In the case of any claims-made policy, the necessary retroactive dates and extended reporting periods shall be procured to maintain such continuous coverage. Any insurance carried by the Town, its officers, its employees or its contractors shall be excess and not contributory insurance to that provided by Contractor. Contractor shall be solely responsible for any deductible losses under any policy.
C. Contractor shall provide to the Town a certificate of insurance as evidence that the required policies are in full force and effect. The certificate shall identify this Agreement.
VIII. INDEMNIFICATION
Contractor agrees to indemnify and hold harmless the Town and its officers, insurers, volunteers, representatives, agents, employees, heirs and assigns from and against all claims, liability, damages, losses, expenses and demands, including attorney fees, on account of injury, loss, or damage, including, without limitation, claims arising from bodily injury, personal injury, sickness, disease, death, property loss or damage, or any other loss of any kind whatsoever, which arise out of or are in any manner
Bid Invitation Page 12 connected with this Contract, to the extent that such injury, loss or damage is attributable to the act, omission, error, professional error, mistake, negligence or other fault of Contractor, any subcontractor of Contractor, or any officer, employee, representative, or agent of Contractor or of any subcontractor of Contractor, or which arise out of any worker's compensation claim of any employee of Contractor or of any employee of any subcontractor of Contractor. Contractor, to the fullest extent permitted by law, shall defend, investigate, handle, respond and provide defense for and defend against any such liability, claims, damages, losses, expenses or demands at the sole expense of Contractor, or at the option of the Town, Contractor agrees to pay the Town or reimburse the Town for defense costs incurred by the Town in connection with any such liability, claims, damages, losses, expenses or demands. Contractor, to the fullest extent permitted by law, shall defend and bear all other costs and expenses related thereto, including court costs and attorney fees, whether or not such liability, claims or demands alleged are groundless, false or fraudulent. This indemnification provision is intended to comply with C.R.S. § 13- 21-111.5(6), as amended, and shall be read as broadly as permitted to satisfy that intent.
IX. TERMINATION
This Contract shall terminate when all the work described in the Scope of Work is completed to the Town's satisfaction, or upon the Town's providing Contractor with seven (7) days advance written notice, whichever occurs first. If the Contract is terminated by the Town's issuance of written notice, the Town shall pay Contractor for all work authorized and completed prior to the date of termination.
X. WARRANTY
Contractor shall warrant and guarantee all materials furnished and work performed by Contractor under this Contract for a period of two (2) years from the date of final acceptance by the Town. Under this warranty, Contractor agrees to repair or replace, at its own expense and under the direction of the Town, any portion of the work or materials that fails or is defective, unsound, unsatisfactory because of materials or workmanship, or that is not in conformity with the provisions of the Contract. The expiration of the warranty period shall in no way limit the Town's legal or equitable remedies, or the period in which such remedies may be asserted, for work negligently or defectively performed.
XI. BONDS
Within ten (10) days of the date of this Contract, Contractor shall furnish a Payment and Performance Bond in the full amount of the Contract Price, as security for the faithful performance and payment of all Contractor's obligations under this Contract, including the warranty. The bond shall remain in effect at least until one (1) year after the date of final acceptance
XII. LIQUIDATED DAMAGES
A. Not applicable
XIII. MISCELLANEOUS
A. Governing Law and Venue. This Contract shall be governed by the laws of the State of
Colorado, and any legal action concerning the provisions hereof shall be brought in Grand County, Colorado.
B. Integration. This Contract and any attached exhibits constitute the entire agreement between Contractor and the Town, superseding all prior oral or written communications.
C. Third Parties. There are no intended third-party beneficiaries to this Contract.
Bid Invitation Page 13
D. Notice. Any notice under this Contract shall be in writing, and shall be deemed sufficient when directly presented or sent pre-paid, first class United States Mail to the address included on Page 1 of this Contract.
E. Severability. If any provision of this Contract is found by a court of competent jurisdiction to be unlawful or unenforceable for any reason, the remaining provisions hereof shall remain in full force and effect.
F. Modification. This Contract may only be modified upon written agreement of the Parties.
G. Assignment. Neither this Contract nor any of the rights or obligations of the Parties hereto, shall be assigned by either party without the written consent of the other.
H. Governmental Immunity. The Town and its officers, attorneys and employees are relying on, and do not waive or intend to waive by any provision of this Contract, the monetary limitations or any other rights, immunities, and protections provided by the Colorado Governmental Immunity Act, C.R.S. § 24-10-101, et seq., as amended, or otherwise available to the Town and its officers, attorneys or employees.
I. Rights and Remedies. Delays in enforcement or the waiver of any one or more defaults or breaches of this Contract by the Town shall not constitute a waiver of any of the other terms or obligation of this Contract. The rights and remedies of the Town under this Contract are in addition to any other rights and remedies provided by law. The expiration of this Contract shall in no way limit the Town's legal or equitable remedies, or the period in which such remedies may be asserted, for work negligently or defectively performed.
J. Subject to Annual Appropriation. Consistent with Article X, § 20 of the Colorado
Constitution, any financial obligation of the Town not performed during the current fiscal year is subject to annual appropriation, shall extend only to monies currently appropriated, and shall not constitute a mandatory charge, requirement or liability beyond the current fiscal year.
Bid Invitation Page 14
IN WITNESS WHEREOF, the Parties hereto have executed this Contract on the date first set forth above.
TOWN OF WINTER PARK, COLORADO
Nick Kutrumbos, Mayor
ATTEST:
Danielle Jardee, Town Clerk
CONTRACTOR
By: ______________________________
COUNTY OF __________________ )
The foregoing instrument was subscribed, sworn to and acknowledged before me this ___ day of ________________, 2025, by _______________________________ as _________________ of
My commission expires:
(S E A L) ___________________________________
Bid Invitation Page 15
EXHIBIT A
SCOPE OF WORK
Installation of two (2) ChargePoint Express Plus Power Block Enclosures, two (2) 250 Amp ChargePoint Express Plus Dual Dispensers, two (2) cable management kits (one per dispenser), and ten (10) ChargePoint Express Plus Power Modules (40kW each).
Primary improvements to include:
Installation of charging infrastructure to be installed as per the attached ChargePoint site design guide which can be found in Exhibit B.
Bid Invitation Page 16
PART 8 - CERTIFICATE OF INSURANCE
STATE OF )
COUNTY OF )
I, ______________________, being first duly sworn, state and affirm, under penalty of law, that I am familiar with the insurance coverages maintained by the Insured, ___________________, and the coverage requirements set forth in the foregoing Certificate of Insurance, that I have completed or caused to be completed and subsequently reviewed the foregoing Certificate of Insurance and that the information provided contained therein is true and correct to the best of my knowledge. I further understand that the Town of Winter Park shall rely on the information provided.
This information is provided for the Town of Winter Park, Colorado.
By: ______________________________________
Title: ___________________________________
Agency: ________________________________
COUNTY OF _________________ )
The foregoing instrument was subscribed, sworn to and acknowledged before me this ___ day of ___________________, 2025, by __________________________, as _________________ of
My commission expires:
(S E A L) _______________________
Bid Invitation Page 17
PART 9 - NOTICE OF AWARD
Date: ____________________
Contractor Name: _________________________
Address: _________________________
RE: Bus Charger Installation
Dear ___________________:
Your firm submitted the most qualified Bid and you have been selected as the successful Contractor.
Accordingly, this is your Notice of Award for the ________________________.
Enclosed please find an original and duplicate original Construction Contract. Please review and sign both, then, within ten days of receipt of this letter, return both to me along with your certification of insurance, payment and performance bond, each in the full amount of the Contract Price, and appropriate powers of attorney. When dating the above documents, please make sure that all dates, on all documents, are the same and that the insurance policy reflects the requirements of the Contract Documents. Please return all of the documents at the same time, in the same envelope.
Upon receipt of the signed Contracts, the Town will execute both and return one fully executed original to you.
Should you have any questions, please call me at 970-726-8081 x 210.
Sincerely, Charles McCarthy, Project Manager
Bid Invitation Page 18
PART 10 - NOTICE TO PROCEED
Date: ____________________
Contractor Name: _________________________
Address: _________________________
RE: Bus Charger Installation
Dear ______________:
This letter is your Notice to Proceed, effective as of the date cited below. This notice is in reference to the Construction Contract between you and the Town of Winter Park concerning the Bus Charger Installation).
Please note that in accordance with the Construction Contract, Work must commence within ten days of the date of this Notice, and all Work must be substantially completed within __________________ (_______) days of the date of this Notice, which shall be the ___ day of _________, 20__, and finally completed within __________________ days of the date of this Notice, which shall be the ___ day of _________, 20_.
If you have any questions, please call me at 970-726-8081 x 210.
Sincerely, Charles McCarthy, Project Manager
Date
Bid Invitation Page 19
PART 11 - PAYMENT AND PERFORMANCE BOND
Bond No._____________
KNOW ALL MEN BY THESE PRESENTS: that
(Firm) _______________________________________________________________________
(Address) _________________________________________________________________ (an Individual), (a Partnership), (a Corporation), hereinafter referred to as "the Principal", and
(Firm)__________________________________________________________________
(Address) _________________________________________________________________ hereinafter referred to as "the Surety", are held and firmly bound unto the Town of Winter Park, Colorado, a Municipal Corporation, hereinafter referred to as "the Owner", in the penal sum of __________________________ Dollars in lawful money of the United States, for the payment of which sum well and truly to be made, we bind ourselves, successors and assigns, jointly and severally, firmly by these presents.
THE CONDITIONS OF THIS OBLIGATION are such that whereas the Principal entered into a certain Contract with the Owner, dated the ____ day of ______________________,20____, a copy of which is hereto attached and made a part hereof for the performance of the Work, NOW, THEREFORE, if the Principal shall well, truly and faithfully perform its duties, all the undertakings, covenants, terms, conditions and agreements of said Contract during the original term thereof, and any extensions thereof which may be granted by the Owner, with or without Notice to the Surety and during the life of the guaranty or warranty period, and shall satisfy all claims and demands incurred under such Contract, and shall fully indemnify and save harmless the Owner from all cost and damages which it may suffer by the Principal's failure to do so, and shall reimburse and repay the Owner all outlay and expense which the Owner may incur in making good any default, and make payment to all persons, firms, subcontractors and corporations furnishing materials for or performing labor in the prosecution of the work provided for in such Contract, and any authorized extension or modification thereof, including all amounts due for materials, lubricants, repairs on machinery, equipment and tools, consumed, rented or used in connection with the construction of such work, and all insurance premiums on said work, and for all labor performed in such work, whether by subcontractor or otherwise, then this obligation shall be void; otherwise it shall remain in full force and effect.
PROVIDED, FURTHER, that the said Surety, for value received, hereby stipulates and agrees that no change, extension of time, alteration or addition to the terms of the Contract or to the Work to be performed thereunder or the specifications accompanying the same shall in any way affect its obligation on this Bond; and it does hereby waive notice of any such change, extension of time, alteration or addition to the terms of the Contract or to the Work or to the Specifications.
PROVIDED, FURTHER, that no final settlement between the Owner and the Principal shall abridge the right of any beneficiary hereunder whose claim may be unsatisfied.
IN WITNESS WHEREOF, this instrument is executed in five (5) counterparts, each one of which shall be deemed an original, this ______ day of ____________________________, 20_____.
Bid Invitation Page 20
ATTEST: PRINCIPAL
By: _______________________________ By:________________________________
Title:______________________________ Title:_______________________________
Address:____________________________
(Corporate Seal)
SURETY
ATTEST: Surety:_____________________________
By: _________________________________ By: _______________________________
Attorney-in-Fact: ______________________ Title: ______________________________
Address:____________________________
(Surety Seal)
NOTE: Date of Bond must not be prior to date of Contract and Surety must be authorized to transact business in the State of Colorado and be acceptable to the Town.
Bid Invitation Page 21
PART 12 - CERTIFICATE OF FINAL PAYMENT
With reference to Contract Number ____________ dated _____________________, 20__, between the undersigned Contractor and the Town of Winter Park, Colorado, for: _______________________ at Winter Park, Colorado
The undersigned hereby certifies that all costs, charges and expenses incurred by it on its behalf for work, labor, services, materials and equipment supplied to the foregoing premises, and/or used in connection with its Work under the Contract have been duly paid.
The undersigned further certifies that to its best knowledge and belief (based upon reasonable investigation) each of its subcontractors and material men have duly paid all costs, charges and expenses incurred by them or on their behalf for work, labor, services, materials and equipment supplied to the foregoing premises and/or used by them in connection with the Undersigned’s Work under the Contract.
In consideration of ________________ dollars ($__________) representing final payment under the Contract, the undersigned hereby releases and discharges the Owner and Owner's property from all claims, liens and obligations of every nature arising out of or in connection with the performance of the Work.
As additional consideration for the final payment, and to the fullest extent permitted by law, the undersigned agrees to indemnify and hold harmless Owner from and against all costs, losses, damages, claims, causes of action, judgments and expenses arising out of or in connection with claims against Owner which may be asserted by the undersigned or any suppliers, subcontractors of any tier or any of their representatives, officers, agents and employees for the costs, losses, damages, claims, causes of action, judgments and expenses and expenses that are attributable to the act, omission, error, professional error, mistake, negligence or other fault of the undersigned.
The foregoing shall not relieve the Undersigned of its obligations under the provisions of the Contract as amended, which by their nature survive completion of the Work including, without limitation, warranties, guarantees and indemnities.
Executed this ________ day of _____________________, 20__.
Contractor
Bid Invitation Page 22
PART 13 - CERTIFICATE OF FINAL ACCEPTANCE
Date: ____________________________________
TO: ____________________
Project Title: Bus Charger Installation
This is to advise you that a final inspection of the referenced Work has been made and all work and material was found to be satisfactory. Therefore, the Work is considered to be complete in accordance with the approved plans, specifications and contract documents.
In accordance with the Contract, all Warranty periods shall begin as of the date of this letter.
TOWN OF WINTER PARK, COLORADO
By:_________________________________
Title: ________________________________
Bid Invitation Page 23
PART 14 - GENERAL PROVISIONS
SECTION 1. DEFINITIONS
1.01 CONTRACT DOCUMENTS:
A. Bid Form (Including Bid Summary);
B. Bid Schedule;
C. Bidder’s Qualification Statement;
D. Construction Contract;
E. General Provisions F. Special Provisions;
G. Technical Specifications;
H. Construction Drawings;
I. Certificate of Insurance Verification;
J. Notice of Award;
K. Notice to Proceed;
L. Payment and Performance Bond;
M. Certificate of Final Payment;
N. Final Acceptance Form;
O. Documentation submitted by Contractor prior to Notice of Award; and P. Addenda (if needed)
1.02 CHANGE ORDER:
A written order issued by the Town after execution of the Contract authorizing an addition, deletion or revision in the Work, or an adjustment in the Contract Price or the Contract Time.
1.03 TOWN:
The Town of Winter Park, Colorado.
1.04 CONTRACT:
The entire written agreement covering the performance of the Work described in the Contract Documents including all supplemental agreements thereto and all general and special provisions pertaining to the Work and materials therefor.
1.05 CONTRACT PRICE:
The amount set forth in Paragraph 4 of the Construction Contract.
1.06 CONTRACT TIME:
The time for completion of the Work as set forth in Paragraph 3 of the Construction Contract.
1.07 DAY:
Calendar day, unless otherwise specified. When the last day for the occurrence of an event falls on a Sunday or legal holiday as recognized by the Town, the time for performance shall be automatically extended to the next business day.
1.08 FINAL COMPLETION:
The date as certified by the Project Manager when all of the Work is completed, and final payment may be made.
1.09 PROJECT MANAGER:
The Town's duly authorized representative in connection with the Work.
Bid Invitation Page 24
1.10 SUBCONTRACTOR:
Any person, firm or corporation with a direct contract with Contractor who acts for or in behalf of Contractor in executing any part of the Contract, excluding one who merely furnishes material.
1.11 SUBSTANTIAL COMPLETION:
The date as certified by the Project Manager when the Town occupies or takes possession of all or substantially all of the Work, or when the Town may occupy or take possession of all or substantially all of the Work and put it to beneficial use for its intended purposes.
1.12 WORK:
All the work specified, indicated, shown or contemplated in the Contract Documents, including all alterations, amendments or extensions thereto made by supplemental agreements or written orders of the Project Manager.
SECTION 2. TIME
2.01 TIME OF THE ESSENCE:
All times stated in the Contract Documents are of the essence.
2.02 FINAL ACCEPTANCE:
Upon Final Completion, the Project Manager will issue final acceptance.
2.03 CHANGES IN THE WORK:
The Town reserves the right to order changes in the Work, in the nature of additions, deletions or modifications, without invalidating the Contract, and to make corresponding adjustments in the Contract Price and the Contract Time. All changes shall be authorized by a written Change Order signed by the Project Manager. The Change Order shall include appropriate changes in the Contract Documents and the Contract Time. The Work shall be changed and the Contract Price and Contract Time modified only as set forth in the written Change Order. Any adjustment in the Contract Price resulting in a credit or a charge to the Town shall be determined by mutual agreement of the parties before the work set forth in the Change Order is commenced. If a Change Order results in an increase in the Contract Price, approval of the Winter Park Town Council shall be required, and if such approval is not obtained, the Town shall have no payment obligation regardless of whether the Work pursuant to the Change Order has been performed.
2.04 DELAYS:
A. Any request for extension of the Contract Time shall be made in writing to the Project Manager not more than seven days after commencement of the delay; otherwise it shall be waived. Any such request shall contain an estimate of the probable effect of such delay on the progress of the Work.
B. Contractor shall not be entitled to any increase in the Contract Price, or to damages, or to additional compensation as a consequence of any such delays.
2.05 NO DAMAGES FOR DELAY:
In strict accordance with C.R.S. § 24-91-103.5, the Town shall not amend the Contract Price to provide for additional compensation for any delays in performance which are not the result of acts or omissions of the Town or persons acting on behalf of the Town.
Bid Invitation Page 25
SECTION 3. CONTRACTOR'S RESPONSIBILITIES
3.01 COMPLETION/SUPERVISION OF WORK:
Contractor hereby warrants that it is qualified to assume the responsibilities and render the services described herein and has all requisite corporate authority and licenses in good standing. The services performed by Contractor shall be in accordance with generally accepted professional practices and the level of competency presently maintained by others in the same or similar type of work, and in compliance with applicable laws, ordinances, rules and regulations. Contractor shall be responsible for completion of all Work in a timely and workmanlike manner in accordance with the terms and specifications of the Contract Documents, including the techniques, sequences, procedures and means. Contractor shall be responsible for the coordination of all Work. Contractor shall supervise and direct the Work and give it all attention necessary for proper supervision and direction. Contractor shall maintain a supervisor on site at all times when Contractor or any subcontractor is performing Work.
3.02 DUTY TO INSPECT:
Contractor shall inspect all Contract Documents, tests and reports, including soil tests and engineering tests, if applicable, and shall conduct a site or field review prior to executing the Contract. Contractor assumes the risk of all conditions which are disclosed, or which are reasonably suggested by any such tests or reports, or which would be disclosed by a field or site review. Contractor shall have the affirmative duty to advise the Town of any concerns which Contractor may have regarding construction conditions prior to executing the Contract.
3.03 FURNISHING OF LABOR AND MATERIALS:
A. Contractor shall provide and pay for all labor, materials and equipment, including: tools;
construction equipment and machinery; utilities, including water; transportation; and all other facilities and services necessary for the proper completion of the Work.
B. In all purchases of supplies, materials and provisions to be incorporated or otherwise used by Contractor in the Work, Contractor shall use supplies, materials and provisions produced, manufactured or grown in Colorado if such supplies, materials and provisions are not of inferior quality to those offered by competitors outside of Colorado.
C. While engaged in the performance of the Work, Contractor shall maintain employment practices that do not violate the provisions of the Colorado Antidiscrimination Act of 1957, C.R.S. § 24-34-301, et seq., as amended.
3.04 EMPLOYEES AND SAFETY:
A. Contractor shall maintain at all times strict discipline of its employees, and Contractor shall not employ on the Work any person unfit or without sufficient knowledge, skill, and experience to perform properly the job for which the employee was hired.
B. Contractor shall be responsible to the Town for the acts, negligence and omissions of all direct and indirect employees and subcontractors. The Contract Documents shall not be construed as creating any contractual relation between any subcontractor and the Town.
C. Contractor shall provide for and oversee all safety orders and precautions necessary for the safe performance of the Work. Contractor shall take reasonable precautions for the safety of all employees and others whom the Work might affect, all work and materials incorporated into the Work, and all property and improvements on the work site and adjacent property.
3.05 CLEANUP:
A. Contractor shall keep the work site and adjoining ways free of waste material and rubbish caused by its employees or subcontractors. Contractor shall remove all such waste
Bid Invitation Page 26 material and rubbish daily during construction, together with all tools, equipment, machinery and surplus materials. Contractor shall, upon termination of its Work, conduct general cleanup operations on the work site, including the cleaning of all surfaces, paved streets and walks, and steps. Contractor shall also conduct such general cleanup operations on adjacent properties which were disturbed by the Work.
C. If Contractor fails to perform the cleanup required by this Section, after written notice, the Town may cause the cleanup to be performed at Contractor's expense. Upon receipt of a statement for such cleanup, Contractor shall pay to the Town the costs incurred by the Town for such cleanup, or the Town shall have the right to withhold said amount from any final payment due to Contractor.
3.06 PAYMENT OF ROYALTIES AND LICENSE FEES:
Contractor agrees to pay all royalties and license fees necessary for the Work, and to defend against all actions for infringement of copyright or patent rights, and to save and hold the Town harmless from such actions.
3.07 TAXES, LICENSES AND PERMITS:
Contractor shall pay all taxes imposed by law in connection with the Work, except the Town of Winter Park Sales Tax, for purchases within the Town, and shall procure all permits and licenses necessary for the prosecution of the Work. Contractor shall obtain a Town tax-exempt number for the sales tax exemption.
3.08 SAMPLES AND SHOP DRAWINGS:
Contractor shall furnish, upon the request of the Project Manager, samples and shop drawings to the Project Manager, who shall review them for conformance with the Contract Documents. All Work shall comply with approved samples and drawings.
3.09 COMPLIANCE WITH LAWS AND REGULATIONS:
Contractor shall comply with all federal, state and local laws, ordinances, rules, regulations and orders in any manner relating to the Work. If any provision of the Contract Documents is at variance therewith, Contractor shall notify the Project Manager promptly.
3.10 SUBCONTRACTORS:
A. Contractor shall furnish to the Project Manager at the time the Construction Contract is executed, a list of names of subcontractors to whom Contractor proposes to award the portions of the Work to be subcontracted by Contractor.
B. Contractor shall not employ a subcontractor to whose employment the Town reasonably objects, nor shall Contractor be required to hire a subcontractor to whose employment Contractor reasonably objects.
C. All contracts between Contractor and subcontractor shall conform to the provisions of the Contract Documents, and shall incorporate the relevant provisions of the Contract Documents.
3.11 CORRECTIVE WORK:
When any Work does not conform to the Contract Documents, Contractor shall make the necessary corrections so that the Work will so conform. Such corrections shall be accomplished within the time period approved by the Project Manager. Failure to complete such required corrections within the time period required shall constitute a breach of the Contract. The Town's review, approval or acceptance of, or payment for any work shall not be construed as a waiver of any rights under this Contract or any cause of action arising out of the performance of this Contract.
Bid Invitation Page 27
3.12 OTHER CONTRACTS:
The Town reserves the right to let other contracts in connection with the Work. Contractor shall cooperate with all other contractors so that their work is not impeded by the Work, and Contractor shall give other contractors access to the work site necessary to perform their contracts.
3.13 COMMUNICATION:
Contractor shall direct all communications to the Town regarding the Work to the attention of the Project Manager.
SECTION 4. TERMINATION
4.01 LABOR DISPUTES:
Notwithstanding any other provision contained in this Contract, in the event of any picket or other form of labor dispute at the construction site, Contractor shall continue to perform the Work without interruption or delay. If Contractor ceases performance of the Work because of such picket or other form of labor dispute, the Town may terminate the services of Contractor after giving forty-eight (48) hours' written notice of its intent to do so.
4.02 DEFAULT:
The Town may terminate this Contract upon seven days' written notice to Contractor if Contractor defaults in the timely performance of any provision of the Contract Documents, or otherwise fails to perform the Work, or any part thereof, in accordance with the Contract Documents. Termination of the Contract by the Town shall not be the Town's exclusive remedy, and the Town may pursue such other remedies and actions lawfully available to the Town including, but not limited to, an action at law for damages against Contractor or any bonding agency issuing a bond hereunder, or an action in equity for injunctive relief.
SECTION 5. WARRANTIES:
5.01 WARRANTY OF FITNESS OF EQUIPMENT AND MATERIALS:
Contractor represents and warrants to the Town that all equipment and materials used in the Work, and made a part of the Work, or placed permanently in the Work, shall be new unless otherwise specified in the Contract Documents. All equipment and materials used shall be of good quality, free of defects and in conformity with the Contract Documents. All equipment and materials not in conformity with the Contract Documents shall be considered defective.
5.02 GENERAL WARRANTY:
Contractor shall warrant and guarantee all material furnished and work performed by Contractor for a period of two years from the date of final acceptance of the…
This is the start of the file's text. The full file is on GovTribe.