About this file
This is a technical drawings document prepared by the Town of Greenwich, Connecticut Department of Public Works for Town Project No. 26-7099, the Holly Hill Area Sewer and Manhole Rehabilitation project, dated August 2026. The project is managed by James W. Michel, P.E., Commissioner of Public Works, with Richard C. Feminella, P.E., serving as Deputy Commissioner and Wastewater Division Manager. The drawings were prepared by engineering consultant WE&E located in East Hartford, Connecticut, with Gabriella Circosta-Cohee, P.E., serving as the project engineer. The project encompasses sewer and manhole rehabilitation work across multiple locations in the Holly Hill area of Greenwich, including work along East Weaver Street, West Putnam Avenue, Holly Hill Lane, Muskrat Pond Drive, the Resource Recovery Facility, Armstrong Court, and Booth Place.
The technical drawings include comprehensive plan sheets (C-1 through C-5) showing the project layout and locations, detailed cross-country views, and design details (D-1 through D-3) specifying erosion control measures and construction specifications. Key specifications include the installation of composite filter socks at all ground disturbance locations using Filtrexx or equal products, with FilterSoxx compost/soil/rock/seed fill to meet application requirements. The drawings document includes detailed plan views, sections, and tabular information for each project area, with all materials required to meet specified standards and engineer approval for material dispersal on site. The document was reviewed and approved by Kristie G. Wagner on August 5, 2026.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF PUBLIC WORKS
AUGUST 2026
HOLLY HILL AREA
SEWER AND MANHOLE REHABILITATION
TOWN OF GREENWICH, CONNECTICUT
Water Environment EnergyTransportation Facilities
N
EAST HARTFORD, CONNECTICUT
COMMISSIONER OF PUBLIC WORKS
101 FIELD POINT ROAD
GREENWICH, CT
JAMES W. MICHEL, P.E.
TOWN PROJECT NO. 26-7099
DEPUTY COMMISSIONER OF PUBLIC WORKS
WASTEWATER DIVISION MANAGER
RICHARD C. FEMINELLA, P.E.
MANAGER OF FIELD OPERATIONS
CHRISTOPHER MANDRAS
TOWN OF
GREENWICH
PROJECT
WORK
LOCATION
CONTRACT NO. 7099
GRABIELLA CIRCOSTA-COHEE, P.E.
G-1
SHEET INDEX, SHEET LAYOUT
LEGEND AND GENERAL NOTES
N
PLAN
C-2
C-3
C-1
C-4
TOWN OF GREENWICH, CONNECTICUT
HOLLY HILL AREA
SEWER AND MANHOLE REHABILITATION101 East River Drive, Suite 1A
East Hartford, CT 06108 Tel: (860) 529-7615
TOWN PROJECT NO. 26-7099
C-5
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO
WEST PUTNAM AVE
HOLLY HILL LANE
N
SEWER AND MANHOLE REHABILITATION101 East River Drive, Suite 1A
East Hartford, CT 06108
PLAN
EAST WEAVER STREET / CROSS COUNTRY
SEWER AND MANHOLE REHABILITATION101 East River Drive, Suite 1A
East Hartford, CT 06108
EAST WEAVER STREET / CROSS COUNTRY
TABLES A
ion © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO ion © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO
C-2
SEWER AND MANHOLE REHABILITATION101 East River Drive, Suite 1A
East Hartford, CT 06108
PLAN
PLAN
N
WEST PUTNAM AVENUE
HOLLY HILL LANE / CROSS COUNTRY
C-2A
SEWER AND MANHOLE REHABILITATION101 East River Drive, Suite 1A
East Hartford, CT 06108
WEST PUTNAM AVENUE /
HOLLY HILL LANE / CROSS COUNTRY
TABLES
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMA
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO
C-3
SEWER AND MANHOLE REHABILITATION101 East River Drive, Suite 1A
East Hartford, CT 06108
PLAN
MUSKRAT POND DRIVE / RESOURCE
RECOVERY FACILITY / CROSS COUNTRY
N
PLAN
HOLLY HILL RESOURCE
RECOVERY FACILITY
HOLLY HILL RESOURCE
RECOVERY FACILITY
C-3
SEWER AND MANHOLE REHABILITATION101 East River Drive, Suite 1A
East Hartford, CT 06108
MUSKRAT POND DRIVE / RESOURCE
RECOVERY FACILITY / CROSS COUNTRY
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO
SEWER AND MANHOLE REHABILITATION101 East River Drive, Suite 1A
East Hartford, CT 06108
RESOURCE RECOVERY FACILITY /
BOOTH PLACE / CROSS COUNTRY
N
PLAN
HOLLY HILL RESOURCE
RECOVERY FACILITY
HOLLY HILL RESOURCE
RECOVERY FACILITY
SEWER AND MANHOLE REHABILITATION101 East River Drive, Suite 1A
East Hartford, CT 06108
RESOURCE RECOVERY FACILITY /
BOOTH PLACE / CROSS COUNTRY
© 2026 Microsoft Corporation © 2026 Maxar ©CNES (2026) Distribution Airbus DS © 2026 TMAP MOBILITY Earthstar Geographics SIO
SEWER AND MANHOLE REHABILITATION101 East River Drive, Suite 1A
East Hartford, CT 06108
PLAN
N
ARMSTRONG COURT /
MUSKRAT POND DRIVE / CROSS COUNTRY
SEWER AND MANHOLE REHABILITATION101 East River Drive, Suite 1A
East Hartford, CT 06108
ARMSTRONG COURT /
MUSKRAT POND DRIVE / CROSS COUNTRY
D-1
DETAILS I
DETAIL A
DETAIL B
SEWER AND MANHOLE REHABILITATION101 East River Drive, Suite 1A
East Hartford, CT 06108
DETAIL D
DETAIL C
D-2
DETAILS II
SEWER AND MANHOLE REHABILITATION101 East River Drive, Suite 1A
East Hartford, CT 06108
DETAIL D DETAIL E DETAIL F
DETAIL A
DETAIL G
DETAIL CDETAIL B
DETAIL I
D-3
DETAILS III
SEWER AND MANHOLE REHABILITATION101 East River Drive, Suite 1A
East Hartford, CT 06108
DETAIL A
DETAIL C
DETAIL B
3" - 4"
12"±
2" x 2" Wooden Stake
Filtrexx® FilterSoxx™
Filtrexx® FilterSoxx™
Stake on 5' Lineal Spacing
Flow
Filtrexx® FilterSoxx™
Notes:
1. All material to meet Filtrexx® or equal specifications.
2. FilterSoxx™ compost/jsoil /rock/seed fill to meet application requirements.
3. Compost material to be dispersed on site, as determined by Engineer.
Filtrexx®DitchChexx™ Plan View Filtrexx®EdgeSaver™ �
Plan View
FlowStake on 5' Lineal Spacing
Stake on � 10' Lineal �
Spacing
Filtrexx®SiltSoxx™ � Plan View
Upslope
Downslope
Flow
Filtrexx® FilterSoxx™
Filtrexx®FilterSoxx™ Section
4. Install composite filter sock at all ground disturbance locations, DETAIL D whether erosion controls are noted on drawings or not. Composite filter sock is required at any location where siltation is a concern as directed by Engineer or Town of Greenwich.
| 0-COVER |
| Layout1 |
| 0-G-1 |
| G-1 |
| C-1 |
| C-1 |
| C-1A |
| C-1 A |
| C-2 |
| C-2 |
| C-2A |
| C-2A |
| C-3 |
| C-3 |
| C-3A |
| C-3A |
| C-4 |
| C-4 |
| C-4A |
| C-4A |
| C-5 |
| C-5 |
| C-5A |
| C-5A |
| D-1 |
| D-1 |
| D-2 |
| D-2 |
| D-3 |
| D-3 |
| 2026-08-05T17:15:35-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:15:53-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:16:08-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:16:25-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:16:34-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:16:44-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:16:54-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:17:03-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:17:11-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:17:18-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:17:26-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:17:34-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:17:42-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:17:50-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:17:58-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
| 2026-08-05T17:05:27-0400 | |
| Kristie G Wagner | |
| I have reviewed this document |
File details come from the government source that posted it. Updated .