This is a Performance Bond template document for the Town of Manchester, Connecticut, designed to ensure contractor compliance with municipal contract obligations. The bond secures performance on contracts awarded by the Town, with the Principal (contractor) and Surety (bonding company) jointly liable to the Town as Obligee. The bond covers contract performance, faithful completion of work, and compliance with prevailing wage requirements applicable to the specific project. For the related Forebay Dredging at Center Springs Pond project (Bid No. 25/26-27), bidders must submit a performance bond equal to 100% of the contract price along with a 5% bid bond. Sealed bids are due via the Town's eProcurement Portal by 2:00 pm on Tuesday, December 9, 2025, with a question submission deadline of December 5, 2025 at 4:00 pm. The project involves removal of approximately 750 to 1,000 cubic yards of accumulated sediment from the forebay, including erosion and sedimentation controls, water handling, dewatering, riprap installation, and restoration work. All work must be completed by March 1, 2026, with contractors required to work continuously once mobilized. The contract award is anticipated approximately two weeks following the bid opening, which will be conducted virtually via Zoom.
The performance bond obligates the surety to either complete the contract or provide sufficient funds to cover completion costs should the principal default, with liability capped at the bond amount. Contractors must comply with Connecticut prevailing wage requirements under General Statute 31-53 for dredging classifications and submit a Living Wage Certification Form per the Manchester Living Wage Ordinance. Federal Disadvantaged Business Enterprise (DBE) requirements apply, mandating fair competition, documentation of DBE participation efforts, and detailed records of subcontractor performance. Additionally, all workers must complete a 10-hour OSHA Construction Safety and Health Course, and contractors must obtain all necessary permits. Bidders must submit comprehensive documentation including bidder qualifications, references, a non-collusion affidavit, and a conflict of interest statement. The performance bond remains in full force unless the principal promptly and faithfully performs the contract and certifies compliance with prevailing wage requirements, at which point the bond obligation becomes null and void.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE BOND
Bond No.____________
KNOW ALL MEN BY THESE PRESENTS:
THAT ___________________________________________________________as Principal, Hereinafter called "PRINCIPAL," and _______________________________
________________________ as Surety, hereinafter called "SURETY," are held and firmly bound unto the Town of Manchester, Connecticut, as Obligee, hereinafter called "TOWN," in the amount of
Dollars, ($ ), for the payment whereof PRINCIPAL and SURETY bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, PRINCIPAL has by written Contract dated ______________________ entered into a Contract with TOWN for _____________________________________________________________ which Contract is by reference made a part hereof, and is hereinafter referred to as the
"CONTRACT."
NOW, THEREFORE, the condition of this obligation is such that, if PRINCIPAL shall promptly and faithfully perform said CONTRACT, and shall certify in writing that all wages paid under said
CONTRACT to any mechanic, laborer or workman were equal to the rates of wages customary or then prevailing for the same trade or occupation in the Town of Manchester, then this obligation shall be null and void, otherwise it shall remain in full force and effect.
Whenever PRINCIPAL shall be, and declared by the TOWN to be in default under the
CONTRACT, the TOWN having performed its obligations thereunder, the SURETY may promptly remedy the default, or shall promptly:
1. Complete the CONTRACT in accordance with its terms and conditions; or
2. Obtain a bid or bids for submission to the TOWN for completing the CONTRACT in accordance with its terms and conditions, and upon determination by the TOWN and SURETY of the lowest possible bidder, arrange for a CONTRACT between such bidder and the TOWN, and make available as work progresses (even though there should be a default or a succession of defaults under the CONTRACT or Contracts of completion arranged under this paragraph) sufficient funds to pay the cost of completion less the balance of the Contract Price; but not exceeding, including other costs and damages for which the SURETY may be liable hereunder, the amount set forth in the first paragraph hereof. The term, "Balance of the Contract Price," as used in this paragraph, shall mean the total amount payable by the TOWN to PRINCIPAL under the
CONTRACT and any amendments thereto, less the amount properly paid by the TOWN to the
PRINCIPAL.
No right of action shall accrue on this bond to or for the use of any person or corporation other than the
TOWN named herein or the heirs, executors, administrators or successors of TOWN.
Signed and sealed this ______________ day of ________________________, A.D., 20__.
In the Presence of:
(SEAL)
(PRINCIPAL)
By:
(SURETY)
By: