Town of Frisco_Concrete Replacement 2025_Various Locations.pdf
PDF 19 MB Posted
- Attached to
- Town of Frisco - Concrete Replacement 2025
- Solicitation number
- TOF_Conc.2025
- Issued by
- Sedgwick County, Colorado
About this file
This document is a detailed project listing for the Town of Frisco's Concrete Replacement Project 2025, which outlines specific concrete replacement and repair locations across multiple areas within the municipality. The project encompasses 30 distinct sites, including locations at the Marina (items 1-15), Galena Alley (items 16-18), West Main Parking areas (items 19-21), Hawn Drive (items 22-24), and various other municipal zones. The comprehensive list includes curb and gutter replacements, drain pan repairs, and concrete surface repairs, with total measurements including 286 linear feet of curb and gutter, 75 linear feet of curb-only work, and 5,360 square feet of pan/surface replacements.
The project documentation includes photographic evidence of each site, with green numeric markers indicating specific locations and highlighting areas of concrete deterioration, cracking, and structural weakness. The images reveal varying degrees of concrete damage, from minor surface cracks to significant structural breaks, suggesting a systematic approach to infrastructure maintenance. Additional notes on the documentation recommend saw cutting to preserve concrete asphalt seams and adding 2-foot asphalt patch-backs where necessary. The project appears to be part of the town's ongoing infrastructure improvement and maintenance strategy, focusing on enhancing safety and preserving municipal roadways and pedestrian areas.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .