This is an Invitation for Bids (IFB) document issued by the Town of Fountain Hills Public Works Department for the Town Campus Roof Rehabilitation Project [F4046]. The project involves securing a qualified general contractor to install a flexible 100 percent acrylic reinforced coating system over existing spray foam roofing, including all material, labor, roof preparation, equipment, tools, detailing, and supervision necessary for completion. The IFB was released on September 17, 2026, with a deadline for questions on October 22, 2026, and a response deadline of October 29, 2026, at 5:30 p.m. The contract time is 120 days from the Notice to Proceed. Bidders must demonstrate successful completion of at least three similar projects within the past 60 months, with one project valued at a minimum of 75 percent of the total bid amount. A prospective bidders' conference may be scheduled, with details provided on the IFB cover page.
Bidders must submit a 10 percent bid bond with their sealed bids and, upon award, provide both a performance bond and payment bond, each equal to 100 percent of the total contract price. All pricing must be submitted on a per-unit basis by line item, with all pricing blanks completed; empty spaces may result in bid rejection. The Town is exempt from federal excise tax and sales tax, which must be calculated and itemized separately by the bidder. Payment terms require 30-day minimum payment periods, with monthly progress payments submitted by the 15th of each month and processed within 14 days of approval. Retainage of 10 percent is held until Final Completion, with 50 percent of retained amounts released when work is 50 percent complete. The contractor must obtain a business license before commencing work and maintain comprehensive insurance coverage, including Commercial General Liability ($1,000,000 per occurrence), Vehicle Liability ($1,000,000), and Workers' Compensation insurance with Employers Liability coverage. Liquidated damages of $1,600 per calendar day apply for delays beyond the Substantial Completion date.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
IFB-2026-013
INVITATION FOR BIDS
TOWN CAMPUS ROOF REHABILITATION PROJECT [F4046]
The Town of Fountain Hills
Public Works
16705 E. Avenue of the Fountains
Fountain Hills, AZ 85268
RELEASE DATE: September 17, 2026
DEADLINE FOR QUESTIONS: October 22, 2026
RESPONSE DEADLINE: October 29, 2026, 5:30 pm
Invitation for Bids #IFB-2026-013 Title: Town Campus Roof Rehabilitation Project [F4046]
Town of Fountain Hills
INVITATION FOR BIDS
Town Campus Roof Rehabilitation Project [F4046]
I. ARTICLE I - DEFINITIONS
II. ARTICLE II – BID PROCESS; BID AWARD
III. ARTICLE III – GENERAL TERMS AND CONDITIONS
IV. Scope of Work V. Vendor Questionnaire
VI. OFFER
Attachments:
A - IFB_Construction-Sample
B - SUBSTITUTION EQUAL REQUEST FORM
C - BID BOND
D - PERFORMANCE BOND
E - PAYMENT BOND
F - SCOPE - Fluid Applied Roofing Over Spray Foam
G - Original roof drawings Binder
H - Fountain Hill Review Set - 2026-07-29
I - Signature_Page_and_Bid_Form_Edit
1. ARTICLE I - DEFINITIONS
Summary
The Town of Fountain Hills (the “Town”) is issuing this Invitation for Bid (this “IFB”) from qualified, licensed firms (“Vendors”) as more particularly described in the Scope of Work. In accordance with the
Town’s Procurement Code, the Town will accept sealed bids for the Goods/Services specified in the
Scope of Work.
Background
The Town of Fountain Hills overlooks the Verde River Valley and the east valley of the metro Phoenix area. The Town is a master planned community established in 1970 by McCulloch Properties (now MCO
Properties, Inc.). Prior to 1970, the area was a cattle ranch and was part of one of the largest land and cattle holdings in Arizona. The land was purchased by Robert McCulloch in the late 1960s and the community designed by Charles Wood, Jr. (designer of Disneyland in southern California). The centerpiece of Fountain Hills is one of the world's tallest man-made fountains, a focal point that attracts thousands of visitors each year.
Located on 13,006 acres of land, Fountain Hills is surrounded by the McDowell Mountains and
Scottsdale on the west, the Fort McDowell Yavapai Nation on the east, the Salt River Pima-Maricopa
Indian Community on the south, and by the McDowell Mountain Regional Park on the north. The elevation is 1,520 feet at the fountain, 2,460 feet at the Adero Canyon Trailhead, and is approximately
500 feet above Phoenix. Over the past thirty years, Fountain Hills has grown from 10,030 residents to a town of about 24,000 at present. On June 5, 2006, the Town of Fountain Hills became twenty square miles and about ten percent larger by annexing 1,300 acres of State Trust Land.
The Town is also renowned for its preservation of the natural desert, its abundant wildlife, scenic qualities and dark skies. One of Fountain Hills’ most valuable assets is its natural beauty. The Town’s scenic terrain provides for a wide range of outdoor activities including hiking, biking, and golf in support of healthy lifestyles. Fountain Hills contains some of the more challenging and picturesque golf courses in the State of Arizona. Its dark skies provide opportunities for star gazing.
Fountain Hills was named by Phoenix Magazine as the best place to live in the Valley of the Sun and was cited as "a welcome oasis on the outskirts of a metropolis." The small town charm, lakeside park, Town
Center, relaxed desert lifestyle, lush desert landscapes, diverse landforms, public art, and idyllic location at the foothills of a picturesque mountain setting overlooking Fountain Park make Fountain Hills an oasis in the desert.
For purposes of this Invitation for Bids, the following definitions shall apply:
https://secure.procurenow.com/portal/fhaz/projects/288942?section=undefined https://secure.procurenow.com/portal/fhaz/projects/288942?section=undefined
“Bid” or “Offer” means a responsive bid or quotation submitted by a Bidder in response to this IFB.
“Bid Deadline” means the date and time set forth on the cover of this IFB for Bids to be uploaded into the Town bid portal.
“Bid Opening” means the date and time set forth on the cover of this IFB for opening of sealed Bids.
“Bidder” means any person or firm submitting a competitive Bid in response to this IFB.
“Confidential Information” means that portion of a Bid, proposal, Offer, Specification or protest that contains information that the person submitting the information believes should be withheld, provided
(i) such person submits a written statement advising the Town of this fact at the time of the submission and (ii) the information is so identified wherever it appears.
“Contract” means, collectively, the (i) Offer/Bid, (ii) this IFB, including all exhibits, (iii) the Notice of
Award, (iv)the Notice to Proceed or Purchase Order(s), (v) any approved Addendum, Change Order or
Amendment, (vi) the Contractor’s Certificates of Insurance and a copy of the Declarations Page(s) of the
“Contractor” means the individual, partnership, corporation or limited liability company who has submitted a Bid in response to this IFB and who, as a result of the competitive bidding process, is awarded a contract for Materials or Services by the Town.
“Contract Time” means the time period during which the Contractor must complete all of the Work related to the Project.
“Days” means calendar days unless otherwise specified.
“Engineer” means the Town Engineer or authorized designee.
“Final Completion” shall be defined as set forth in Section 3.16 and shall occur not later than 30 Days from the date of Substantial Completion unless otherwise designated by the Engineer and subject to modification by changes in the Work as provided in Section 3.14 below.
“Invitation for Bids” or “IFB” means this request by the Town for participation in the competitive bidding process according to all documents, including those attached or incorporated herein by reference, utilized for soliciting Bids for the Materials and/or Services in compliance with the Town’s Procurement
Code.
“MAG Specifications” means, collectively, the “Uniform Standard Specifications for Public Works
Construction,” current edition as of the date of Contract award and the “Uniform Standard Details for
Public Works Construction,” current edition as of the date of Contract award, which are sponsored and distributed by the Maricopa Association of Governments (“MAG”) and any amendments or supplements adopted by the Town.
“MAG Supplement” means the most current edition of the Town of Fountain Hills Supplement to the
MAG Uniform Standard Specifications and Details for Public Works Construction. of the insurance policies, (vii) the Certificate of Completion and (viii) any Plans, Specifications or other Documents attached, appended or incorporated herein by refence.
“Materials” means any personal property, including equipment, materials, replacements and supplies provided by the Contractor in conjunction with the Contract and shall include, in addition to Materials incorporated in the Project, equipment and other material used and/or consumed in the performance of the Work.
“Multiple Award” means an award of an indefinite quantity contract for one or more similar products, commodities or Services to more than one Bidder.
“Price” means the total expenditure for the defined Project, inclusive of all Materials, commodities or
Services.
“Procurement Administrator” means a Town employee who has specifically been designated to act as a contact person to the Bidders and/or Contractor relating to their IFB.
“Procurement Agent” means the Town Manager or authorized designee.
“Procurement Code” means the Town of Fountain Hills Procurement Code, as amended from time to time.
“Project” means the purpose and Work described as set forth in Section 2.1, in the “Purpose/Scope of
Work” of the IFB.
“Punch List” means that list of items provided by Town to Contractor at the time of Substantial
Completion indicating items to be completed or corrected, including the time for completion or correction by Contractor after Substantial Completion.
“Services” means the furnishing of labor, time or effort by a Contractor, not involving the delivery of a specific end product other than reports which are merely incidental to the required performance and as further defined in the Contract. This term does not include “professional and technical services” as defined in the Procurement Code.
“Specification” means any description of the physical characteristics, functional characteristics, or the nature of a commodity, product, supply or Services. The term may include a description of any requirements for inspecting, testing, or preparing a supply or service item for delivery.
“Subcontractor” means those persons or groups of persons having a direct contract with the Contractor to perform a portion of the Work and those who furnish Materials according to the plans and/or
Specifications required by this Contract.
“Substantial Completion” shall be defined as set forth in Section 3.15 below and shall occur not later than the date set forth in the Schedule, subject to modification by changes in the Work as provided in
Section 3.14 below.
“Town” means the Town of Fountain Hills, an Arizona municipal corporation.
“Town Representative” means the Town employee who has specifically been designated to act as a contact person to the Town’s Procurement Administrator, and who is responsible for monitoring and overseeing the Contractor’s performance under the Contract and for providing information regarding details pertaining to the Work.
“Vendor” means any firms, entities or individuals desiring to prepare a responsive Bid in response to this
IFB.
“Work” means all labor, Materials and equipment incorporated or to be incorporated in the Project that are necessary to accomplish the construction required by this Contract.
2. ARTICLE II – BID PROCESS; BID AWARD
2.1 Purpose/Scope of Work. The Town is issuing this IFB is to secure a qualified General Contractor to perform the Work and provide Materials as more particularly described in the Plans and Specifications attached hereto. Bidders must submit Bids encompassing the entire Project, inclusive of the related
Plans and/or Construction Drawings. Failure to do so may result in a determination that the Bid is non-responsive.
2.2 Amendment of IFB. Except as set forth in Section 3.56 below, no alteration may be made to this IFB or the resultant Contract without the express, written approval of the Town in the form of an official IFB addendum or Contract amendment. Any attempt to alter this IFB/Contract without such approval is a violation of this IFB/Contract and the Town Procurement Code. Any such action is subject to the legal and contractual remedies available to the Town including, but not limited to, Contract cancellation and suspension and/or debarment of the Bidder or Contractor.
2.3 Preparation/Submission of Bid. Bidders are invited to participate in the competitive bidding process for the Project specified in this IFB. Bidders shall review their Bid submissions to ensure the following requirements are met.
A. Irregular/Non-responsive Bids. The Town will consider as “irregular” or “non-responsive” and may reject any Bid not prepared and submitted in accordance with the IFB and Specifications, or any Bid lacking sufficient information to enable the Town to make a reasonable determination of compliance with the Specifications. Unauthorized or unreasonable exceptions, conditions, limitations, or provisions may be cause for rejection. Bids may be deemed non-responsive at any time during the evaluation process if, in the sole opinion of the Procurement Agent, any of the following are true:
1.Bidder does not meet the minimum required skill, experience or requirements to perform the Work or provide the Materials.
2.Bidder has a past record of failing to fully perform or fulfill contractual obligations.
3.Bidder cannot demonstrate financial stability.
4.Bid submission contains false, inaccurate or misleading statements that, in the opinion of the Procurement Administrator, are intended to mislead the Town in its evaluation of the
Bid.
B. Specification Minimums. Bidders are reminded that the Specifications in this IFB are the minimum levels required and that Bids submitted must be for products that meet or exceed the minimum level of all features specifically listed in this IFB. Bids offering less than the minimums specified will be deemed not responsive. It shall be the Bidder’s responsibility to carefully examine each item listed in the Specifications.
C. Required Submittal. Bidders shall provide all of the following documents to be considered a responsive Bid:
1.Complete, fully executed original of this IFB, with the Offer signed Electronically or in ink by a person authorized to bind the Bidder.
2.Price Sheet.
3.Bid Bond.
4.Licenses.
5.References.
6.Federal Requirements, if applicable.
7.Acknowledgment for each Addendum and acknowledgment/appropriate response to
Vendor Questionnaire questions.
D. Bidder Responsibilities. All Bidders shall (1) examine the entire Bid package, (2) seek clarification of any item or requirement that may not be clear, (3) check all responses for accuracy before submitting a Bid and (4) submit the entire, completed Bid package into the Town’s bid e-portal by the official Bid Deadline.
E. Withdrawal. At any time prior to the specified Bid Opening, a Bidder (or designated representative) may amend or withdraw its Bid. Facsimile or mailgram Bid amendments or withdrawals will not be considered. No Bid shall be altered, amended or withdrawn after the specified Bid Deadline, unless otherwise permitted pursuant to the Town Procurement Code.
2.4 Inquiries; Interpretation of Plans, Specifications and Drawings.
A. Inquiries. Any question related to the IFB, including any part of the Plans, Specifications, Scope of Work or other Contract Documents, shall be directed to the Town Procurement Administrator.
Questions shall be submitted through the Town’s bid e-portal; the Town will not respond to any inquiries submitted later than the Final Date for Inquiries. The Vendor submitting such inquiry will be responsible for its prompt delivery to the Town.
B. Addenda. It shall be the Bidder’s responsibility to check for addenda issued to this IFB. Any addendum issued by the Town with respect to this IFB will be available in the Town’s bid e-portal.
C. Approval of Substitutions. The Materials, products, and equipment described in this IFB establish a standard or required function, dimension, appearance and quality to be met by any proposed substitution. No substitute will be considered unless written Substitution/Equal
Request has been received within the Town’s bid e-portal Each such request shall include the name of the Material or equipment for which it is to be substituted and a complete description of the proposed substitute, including any drawings, performance and test data and any other information necessary for evaluation of the substitute. If a substitute is approved, the approval shall be by written addendum to the IFB. Bidder shall not rely upon approvals made in any other manner.
D. Use of Equals. When the Specifications for materials, articles, products and equipment include the phrase “or equal,” Bidder may bid upon and use materials, articles, products and equipment that will perform equally the requirements imposed by the general design. The Engineer will have the final approval of all materials, articles, products and equipment proposed to be used as an
“equal.” No such “equal” shall be purchased or installed without prior, written approval from the
Engineer. No “equal” will be considered unless a written Substitution/Equal Request in the
Town’s bid e-portal. The request shall include the name of the material or equipment for which the item is sought to be considered an equal and a complete description of the proposed equal including any drawings, cuts, performance and test data and any other information necessary for evaluation of the equal. All approval of equals shall be issued in the form of written addendum or amendment, as applicable, to this IFB or the Contract.
E. Bid Quantities. It is expressly understood and agreed by the parties hereto that the quantities of the various classes of Services and/or Materials to be furnished under this Contract, which have been estimated as stated in the Bidders’ Offer, are only approximate and are to be used solely for the purpose of comparing, on a consistent basis, the Bidders’ Offers presented for the
Work under this Contract. The selected Contractor agrees that the Town shall not be held responsible if any of the quantities shall be found to be incorrect and the Contractor will not make any claim for damages or for loss of profits because of a difference between the quantities of the various classes of Services and/or Materials as estimated and the Services and/or Materials actually provided. If any error, omission or misstatement is found to occur in the estimated quantities, the same shall not (1) invalidate the Contract or the whole or any part of the Scope of
Work, (2) excuse Contractor from any of the obligations or liabilities hereunder or (3) entitle
Contractor to any damage or compensation except as may be provided in this Contract.
2.5 Prospective Bidders’ Conference. A Prospective Bidders’ Conference may be held. If scheduled, the date and time of the Prospective Bidders’ Conference will be indicated on the cover page of this IFB. The
Prospective Bidders’ Conference may be designated as mandatory or non-mandatory on the cover of this IFB. Bids shall not be accepted from Bidders who do not attend a mandatory Prospective Bidders’
Conference. Bidders are strongly encouraged to attend those Prospective Bidder’s Conferences designated as non-mandatory. The purpose of the Prospective Bidders’ Conference will be to clarify the contents of the IFB in order to prevent any misunderstanding of the Town’s requirements. Any doubt as to the requirements of this IFB or any apparent omission or discrepancy should be presented to the
Town at the Prospective Bidders’ Conference. The Town will then determine if any action is necessary and may issue a written amendment or addendum to the IFB. Oral statements or instructions will not constitute an amendment or addendum to the IFB.
2.6 New Materials. All Materials to be provided by the Contractor and included in the Bid shall be new, unless otherwise stated in the Specifications.
2.7 Prices. Work shall be performed at the unit prices as set forth in the Price Sheet attached hereto as
Exhibit I and incorporated herein by reference. Bid prices shall be submitted on a per unit basis by line item, when applicable. In the event of a disparity between the unit price and extended price, the unit price shall prevail. NOTE: All pricing blanks must be filled in. Empty or unfilled spaces in the Bid Price
Sheet may result in a determination that a Bid is non-responsive.
2.8 Intentionally Omitted.
2.9 Payment; Discounts. Any Bid that requires payment in less than 30 Days shall not be considered.
Payment discounts of 30 Days or less will not be deducted from the Bid Price in determining the low Bid.
The Town shall be entitled to take advantage of any payment discount offered, provided payment is made within the discount period. Payment discounts shall be indicated on Price Sheet.
2.10 Taxes. The Town is exempt from Federal Excise Tax, including the Federal Transportation Tax. Sales tax, if any, shall be indicated as a percentage and set forth as a separate item. It shall not be considered a lump sum payment item. It is the sole responsibility of the Bidder to determine any applicable State tax rates and calculate the Bid accordingly. Failure to accurately tabulate any applicable taxes may result in a determination that a Bid is non-responsive. The Bidder shall not rely on, and shall independently verify, any tax information provided by the Town.
2.11 Federal Funding. It is the responsibility of the Bidder to verify and comply with federal requirements that may apply to the Work (the “Federal Requirements”). It is also the responsibility of the Bidder to incorporate any necessary amounts in the Bid to accommodate for required federal record-keeping, necessary pay structures or other matters related to the Federal Requirements. Federal
Requirements, if any, shall be attached hereto. In addition to any applicable Federal Requirements, this procurement is subject to a number of state and Town regulations. In general, where these rules conflict, the more stringent law or rule applies.
2.12 Cost of Bid/Proposal Preparation. Bids submitted for consideration should be prepared simply and economically, providing adequate information in a straightforward and concise manner. The Town does not reimburse the cost of developing, presenting or providing any response to this solicitation; the
Bidder is responsible for all costs incurred in responding to this IFB. All materials and documents submitted in response to this IFB become the property of the Town and will not be returned.
2.13 Public Record. All Bids shall become the property of the Town. After Contract award, Bids shall become public records and shall be available for public inspection in accordance with the Town’s
Procurement Code, except that any portion of a Bid that was designated as confidential pursuant to
Section 2.14 below shall remain confidential from and after the time of Bid opening to the extent permitted by Arizona law.
2.14 Confidential Information. If a Vendor/Bidder believes that a Bid, Specification, or protest contains information that should be withheld from the public record, a statement advising the Procurement
Agent of this fact shall accompany the submission and the information shall be identified. The
Procurement Administrator shall review the statement and information and shall determine in writing whether the information shall be withheld. The information identified by the Vendor or Bidder as confidential shall not be disclosed until the Procurement Administrator makes a written determination.
If the Procurement Administrator determines to disclose the information, the Procurement
Administrator shall inform the Vendor or Bidder in writing of such determination.
2.15 Vendor Licensing and Registration. The successful Bidder shall (A) be licensed with the Arizona
Corporation Commission to do business in Arizona, (and (B) obtain a Town business license upon entering into contract. Bidders shall provide license and certification information with the Bid. Upon the
Town’s request, corporations, limited liability companies, partnerships or other entities shall provide
Certificates of Good Standing from the Arizona Corporation Commission.
2.16 Bidder Qualifications
A. Experience and References. Bidder must demonstrate successful completion of at least three similar projects within the past 60 months, one of which must have a dollar value of at least 75% of the total bid for this Project as set forth in the Price Sheet. Total bid price does not include any
Town allowances identified. For the purpose of this Solicitation, “successful completion” means completion of a project within the established schedule and budget and “similar projects” resemble this Project in size, nature and scope. References for these three projects shall be listed in the Bid. These references will be checked, and it is the Bidder’s responsibility to ensure that all information is accurate and current. Bidder authorizes the Town’s representative to verify all information from these references and releases all those concerned from any liability in connection with the information they provide.
B. Investigation. The Town’s representative may conduct any investigation deemed necessary to determine the Bidder’s ability to perform the Work in accordance with the Contract Documents.
The three lowest Bidders may be requested to submit the following documentation within 72 hours to assist the Town in its evaluation:
1.Evidence of loss history and underwriting criteria.
2.Bidder’s safety program.
3.CPA-certified audits for the past three fiscal years of operations.
4.Similar documents deemed necessary by the Town.
2.17 Certification. By submitting a Bid, the Bidder certifies:
A. No Collusion. The submission of the Bid did not involve collusion or other anti-competitive practices.
B. No Gratuity. It has not given, offered to give, nor intends to give at any time hereafter, any economic opportunity, future employment, gift, loan, gratuity, special discount, trip favor or service to a Town employee, officer, agent or elected official in connection with the submitted
Bid or a resultant Contract. In the event that the resultant Contract is canceled pursuant to this provision, the Town shall be entitled, in addition to any other rights and remedies, to recover and withhold from the Contractor an amount equal to 150% of the gratuity.
C. Financial Stability. It is financially stable, solvent and has adequate cash reserves to meet all financial obligations including any potential costs resulting from an award of the Contract.
D. No Signature/False Statement. Failure to sign the Bid, or signing it with a false statement, shall void the submitted Bid and any resulting Contract and the Bidder may be debarred from further bidding in the Town.
2.18 Bid Bond. All Vendors desiring to prepare a responsive Bid shall submit a non-revocable bid security payable to the Town in the amount of ten percent (10%) of the total Bid Price. This security shall be in the form of a bid bond, certified check or cashier’s check and must be in the possession of the Town
Representative by the Bid Deadline. All bid security from Contractor(s) who have been issued a Notice of
Award shall be held until the successful execution of all required Contract Documents and bonds. If the
Contractor fails to execute the required contractual documents and bonds within the time specified, or ten Days after Notice of Award if no period is specified, the Contractor may be found to be in default and the Contract terminated by the Town. In case of default, the Town reserves all rights inclusive of, but not limited to, the right to purchase material and/or to complete the Work and to recover any actual excess costs associated with such completion from the Contractor. Individual sureties are unacceptable.
All insurers and sureties shall have, at the time of submission of the proposal, an A.M. Best’s Key Rating
Guide of “A-” or better as currently listed in the most recent Best Key Guide, published by the A.M. Best
Company.
2.19 Award of Contract.
A. Multiple Award. The Town may, at its sole discretion, accept Bidder’s Offer as part of a
Multiple Award.
B. Evaluation. The evaluation of this Bid will be based on, but not limited to, the following:(1)
Compliance with Specifications, (2) Price, including alternates, if any, (3) Bidder qualifications to perform the Work, and (4) Best overall value for the Town (warranty and price).
C. Waiver, Rejection, Reissuance. Notwithstanding any other provision of this IFB, the Town expressly reserves the right to: (1) waive any immaterial defect or informality, (2) reject any or all
Bids or portions thereof and (3) cancel or reissue an IFB.
D. Offer. A Bid is a binding offer to contract with the Town based upon the terms ,conditions and
Specifications contained in this IFB and the Bidder’s responsive Bid, unless any of the terms, conditions, or Specifications are modified by a written addendum or Contract amendment. Bids become binding Contracts when the Acceptance of Offer and Notice of Award is executed in writing by the Town. Bidder Offers shall be valid and irrevocable for 90 days after the Bid
Opening.
E. Protests. Any Bidder may protest this IFB, the proposed award of a Contract, or the actual award of a Contract. All protests will be considered in accordance with the process set forth by the Town Manager or qualified designee.
3. ARTICLE III – GENERAL TERMS AND CONDITIONS
Terms and Conditions; Performance of the Work; Misc; Alternative Dispute Resolution.
ARTICLE III – GENERAL TERMS AND CONDITIONS
PART A - GENERAL
3.1 Reference Standards. The Contractor shall perform the Work required in conformance with the attached Specifications.
3.2 Plans and Specifications to Successful Contractor. The successful Contractor may obtain Plans and
Specifications for this Project from the Engineer at no cost.
3.3 Contract Time. The Contract Time for this Project shall be 120 days from the Notice to Proceed. All
Work on the Project shall be completed on or before the expiration of the Contract Time.
3.4 Pre-Construction Conference. Within 30 days of the issuance of the Notice of Award, the Contractor shall attend a pre-construction conference. The Town will contact the Contractor to schedule a specific date, time and location for the pre-construction conference. The purpose of this conference is to outline specific items and procedures and to address items that require special attention on the part of the
Contractor. The Contractor may also present proposed variations in procedures that the Contractor believes may (A) improve the Project, (B) reduce cost or (C) reduce inconvenience to the public. Any necessary coordination and procedures for construction inspection and staking will be addressed during the pre-construction conference. The Contractor will be required to provide the following items at, or prior to, the pre-construction conference, each of which is subject to review and approval by the
Engineer:
A. Key Personnel; Subcontractors. A list of the names and emergency telephone numbers of all proposed key personnel, Subcontractors and suppliers that the Contractor intends to utilize on the Project. Proposed Subcontractors shall be qualified and have the requisite professional or technical licenses and be licensed to do business in the State of Arizona. The list shall include such information on the professional background of each of the assigned key individuals as may be requested by the Town Representative. Such key personnel and Subcontractors shall be satisfactory to the Engineer and shall not be changed except with the consent of the Engineer.
Additionally, the Engineer shall have the right to request that the Contractor personnel and
Subcontractors be removed from the Project if, in the Engineer’s sole discretion, such personnel or Subcontractor(s) are detrimental to the Project delivery process. Upon receipt of such request, the Contractor shall remove such personnel or Subcontractor(s) unless the Contractor can provide the Town with sufficient documentation to prove it is commercially impractical to replace the personnel or Subcontractor(s) with substitute personnel possessing similar qualifications. The
Engineer’s approval of substituted personnel or Subcontractor(s) shall not be unreasonably withheld.
B. Progress Schedule. A construction progress schedule showing the estimated time for start and completion of the major items of Work.
C. Payment Schedule. A payment schedule showing the estimated dollar volume of Work for each calendar month during the life of the Project.
D. Traffic Control. A written proposal outlining the intended plans for traffic control and for maintaining continuous access to residences and businesses along the construction site.
E. Site Security. A written proposal outlining the intended plans to secure the Project site for public safety and security.
F. Drawings, Materials & Equipment. An itemized list of all required shop drawings, material and equipment submittals and a schedule indicating the dates each of these items will be transmitted to the Town for review.
3.5 Notice to Proceed. Within 45 days of the issuance of the Notice of Award the Town may issue a written Notice to Proceed. The Notice to Proceed shall stipulate the actual Contract start date, the
Contract Time and the dates of Substantial Completion and Final Completion. The time required for the
Contractor to obtain permits, licenses and easements shall be included in the Contract Time and shall not be justification for a delay claim by the Contractor. The time required for the Contractor to prepare, transmit and obtain approval of applicable submittals shall be included in the Contract Time and shall not be justification for a delay claim by the Contractor. No Work shall be started until after all required permits, licenses, and easements have been obtained. The Contractor shall notify the Engineer, in writing, at least 72 hours before the following events:
A. Commencement. The start of construction.
B. Services Shut Down. Shut down of water, sewer, drainage, irrigation and/or traffic control facilities, including the anticipated length of time for each shut down.
C. Well or Pump Shut Down. Shut down of existing water wells and booster pumps. Such shut down shall not exceed 72 hours of any facility and only one facility may be shut down at any one time. Shut downs shall be coordinated with proper utility agency/company.
D. Water Lines. All draining and filling of water lines and irrigation laterals and all operations of existing valves or gauges, which shall also be coordinated with the proper utility agency/company.
E. Start-up and Testing. Start-up or testing of any water well or booster pump to be connected to any part of the existing water system. This includes operation of existing valves necessary to accommodate the water.
3.6 Laws and Regulations. The Contractor shall keep fully informed of all rules, regulations, ordinances, statutes or laws affecting the Work herein specified, including existing and future (A) Town and County ordinances and regulations, (B) State and Federal laws and (C) Occupational Safety and Health
Administration (“OSHA”) standards.
3.7 Rights-of-Way. The Contractor shall obtain a right-of-way permit for any of the Work completed in the public right-of-way. The Contractor will be responsible for any required Maricopa County permits or other agency permits. The Town will provide any necessary easements for Work specified under this
Contract, and the Contractor shall not enter or occupy with workers, tools, equipment or materials any private ground outside the property of the Town without the written consent of the owner thereof. The
Contractor, at its own expense, is responsible for the acquisition of any additional easements or rights-of-way.
3.8 Inspection, Safety and Compliance. Each Contractor must inform itself fully of the conditions relating to the construction of the Project and the employment of labor thereon. Failure to do so will not relieve the Contractor of its obligation to furnish all material and labor necessary to carry out the provisions of this Contract. Insofar as possible in carrying out its work, the Contractor must employ such methods or means as will not cause any interruption of or interference with the Work of any other contractor.
Contractor affirms that it has inspected the jobsite and has thoroughly reviewed the Contract including, without limitation, the Specifications listed herein, as the same may be revised by the Town, and is not relying on any opinions or representations of Town. Contractor agrees to perform and complete such
Work in strict accordance with the Contract and under the general direction of the Town. Contractor agrees that any exclusions of any Work must be approved in writing by the Town prior to acceptance of this Contract or same shall not be excluded hereunder. Contractor is responsible for all safety precautions and programs and shall provide all protection and necessary supervision to implement said precautions and programs. Contractor shall take all reasonable precautions for the safety of and provide reasonable protection to prevent damage, injury or loss to: (A) Town personnel and members of the public, (B) employees or others on the Project, (C) the Work and materials and (D) other property at the
Project or adjacent thereto. Contractor shall designate a responsible person on the Project whose duty shall be prevention of accidents. Contractor shall provide all competent supervision necessary to execute all Work and any Work incidental thereto in a thorough, first-class, workmanlike manner. It is
Contractor’s responsibility that all of the Work and any Work incidental thereto conforms to, and is performed in accordance with, all applicable Federal, State, County and Town laws, codes, ordinances, regulations (including National Pollutant Discharge Elimination System and air pollution standards) and orders of public authorities bearing on performance of the Work.
3.9 Traffic Regulations. All traffic affected by the Work under this Contract shall be regulated in accordance with the then-current version of the City of Phoenix-Traffic Barricade Manual (the
“Barricade Manual”) which is incorporated herein by reference; provided, however, that this Contract shall govern in a conflict with the terms of the Barricade Manual. At the time of the pre-construction conference, the Contractor shall designate an employee who is well qualified and experienced in construction traffic control and safety to be responsible for implementing, monitoring and altering traffic control measures, as necessary. At the same time, the Town will designate a representative who will be responsible to see that all traffic control and any alterations are implemented and monitored to the extent that traffic is carried through the Work area in an effective manner and that motorists, pedestrians, bicyclists and workers are protected from hazard and accidents.
A. Major Streets. The following shall be considered major streets: All major parkway, mile (section line), arterial and collector (mid-section line and quarter section line) streets so classified by the
Town.
B. Traffic Control Devices. All traffic control devices required for the Work under this Contract shall be the responsibility of the Contractor. The Contractor shall place advance warning signs
(such as REDUCE SPEED, LOOSE GRAVEL, 25 MPH SPEED LIMIT and DO NOT PASS) in accordance with the Barricade Manual. The Contractor shall provide, erect and maintain all necessary flashing arrow boards, barricades, suitable and sufficient warning lights, signals and signs and shall take all necessary precautions for the protection of the Work and safety of the public. The Contractor shall provide, erect and maintain acceptable and adequate detour signs at all closures and along detour routes. All barricades and obstructions shall be illuminated at night, and all safety lights shall be illuminated from sunset until sunrise. All barricades and signs used by the Contractor shall conform to the standard design generally accepted for such purposes and payment for all such services and materials shall be considered as included in the other pay items of the Contract.
C. Existing Signs. The Contractor shall ensure that all existing traffic signs are erect, clean and in full view of the intended traffic at all times. Street name signs at major street intersections shall be maintained erect at all times. If these signs should interfere with construction, the Contractor shall notify the Engineer, in writing, at least 48 hours in advance for Town personnel to temporarily relocate or cover said signs. The Engineer will direct the Contractor as to the correct positions to re-set all traffic and street name signs to permanent locations when notified by the
Contractor that the interfering construction is complete.
D. Manual Traffic Control. Manual traffic control shall be in conformity with the Barricade
Manual, except that the designated liaison officer shall be contacted at the Maricopa County
Sheriff’s Office, District 7. When construction activities or traffic hazards at the construction site require the use of flagmen, it shall be the Contractor’s responsibility to provide trained flagmen to direct traffic safely. When traffic hazards at construction sites warrant the use of certified police personnel to direct traffic, arrangements must be made with the liaison officer at the
Maricopa County Sheriff’s Office, District 7.
E. Contractor Equipment. The assembly and turnarounds of the Contractor’s equipment shall be accomplished using adjacent local streets when possible. Equipment used and/or directed by the
Contractor shall travel with traffic at all times. Supply trucks shall travel with traffic except when being spotted. Contractor shall provide a flagman or off-duty, uniformed Sheriff’s Deputy to assist with spotting.
F.Traffic Alterations. During construction, it may be necessary to alter traffic control. Any such alterations shall be in accordance with the Barricade Manual. No street within the Project area may be closed to through traffic or to local emergency traffic without prior, written approval of the Engineer. Written approval may be given if sufficient time exists to allow for notification of the public at least 72 hours in advance of such closing. Partial closure of streets within the Project shall be done in strict conformity with the Barricade Manual and the Engineer’s written directions.
G. Intersections. Caution should be used when excavating near intersections with traffic signal underground cable. Contractor shall notify the Engineer, in writing, 24 hours in advance of any
Work at such intersections. The Contractor shall install and maintain temporary overhead traffic signal cable as specified by the Engineer when underground conduit is to be severed by excavations at intersections. The Contractor shall provide an off-duty, uniformed Sheriff’s Deputy to direct traffic while the traffic signal is turned off and the wiring is transferred. All damaged or modified traffic signal overhead and underground items shall be repaired and restored to the
Engineer’s satisfaction. Magnetic detector loops shall, under no circumstances, be spliced.
H. Adjacent Property Access. The Contractor shall maintain access to all businesses, schools and residences along the Project alignment at all times in accordance with the MAG Supplement, Section 107.7.1 (Access).
I. Covered Crossings. Where crossings of existing pavement occurs, no open trenches shall be permitted overnight, but plating may be permitted if conditions allow, as determined by the
Engineer in his sole discretion. If plates cannot be used, crossings shall either be back-filled or the
Contractor shall provide a detour.
3.10 Indemnification. To the fullest extent permitted by law, the Contractor shall indemnify, defend and hold harmless the Town and each council member, officer, employee or agent thereof (the Town and any such person being herein called an “Indemnified Party”), for, from and against any and all losses, claims, damages, liabilities, costs and expenses (including, but not limited to, reasonable attorneys’ fees, court costs and the costs of appellate proceedings) to which any such Indemnified Party may become subject, under any theory of liability whatsoever (“Claims”), insofar as such Claims (or actions in respect thereof) relate to, arise out of, or are caused by or based upon the negligent acts, intentional misconduct, errors, mistakes or omissions, in connection with the Work or Services of the Contractor, its officers, employees, agents, or any tier of Subcontractor in the performance of this Contract. The amount and type of insurance coverage requirements set forth below will in no way be construed as limiting the scope of the indemnity in this Section.
3.11 Insurance.
A. General.
1.Insurer Qualifications. Without limiting any obligations or liabilities of Contractor, Contractor shall purchase and maintain, at its own expense, hereinafter stipulated minimum insurance with insurance companies authorized to do business in the State of
Arizona pursuant to ARIZ. REV. STAT. § 20-206, as amended, with an AM Best, Inc. rating of
A- or above with policies and forms satisfactory to the Town. Failure to maintain insurance as specified herein may result in termination of this Contract at the Town’s option.
2.No Representation of Coverage Adequacy. By requiring insurance herein, the Town does not represent that coverage and limits will be adequate to protect Contractor. The Town reserves the right to review any and all of the insurance policies and/or endorsements cited in this Contract but has no obligation to do so. Failure to demand such evidence of full compliance with the insurance requirements set forth in this Contract or failure to identify any insurance deficiency shall not relieve Contractor from, nor be construed or deemed a waiver of, its obligation to maintain the required insurance at all times during the performance of this Contract.
3.Additional Insured. All insurance coverage and self-insured retention ordeductible portions, except Workers’ Compensation insurance and Professional Liability insurance, if applicable, shall name, to the fullest extent permitted by law for claims arising out of the performance of this Contract, the Town, its agents, representatives, officers, directors, officials and employees as Additional Insured as specified under the respective coverage sections of this Contract.
4.Coverage Term. All insurance required herein shall be maintained in full force and effect until all Work or Services required to be performed under the terms of this Contract are satisfactorily performed, completed and formally accepted by the Town, unless specified otherwise in this Contract.
5.Primary Insurance. Contractor’s insurance shall be primary insurance with respect to performance of this Contract and in the protection of the Town as an Additional Insured;
the Town’s insurance shall be non-contributory and a waiver of subrogation shall apply.
6.Waiver. All policies, except for Professional Liability, including Workers’ Compensation insurance, shall contain a waiver of rights of recovery (subrogation) against the Town, its agents, representatives, officials, officers and employees for any claims arising out of the
Work or Services of Contractor. Contractor shall arrange to have such subrogation waivers incorporated into each policy via formal written endorsement thereto.
7.Policy Deductibles and/or Self-Insured Retentions. The policies set forth in theserequirements may provide coverage that contains deductibles or self-insured retention amounts. Such deductibles or self-insured retention shall not be applicable with respect to the policy limits provided to the Town. Contractor shall be solely responsible for any such deductible or self-insured retention amount.
8.Use of Subcontractors. If any Work under this Contract is subcontracted in anyway, Contractor shall execute written agreement with its Subcontractors containing the indemnification provisions set forth in this Section and insurance requirements set forth herein protecting the Town and Contractor. Contractor shall be responsible for executing any agreements with its Subcontractor and obtaining certificates of insurance verifying the insurance requirements.
9.Evidence of Insurance. Prior to commencing any Work or Services under thisContract, Contractor will provide the Town with suitable evidence of insurance in the form of certificates of insurance and a copy of the declaration page(s) of the insurance policies as required by this Contract, issued by Contractor’s insurance insurer(s) as evidence that policies are placed with acceptable insurers as specified herein and provide the required coverages, conditions and limits of coverage specified in this Contract and that such coverage and provisions are in full force and effect. Confidential information such as the policy premium may be redacted from the declaration page(s) of each insurance policy, provided that such redactions do not alter any of the information required by this
Contract. The Town shall reasonably rely upon the certificates of insurance and declaration page(s) of the insurance policies as evidence of coverage but such acceptance and reliance shall not waive or alter in any way the insurance requirements or obligations of this
Contract. In the event any insurance policy required by this Contract is written on a “claims made” basis, coverage shall extend for three years past Final Completion and the Town’s acceptance of the Contractor’s Work or Services and as evidenced by annual certificates of insurance. If any of the policies required by this Contract expire during the life of this
Contract, it shall be Contractor’s responsibility to forward renewal certificates and declaration page(s) to the Town 30 days prior to the expiration date. All certificates of insurance and declarations required by this Contract shall be identified by referencing this
Contract. A $25.00 administrative fee shall be assessed for all certificates or declarations received without a reference to this Contract. Additionally, certificates of insurance and declaration page(s) of the insurance policies submitted without referencing this Contract will be subject to rejection and may be returned or discarded. Certificates of insurance and declaration/endorsement page(s) shall specifically include the following provisions:
a. The Town, its agents, representatives, officers, directors, officials and employees are Additional Insureds as follows:
(i)Commercial General Liability - Under Insurance Services Office, Inc., (“ISO”) Form
CG 20 10 03 97 or equivalent.
(ii)Auto Liability - Under ISO Form CA 20 48 or equivalent.
(iii)Excess Liability - Follow Form to underlying insurance.
b. Contractor’s insurance shall be primary insurance with respect to performance of the Contract; the Town's insurance shall be non-contributory and a waiver of subrogation shall apply. c. All policies, except for Professional Liability, including
Workers’ Compensation, waive rights of recovery (subrogation) against Town, its agents, representatives, officers, officials and employees for any claims arising out of Work or Services performed by Contractor under this Contract. d. ACORD certificate of insurance form 25 (2014/01) is preferred. If ACORD certificate of insurance form 25 (2001/08) is used, the phrases in the cancellation provision
“endeavor to”…