Todd Co WLS.pdf

PDF 58 KB Posted

Attached to
RoW Mow Only Logan and Todd Co D-3
Solicitation number
RFB 605 2200000450 1
Issued by
Laurel County, Kentucky

About this file

This is a Mowing Work Location Sheet for Todd County, Kentucky, detailing roadside mowing services across multiple state and local routes. The document specifies mowing work on 26 separate routes, including U.S. highways (US 41, US 68, US 79), state highways (KY 104, KY 106, KY 107, KY 178, KY 181, KY 294, and others), and their respective road sections (RS). The total project encompasses 205.872 miles of roadway requiring mowing services, with an estimated 961 total acres to be mowed. The work is classified as Type 3 mowing, with a maximum of 15 working days permitted to complete each mowing cycle. Several routes are designated to allow batwing mower equipment. The work location sheet does not specify response dates, due dates, site visits, bidders' meetings, award dates, or contract terms, as it serves primarily as a descriptive schedule of work locations and specifications.

The document contains no information regarding pricing terms, set-asides, incumbent contractors, funding sources, or contract amounts. The work location sheet functions as a technical specification document outlining the geographic scope and mowing frequency requirements across Todd County's transportation network, with the estimated number of cycles per route ranging from 1 to 232 cycles based on route length and acreage. No renewal options or additional contractual terms are referenced in this document.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MOWING WORK LOCATION SHEET

Route Number System County Project Number FROM TO

Project Length

Type 3 Mowing Acres

Estimated Number of

Cycles

US 41 * MP TODD

FE01 110 0041 000-

Covington Street

(1.304) Christian County

Line (12.458) 11.154 47 3

US 68 * MP TODD

FE01 110 0068 000-

Christian County

Line (0.000) Logan County Line (14.422) 14.422 232 3

US 79 * MP TODD

FE01 110 0079 000-

Tennessee State

Line (0.000) Logan County Line (10.606) 10.606 51 3

KY 104 MP TODD

FE01 110 0104 000-

Tennessee State

Line (0.000) KY 181 (14.246) 14.246 67 3

KY 106 MP TODD

FE01 110 0106 000-

010 KY 181 (0.000)

Logan County Line (9.935) 9.935 39 3

KY 107 * MP TODD

FE01 110 0107 007-

KY 181 near Clifty

(7.268) KY 181 (9.269) 2.001 10 3

KY 178 MP TODD

FE01 110 0178 000-

004 KY 106 (0.000)

Logan County Line (3.123) 3.123 12 3

KY 181 * MP TODD

FE01 110 0181 000-

013 US 79 (0.000) US 68 (13.042) 13.042 58 3

Ky 181 MP TODD

FE01 110 0181 012-

029 US 68 (13.042)

Muhlenberg Co Line (28.002) 14.960 67 3

KY 294 MP TODD

FE01 110 0294 000-

Tennessee State

Line (0.000) KY 181 (2.909) 2.909 14 3

US 68 X MP TODD

FE01 110 068X 000-

005 US 68 (0.000) US 68 (4.786) 4.786 19 3

KY 1309 MP TODD

FE01 110 1309 000-

001 US 68 (0.000)

Logan County Line (0.892) 0.892 2 3

* A Batwing Mower will be allowed on this route(s).

Maximum time to complete a cycle: 15 working days 1

Number System County Project Number FROM TO

Project Length

Type 3 Mowing Acres

Estimated Number of

Cycles

KY 1753 MP TODD

FE01 110 1753 000-

003 KY 104 (0.000) KY 181 (2.762) 2.762 11 3

KY 1802 MP TODD

FE01 110 1802 000-

005 KY 104 (0.000) KY 104 (5.000) 5.000 21 3

KY 2128 MP TODD

FE01 110 2128 000-

US 79/ KY 181

(0.000) Tennessee State

Line (0.201) 0.201 1 3

KY 102 RS TODD

FE01 110 0102 000-

Logan County Line

(0.000) US 68 X at

Elkton (9.412) 9.412 37 3

KY 107 RS TODD

FE01 110 0107 000-

Christian County

Line (0.000) KY 181 (7.268) 7.268 25 3

KY 107 RS TODD

FE01 110 0107 009-

014 KY 181 (9.269)

Logan County Line (13.976) 4.707 15 3

KY 171 RS TODD

FE01 110 0171 000-

017 KY 106 (0.000)

Muhlenberg Co Line (16.130) 16.130 65 3

KY 189 RS TODD

FE01 110 0189 000-

002 KY 507 (0.000)

Christian County

Line (1.891) 1.891 4 3

KY 346 RS TODD

FE01 110 0346 000-

001 US 41 (0.000) US 79 (0.868) 0.868 1 3

KY 475 RS TODD

FE01 110 0475 000-

US 41 near Trenton

(0.000) US 68 (8.176) 8.176 35 3

KY 507 RS TODD

FE01 110 0507 000-

Christian County

Line (0.000) KY 106 (11.703) 11.703 33 3

KY 508 RS TODD

FE01 110 0508 000-

Christian County

Line (0.000) KY 171 (6.651) 6.651 25 3

Maximum time to complete a cycle: 15 working days 2

Number System County Project Number FROM TO

Project Length

Type 3 Mowing Acres

Estimated Number of

Cycles

US 68 A RS TODD

FE01 110 068A 000-

Christian County

Line (0.000) US 68 (0.723) 0.723 3 3

KY 848 RS TODD

FE01 110 0848 000-

US 41/KY 104

(0.000) Logan County Line (12.957) 12.957 32 3

KY 890 RS TODD

FE01 110 0890 000-

005 KY 107 (0.000)

Muhlenberg Co

Line (4.192) 4.192 10 3

KY 1785 RS TODD

FE01 110 1785 000-

005 KY 181 (0.000)

Logan County Line (4.083) 4.083 9 3

KY 2627 RS TODD

FE01 110 2627 000-

Christian County

Line (0.000) US 41 (4.052) 4.052 9 3

KY 2628 RS TODD

FE01 110 2628 000-

004 US 41 (0.000)

Tennessee State

Line (3.020) 3.020 7 3

205.872 961 acres

*A batwing mower may be allowed on these routes.

Maximum time to complete a cycle: 15 working days

Maximum time to complete a cycle: 15 working days 3

Sheet2

File details come from the government source that posted it. Updated .