TOC.pdf
PDF 69 KB Posted
- Solicitation number
- PD 25-26.099
- Issued by
- Escambia County, Florida
About this file
Table of Contents (TOC.pdf)
This file is a table of contents document for the CDBG-DR Oakfield-Palafox Stormwater Upgrades Phase III construction project administered by the Escambia County Board of County Commissioners in Florida. The project involves approximately 6,200 linear feet of stormwater, drainage, utility, and roadway improvements along the Palafox Street corridor extending from 700 feet south of Industrial Boulevard north to West Pinestead Road, with associated work on Industrial Boulevard, Majors Road, Hancock Lane, Pacific Street, and the West Oakfield Pond facility. The scope includes roadway reconstruction and resurfacing, stormwater drainage system improvements, utility relocation and replacement, sanitary sewer system upgrades, sidewalk enhancements, and pond rehabilitation comprising 51 line items with pond excavation of 3,449 cubic yards and 6,116 linear feet of RCP pipe installation (18-inch, 24-inch, and 42-inch). Sealed bids are due August 24, 2026, with a mandatory pre-bid meeting scheduled for July 30, 2026, and questions due by August 6, 2026, at 3:00 p.m. Substantial completion is required within 365 consecutive calendar days from Notice to Proceed, with final completion within an additional 30 days, subject to liquidated damages of $5,021.00 per calendar day for delays.
The project is funded through HUD's Community Development Block Grant-Disaster Recovery program (DR-4564) for Hurricane Sally recovery. Federal Section 3 requirements mandate that 25 percent of total project hours be performed by Section 3 workers, with 5 percent by targeted Section 3 workers; Escambia County awards a contracting preference to bidders utilizing the highest number of qualified Section 3 subcontractors and workers if the bid is reasonable and no more than 10 percent higher than the lowest responsive bid. Bidders must submit a 5 percent bid bond, 100 percent performance and payment bonds upon award, and comprehensive general liability insurance of $1,000,000 per occurrence and $2,000,000 annual aggregate, along with business auto liability of $1,000,000 per accident and workers' compensation insurance at statutory limits. All work must comply with Escambia County Technical Specifications, ECUA's Engineering Manual, Florida Department of Transportation specifications, and Davis-Bacon Act prevailing wage standards. Required submittals include anti-human trafficking affidavit, references, E-Verify certification, sworn statement on public entity crimes, conflict of interest declaration, drug-free workplace form, scrutinized companies certification, and proof of authority to do business in Florida.
View the file
Other files
Show all 23
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ECUA Utility – Technical Specifications
Section 2221 – Trench Excavation, Backfill & Compaction Section 2300 – Horizontal Directional Drilling (HDD) Section 2310 – Jack and Bore Section 2556 – Water Distribution Systems Section 2570 – Gravity Sewer Collection Systems Section 2576 – Wastewater Forcemain Systems Section 2651 – Television Inspection Section 4000 – Record Drawings Requirements
ECUA Utility – Technical Specifications
File details come from the government source that posted it. Updated .