TO1 Seed - DifficultCG-AsphaltPaving Attachments.pdf
PDF 4 MB Posted
- Solicitation number
- 1240LT21Q0046
- Issued by
-
Department of Agriculture Forest Service
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Rev3 IDIQ SOW RandB Const and Maint.docx | DOCX document | |
| Rev3 2021RandB Const and Maint IDIQ BaseContractAttachments.pdf | ||
| Rev1 IDIQ Statement of Work.docx | DOCX document | |
| 20210715PreBidQandAWhiteRiverNF1240LT21Q0046.docx | DOCX document | |
| Rev1 RFQ 1240LT21Q0046.pdf | ||
| Rev1 TO1 Seed - WRNF-RBCM-IDIQ-DifficultCGAsphaltPaving.docx | DOCX document | |
| Rev1 IDIQ SOW RandB Const and Maint .docx | DOCX document | |
| Atth 5 Performance Bond SF25-16a.pdf | ||
| IDIQ Attachments RandB Const and Maint IDIQ-BaseContract.pdf | ||
| Atth 6 Bid Bond SF24.pdf | ||
| Atth 4 Payment Bond SF25A-16a.pdf | ||
| Atth 3 General Decision Number CO20210013.txt | TXT text file | |
| Experience Questionnaire.doc | DOC document | |
| RFQ 1240LT21Q0046.pdf | ||
| IDIQ SOW RandB Const and Maint .docx | DOCX document | |
| TO1 Seed - WRNF-RBCM-IDIQ-DifficultCGAsphaltPaving.docx | DOCX document |
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
26 Mar 21
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/2 4/2
1 1 3:
BC
ON
AN
T D :\B
RE
TC
ON
AN
T\ W
RN
F\
PR
OJ
EC
TS
\20
W
RN
F-
RO
AD
SI
DI
Q\
TA
SK
OR
DE
R1 -S
EE
DP
RO
JE
CT
\C
ON
TR
AC
TP
RE
P\
SU
RV
EY
DE
SI
GN
PL
AN
SA
ND
SP
EC
S\
PL
AN
SD
RA
W
IN
GS
\20
DI
FF
IC
UL
TC
GA
SP
HA
LT
PA
VI
NG
W
RN
F-
RB
CM
-ID
IQ
-T
O1 .D
W G
R02
ROCKY MOUNTAIN REGION
DIFFICULT CG
ASPHALT PAVING;
WRNF RBCM IDIQ;
TASK ORDER #1
(SEED PROJECT)
WHITE RIVER NATIONAL
FOREST
ASPEN RANGER DISTRICT
GENERAL PROJECT
INFORMATION
2/22/2021 N/A
B.CONANT
B.CONANT
E.BORUM
N/A
C-02 2 6
PROJECT NOTES:
The contractor shall provide temporary traffic control in accordance with section 635 and contract traffic control plan on sheet 3 of the plans.
Pay item 63308; furnish and install 72" flanged
U-channel steel posts (green) with Type 1, 3" clear plastic lens reflectors on each side of post.
See sheet 4 of the plans for 18' Ft. wide template grading and paving details.
See sheet 5 of the plans for day use parking area grading, paving and pavement marking (painting) details.
See sheet 4 of the plans for 10' Ft. wide template grading and paving details.
See sheet 6 of the plans for culvert summary and installation details.
Pay Item 63310.1; remove 24" x 18' x 4" asphalt speed bumps, replace with 24" x 18' x 3" asphalt speedbumps. Hot mix asphalt shall be 3 inches compacted, PG 64-28, 75 gyration mix with up to
20% RAP max.
1"=500'
PROJECT INFORMATION MAP
108.1A
ASPEN RANGER
DISTRICT
PRIVATE PROPERTY
WHITE RIVER
NATIONAL
FOREST
Loop A
Loop B
Sta.0+00
Sta. 32+50 (End Entrance Road)
Sta. 0+00 (Begin Loop A)
Sta. 15+40 (End Loop A)
Sta.0+00
(Begin Loop B)
Sta.14+30
(End Loop B)
Description of Work
Station
Description
0+00
Begin full depth reclamation and 18' ft. wide paving
25+00
Remove and replace speedbump
25+20
Day use parking area right, intersection
27+85
Remove and replace speedbump
32+00
End 18' ft. wide paving and begin transition into
10' wide for 50' feet to Loop A
32+50 = 0+00
(Loop A)
End 50' ft. transition and begin 10' ft. wide paving on Loop A
15+40
End 10' ft. wide paving Loop A
0+00 (Loop B) Begin 10' ft. wide paving Loop B
0+20
Remove 48" x 40' CMP, install 71 inch span, 47 inch rise x 40', pipe arch culvert (item 60202.1)
1+30
Remove 36" x 33' CMP, install 57 inch span, 38 inch rise x 35', pipe arch culvert (item 60202.2)
2+65
Remove 24" x 28' CMP, install 35 inch span, 24 inch rise x 30', pipe arch culvert (item 60202.3)
9+15
Remove 36" x 30' CMP, install 71 inch span, 47 inch rise x 30', pipe arch culvert (item 60202.1)
14+30
End 10' ft. wide paving Loop B, intersection with main entrance road.
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
AutoCAD SHX Text E
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/2 4/2
1 1 3:
BC
ON
AN
T D :\B
RE
TC
ON
AN
T\ W
RN
F\
PR
OJ
EC
TS
\20
W
RN
F-
RO
AD
SI
DI
Q\
TA
SK
OR
DE
R1 -S
EE
DP
RO
JE
CT
\C
ON
TR
AC
TP
RE
P\
SU
RV
EY
DE
SI
GN
PL
AN
SA
ND
SP
EC
S\
PL
AN
SD
RA
W
IN
GS
\20
DI
FF
IC
UL
TC
GA
SP
HA
LT
PA
VI
NG
W
RN
F-
RB
CM
-ID
IQ
-T
O1 .D
W G
R02
ROCKY MOUNTAIN REGION
DIFFICULT CG
ASPHALT PAVING;
WRNF RBCM IDIQ;
TASK ORDER #1
(SEED PROJECT)
WHITE RIVER NATIONAL
FOREST
ASPEN RANGER DISTRICT
CONTRACT TRAFFIC
CONTROL PLAN
2/22/2021 N/A
B.CONANT
B.CONANT
E.BORUM
N/A
C-03 3 6
GENERAL NOTES:
1. All work shall be done in accordance with the
Standard Specifications applicable to the
Project and the "Manual on Uniform Traffic
Control Devices" (MUTCD) published by the
U.S. Department of Transportation, Federal
Highway Administration.
2. Where traffic is maintained through or over any part of the Project, the Contractor will be required to mark all hazards within the limits of the Project (including connecting roads) with well-maintained signs. Signs shall be moved, added to, changed or removed as required during the progress of construction and removed entirely when the Project is completed.
3. All signs shall be placed for best visibility and legibility, maintained in good condition and kept clean and free of dirt at all times. Contractor's vehicles and equipment must be parked so that signs and barricades are visible to approaching traffic at all times.
W20-1
100' Feet
Past Gate
1"=500'
TRAFFIC CONTROL PLAN MAP
108.1A
ASPEN RANGER
DISTRICT
PRIVATE PROPERTY
WHITE RIVER
NATIONAL
FOREST
Sign Summary
Sign Num. Description
Type III
Barricade(s) Movable type III barricade(s)
R11-2
Road Closed (X1)
W20-1
Road Work Ahead (X1)
FW11-10d
Heavy Truck Traffic (X2)
WORK
AHEAD
ROAD
W20-1
(30" x 30")
(black on orange)
As Required
CLOSED
ROAD
max.
min.
1'-8"
1'-8"
6'-6"
5'
Type lll Movable Barricades
R11-2
CLOSED
ROAD
(black on white)
(48" x 30")
TRUCK
TRAFFIC
HEAVY
FW11-10d
(36" x 36")
(black on orange)
FW11-10d
500' Feet From
Intersection
Type III Barricade(s) with R11-2 At Gate
FW11-10d
500' Feet From
Intersection
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
3" DEPTH OF
ASPHALT
8" DEPTH OF
NEW BASE COURSE
(PULVERIZED ASPHALT
AND AGGREGATE BASE)
1.0' 9.0' 9.0' 1.0'
SHAPE TO
EXISTING SLOPE
1.5% - 2%
1.5% - 2%
3" DEPTH OF
SHOULDER
AGGREGATE,
COVER ALL
EXPOSED BASE
MATERIAL (TYP.)
EXISTING SURFACE
VARIABLE SLOPES
5" ± DEPTH OF
EXISTING ASPHALT
3" ± DEPTH OF
EXISTING AGGREGATE
BASE
1.0' 9.0' 9.0' 1.0'
1.5% - 2%
1.5% - 2%
SHOULDER
AGGREGATE
EXISTING SURFACE
VARIABLE SLOPES
CLEAN OR RESHAPE
DITCHES AS NEEDED
(MINIMAL EXPECTED)
3" DEPTH OF
ASPHALT
8" DEPTH OF
NEW BASE COURSE
(PULVERIZED ASPHALT
AND AGGREGATE BASE)
1.0' 5.0' 5.0' 1.0'
SHAPE TO
EXISTING SLOPE
1.5% - 2%1.5% - 2%
3" DEPTH OF
SHOULDER
AGGREGATE,
COVER ALL
EXPOSED BASE
MATERIAL (TYP.)
EXISTING SURFACE
VARIABLE SLOPES
CLEAN OR RESHAPE
DITCHES AS NEEDED
(MINIMAL EXPECTED)
5" ± DEPTH OF
EXISTING ASPHALT
3" ± DEPTH OF
EXISTING AGGREGATE
BASE
SHOULDER
AGGREGATE
EXISTING SURFACE
VARIABLE SLOPES
1.0' 5.0' 5.0' 1.0'
1.5% - 2%1.5% - 2%
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/2 4/2
1 1 3:
BC
ON
AN
T D :\B
RE
TC
ON
AN
T\ W
RN
F\
PR
OJ
EC
TS
\20
W
RN
F-
RO
AD
SI
DI
Q\
TA
SK
OR
DE
R1 -S
EE
DP
RO
JE
CT
\C
ON
TR
AC
TP
RE
P\
SU
RV
EY
DE
SI
GN
PL
AN
SA
ND
SP
EC
S\
PL
AN
SD
RA
W
IN
GS
\20
DI
FF
IC
UL
TC
GA
SP
HA
LT
PA
VI
NG
W
RN
F-
RB
CM
-ID
IQ
-T
O1 .D
W G
R02
ROCKY MOUNTAIN REGION
DIFFICULT CG
ASPHALT PAVING;
WRNF RBCM IDIQ;
TASK ORDER #1
(SEED PROJECT)
WHITE RIVER NATIONAL
FOREST
ASPEN RANGER DISTRICT
ROAD GRADING AND
PAVING SECTIONS
2/22/2021 N/A
B.CONANT
B.CONANT
E.BORUM
N/A
C-04 4 6
GENERAL NOTES:
1. Pulverize full depth of existing asphalt, average thickness is 5"± inches on all paved areas. Pulverize at least 3" inches of existing aggregate base course material beneath existing asphalt. Refer to FP-14 section 304 for mixing, finishing and compaction requirements. Obtain material sampling and testing reports of pulverized material prior to compacting and paving
(refer to FSSS section 204.11).
2. Hot mix asphalt shall be 3 inches compacted, PG 64-28, 75 gyration mix with up to 20% RAP max. Place asphalt in one, 3" compacted lift with the top longitudinal joint along the centerline.
3. All new road sections are crowned with 1.5% - 2% slopes.
4. Saw cut existing asphalt at project beginning point. Match existing road grades with a 50' foot transition between the 18' foot and 10' foot sections.
5. Maintain existing centerlines for all roads.
6. Complete placement and compaction of shoulder aggregate
(CDOT CLASS 6) following compaction and finish rolling of asphalt. Shoulder aggregate shall cover all exposed pulverized asphalt base material remaining on shoulders and slopes.
1"=5'
NEW 18' PAVED SECTION STA. 0+00 - 32+00
MAIN ENTRANCE ROAD
1"=5'
EXISTING 18' PAVED SECTION STA. 0+00 - 32+00
MAIN ENTRANCE ROAD
1"=5'
NEW 10' PAVED SECTION, STA. 0+00 - 15+40 LOOP
A STA. 0+00 - 14+30 LOOP B
1"=5'
EXISTING 10' PAVED SECTION, STA. 0+00 - 15+40 LOOP
A STA. 0+00 - 14+30 LOOP B
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
TIMBER AND CONCRETE
WHEELSTOPS TO BE
REMOVED (TYP.)
OPTION ITEM 20301.2
EXISTING 36" BOULDERS
TO BE MOVED AND/OR
REPLACED (TYP.)
OPTION ITEM 63310.2
G
R
A
D
I
N
G
G
R
A
D
I N
G
G
R
A
D
I
N
G
G R
A D
I N
G
G
R
A
D
I
N
G
G
R
A
D
I
N
G
G
R
A
D
I
N
G
G -0
ISLAND (NO
PAVEMENT)
I S
L A
N D
N
O
P A
V E
M E
N T
R V
P
A R
K I N
G
1.0' 7.5' 7.5' 1.0'
1.0' 7.5' 7.5' 1.0'
1.5% - 2%1.5% - 2%
1.5% - 2%1.5% - 2%
5" ± DEPTH OF
EXISTING ASPHALT
3" ± DEPTH OF
EXISTING AGGREGATE
BASE
SHOULDER
AGGREGATE
3" DEPTH OF
ASPHALT
8" DEPTH OF
NEW BASE COURSE
(PULVERIZED ASPHALT
AND AGGREGATE BASE)
3" DEPTH OF
SHOULDER
AGGREGATE,
COVER ALL
EXPOSED BASE
MATERIAL (TYP.)
EXISTING SURFACE
VARIABLE SLOPES
SHAPE TO
EXISTING SLOPE
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/2 4/2
1 1 3:
BC
ON
AN
T D :\B
RE
TC
ON
AN
T\ W
RN
F\
PR
OJ
EC
TS
\20
W
RN
F-
RO
AD
SI
DI
Q\
TA
SK
OR
DE
R1 -S
EE
DP
RO
JE
CT
\C
ON
TR
AC
TP
RE
P\
SU
RV
EY
DE
SI
GN
PL
AN
SA
ND
SP
EC
S\
PL
AN
SD
RA
W
IN
GS
\20
DI
FF
IC
UL
TC
GA
SP
HA
LT
PA
VI
NG
W
RN
F-
RB
CM
-ID
IQ
-T
O1 .D
W G
R02
ROCKY MOUNTAIN REGION
DIFFICULT CG
ASPHALT PAVING;
WRNF RBCM IDIQ;
TASK ORDER #1
(SEED PROJECT)
WHITE RIVER NATIONAL
FOREST
ASPEN RANGER DISTRICT
DAY USE AREA
GRADING, PAVING AND
PAVEMENT MARKING
DETAILS
2/22/2021 N/A
B.CONANT
B.CONANT
E.BORUM
N/A
C-05 5 6
GENERAL NOTES:
1. Pulverize full depth of existing asphalt, average thickness is 5"± inches on all paved areas. Pulverize at least 3" inches of existing aggregate base course material beneath existing asphalt. Refer to
FP-14 section 304 for mixing, finishing and compaction requirements. Obtain material sampling and testing reports of pulverized material prior to compacting and paving (refer to FSSS section 204.11).
2. Hot mix asphalt shall be 3 inches compacted, PG 64-28, 75 gyration mix with up to 20% RAP max.Place asphalt in one, 3" compacted lift with the top longitudinal joints located where necessary.
3. Grade the parking area with 1.5% - 2% slopes as shown on this sheet.
4. Shape and grade curve radii and transitions smoothly and to closely match the existing parking lot as possible.
5. Complete placement and compaction of shoulder aggregate
(CDOT CLASS 6) around all paved areas following compaction and finish rolling of asphalt. The aggregate shall cover all exposed pulverized asphalt base material.
6. Pavement markings shall be in accordance with FP-14 Section 634, type K (waterborne), white, apply 2 coats.
7. For boulder placement (option item 63310.2), utilize on-site materials and/or materials obtained from the designated borrow source (see FSSS 105.02(a)) and approved by the CO. Place in locations marked on the ground and approved by the CO.
8. For removal of timber and concrete wheelstops (option item
20301.2), all disturbed ground shall be be restored to the same grades as the surrounding undisturbed areas. Fill all holes and depressions resulting from the removal of the wheelstops.
Lot Striping Summary
Type Dimensions/ Quantity
Passenger
Vehicle
9' x 20'/ 26 spaces
Passenger
Vehicle
(Handicapped) 9' x 20', median is 4.5' x 20'/ 2 spaces
RV
10' x 20'/ 1 space
RV
10' x 30'/ 2 spaces
1"=30'
DAY USE PARKING GRADING AND PAVEMENT
MARKING DETAILS
1"=5'
NEW 15' PAVED ENTRANCE SECTION
1"=5'
EXISTING 15' PAVED ENTRANCE SECTION
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
UNDISTURBED
EARTH
CMP
12 IN MIN.
COVER
*Excavate and compact according to FSSS section 209.10, (f)
Compaction Method 6.
AS STAKED
A S
S T
A K
E D
ROAD
3FT
* Material found on-site (Gov. furnished) OR commercial source may be used if no on-site material is available. On-site material size or commercial rock class size shall be designated by the CO. Typical dimensions shown, construct as staked.
2FT
CORRUGATED METAL PIPE
SIZE AS STAKED
(GALVANIZED)
* ROCK APRON
AT OUTLET
WIDTH = DIAMETER (OR SPAN) OF PIPE + 1 FT ON EACH SIDE
2 FT DEPTH X
3 FT LENGTH
EXISTING STREAMBED
OR FLOW CHANNEL
ROAD SURFACE
EXCAVATION LIMITS PER
OSHA REQUIREMENTS
PIPE BEDDING
4" INCH MIN.
BACKFILL IN 6 IN
COMPACTED LIFTS*.
PLACED GOV.
FURNISHED RIPRAP
ON EMBANKMENTS
LOCATIONS ARE
APPROVED
BY THE CO (TYP.)
DRAWN
DESIGNER
STAMPS, LOGOS, AND SEALS
PROJECT NAME
DRAWING TITLE
CHECKED
ARCHIVE NO.
DATE
PROJECT NO.
DRAWING SHEET NO.
DATENO.
REVISION / ISSUE
OFSHEET
United States Department of Agriculture Forest Service
3/2 3/2
1 1 3:
BC
ON
AN
T D :\B
RE
TC
ON
AN
T\ W
RN
F\
PR
OJ
EC
TS
\20
W
RN
F-
RO
AD
SI
DI
Q\
TA
SK
OR
DE
R1 -S
EE
DP
RO
JE
CT
\C
ON
TR
AC
TP
RE
P\
SU
RV
EY
DE
SI
GN
PL
AN
SA
ND
SP
EC
S\
PL
AN
SD
RA
W
IN
GS
\20
DI
FF
IC
UL
TC
GA
SP
HA
LT
PA
VI
NG
W
RN
F-
RB
CM
-ID
IQ
-T
O1 .D
W G
R02
ROCKY MOUNTAIN REGION
DIFFICULT CG
ASPHALT PAVING;
WRNF RBCM IDIQ;
TASK ORDER #1
(SEED PROJECT)
WHITE RIVER NATIONAL
FOREST
ASPEN RANGER DISTRICT
CULVERT SUMMARY AND
INSTALLATION DETAILS
2/22/2021 N/A
B.CONANT
B.CONANT
E.BORUM
N/A
C-06 6 6
GENERAL NOTES:
1. Install culverts as staked. Staking for control of culvert installations is established by the Forest Service. Stakes reference culvert inlet and outlet locations and invert elevations.
2. Do not order culvert material until the CO has accepted the final structure size, length and alignment.
3. Temporary water diversions and dewatering may be needed, the contractor shall provide the materials and equipment of sufficient capacity and strength to carry the entire stream flow. the contractor shall submit a written plan for all stream channel and diversion operations, such plan shall be approved by the CO in writing prior to performing the work. Diversions are required from the time stream flow is disrupted by operations and until culvert installation and backfill is complete or approved by the CO.
4. Minor diversions and dewatering are expected for this project, the contractor shall verify the culvert locations on the ground.
5. Conserve suitable material from the trench excavation and utilize as backfill. If additional material is needed for backfill, utilize material from a commercial source or borrow source approved by the CO.
6. Utilize commercial source CDOT Class 6 road base for bedding material.
CULVERT SUMMARY
DESIGNED AS BUILT THICKNESS NOTES
ROAD NO. STATION
LENGTH (FT.) SIZE (IN.)
STATION
LENGTH (FT.) SIZE (IN.)
ALUMINUM STEEL -
LOOP B 0+20 40
CMPA 71"
SPAN X
47"RISE 12 GA.
Aluminized, 2
2/3” x 1/2” corrugations
LOOP B 1+30 35
CMPA 57"
SPAN X 38"
RISE 12 GA.
Aluminized, 2
2/3” x 1/2” corrugations
LOOP B 2+65 30
CMPA 35"
SPAN X 24"
RISE 12 GA.
Aluminized, 2
2/3” x 1/2” corrugations
LOOP B 9+15 30
CMPA 71"
SPAN X
47"RISE 12 GA.
Aluminized, 2
2/3” x 1/2” corrugations
1"=5'
TYPICAL CULVERT INSTALLATION PROFILE
1"=5'
TYPICAL CULVERT INSTALLATION SECTION
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text C
AutoCAD SHX Text L
AutoCAD SHX Text F
AutoCAD SHX Text O
AutoCAD SHX Text R
AutoCAD SHX Text E
AutoCAD SHX Text S
AutoCAD SHX Text T
AutoCAD SHX Text S
AutoCAD SHX Text E
AutoCAD SHX Text R
AutoCAD SHX Text V
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text D
AutoCAD SHX Text E
AutoCAD SHX Text P
AutoCAD SHX Text A
AutoCAD SHX Text R
AutoCAD SHX Text T
AutoCAD SHX Text M
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text T
AutoCAD SHX Text O
AutoCAD SHX Text F
AutoCAD SHX Text A
AutoCAD SHX Text G
AutoCAD SHX Text R
AutoCAD SHX Text I
AutoCAD SHX Text C
AutoCAD SHX Text U
AutoCAD SHX Text L
AutoCAD SHX Text T
AutoCAD SHX Text U
AutoCAD SHX Text R
Applicable FP‐14 Forest Service Supplemental Specifications for Difficult
Campground Asphalt Paving; WRNF RBCM IDIQ Task Order #1 (seed project)
Note: Full text of all supplemental specifications are included in the base contract attachments.
Supplemental specifications with fill‐in information are shown full text in this document as needed.
Preface
Delete all but the first paragraph and add the following:
The Forest Service, US Department of Agriculture has adopted FP‐14 for construction of National Forest
System Roads.
101 ‐ Terms¸ Format¸ and Definitions
101.01 Meaning of Terms
101.03 Abbreviations
101.04 Definitions
102 ‐ Bid¸ Award¸ and Execution of Contract
Delete Section 102
103 ‐ Scope of Work
Delete Subsections 103.02, 103.03, 103.04, 103.05
104 ‐ Control of Work
Delete Subsections 104.01, 104.02, 104.04
104.06 Use of Roads by Contractor
105 ‐ Control of Material
105.02(a) Government‐provided sources
105 ‐ Control of Material 105.02_National_11_1_2016
Add the following to Subsection 105.02(a):
105.02(a) Government‐provided sources.
Government‐provided sources for this project are identified as follows:
(1) Government‐provided mandatory sources.
Pay Item Description Material source number or name
N/A N/A N/A
(2) Government‐provided optional sources for this project are identified as follows:
Pay Item Description Material source number or name
25101 Placed riprap, government furnished 18" minus
Borrow pit on Hwy. 82, 9.1 miles east of difficult campground.
63310.2 OPTION ITEM: Place 36"
minimum government furnished boulders at day use parking area
Borrow pit on Hwy. 82, 9.1 miles east of difficult campground.
If the Contractor elects to obtain material from < borrow source on Hwy. 82, 9.1 miles east of difficult campground.> the following applies:
(1) Obtain approval from the CO prior to entering the borrow pit.
105.05 Use of Material Found in the Work
106 ‐ Acceptance of Work
106.01 Conformity with Contract Requirements
106.02 Visual Inspection
106.07 Partial and Final Acceptance
107 ‐ Legal Relations and Responsibility to the Public
Delete Subsection 107.05
107.08 Sanitation, Health, and Safety
108 ‐ Prosecution and Progress
Delete Section 108
109 ‐ Measurement and Payment
Delete Subsections 109.06, 109.07, 109.08, 109.09
109.02 Measurement Terms and Definitions
153 ‐ Contractor Quality Control
153.02 Qualifications
153.03 Quality Control Plan
153.07 Records and control charts
155 ‐ Schedules for Construction Contracts
Delete Section 155
156 ‐ Public Traffic
156 ‐ Public Traffic 156.00_National_11_4_2016
Delete Section 156 in its entirety and replace with the following:
Section 156. – PUBLIC TRAFFIC Description
156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.
Material
156.02 Conform to the MUTCD and the following Sections and Subsections:
Permanent Traffic Control 633
Traffic Signing and Marking Material 718
Concrete Barriers and Precast Guardwalls 618
Temporary plastic fence 710.11
Construction Requirements
156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section. Perform work in a manner that ensures safety and convenience of the public. Unless otherwise provided for in Table 156‐1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed <N/A> minutes at any one time followed by an open period of no less than <N/A> minutes. Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to
Subsection 106.07(b).
Submit traffic control plan at least 30 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.
Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM
7100‐15. All required signs will be in place and approved prior to beginning work on project.
If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.
156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:
(a) Furnish and install traffic control devices before the start of construction operations.
(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.
(c) Install only those traffic control devices needed for each stage or phase.
(d) Relocate temporary traffic control devices as necessary.
(e) Remove devices that no longer apply to the existing conditions.
(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.
(g) Keep temporary traffic control devices clean.
(h) Remove all temporary traffic control devices upon contract completion or when approved.
(i) When required, use flaggers certified by the American Traffic Safety Services Association, the
National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.
156.05 Temporary Closures. Road segments may be closed as shown in Table 156‐1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.
Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.
Table 156‐1 Temporary Road Closures
Road
Number From Terminus To Terminus
Maximum
Consecutive Days of
Closure
Minimum
Consecutive
Days Open
Difficult
Campground
All Campground
Areas and Roads
All Campground
Areas and Roads
Until Project
Completion and
Demobilization N/A
156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.
Measurement and Payment
156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly. See
Subsection 109.05.
157 ‐ Soil Erosion and Sediment Control
157.04 General.
203 ‐ Removal of Structures and Obstructions
203.05 Disposing of Material
204 ‐ Excavation and Embankment
209 ‐ Structure Excavation and Backfill
209.09 Backfill
209.10 Compacting
302 ‐ Minor Crushed Aggregate
302.04 Placing Crushed Aggregate
302.05 Compacting and Finishing Crushed Aggregate
411 ‐ Asphalt Prime Coat
411.05 Weather Limitations
411.08 Maintenance
411.09 Acceptance
412 ‐ Asphalt Tack Coat
412.05 Weather Limitations
413 ‐ Asphalt Pavement Milling
413.01 Description
413.03 Milling
413.05 Measurement
413.06 Payment
633 ‐ Permanent Traffic Control
633.02 Material
633.03 General
633.05 (a) Fabrication
704 ‐ Soil
704.02 Bedding Material
Fire Plan (Region 2; White River National Forest)
Contractor Contract Number
Project Name Contract Performance Period
Contractor's Representative for Fire Matters
Name Title Office Phone Home Phone
Contracting Officer's Representative
Name Office Phone Home Phone
Forest Service Inspector(s)
Action by Contractor
The Contractor shall take on reasonable and practical action to prevent and suppress fires in the project area. The Contractor shall take suppression action immediately upon discovery of, or becoming aware of such fire.
Action by Forest Service
The Forest Service may counsel with the Contractor on suppression action and will, when necessary, supplement the Contractor's efforts by furnishing personnel and equipment not available to the Contractor. In the event that a fire is not suppressed by the Contractor, and will require appreciable reinforcements, the Forest Service may take over suppression of the fire and may employ the Contractor's personnel and equipment.
Fire Prevention and Suppression
Predicted fire precautions class may be obtained from the following sources:
The Contractor has employed or designated the following named individual(s) as fireguard, whose duty is the detection and suppression of fires:
Contractor will, will not, permit employees to smoke while in the project area.
Open fires will, will not, be permitted by the Contractor. Although these activities may be permitted by the Contractor, it is understood that neither shall be allowed without being authorized, in writing, by the Contracting Officer's Representative.
Fires shall be reported to one of the following Forest Service employees:
Name Address or Location Office Phone Home Phone
Special Fire Qualifications of Contractor’s Employees
Name
Best Fire Assignment
Other Qualifications
Total number of employees who could perform firefighting duties:
Vehicle Description, Type, Make, Model, Size, Year
Number of Units
Location
Joint Preparation of this fire plan is acknowledged:
Contractor or Designated Representative Contracting officer's Representative
Date Date
USDA FOREST SERVICE
REGION 2; WHITE RIVER
NATIONAL FOREST
FIRE PROTECTION AND SUPPRESSION
1. Fire Period Specific fire prevention measures are listed below and shall be effective for the period April
1 to October 31 of each year. The Forest Service may change the dates of said period by advance written notice if justified by unusual weather or other conditions. Required tools and equipment shall be kept currently in serviceable condition and immediately available for initial attack on fires.
2. Fire Plan Before starting any operations on the project, the Contractor, Permittee, Licensee, or Purchaser, hereinafter referred to as the "Contractor," shall prepare a fire plan in cooperation with the Contracting Officer providing for the prevention and control of fires in the project area.
The Contractor shall certify compliance with fire protection and suppression requirements before beginning operations during the fire period and closed season, and shall update such certification when operations change
3. Substitute Measures The Contracting Officer, in coordination with the designated Fire Management Officer in the Fire management Area for which the contract is operating, and applicable “Line Officer” (Deciding Official), may by written notice authorize substitute measures or equipment, or may waive specific requirements of ordered restrictions during periods of low fire danger.
4. Emergency Measures The Forest Service may require emergency measures, including the necessary shutting down of equipment or portions of operations in the project area during periods of fire emergency created by hazardous climatic conditions.
5. Fire Control The Contractor shall, independently and in cooperation with the Forest Service, take all reasonable action to prevent and suppress fires in the project area. Independent initial action shall be prompt and shall include the use of all personnel and equipment available in the project area.
For the purpose of fighting forest fires on or in the vicinity of the project which are not caused by the Contractor's operations, the Contractor shall place employees and equipment temporarily at the disposal of the Forest Service. Any individual hired by the Forest Service will be employed in accordance with the Interagency Pay Plan for Emergency Firefighters.
The Forest Service will compensate the Contractor for equipment rented at firefighting equipment rates common in the area, or at prior agreed to rates.
6. Compliance with State Forest Laws Listing of specific fire precautionary measures herein is not intended to relieve the Contractor in any way from compliance with the State Fire Laws covering fire prevention and suppression equipment, applicable to operations under this contract, permit or license.
7. Fire Precautions Specific fire precautionary measures are as follows:
a. Smoking and Open Fires
Smoking and fires shall be permitted only at the option of the Contractor. The Contractor shall not allow open fires on the project area without advance permission in writing from Forest Service.
Unless restricted by State Law or Federal Regulation, smoking shall be permitted only in such portions of the project area that are free of flammable material. Smokers shall sit down to smoke in such a position that any burning material will fall within a cleared area, and shall extinguish and press out in mineral soil all burning material before leaving the cleared area.
b. Fire Extinguishers and Equipment on Trucks, Tractors, etc.
All power-driven equipment operated by the Contractor on National Forest land, except portable fire pumps, shall be equipped with one fire extinguisher having a UL rating of at least 5 BC, and one "D" handled or long handled round point shovel, size "0" or larger. In addition, each motor patrol, truck and passenger-carrying vehicle shall be equipped with a double-bit axe or Pulaski, 3-1/2 pounds or larger.
Equipment shall be kept in a serviceable condition and shall be readily available.
c. Power Saws Each gasoline power saw operator shall be equipped with a pressurized chemical fire extinguisher of not less than 8-ounce capacity by weight, and one long-handled round point shovel, size "0" or larger. The extinguisher shall be kept in possession of the saw operator at all times. The shovel shall be accessible to the operator within 1 minute.
d. Extinguishers One refill for each type or one extra extinguisher sufficient to replace each size extinguisher required on equipment shall be safely stored in the fire tool box or other agreed upon place on the project area that is protected and readily available.
e. Spark Arresters and Mufflers Each internal combustion engine shall be equipped with a spark arrester meeting either
(1) USDA Forest Service Standard 5100-1a, or (2) appropriate Society of Automotive Engineers (SAE) recommended practice J335(b) and J350(a) as now or hereafter amended unless it is:
(1) Equipped with a turbine-driven exhaust supercharger such as the turbocharger.
There shall be no exhaust bypass
(2) A passenger-carrying vehicle or light truck, or medium truck up to 40,000 GVW, used on roads and equipped with a factory-designed muffler complete with baffles and an exhaust system in good working condition.
(3) A heavy duty truck, such as a dump or log truck, or other vehicle used for Commercial hauling, used only on roads and equipped with a factory designed muffler and with a vertical stack exhaust system extending above the cab. Exhaust equipment described in this subsection, including spark arresters and mufflers, shall be properly installed and constantly maintained in serviceable condition.
f.
Ordered Fire Restrictions and Closures
The Contractor shall restrict operations in accordance with ordered fire restrictions in place at the time. The Forest Service may order restrictions at any time, and when such changes are necessary for the protection of the National Forest. When sent to the contractor, any revised fire restriction order will supersede the previous restriction.
8. Fire Tools The Contractor shall furnish serviceable firefighting tools in a readily accessible fire tool box or compartment of sound construction with a hinged lid and hasp so arranged that the box can be secured or sealed. The box shall be red and marked "Fire Tools" in letters one inch high. It shall contain a minimum of:
a. 2 axes or Pulaski’s with a 32-inch handle;
b. 3 adze eye hoes. One Pulaski may be substituted for 1 adze eye hoe;
c. 3 long-handled, round point shovels, size "0" or larger.
9. Fire Security When an Ordered Fire Restriction of Stage "I" or higher is in place, and unless a waiver is granted, the Contractor shall designate a person who shall perform fire security services listed below on the project area and vicinity. The designated person shall be capable of operating the Contractor's communications and firefighting equipment specified in the contract, excluding helicopters, and of directing the activities of the Contractor's personnel on forest fires. In lieu of having the designated person perform the required supervisory duties, the Contractor may provide another person meeting the qualifications stated above to direct the activities of Contractor's personnel and equipment during all firefighting activities.
Services described shall be for at least 1 hour from the time the Contractor's operations are shut down. For the purposes of this provision, personnel servicing equipment, and their vehicles, who are not engaged in cutting or welding metal are excluded.
Fire security services shall consist of moving throughout the operation area or areas constantly looking, reporting, and taking suppression action on any fires detected.
Where possible, the designated person shall observe inaccessible portions of helicopter operating areas from vantage points within or adjacent to project area.
10. Blasting Whenever an Ordered Fire Restriction of Stage "II" or higher is in place, and unless a waiver is granted, a fire security person equipped with a long-handled, round point, No.
"0" or larger, shovel, and a five-gallon backpack pump can filled with water will stay at location of blast for 1 hour after blasting is done. Blasting may be suspended by Forest Service in writing, in an area of high rate of spread and resistance to control.
Fuses shall not be used for blasting. Explosive cords shall not be used without written permission of Forest Service, which may specify conditions under which such explosives may be used and precautions to be taken.
USDA FOREST SERVICE
REGION 2; WHITE RIVER
NATIONAL FOREST
FIRE PROTECTION AND SUPPRESSION
Additional Fire Precautionary Measure 1 - Tank Truck (NOT
APPLICABLE UNLESS ORDERED BY THE CONTRACTING
OFFICER)
11. The Contractor shall provide a tank truck or trailer, containing not less than 300 gallons of water, during yarding, loading, land clearing, right-of-way clearing and mechanical treatment of slash. A tank truck or trailer will not be required if power saw falling and bucking is the only operation. Such tank truck or trailer shall be maintained in a serviceable condition and located within 10 minutes, round trip, from each project area during fire period and closed season.
The tank truck or trailer shall be equipped with a pump capable of discharging 20 gallons of water per minute, using a 1/4 inch nozzle tip, through a 50 foot length of rubber line hose.
In addition, 500 feet of serviceable fabric jacket rubber lined hose of not less than 1 inch outside diameter, fitted with a nozzle capable of discharging a straight stream of 1/4 inch diameter and a spray pattern shall be immediately available for use. The tank, pump and at least 250 feet of hose and nozzle shall be connected and ready for use at all times.
If a trailer is used, it shall be equipped with a hitch to facilitate prompt movement. A serviceable tow vehicle shall be immediately available for attachment to the trailer and must meet the time requirements stated above. Such truck or trailer shall be equipped to operate for a minimum of 8 hours. Tank truck or trailer shall be available from the start of work to the end of the Fire Watch / Fire Security service.
Additional Fire Precautionary Measure 2 – Communications (NOT
APPLICABLE UNLESS ORDERED BY THE CONTRACTING
OFFICER)
12. The contractor shall provide adequate two-way communication facilities to report a fire to Forest Service within 15 minutes of detection. FCC Regulations prohibit commercial use of Citizen Band (CB) radios. (CB's are not considered adequate two-way communications).
Such communications shall be operable during periods of operation of power-driven equipment, including the time fire security is required.
| 1-2021DifficultCG-AsphaltPavingIDIQTaskOrder1ProjectDrawings |
| 2021DifficultCGAsphaltPavingWRNF-RBCM-IDIQ-TO1-Sheet1SIGNED |
| 2021DifficultCGAsphaltPavingWRNF-RBCM-IDIQ-TO1-Sheet2 |
| Sheets and Views |
| Sheet2 |
| 2021DifficultCGAsphaltPavingWRNF-RBCM-IDIQ-TO1-Sheet3 |
| Sheets and Views |
| Sheet3 |
| 2021DifficultCGAsphaltPavingWRNF-RBCM-IDIQ-TO1-Sheet4 |
| Sheets and Views |
| Sheet4 |
| 2021DifficultCGAsphaltPavingWRNF-RBCM-IDIQ-TO1-Sheet5 |
| Sheets and Views |
| Sheet5 |
| 2021DifficultCGAsphaltPavingWRNF-RBCM-IDIQ-TO1-Sheet6 |
| Sheets and Views |
| Sheet6 |
| 2-2021DifficultCG-AsphaltPavingIDIQTaskOrder1FP14FSSS-List-Applicable |
| 3-2021DifficultCG-AsphaltPavingIDIQTaskOrder1FirePlan |
| Contractor's Representative for Fire Matters |
| Action by Forest Service |
| Fire Prevention and Suppression |
| Special Fire Qualifications of Contractor’s Employees |
| Additional Fire Precautionary Measure 1 - Tank Truck (NOT APPLICABLE UNLESS ORDERED BY THE CONTRACTING OFFICER) |
File details come from the government source that posted it. Updated .