- BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region Federal contract opportunity
- Solicitation number
- FA890320R0010
About this file
This document outlines requirements for environmental remediation and monitoring services at the former Reese Air Force Base in Texas. The scope of work includes long-term groundwater monitoring of domestic wells under an EPA administrative order, as well as conducting annual land use controls and five-year review inspections. Remediation of PFAS and additional work on well JS17-DW014 are excluded. Public meetings and fact sheets in both English and Spanish may be required on an ad hoc basis to inform the local community. The related federal contract solicitation is seeking proposals for Base Realignment and Closure environmental construction and optimization services in the Central South region, as specified in the attachments.
View the file
Other files for this federal contract opportunity
Show all 50
BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4890-06-R-9999
Attachment 1
APRIL XX, 2009
- final – fa8903-20-r-0010 to 2 Attachment 2 Central South Region - Reese 5 December 2019
1.1 Scope
The former Reese AFB is not listed on the National Priorities List (NPL). Environmental restoration is executed through the Texas Commission on Environmental Quality (TCEQ) issued Resource Conservation and Recovery Act (RCRA) corrective action permit and compliance plan, consequently there is no Federal Facility Agreement or Records of Decision.
In addition to the requirements presented in this PWS, this scope includes the following:
· N/A
Contractors are not responsible for the following:
· Investigation and remediation of PFAS, except as noted in Attachment 1.
· Any additional remediation of Well No. JS17-DW014.
· US EPA 7003(a) Order Compliance (this component will be included for performance in FY22 as part of a separate action): The Contractor shall perform semi-annual groundwater sampling of up to six (6) domestic wells under the USEPA 7003 Order which are still being monitored as a result of groundwater contamination from the Tower Area plume. This sampling will continue for the duration of the project. The contractor shall pay any fees and/or costs associated with the necessary rights of access or easements required to complete the work described in this section.
1.3 Applicable Documents
Key Documents
| Entry No. |
| Document Title |
| Location |
| Date Issued |
| 1. |
| Administrative Order on Consent RCRA 7003 Order, Reese Air Force Base, Texas |
| AR #174 |
| June 1, 1993 |
| 2. |
| Final 2018 Annual Land Use Controls Monitoring Report Formerly Active Fire Training Area (FT009), Southwest Landfill |
(LF003), Hurlwood Acquisition Landfill (LF005), Landfill 4 (LF016), Civil Engineering Paint Shop Trench (OT013), Picnic Lake (WP006), Golf Course Lake (WP008), and Main (Building 555) Oil-Water Separator (WP015), Former Reese Air Force Base, Lubbock County, Texas
| Google Drive |
| January 2019 |
| 3. |
| Hazardous Waste Permit and Compliance Plan No. 50302, Industrial Solid Waste Registration No. 62005, Former Reese Air Force Base, Lubbock County, Texas |
| Google Drive |
| March 13, 2019 |
1.4 Work Ramp-Up and Transition
Transition of Work
| Contract No. |
| Project Name |
| Field Support |
Complete Reporting Complete
| Contract GS10F0280V, Order Number FA8903-16-F-0014 |
| PBR, Central Region BRAC Installations |
| 4/27/2021 |
| 6/27/2021 |
2.6.1 Meeting/Teleconference Support
· Former Reese BCT meetings are currently held on an as-needed basis approximately 2 times per year, and are typically scheduled to occur the same week as other Air Force meetings (e.g., public meetings, stakeholder meetings). Onsite meetings are typically held at the former base in the main conference room of the Lubbock-Reese Redevelopment Authority. Offsite meetings are held at the TCEQ’s offices in Austin, Texas.
2.6.2 Public Meetings and Hearings
· The Restoration Advisory Board (RAB) at the former Reese AFB was adjourned and there are currently no plans to reform the RAB; however, tad-hoc meetings to inform the Lubbock community of the environmental cleanup progress may be required.
· Newspaper notices and facts sheets/written meeting materials shall be prepared in both English and Spanish.
2.6.5 Site Access: Permits, Easements, and Work Site Access
· No additional base-specific requirements beyond those specified in the PWS.
3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates
· No base-specific requirements in addition to those in the PWS.
6.14 Land Use Controls (LUC)
· The Contractor shall conduct LUC/IC inspections at sites listed in Attachment 1 and prepare a report. Currently, LUC/IC monitoring is held on an annual basis.
6.15 Five-Year Reviews
· The Contactor shall prepare the Five-Year Review Report for sites identified in Attachment 1. The next Five-Year Review Report is due in September 2026.