TO 2 PWS Attch 2 Reese Base Spec Req Central South vf5.docx

DOCX document 51 KB Posted

Attached to
BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region Federal contract opportunity
Solicitation number
FA890320R0010
Issued by
Department of the Air Force Materiel Command Installation and Mission Support Center Installation Contracting Agency

About this file

This document outlines requirements for environmental remediation and monitoring services at the former Reese Air Force Base in Texas. The scope of work includes long-term groundwater monitoring of domestic wells under an EPA administrative order, as well as conducting annual land use controls and five-year review inspections. Remediation of PFAS and additional work on well JS17-DW014 are excluded. Public meetings and fact sheets in both English and Spanish may be required on an ad hoc basis to inform the local community. The related federal contract solicitation is seeking proposals for Base Realignment and Closure environmental construction and optimization services in the Central South region, as specified in the attachments.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region, newest first.
File Type Posted
05202020_FA8903-20-R-0010_Two Questions.xlsx XLSX spreadsheet
FA8903-20-R-0010_BECOS RFP Questions_05-15-20.xlsx XLSX spreadsheet
20200511_FA8903-20-R-0010_BECOS RFP Questions and Answers.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00100002 SF 30 (002).pdf PDF
FA890320R0010 Central South Amendment Changes.docx DOCX document
20200427_Central South TO2 Price Model Amendment 01.xlsx XLSX spreadsheet
FOUO_Attach2_Reference_Docs_Homestead_Central_Southv4.docx DOCX document
20200427_FA8903-20-R-0010_BECOS RFP Questions and Answers.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00100001 SF 30 (1).pdf PDF
20200427_FA890320R0010_BECOS_Central South_Section_L Amendment 01.docx DOCX document
TX20190231 10042019 Bexar Building.pdf PDF
CO20190002 09272019 Denver Heavy.pdf PDF
TO 2 PWS Attch 2 England Base Spec Req Central South vf2.docx DOCX document
IDIQ PWS Central South BECOS vf4.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B002-B003 (MGMT) Central South BECOS vf1.pdf PDF
20200131_FA890320R0010_BECOS_Relevancy_Matrix v2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A001-A002-A004 (MISC) Central South BECOS vf1.pdf PDF
20200203_FA890320R0010_BECOS_Central South_Section_L v5.docx DOCX document
20200131_FA890320R0010_BECOS_Relevancy_PPQ v2.docx DOCX document
TX20190280 10042019 Lubbock Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A007-A008-A009 (ENVR) Central South BECOS vf1.pdf PDF
20200122_Central South FFP FBLR Tables.xlsx XLSX spreadsheet
20191217_Compensation Plan Model.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Kelly Base Spec Req Central South vf3.docx DOCX document
20200109_Central South TO2 Price Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Central South BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Carswell Base Spec Req Central South vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Central South BECOS vf1.pdf PDF
TX20190026 10042019 Tarrant Heavy.pdf PDF
TX20190271 10042019 Travis Building.pdf PDF
IDIQ PWS Attch 4 Central South Perf Obj Def and Req BECOS vf2.docx DOCX document
TO 1 CDRLs Exhibit A B Central South BECOS vf1.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Central South BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Bergstrom Base Spec Req Central South vf2.docx DOCX document
Solicitation FA890320R0010 Central South.pdf PDF
TX20190002 01042019 Lubbock Heavy.pdf PDF
20200131_FA8903-20-R-0010_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN) Central South BECOS vf1.pdf PDF
FL20190215 10252019 Miami-Dade Building.pdf PDF
TO 2 PWS Attch 2 Myrtle Beach Base Spec Req Central South vf2.docx DOCX document
TO 2 PWS Attch 1 Central South Site List BECOS vf8.xlsx XLSX spreadsheet
FL20190125 11012019 Miami-Dade Heavy.pdf PDF
AR20190022 10252019 Mississippi County Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Central South BECOS vf1.pdf PDF
Central South IDIQ_Sched B_CLIN Structure and Price Model_v1_02032020.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Homestead Base Spec Req Central South vf2.docx DOCX document
TO 2 CDRLs Exhibit A B Central South BECOS vf1.docx DOCX document
IDIQ PWS Attch 3 Central South Del Rev Process BECOS vf2.docx DOCX document
TO 2 PWS Attch 2 Eaker Base Spec Req Central South vf2.docx DOCX document
TO 2 PWS Central South BECOS vf3.docx DOCX document
Show all 50

BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4890-06-R-9999

Attachment 1

APRIL XX, 2009

- final – fa8903-20-r-0010 to 2 Attachment 2 Central South Region - Reese 5 December 2019

1.1 Scope

The former Reese AFB is not listed on the National Priorities List (NPL). Environmental restoration is executed through the Texas Commission on Environmental Quality (TCEQ) issued Resource Conservation and Recovery Act (RCRA) corrective action permit and compliance plan, consequently there is no Federal Facility Agreement or Records of Decision.

In addition to the requirements presented in this PWS, this scope includes the following:

· N/A

Contractors are not responsible for the following:

· Investigation and remediation of PFAS, except as noted in Attachment 1.

· Any additional remediation of Well No. JS17-DW014.

· US EPA 7003(a) Order Compliance (this component will be included for performance in FY22 as part of a separate action): The Contractor shall perform semi-annual groundwater sampling of up to six (6) domestic wells under the USEPA 7003 Order which are still being monitored as a result of groundwater contamination from the Tower Area plume. This sampling will continue for the duration of the project. The contractor shall pay any fees and/or costs associated with the necessary rights of access or easements required to complete the work described in this section.

1.3 Applicable Documents

Key Documents

Entry No.
Document Title
Location
Date Issued
1.
Administrative Order on Consent RCRA 7003 Order, Reese Air Force Base, Texas
AR #174
June 1, 1993
2.
Final 2018 Annual Land Use Controls Monitoring Report Formerly Active Fire Training Area (FT009), Southwest Landfill

(LF003), Hurlwood Acquisition Landfill (LF005), Landfill 4 (LF016), Civil Engineering Paint Shop Trench (OT013), Picnic Lake (WP006), Golf Course Lake (WP008), and Main (Building 555) Oil-Water Separator (WP015), Former Reese Air Force Base, Lubbock County, Texas

Google Drive
January 2019
3.
Hazardous Waste Permit and Compliance Plan No. 50302, Industrial Solid Waste Registration No. 62005, Former Reese Air Force Base, Lubbock County, Texas
Google Drive
March 13, 2019

1.4 Work Ramp-Up and Transition

Transition of Work

Contract No.
Project Name
Field Support

Complete Reporting Complete

Contract GS10F0280V, Order Number FA8903-16-F-0014
PBR, Central Region BRAC Installations
4/27/2021
6/27/2021

2.6.1 Meeting/Teleconference Support

· Former Reese BCT meetings are currently held on an as-needed basis approximately 2 times per year, and are typically scheduled to occur the same week as other Air Force meetings (e.g., public meetings, stakeholder meetings). Onsite meetings are typically held at the former base in the main conference room of the Lubbock-Reese Redevelopment Authority. Offsite meetings are held at the TCEQ’s offices in Austin, Texas.

2.6.2 Public Meetings and Hearings

· The Restoration Advisory Board (RAB) at the former Reese AFB was adjourned and there are currently no plans to reform the RAB; however, tad-hoc meetings to inform the Lubbock community of the environmental cleanup progress may be required.

· Newspaper notices and facts sheets/written meeting materials shall be prepared in both English and Spanish.

2.6.5 Site Access: Permits, Easements, and Work Site Access

· No additional base-specific requirements beyond those specified in the PWS.

3.4 Computer Aided Design Drawing (CADD) and Geographic Information Systems (GIS) Updates

· No base-specific requirements in addition to those in the PWS.

6.14 Land Use Controls (LUC)

· The Contractor shall conduct LUC/IC inspections at sites listed in Attachment 1 and prepare a report. Currently, LUC/IC monitoring is held on an annual basis.

6.15 Five-Year Reviews

· The Contactor shall prepare the Five-Year Review Report for sites identified in Attachment 1. The next Five-Year Review Report is due in September 2026.

File details come from the government source that posted it. Updated .