This document outlines a deliverable review process for a federal contract. It details the review tasks, timeframes, and scope for contractor-prepared documents related to Base Realignment and Closure environmental construction and optimization services in the Central South region. The Air Force and regulatory agencies will review working drafts and provide comments within 30 days or 7 days as specified. The contractor will incorporate comments, obtain additional regulatory review, and submit final documents for regulatory acceptance. Actual review times may vary based on other agreements and workload.

View the file

Other files for this federal contract opportunity

Other files attached to BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region, newest first.
File Type Posted
FA8903-20-R-0010_BECOS RFP Questions_05-15-20.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00100002 SF 30 (002).pdf PDF
20200427_Central South TO2 Price Model Amendment 01.xlsx XLSX spreadsheet
FOUO_Attach2_Reference_Docs_Homestead_Central_Southv4.docx DOCX document
20200427_FA8903-20-R-0010_BECOS RFP Questions and Answers.xlsx XLSX spreadsheet
Solicitation Amendment FA890320R00100001 SF 30 (1).pdf PDF
20200427_FA890320R0010_BECOS_Central South_Section_L Amendment 01.docx DOCX document
20200427_FA890320R0010_Central South_BECOS_Section_M Amendment 01.docx DOCX document
TO 2 PWS Attch 2 Kelly Base Spec Req Central South vf3.docx DOCX document
20200109_Central South TO2 Price Model.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT C001 (MGMT) Central South BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Carswell Base Spec Req Central South vf2.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT B004 (CMAN) Central South BECOS vf1.pdf PDF
TX20190026 10042019 Tarrant Heavy.pdf PDF
TX20190271 10042019 Travis Building.pdf PDF
IDIQ PWS Attch 4 Central South Perf Obj Def and Req BECOS vf2.docx DOCX document
TO 1 CDRLs Exhibit A B Central South BECOS vf1.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A010 (QCIC) Central South BECOS vf1.pdf PDF
TO 2 PWS Attch 2 Bergstrom Base Spec Req Central South vf2.docx DOCX document
TO 2 PWS Attch 2 Reese Base Spec Req Central South vf5.docx DOCX document
Solicitation FA890320R0010 Central South.pdf PDF
TX20190002 01042019 Lubbock Heavy.pdf PDF
20200131_FA8903-20-R-0010_BECOS RFP Questions and Answers Template v2.xlsx XLSX spreadsheet
IDIQ DD1423 CDRLS EXHIBIT B005-B006-B007 (ADMN) Central South BECOS vf1.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A003-A012 (MGMT) Central South BECOS vf1.pdf PDF
SC20190043 10042019 Horry Heavy.pdf PDF
CO20190020 09272019 Denver Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT B001 (MISC) Central South BECOS vf1.pdf PDF
TX20190007 01042019 Bexar Travis Heavy.pdf PDF
LA20190051 10042019 Rapides Building.pdf PDF
TX20190270 10042019 Tarrant Building.pdf PDF
SC20190026 04192019 Horry Building.pdf PDF
LA20190002 10042019 Rapides Heavy.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A013 (MISC CONT) Central South BECOS vf1.pdf PDF
IDIQ PWS Attch 2 Central South Acr and Def BECOS vf3.docx DOCX document
AR20190048 01042019 Mississippi County Heavy.pdf PDF
TO 1 PWS Central South BECOS vf3.docx DOCX document
20200203_FA890320R0010_Central South_BECOS_Section_M v4.docx DOCX document
FL20190215 10252019 Miami-Dade Building.pdf PDF
TO 2 PWS Attch 2 Myrtle Beach Base Spec Req Central South vf2.docx DOCX document
TO 2 PWS Attch 1 Central South Site List BECOS vf8.xlsx XLSX spreadsheet
FL20190125 11012019 Miami-Dade Heavy.pdf PDF
AR20190022 10252019 Mississippi County Building.pdf PDF
IDIQ DD1423 CDRLS EXHIBIT A014 (DRPR) Central South BECOS vf1.pdf PDF
Central South IDIQ_Sched B_CLIN Structure and Price Model_v1_02032020.xlsx XLSX spreadsheet
TO 2 PWS Attch 2 Homestead Base Spec Req Central South vf2.docx DOCX document
TO 2 CDRLs Exhibit A B Central South BECOS vf1.docx DOCX document
TO 2 PWS Attch 2 Eaker Base Spec Req Central South vf2.docx DOCX document
TO 2 PWS Central South BECOS vf3.docx DOCX document
IDIQ DD1423 CDRLS EXHIBIT A005-A006-A011 (CMAN) Central South BECOS vf1.pdf PDF
Show all 50

BASE REALIGNMENT AND CLOSURE (BRAC) ENVIRONMENTAL CONSTRUCTION AND OPTIMIZATION SERVICES (BECOS) Central South Region has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA8903-20-R-0010

Central South Region Attachment 3 5 December 2019

Deliverable Review Process Air Force Contractor Regulators Task: Prepare working copy document.

Timeframe: Dependent on task Scope: Dependent on task Task: Review working copy document.

Timeframe: 30 calendar days (max) Scope: Comments will focus on regulatory, factual, technical, and legal issues and should not conflict with the terms and conditions of the contract (e.g., directing the contractor on approach).

Tasks: Incorporate review comments. Prepare submittal letter.

Timeframe: Dependent on task Scope: Evaluate and incorporate all regulatory, factual, technical, and legal Air Force comments that do not conflict with the terms and conditions of the contract.

Task: Review draft document and sign submittal letter if document is acceptable. Return for further revisions if required.

Timeframe: 7 calendar days (max) Scope: Review and sign submittal letter. Provide letter to Contractor.

Task: Obtain regulatory review of draft document.

Timeframe: TBD Scope: Distribute submittal letter and document to regulators. Provide copies to the Air Force.

Task: Provide regulatory review.

Timeframe: FFA/DSMOA/Circumstantial Scope: Provide regulatory review of submitted document.

Tasks: Resolve comments and revise document. Prepare submittal letter.

Timeframe: TBD Scope: Provide timely evaluation and resolution of regulatory comments with a goal of meeting predetermined objectives.

Task: Submit final document.

Timeframe: TBD Scope: Submit final document for regulatory acceptance/concurrence.

Task: Review final document and sign submittal letter if document is acceptable. Return for further revisions if required.

Timeframe: 7 calendar days (max) Scope: Review and sign submittal letter. Provide letter to Contractor.

Task: Accept final document.

Timeframe: FFA/DSMOA/Circumstantial Scope: Accept final document and provide written notice.

Note: This is a generic document review process for this contract. Actual review times will be based on the Federal Facility Agreement (FFA) where applicable or the Joint Execution Plan (JEP) and associated schedules developed under the Defense State Memorandum of Agreement (DSMOA). Agencies reviewing the document may make specific requests based on complexity of the deliverable or work load of their technical review team that impact review timelines. Depending on the document, there may or may not be a draft version or there may be multiple draft versions.