TMPBLST-NBPL-Vendor Compliance Checklist.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Rental of Temp Abrasive Blast System w/ Dust Collection
Solicitation number
N3904026Q1010
Issued by

About this file

This is a Vendor Compliance Checklist for a Temporary Abrasive Blast System with Dust Collection rental opportunity. The checklist itemizes all required equipment components and performance specifications organized by category, with cross-references to the Statement of Work (SOW) sections and provides columns for vendor compliance verification.

The required equipment includes: two dust collectors, three 150HP Vacuum Recovery Units (VRUs), three 4-Pot Recycle Blast Systems, one Blast Recovery System (35 cubic feet), associated cabling and fittings, and 400 feet of flexible vent duct. The Dust Collector must be capable of greater than 10,000 CFM at 14" water gauge static pressure, powered by a single 3-phase 200A source at 460V, equipped with MERV-15 or greater filters, pneumatic pulse jet cleaning, and a maximum footprint of 180" x 120". Each VRU must have a positive displacement blower with minimum 2,300 CFM free air capacity, 27" mercury static pressure rating, sound attenuation package, UL-approved skid-mounted design with fork pockets, and be pre-wired with a remote E-stop switch capable of connecting up to 1,500 feet of heavy-duty cable. The 4-Pot Recycle Blast System must process minimum 15,000 lbs/hr of steel abrasive, feature four 30" diameter pots rated at 175 PSI, and include an integrated 1,600 CFM air dryer with high-level water shutdown. The Blast Recovery System requires 3-outlet configuration, 35 cubic feet capacity, ASME coding, and two jet vac pumps rated at 1,400 CFM at 18" mercury. All equipment must meet construction standards for continuous outdoor use (-10 to +110°F), comply with NEC/ASME codes, include technical manuals in waterproof cases, and be supported by 24/7 emergency repair contacts and vendor-provided start-up, commissioning, and operator training.

View the file

Other files

File Type Posted
SOW-NBPL-TMPBLST.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

CategorySub-CategoryRequirementSOW ReferenceCompliant (Yes/No)Explanation (If No)
Component ListBill of MaterialsQty 2: Dust Collector3.1, PC-1,2
Qty 3: 150HP Vacuum Recovery Unit (VRU)3.1, PC-3,4
Qty 3: 4-Pot Recycle Blast System3.1, PC-5,6
Qty 1: Blast Recovery System (35CF)3.1, PC-7
Qty 3: VRU E-stop and cabling3.1, PC-8,9
Qty 4: 14"� Air Inlet Reducer Fittings3.1, PC-10-13
Qty 400 FT: 14"� Flexible Vent Duct3.1, PC-14
Qty 1: Rock Box3.1, PC-15
Dust CollectorPerformanceFan capable of > 10,000 CFM at 14"� WG static pressure.3.2.2
ElectricalPowered from a single 3-phase 200A source.3.2.2
460V nominal, 3-phase, 60Hz with soft-start capability (200A FLA).3.2.5
Cam-Lok J series locking style connections.3.2.5
Local breaker or fused disconnect for overcurrent protection.3.2.5
Airflow/InletsProvide means to reduce air inlets to (2) 14"� take-offs.3.2.3
FiltrationMERV-15 or greater filters, pre-installed new.3.2.6
Equipped with a magnehelic gauge.3.2.6
Pneumatic pulse jet style cleaning system.3.2.6
DesignHopper dumps directly into two discharge outlets without an auger.3.2.7
Discharge outlet height for 55-gallon drum on pallet.3.2.7
PhysicalMax Footprint (L x W): 180"� x 120"3.2.8
Safety/ControlsUL listed.3.2.9
Includes freeze protection measures.3.2.9
Vacuum (VRU)PerformanceTransport grit through min. 400 ft of 6" hose.3.3.2
Positive displacement blower, min. 2300 CFM (free air).3.3.2
Minimum static pressure rating of 27"� hg.3.3.2
Sound attenuation package (dual silencers).3.3.2
DesignSKID MOUNTED: UL approved with frame, fork pockets, certified lift cage.3.3.2
ElectricalSingle 460 VAC, 3-phase, 60Hz source ( 200A breaker).3.3.2
Cam-Lok connections (J series 1016 style).3.3.2
Instrument Panel: NEMA 3, soft start, push button on/off.3.3.2
FiltrationMERV 15 minimum filter efficiency.3.3.2
Safety/ControlsPre-wired for and equipped with a Remote E-stop switch.3.3.3
Contractor to provide up to 1500 FT of heavy-duty E-stop cable.3.3.3
E-stop switch must have a protective clear cover.3.3.3
4-Pot SystemClassifierAir wash, electric vibrating screen, and magnetic drum separator.3.4.2
Process minimum of 15,000 lbs/hr of steel abrasive.3.4.2
Inlet to accommodate 6-inch vacuum hose.3.4.2
Blast PotsFour 30" diameter pots, 4-outlet configuration.3.4.3
Cone bottom with 175 PSI pressure rating.3.4.3
1½"� Schmidt Thompson II tungsten carbide metering valves.3.4.3
Individual high-flow pressure regulators for each pot.3.4.3
Air DryerIntegrated, 1600 CFM capacity.3.4.4
High-level water shutdown on desiccant tank.3.4.4
ControlsSingle NEMA enclosure with 110VAC power supply.3.4.5
12V or 24V deadman with 3-prong twist lock connection.3.4.5
Includes AFOOFA-type safety control system.3.4.5
ConnectionAir inlet: 3 inch spud connection.3.4.9
Inspection & AcceptanceVendor acknowledges and agrees to host a pre-delivery source inspection at their facility7.1
Blast Recovery System(BRS) 35 cu./ft.Performance3-outlet configuration for 3 blast lines.3.5.2
Thompson II metering valves.3.5.2
35 cu./ft. pot capacity and 35 cu./ft. storage hopper.3.5.2
ASME coded pressure vessel.3.5.2
Vacuum: Two jet vac pumps capable of 1400cfm @ 18"Hg.3.5.5
DesignIncludes Rock box to separate large material.3.5.5.4
PhysicalMax Footprint (L x W): 11' x 5'3.5.3
Electrical110 VAC, 20A FLA max, UL listed.3.5.4
ConnectionVacuum: 2-inch inlet; Blast Operation: 2-inch inlet.3.5.7
GeneralServicesProvide start-up, commissioning, and operator training.3.6
ConstructionContinuous outdoor use (-10 to +110°F), meets NEC/ASME.4.1
New/Refurbished within 10 years.4.1
ElectricalComponents meet NEMA 3 standard.4.2
Contractor Resp.Provide repair service within 12 hours.6.2
Replace unit if not fixed in 24 hours.6.2
Submit a Quality Assurance Plan (QAP).6.2
Responsible for all preventative maintenance and weekly inspections.6.3
DeliverablesTechnical Manuals in a waterproof case on each machine.6.5
24/7 emergency repair contacts.6.5
PM Schedules and Equipment Data Sheet (EDS).6.5