US_MINT_SAN_FRANCISCO_GATE.PDF
PDF 4 MB Posted
- Attached to
- Vehicle Sliding Gate Project and Perimeter Security Upgrade-United States Mint San Francisco-
- Solicitation number
- TM-HQ-17-P-0192
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pedestrian_Alert_System.pdf | ||
| C-3_Clearance_Report_Form-SF117.doc | DOC document | |
| Sliding_Gate_and_Perimeter_Upgrade_-SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VEHICLE SLIDING GATE AND
GATE OPERATOR UPGRADE
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
D
C
B
A
REVISION HISTORY
REV. DESCRIPTION DATE APPROVED
DATE
DRAWN BY
CHECKED BY
APPROVED
DESIGN BY
SCALE
DRAWING NUMBER SHEET OF
OF
SHEETS REV.
NOTED
6/29/2017
SAN FRANCISCO
CALIFORNIA
VEHICLE SLIDING GATE AND GATE
OPERATOR UPGRADE
D. DIMATULAC
FINAL STAMPED SUBMITTAL
T1.1
J. ROBERTS
TITLE SHEET
SAN FRANCISCO CALIFORNIA
COVER SHEET
DRAWING INDEX
DRAWING
NO SHEET NO SHEET NAME
1 T1.1 TITLE SHEET
2 T2.1 PROJECT NOTES
3 A2.1 DEMOLITION PLAN
4 A3.1 NEW SITE PLAN
5 A4.1 GATE DETAILS
6 E3.1 ELECTRICAL SITE PLAN
1" = 80'-0"T1.1
1 VICINITY MAP
T1.1
2 GATE 1 3D VIEW
T1.1
3 GATE 2 3D VIEW
TRUE
NORTH
Exp._______
#C-23213
08/17
JEF R. ROBERTSS
TA
TE
OF CA L I FORN
IA
R E
G
I S T ER E D A RC H
I T E
C T
CONTRACTOR SHALL ASSUME THAT LEAD-BASED PAINT IS PRESENT THROUGHOUT THE PROJECT FACILITY, AND SHALL HANDLE
DEMOLITION AND ALTERATION OF PAINTED SURFACES IN COMPLIANCE WITH FEDERAL REQUIREMENTS FOR LEAD ABATEMENT.
CONTRACTOR SHALL ASSUME THAT ITEMS DEMOLISHED OR ALTERED MAY CONTAIN HAZARDOUS/TOXIC MATERIALS. THE CONTRACTOR
SHALL TEST DEMOLISHED OR ALTERED ITEMS/SURFACES SUSPECT OF CONTAINING HAZARDOUS/TOXIC MATERIALS. IF TESTS INDICATE
THE POSITIVE PRESENCE OF HAZARDOUS/TOXIC MATERIALS THE CONTRACTOR SHALL REMOVE AND DISPOSE OF THESE ITEMS IN
ACCORDANCE WITH FEDERAL REQUIREMENT FOR LEAD/HAZARDOUS/TOXIC SUBSTANCE (THIS INCLUDES BUT IS NOT LIMITED TO, ASBESTOS, ASBESTOS PRODUCTS, LEAD BASED PAINT POLYCHLORINATE BIPHENYL (PCB) OR OTHER TOXIC SUBSTANCES) REMOVAL AND
ABATEMENT.
IF THE CONTRACTOR ENCOUNTERS ANY UNKNOWN OR SUSPECTED HAZARDOUS MATERIAL, NOT SPECIFICALLY ADDRESSED IN SAID
DOCUMENTS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK AND SUBMIT A SAMPLE TO THE CONTRACTING OFFICER FOR TESTING.
THE ARCHITECT/ENGINEER AND THEIR CONSULTANTS SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY, PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY FORM AT THE PROJECT SITE. THIS INCLUDES
BUT IS NOT LIMITED TO, ASBESTOS, ASBESTOS PRODUCTS, LEAD BASED PAINT POLYCHLORINATE BIPHENYL (PCB) OR OTHER TOXIC
SUBSTANCES.
EXISTING HAZARDOUS MATERIALS
GENERAL NOTES:
CODE REFERENCES
THE FOLLOWING CODES ARE USED FOR THE BASIS OF DESIGN FOR
THIS PROJECT BUT ARE NOT LIMITED TO:
NOTE: THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING AND
USING THE MOST CURRENT APPLICABLE CODE EDITION. ALL WORK
SHALL BE IN COMPLIANCE WITH THE LATEST EDITION OF THESE
CODES, AND ANY OTHER APPLICABLE CODES AND STANDARDS.
SECURITY AND SCHEDULING
1. CONTRACTOR IS TO FOLLOW ALL US GOVERNMENT SECURITY RULES AND REGULATION REQUIREMENTS FOR ALL PERSONNEL AND
EQUIPMENT ENTERING THE CUSTOMER FACILITY.
2. CONTRACTOR SHOULD ALLOW ADEQUATE TIME WHEN SCHEDULING PERSONNEL AND SUBCONTRACTOR PERSONNEL TO ENTER THE
CUSTOMER'S FACILITY TO ENSURE EACH PERSON HAS SUCCESSFULLY UNDERGONE A SECURITY BACKGROUND CHECK.
3. UNDER NO CIRCUMSTANCES SHALL THERE BE ANY INTERRUPTIONS TO ANY UTILITIES WITHOUT EXPRESS WRITTEN CONSENT FROM
THE CUSTOMER. MOST OF THE WORK REQUIRED UNDER THIS PROJECT WILL BE PERFORMED EVERY OTHER FRIDAY AND ON WEEKENDS
AND HOLIDAYS.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
16.
17.
18.
19.
20.
21.
22.
23.
25.
26.
27.
28.
THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY APPROVALS
AND PERMITS REQUIRED FROM REGULATING AGENCIES BEFORE STARTING ANY
WORK.
THE WORK ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO
CONVEY THE SCOPE OF WORK, INDICATE THE GENERAL ARRANGEMENT OF
EQUIPMENT AND FINAL LAYOUT. THE DRAWINGS ARE GENERIC IN NATURE AND ARE
INTENDED TO BE SUPPORTED BY SPECIFIC MANUFACTURER AND/OR FABRICATORS
SHOP DRAWINGS AND SIMILAR DETAILS TO DETERMINE EXACT SPACING AND/OR
INSTALLATION REQUIREMENTS.
DO NOT SCALE THE DRAWINGS. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE
OVER SCALED DIMENSIONS. IF ANY DISCREPANCIES OR OMISSIONS IN THE
DIMENSIONS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING
OFFICER IMMEDIATELY. ANY WORK DONE WITHOUT PROPER NOTIFICATION BEING
GIVEN TO THE CONTRACTING OFFICER IS THE SOLE RESPONSIBILITY OF THE
CONTRACTOR.
PRIOR TO DEMOLITION, CONTRACTOR SHALL VERIFY ALL DIMENSIONS, EXISTING
CONDITIONS AND LOCATION OF NEW CONSTRUCTION WITH EXISTING ELECTRICAL
EQUIPMENT AND EXISTING CONSTRUCTION.
THE CONTRACTOR IS RESPONSIBLE FOR CHECKING FIELD CONDITIONS PRIOR TO
COMMENCEMENT OF WORK. THE CONTRACTOR SHALL REPORT ANY
PROBLEMS/CONFLICTS TO THE COTR WITHIN TWO (2) DAYS OF DISCOVERY. ANY
CHANGES RESULTING FROM CONDITIONS ARISING IN THE FIELD WHICH ARE NOT
BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER ARE TO BE MADE BY
THE CONTRACTOR AT NO ADDITIONAL COST TO THE GOVERNMENT.
DRAWINGS SHOWN ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY
SITE CONDITIONS AND ENSURE SHOP DRAWINGS ARE PROVIDED BEFORE DETAILING
COMPLETE UTILITY LAYOUT AND INSTALLATION. IT SHALL BE THE CONTRACTOR'S
RESPONSIBILITY TO ROUTE NEW CONDUITS, AND SIMILAR LINES TO AVOID POTENTIAL
INTERFERENCES, AND WHERE THIS CANNOT BE ACCOMPLISHED, IT SHALL BE THE
CONTRACTOR'S RESPONSIBILITY TO REMOVE, REROUTE, ADJUST AND REINSTALL THE
INTERFERENCE SUCH THAT IT NO LONGER POSES A PROBLEM. THESE ITEMS ARE TO
BE ADDRESSED AND CORRECTED AT NO ADDITIONAL COST TO THE GOVERNMENT.
CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES TO AVOID POTENTIAL
CONFLICTS.
FINAL LOCATION OF ELECTRICAL EQUIPMENT SHALL BE APPROVED BY THE COTR.
EACH SUBCONTRACTOR IS CONSIDERED TO BE A SPECIALIST IN HIS RESPECTIVE
FIELD AND SHALL, PRIOR TO SUBMISSION OF BID OR PERFORMANCE OF WORK,
NOTIFY THE GENERAL CONTRACTOR AND THE COTR OF ANY WORK CALLED FOR IN
THE DRAWINGS IN HIS TRADE THAT CANNOT BE FULLY GUARANTEED.
THE CONTRACTOR WARRANTS ALL WORK TO BE PERFORMED AND ALL MATERIALS TO
BE FURNISHED UNDER THIS CONTRACT AGAINST DEFECTS IN WORKMANSHIP FOR A
PERIOD OF NOT LESS THAN 1 YEAR FROM THE DATE OF FINAL ACCEPTANCE. UPON
WRITTEN NOTICE OF ANY DEFECT IN MATERIALS OR WORKMANSHIP, THE
CONTRACTOR SHALL, AT THE OPTION OF THE GOVERNMENT, REPAIR OR REPLACE
SAID DEFECT WITHOUT COST TO THE GOVERNMENT.
ALL CONSTRUCTION WORK, ARCHITECTURAL, MECHANICAL, ELECTRICAL, FIRE
PROTECTION, ETC. SHALL CONFORM TO THE MOST CURRENT ISSUE OF THE NATIONAL
FIRE PROTECTION ASSOCIATION (NFPA), THE INTERNATIONAL BUILDING CODE,
GOVERNMENT CRITERIA AND ANY APPLICABLE LOCAL, STATE AND FEDERAL CODES
AND GUIDELINES. SHOULD THE REQUIREMENTS OF THE INTERNATIONAL BUILDING
CODE CONFLICT WITH THE REQUIREMENTS OF THE NATIONAL FIRE PROTECTION
ASSOCIATION (NFPA), THEN THE MORE STRINGENT BETWEEN THE TWO SHALL
GOVERN.
IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE
CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR WORKING
CONDITIONS AT THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY
DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT SHALL APPLY
CONTINUOUSLY AND SHALL NOT BE LIMITED TO WORK HOURS. CONTRACTOR SHALL
CONFORM TO ALL SAFETY REGULATIONS ENFORCED AT THE TIME OF CONSTRUCTION.
JOB SITE SAFETY IS STRICTLY THE RESPONSIBILITY OF THE CONTRACTOR, AND NOT
THE ARCHITECT/ENGINEER OR THE GOVERNMENT.
THE CONTRACTOR SHALL PROVIDE U.L. RATED PORTABLE FIRE EXTINGUISHERS, TYPE
2A:10B:C ON SITE AND IN A LOCATION APPROVED BY THE GOVERNMENT. 75 FEET MAX.
TRAVEL DISTANCE TO FIRE EXTINGUISHER SHALL BE MAINTAINED.
THE CONTRACTOR SHALL ARRANGE FOR THE PREMISES TO BE MAINTAINED IN A
CLEAN AND ORDERLY MANNER THROUGHOUT THE COURSE OF CONSTRUCTION. DO
NOT BLOCK ENTRANCES, EXITS, LOBBIES, CORRIDORS, ETC. LEAVE AREA CLEAN AND
FREE OF DEBRIS AT THE END OF EACH DAY.
THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL LEFT-OVER
MATERIALS, DEBRIS, TOOLS AND EQUIPMENT INVOLVED IN HIS OPERATIONS AT THE
CONCLUSION OF THE PROJECT. ALL PROJECT AREAS AND SURROUNDING AREAS
AFFECTED BY CONSTRUCTION SHALL BE LEFT CLEAN AND IN PERFECT CONDITION.
THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO ENSURE THAT ALL
PROPERTIES, EQUIPMENT AND DEVICES AT THE PROJECT SITE ARE PROTECTED DURING
THE CONSTRUCTION PERIOD. ANY DAMAGES TO EXISTING CONSTRUCTION,
LANDSCAPING, EQUIPMENT AND DEVICES SHALL BE REPAIRED AND RESTORED TO A
CONDITION EQUAL TO THAT EXISTING AT THE COMMENCEMENT OF THE WORK. THE
CONTRACTOR SHALL RESTORE ANY DAMAGE AT HIS OWN EXPENSE. THE CONTRACTOR
SHALL SUBMIT THE PROCEDURE FOR CONSTRUCTION AND DEMOLITION PRIOR TO
COMMENCING WORK.
ALL FINISH WORK WHICH IS DAMAGED OR STAINED SHALL BE REPAIRED OR REPLACED
AS NECESSARY AT NO ADDITIONAL COST TO GOVERNMENT.
ALL SURFACES SHALL BE SMOOTH, CONTINUOUSLY FREE OF IMPERFECTIONS AND IN
PROPER CONDITION TO RECEIVE THE FINISH AS SPECIFIED. IN AREAS WHERE A FINISH
IS NOT SPECIFIED, THEY SHALL MATCH ADJACENT MATERIAL IN CONSTRUCTION, COLOR,
TEXTURE AND MANUFACTURER.
WORK SHALL NOT BE PERFORMED WHEN WEATHER CONDITIONS MAY CREATE
HAZARDOUS WORKING CONDITIONS OR LEAD TO FAILURE IN WORKMANSHIP.
AN APPROPRIATELY QUALIFIED REPRESENTATIVE OF THE CONTRACTOR SHALL BE ON
SITE TO SUPERVISE AND COORDINATE CONSTRUCTION AT ALL TIMES WHILE WORK IS IN
PROGRESS. SUCH PERSON SHALL BE RESPONSIBLE FOR OSHA COMPLIANCE AND JOB
SITE SAFETY.
THE CONTRACTOR SHALL NOT STORE ANY CHEMICALS ON THE SITE OR WITHIN THE
CONFINES OF THE BUILDING.
CONTRACTOR SHALL MAINTAIN AND KEEP THE EXISTING FIRE ACCESS LANE AND
PEDESTRIAN ACCESS AND EXIT PATHS CLEAR AT ALL TIMES.
CONTRACTOR SHALL SUBMIT TO THE COTR, FOR APPROVAL, THE LOCATION AND LOADING
AND UNLOADING MATERIALS. CONTRACTOR IS ADVISED THAT THERE WILL BE TIME
RESTRICTIONS ASSOCIATED WITH SUCH ACTIVITIES AND SHALL TAKE THIS INTO
CONSIDERATION WHEN PREPARING THE PHASING PLAN.
CONSTRUCTION PHASING: CONTRACTOR SHALL DEVELOP AND SUBMIT A DETAILED
CONSTRUCTION PHASING PLAN FOR REVIEW AND APPROVAL OF THE COTR PRIOR TO
MOBILIZING ON THE SITE. SUCH PHASING PLAN SHALL MINIMIZE DISRUPTION INCLUDING
ADEQUATE NOTIFICATION OF ANY UTILITY SHUTDOWNS FOR GOVERNMENT APPROVAL.
ALL WORK AFTER HOURS, ON HOLIDAYS OR WEEKENDS SHALL BE COORDINATED AND
APPROVED BY THE COTR AT LEAST TWO WEEKS IN ADVANCE AND DISCUSSED DURING
WEEKLY MEETINGS.
CONTRACTOR SHALL REMOVE ALL DEBRIS ON A DAILY BASIS IN ACCORDANCE WITH THE
GOVERNMENT AND EPA REGULATIONS. DEBRIS SHALL BE TRANSPORTED ON COVERED
CARTS COORDINATED WITH THE COTR.
CONTRACTOR SHALL PROVIDE ALL SAFETY AND CAUTION SIGNAGE TO REDIRECT
PEDESTRIAN TRAFFIC AND/OR ALERT THEM TO POTENTIAL CONSTRUCTION ACTIVITIES
AND HAZARDS. SAFE AND ACCESSIBLE PEDESTRIAN ROUTES SHALL BE MAINTAINED AT
ALL TIMES. PROVIDE SIGNAGE IN ACCORDANCE WITH OSHA STANDARD SPECIFICATION
FOR ACCIDENT PREVENTION SIGNS AND TAGS 1910.145.
UNDER NO CIRCUMSTANCE SHALL ANY UTILITY SERVICE BE INTERRUPTED WITHOUT THE
EXPRESS WRITTEN CONSENT OF THE COR. FOR MOMENTARY INTERRUPTIONS OF LESS
THAN 15 MINUTES IN DURATION, THE CONTRACTOR SHALL SUBMIT A REQUEST TO THE
COR, IN WRITING, A MINIMUM OF 7 CALENDAR DAYS IN ADVANCE OF PROPOSED
INTERRUPTION. FOR UTILITY INTERRUPTIONS EXCEEDING 15 MINUTES IN DURATION, THE
CONTRACTOR SHALL SUBMIT A REQUEST, IN WRITING, A MINIMUM OF 15 CALENDAR DAYS
IN ADVANCE OF PROPOSED INTERRUPTION.
ASBESTOS CONTAINING MATERIALS ARE NOT PERMITTED.
ALL MATERIALS AND EQUIPMENT SHOWN ON PLANS AND DESCRIBED IN THE
SPECIFICATIONS SHALL BE PROVIDED BY THE CONTRACTOR UNLESS STATED
OTHERWISE.
15.
24.
29.
30.
CO CONTRACTING OFFICER
COTR/COR CONTRACTING OFFICER'S (TECHNICAL) REPRESENTATIVE
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
ABBREVIATIONS
· IBC 2015 EDITION
· IMC LATEST EDITION
· VA HVAC DESIGN MANUAL MARCH 2011 EDITION
· ASHRAE 90.1 LATEST EDITION
· ASHRAE 62.1 LATEST EDITION
· ASHRAE 55 LATEST EDITION
· SMACNA SEISMIC RESTRAINT MANUAL, 3RD EDITION
· NFPA 90A LATEST EDITION
· NFPA 90B LATEST EDITION
· VA FIRE PROTECTION DESIGN MANUAL - 6TH EDITION
· NFPA 101 2015 EDITION
· NFPA 13
· NFPA 72
· NEC LATEST EDITION
· IPC 2012 EDITION
VEHICLE SLIDING GATE AND
GATE OPERATOR UPGRADE
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
D
C
B
A
REVISION HISTORY
REV. DESCRIPTION DATE APPROVED
DATE
DRAWN BY
CHECKED BY
APPROVED
DESIGN BY
SCALE
DRAWING NUMBER SHEET OF
OF
SHEETS REV.
NOTED
6/29/2017
SAN FRANCISCO
CALIFORNIA
GENERAL PROJECT NOTES
R. KORTE
T2.1
J. ROBERTS
08/17
JEF R. ROBERTSS
TA
TE
OF CA L I FORN
IA
R E
G
I S T ER E D A RC H
I T E
C T
COURT YARD BELOW
HERMANN STREET
B U C H A N A N
S T R E E T
W E B S T E R
S T R E E T
MUNI TROLLY TERMINAL
S T
O P
DEMOLISH GATE AND GATE SUPPORT FRAMING
DEMOLISH GATE OPERATOR, CAP ELECTRICAL
COMPONENTS FOR FUTURE CONNECTION TO
NEW GATE OPERATOR
DEMOLISH TURNSTILE, CAP ELECTRICAL
COMPONENTS (INCLUDING BUT NOT LIMITED TO
"GATE OPEN" SENSOR AND GATE ALARM. FOR
FUTURE CONNECTION TO
NEW TURNSTILE
DEMOLISH FENCE BETWEEN GATES AND
TURNSTILE
DEMOLISH REMAINING FENCE ALONG NORTH
SIDE OF PROPERTY
DEMOLISH FENCE ALONG ENTIRE LENGTH OF
THE WEST AND EAST PROPERTY LINES
DEMOLITION NOTES
VEHICLE SLIDING GATE AND
GATE OPERATOR UPGRADE
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
D
C
B
A
REVISION HISTORY
REV. DESCRIPTION DATE APPROVED
DATE
DRAWN BY
CHECKED BY
APPROVED
DESIGN BY
SCALE
DRAWING NUMBER SHEET OF
OF
SHEETS REV.
NOTED
6/29/2017
SAN FRANCISCO
CALIFORNIA
1" = 20'-0"A2.1
1 DEMOLITION SITE PLAN
DEMOLITION SITE PLAN
A2.1
R. KORTE
J. ROBERTS
08/17
JEF R. ROBERTSS
TA
TE
OF CA L I FORN
IA
R E
G
I S T E R E D A RC H
I T E
C T
COURT YARD BELOW
HERMANN STREET
B U C H A N A N
S T R E E T
W E B S T E R
S T R E E T
MUNI TROLLY TERMINAL
S L O
W
M
P H
S T
O P
NEW ORNAMENTAL SECURITY GATE. SEE SHEET AS4.1.
NEW STRUCTURAL SUPPORT FRAMING SYSTEM SHALL
BE PROVIDED BY THE GATE
FABRICATOR/MANUFACTURER.
NEW GATE OPERATOR, “DOORKING” 9200 SERIES OR
APPROVE EQUAL. COORDINATE WITH GATE
FABRICATOR/MANUFACTURER FOR PROPER SIZING.
NEW FULL-HEIGHT, TANDEM, HIGH SECURITY TURNSTILE
WITH POWDER COAT FINISH, “CONTROLLED ACCESS
INC.” SERIES HS430-T OR APPROVED EQUAL. FIELD
VERIFY AND MATCH THE SIZE OF THE EXISTING
TURNSTILE.
NEW FULL-HEIGHT, SINGLE, HIGH SECURITY TURNSTILE
WITH POWDER COAT FINISH, “CONTROLLED ACCESS
INC.” SERIES HS439-S OR APPROVED EQUAL. FIELD
VERIFY AND MATCH THE SIZE OF THE EXISTING
TURNSTILE.
PEDESTRIAN ALERT SYSTEM SIGN ENCLOSURE,
“PEDESTRIAN ALERT SAFETY SYSTEMS” CAR COMING
ALERT SYSTEM OR APPROVED EQUAL. PROVIDE STEEL,
POWDER COATED MOUNTING PLATE FASTENED TO NEW
FENCE. MOUNT 80" FROM SIDEWALK TO BOTTOM OF
SIGN.
PHOTOELECTRIC SENSOR. SENSOR TO ACTIVATE
PEDESTRIAN ALERT SYSTEM FOR OUTGOING TRAFFIC
ONLY.
NEW POWDER COATED STEEL FENCE BETWEEN EACH
GATE AND THE TANDEM TURNSTILE.
NEW POWDER COATED STEEL FENCE BETWEEN EACH
GATE AND THE WEST AND EAST PROPERTY LINES
NEW POWDER COATED STEEL FENCE ALONG THE
ENTIRE LENGTH OF THE WEST AND EAST PROERTY
LINES.
NEW SITE NOTES
VEHICLE SLIDING GATE AND
GATE OPERATOR UPGRADE
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
D
C
B
A
REVISION HISTORY
REV. DESCRIPTION DATE APPROVED
DATE
DRAWN BY
CHECKED BY
APPROVED
DESIGN BY
SCALE
DRAWING NUMBER SHEET OF
OF
SHEETS REV.
NOTED
6/29/2017
SAN FRANCISCO
CALIFORNIA
1" = 20'-0"A3.1
1 NEW SITE PLAN
NEW SITE PLAN
J. ROBERTS
R. KORTE
A3.1 4
FIN FLOOR LINE
0"
GATE 1 T.O. STEEL
14' - 6"
U.S. TREASURY SEAL FRONT AND US MINT POLICE
SEAL ON BACK (27" DIA)
4" (TYP.)
CL
R
A4.1
A4.1
SCROLL
(TYP)
HEAVY DUTY
CASTER
ASSEMBLY
FIN. FLOOR LINE
0"
GATE 2 TOP OF
STEEL
10' - 6"
4" (TYP.)
R
20' - 0"
LC
SCROLL
(TYP.)
A4.1
TREASURY SEAL FRONT
AND US MINT POLICE SEAL
ON BACK (20" DIA.)
A4.1
A4.1
19' - 0" 1/2" 19' - 0"
A4.1
A4.1
TRACK
CLEAR
1/2"
4"
"4
" CL
CL CL CL
TYP
3 1/2"
GATE FRAME/BAR LOCATIONS
DIMENSION EQUAL AT ALL
GATE 1
BUILDING SIDE
STREET SIDE
LEAF GUIDE
TYP OF 3
°LINE OF SIGHT
/8
1 3/8"
VERTICAL
BAR
FIN FLOOR LINE
0"
GATE 1 T.O. STEEL
14' - 6"
GATE 2
BUILDING SIDE
STREET SIDE
°LINE OF SIGHT
/8
1 3/8"
1"
FRONT
BACK
US MINT
POLICE SEAL
COUNTERSINK
SCREW, FILL AND
PAINT
3/8" THICK MOUNTING
PLATE, MATCH DIAMETER
OF SEALUS TREASURY
SEAL
GATE
FRAME
CHAMFER SEAL AS
NECESSARY TO PROVIDE
TIGHT FIT AGAINST
MOUNTING PLATE
WELD TO ONLY ONE
FRAME
FRONT
BACK
US MINT
POLICE SEAL
COUNTERSINK
SCREW, FILL AND
PAINT
3/8" THICK MOUNTING
RING/PLATE
US TREASURY
SEAL
CHAMFER SEAL AS
NECESSARY TO PROVIDE
TIGHT FIT AGAINST
MOUNTING PLATE
8"
8"
/4
/4
/8
5/8" ø 3 /4
CL
CL
3/8"
/8 ø 1 /2
R 3/8"
CL
CL
GATE 1 T.O. STEEL
14' - 6"
LONG VERTICAL
SPIKE WITH
POINTED TIP.
INTERMEDIATE
LANCE TIP
VERTICAL BARS
SCROLL
A4.1
A4.1
A4.1
4"
/2
/2
3 1/2"3 1/2" 3 1/2"
3 1/2"3 1/2"
/8
ALIGN VERIDICAL
CENTER LINE
/4
/1
10.A
A4.1
/8
1"
POINTED TIP
INTERMEDIATE
LANCE TIP
/4
11.A
A4.1
SHORT VERTICAL
SPIKE
CONTRACTOR TO PROVIDE DETAILED SHOP DRAWINGS FOR APPROVAL BY THE
GOVERNMENT PRIOR TO FABRICATION. THE CONTRACTOR IS RESPONSIBLE FOR
HIRING A LICENSED STRUCTURAL ENGINEER TO REVIEW THE SHOP DRAWINGS.
ALL GATE COMPONENTS SHALL BE POWDER COATED.
PROVIDE ALL NECESSARY GATES AND SLIDING GATE FRAMING SUPPORT
COMPONENTS FOR USE WITH AN AUTOMATIC GATE OPERATOR. REFER TO GATE
OPERATOR INSTALLATION INSTRUCTIONS.
GATE FINISH COLORS SHALL BE AS FOLLOWS:
ALL METAL GATE COMPONENTS NOT PRE-FINISHED AND SHALL RECEIVE A POWDER
COAT FINISH SUITABLE FOR WET AND SALTY CLIMATE.
TYPICAL GATE FRAMING/COMPONENTS BLACK
TYPICAL GATE SUPPORT FRAMING BLACK
GATE SEALS REFER TO GATE SEAL MANUFACTURER
SPECIFICATIONS.
LONG VERTICAL SPIKES BLACK FROM BASE TO THE TOP OF THE
INTERMEDIATE LANCE TIP, GRAY/BLUE
FROM TOP OF THE INTERMEDIATE LANCE
TIP TO TOP OF THE POINTED TIP.
SHORT VERTICAL SPIKES BLACK FROM THE BASE TO THE TOP OF
THE LANCE TIP
GATE LETTERING GOLD TO MATCH THE GATE SEALS
THE CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF ALL
EXISTING SECURITY DEVICES ATTACHED TO, OR DIRECTLY ASSOCIATED WITH, THE
EXISTING FENCES, GATES AND GATE OPERATORS BEING REPLACED AS PART OF
THIS PROJECT. REPLACE ALL SUCH DEVICES “IN LIKE AND KIND” TO THE EXISTING.
PROVIDE ELECTRICAL POWER SUPPLIES AS NECESSARY. ALL SUCH DEVICES MUST
BE TIED INTO THE EXISTING SECURITY SYSTEM. THE CONTRACTOR SHALL RETAIN
THE SERVICES OF “CONVERGINT” TO REMOVE, REPLACE AND INSTALL ALL SUCH
SECURITY DEVICES. CONTRACTOR SHALL PROVIDE ALL ASSOCIATED
PROGRAMMING AND CONNECTIONS AS REQUIRED TO PROVIDE A FULLY
OPERATIONAL SYSTEM. CONTRACTOR SHALL PERFORM TESTS IN THE PRESENCE
OF GOVERNMENT REPRESENTATIVE TO DEMONSTRATE THE SYSTEM MEETS OR
EXCEEDS CURENT SYSTEM PERFORMANCE. CONTRACTOR SHALL MAKE ANY
REQUESTED CHANGES AS REQUIRED BY THE GOVERNMENT FOR SATISFACTORY
SYSTEM OPERATION AT NO ADDITIONAL COST TO THE GOVERNMENT.
1.
2.
3.
4.
5.
GENERAL NOTES
VEHICLE SLIDING GATE AND
GATE OPERATOR UPGRADE
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
D
C
B
A
REVISION HISTORY
REV. DESCRIPTION DATE APPROVED
DATE
DRAWN BY
CHECKED BY
APPROVED
DESIGN BY
SCALE
DRAWING NUMBER SHEET OF
OF
SHEETS REV.
NOTED
6/29/2017
SAN FRANCISCO
CALIFORNIA
1/4" = 1'-0"A4.1
1 GATE 1 FRONT VIEW
1/4" = 1'-0"A4.1
2 GATE 2 FRONT VIEW
1/4" = 1'-0"A4.1
3 GATE 1 PLAN
1 1/2" = 1'-0"A4.1
4 ENLARGE CROSS SECTION
1/4" = 1'-0"A4.1
5 RIGHT SIDE VIEW
(GATE 2 SIM.)
1" = 1'-0"A4.1
6A SECTION
GATE 1 (GATE 2 SIM.)
GATE 1 (GATE 2 SIM.)
D. DIMATULAC GATE DETAILS
A4.1
J. ROBERTS
DIMENSIONS ARE TYPICAL FOR GATE 1 AND GATE 2
1" = 1'-0"A4.1
7 LARGE SEAL MOUNT
1" = 1'-0"A4.1
8 SMALL SEAL MOUNT
1 1/2" = 1'-0"A4.1
9 LEAF GUIDE
12" = 1'-0"A4.1
11.A DETAIL 2 PLAN
12" = 1'-0"A4.1
10.A DETAIL 1 PLAN
1" = 1'-0"A4.1
6 ENLARGED DETAILS GATE 1
6" = 1'-0"A4.1
10 LONG VERTICAL SPIKES
6" = 1'-0"A4.1
11 SHORT VERTICAL SPIKE
S T
A
T E
O F CA L I FORN
I A
EXP.________
E 17641 9-30-2017
R
EG
IS
T
ER
ED
PROFESS IONAL
ENG
IN
E E
RA
U
G
UST I NE K . L EU
N G
E
L E C T R I C A
L
COURT YARD BELOW
HERMANN STREET
B U C H A N A N
S T R E E T
W E B S T E R
S T R E E T
MUNI TROLLY TERMINAL
(TYP.)
J4
J
J
INSTALL NEW ELECTRICAL CIRCUIT FOR NEW
PEDESTRIAN ALERT SYSTEM SIGN(S) AND CONNECT TO
SIGN(S), IN ACCORDANCE WITH MANUFACTURER’S
SPECIFICATIONS. INSTALL CIRCUITS UNDERGROUND TO
TRAVERSE ROADWAYS TO FAR SIDE FROM SECURITY
OFFICE. COORDINATE WITH THE GOVERNMENT TO
CONFIRM ADEQUACY FOR INTENDED PURPOSE AND
ROUTING.
CONNECT NEW VEHICULAR GATE OPERATOR(S) TO
EXISTING ELECTRICAL CIRCUIT(S), IN ACCORDANCE WITH
MANUFACTURER’S SPECIFICATIONS. COORDINATE WITH
THE GOVERNMENT TO CONFIRM ADEQUACY FOR
INTENDED PURPOSE.
CONNECT NEW PEDESTRIAN GATE LOCK(S) TO EXISTING
CONTROL CIRCUIT(S), IN ACCORDANCE WITH
MANUFACTURER’S SPECIFICATIONS. COORDINATE WITH
THE GOVERNMENT TO CONFIRM ADEQUACY FOR
INTENDED PURPOSE.
INSTALL NEW ELECTRICAL CIRCUIT(S) FOR NEW
PHOTOELECTRIC SENSOR(S) AND CONNECT TO
SENSOR(S), IN ACCORDANCE WITH MANUFACTURER’S
SPECIFICATIONS. COORDINATE WITH THE GOVERNMENT
TO CONFIRM ADEQUACY FOR INTENDED PURPOSE AND
ROUTING.
COORDINATE WITH THE GOVERNMENT TO CONFIRM
REQUIREMENTS FOR SECURITY CONTROLS FOR
VEHICULAR GATES, PEDESTRIAN GATES, ALERT SIGNS,
AND/OR PHOTOSENSOR CONTROLS AND CONFIGURE
AND/OR MODIFY EXISITING CONTROLS AS DIRECTED.
NEW SITE NOTES
VEHICLE SLIDING GATE AND
GATE OPERATOR UPGRADE
8 7 6 5 4 3 2 1
8 7 6 5 4 3 2 1
D
C
B
A
REVISION HISTORY
REV. DESCRIPTION DATE APPROVED
DATE
DRAWN BY
CHECKED BY
APPROVED
DESIGN BY
SCALE
DRAWING NUMBER SHEET OF
OF
SHEETS REV.
NOTED
6/29/2017
SAN FRANCISCO
CALIFORNIA
1" = 20'-0"E3.1
1 ELECTRICAL SITE PLAN
A. LEUNG
R.KORTE
E3.1
ELECTRICAL SITE PLAN
| Sheets |
| T1.1 - TITLE SHEET |
| T2.1 - PROJECT NOTES |
| A2.1 - DEMOLITION PLAN |
| A3.1 - NEW SITE PLAN |
| A4.1 - GATE DETAILS |
| E3.1 - ELECTRICAL SITE PLAN |