This is a Statement of Work (SOW) for the renovation of Building T1 at the Table Mountain Field Site, a facility operated by the Institute for Telecommunication Sciences (ITS) under the U.S. Department of Commerce's National Telecommunications and Information Administration (NTIA).
The renovation project encompasses comprehensive building improvements including replacement of eight 48" x 36" horizontal slider windows; two doors (one single steel door measuring 36" x 84" on the north side and one double steel door measuring 72" x 84" on the south side with removable center post); flooring with 1/8" commercial grade 12" x 12" white tile after scraping and repair; and a complete HVAC system replacement with an electrically-powered heat pump featuring backup resistive heating. Additional work includes upgrading the external electrical panel to 3-phase 250-amp service with three 20-amp outlet circuits installed 6 feet on center and 40 inches from the floor; replacing the roof with 60-mil EPDM rubber membrane rated for 30 lbs. per square foot snow load and 120 mph wind load with gutters rated for 110 mph winds; replacing two exterior decks (north and south sides with stairs) using composite decking; updating the bathroom with water-efficient fixtures and rodent-resistant pipe insulation; adding electrical service and LED lighting to a 20' x 12' x 10' concrete comms shelter with wire mold and two outlets per wall on separate circuits; and applying Rhino Shield Elastomeric coating to interior and exterior surfaces matching existing colors. The contractor must provide a design-build plan prior to construction. Performance of work shall occur at NTIA's Table Mountain Field Site, 8600 N 39th Street, Longmont, Colorado 80503, with a period of performance not exceeding two years from award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B9 Inside ecletrical panels and transfer switch.jpeg | JPEG file | |
| T1 North electric panel.jpg | JPG image | |
| Amendment 1.pdf | ||
| B9 Outside elctric panel.jpg | JPG image | |
| T1 Main elelctric panel.jpg | JPG image | |
| B9 Electrical panel in equipment room.jpeg | JPEG file | |
| T1 South electric panel.jpg | JPG image | |
| TM-B9 renovation -SOW (2).pdf | ||
| Clauses.pdf | ||
| DBA C020260002.pdf | ||
| Wage Determination.pdf | ||
| RFQ_TM B9 and TM-T1 Renovation.pdf | ||
| Price Sheet.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Table Mountain T1 Renovation
U.S. Department of Commerce
National Telecommunications and Information Administration
Institute for Telecommunication Sciences
1. BACKGROUND
The Institute for Telecommunication Sciences (ITS) provides research and development support for the National Telecommunications and Information Administration (NTIA) by performing basic research in radio science that provides the technical foundation for NTIA’s policy development and spectrum management activities, as well as solving telecommunications challenges for other Federal agencies, state and local Governments, private corporations and associations, and international organizations. Additionally, ITS addresses emerging telecommunications, information technology, and security challenges and contributes to the creation of telecommunications standards that support the full and fair competitiveness of the U.S. communications and information technology business sectors.
2. OBJECTIVE
ITS, as custodians of the Table Mountain Field Site and Radio Quiet Zone, requires building T1 to be renovated to support ITS research activities.
3. REQUIREMENTS
ITS requires The renovation of T1, windows replaced, both doors replaced. The floor needs to be replaced. The HVAC Systems replaced it with a high efficient system. An external power panel added to concrete comms shelter. The comms shelter will need power outlets and lights.
3.1. Replace windows
Window measurements are 49” wide By 35” high. There are 4 windows on the west side of the building and one window on the north side of the building. Windows: (8) 48” wide x 36” high horizontal slider windows.
3.2. Door Replacment
North door measures 36: wide by 84” high. South Door is a double door that measures 72” single steel door with steel frame on the wide by 84” High Front entrance at south side north side of the building with entry stairs. double steel door with steel frame and removable center post.
3.3. Upgrade and Replace Outside Electrical Panel
The outside electrical panel need to be upgraded to 3 phase power Electric service: 250 amp, (3) 20-amp outlet circuits, outlets installed 6’ on center and 40” from the floor.
Upgrade both electrical panels
3.4. Floor covering
The floor will need to be scraped and repaired. New tile installed. Flooring: 1/8” commercial grade
12” x 12” tile floor, white
3.5. HVAC system
The HVAC system need to be replaced with a high affiant system that is powered by electricity.
Heating and cooling: heat pump with backup/assist resistive heating. Contractor to provide specifications with quotation.
3.6. Roof Replacement
The roof is a semi flat roof the measures 46” x 24”.
Roof: EPDM rubber membrane, 60 mil. 30-year warrantee, 30 lbs. per square foot snow load, 120 mph wind load. Roof gutter are to be installed to withstand 110 mph winds.
3.7. Deck Replacement
There is 2 decks with stairs, one on the north side and one on the south side. Replace like for like using a composite decking.
North Deck
South Deck
3.8. Bathroom
Handicap accessible bathroom located on northwest corner of building Handicap accessible bathroom located on northwest corner of building. Toilet and sink need to be replaced with water efficient units.
The plumbing under the building need to be insulated and possibly have electrical tape to keep from freezing. Ther should be a product used that id rodent resistant.
3.9. Electrical and lights added to Comms shelter
The building is 20’ x 12’ x 10 exposed aggregate building. The electrical panel has been removed from another building that we could possibly use. The lighting for the building need to be LED. Install wire mold for electrical outlets. 2 electrical outlets per wall and each on different circuits.
3.10. Lighting
Lighting: (8) ceiling mounted LED light fixtures.
3.11. Interior paint
Interior paint need to be a Rhino shield Elastomeric coating. Color to match existing color.
3.12. Exterior paint
Exterior paint need to be a Rhino shield Elastomeric coating. Color to match existing color.
Contractor shall provide a design build prior to construction.
4. PLACE OF PERFORMANCE
The T1 renovation shall be completed at the following Government location:
NTIA – Table Mountain Field Site
8600 N 39th Street
Longmont, CO 80503
Address is for the facility West gate. North gate access is also available via Nelson Road.
5. PERIOD OF PERFORMANCE
Service starts at the time of the award and does not exceed two years after the award.