Statement of Work Summary: Table Mountain B9 Renovation
This is a Statement of Work for the renovation of Building B9 at the NTIA Table Mountain Field Site in Longmont, Colorado. The Institute for Telecommunication Sciences (ITS), under the U.S. Department of Commerce's National Telecommunications and Information Administration (NTIA), requires comprehensive building renovation to support its research activities at the Table Mountain Field Site and Radio Quiet Zone.
The renovation scope includes: replacement of five windows (49" wide by 35" high) on the west and north sides; replacement of a north door (36" wide by 84" high) and south double doors (72" wide by 84" high); floor acid cleaning and commercial/industrial polymer coating installation; bathroom remodeling to meet ADA requirements; replacement of the HVAC system with a high-efficiency electric-powered unit; upgrade of the exterior electrical panel to support three-phase 220-volt power; creation of a new equipment room to house the HVAC system, cistern water pump and tank, and relocated electrical panels; installation of three-inch metal wire mold with electrical outlets every 120 inches and separate data cable mold; roof gutter repair/replacement rated for 110 mph winds; exterior and interior painting with Rhino Shield Elastomeric coating matching existing colors; and interior ceiling painting with black Rhino Shield Elastomeric coating and installation of twelve 2x4-foot LED troffer lights (9,400 lumen). The contractor must provide design-build plans prior to construction and handle asbestos abatement in wall adhesive when removing interior walls. Performance of work shall be completed at 8600 N 39th Street, Longmont, CO 80503, with a period of performance not to exceed two years from award date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| B9 Electrical panel in equipment room.jpeg | JPEG file | |
| T1 South electric panel.jpg | JPG image | |
| B9 Inside ecletrical panels and transfer switch.jpeg | JPEG file | |
| T1 North electric panel.jpg | JPG image | |
| Amendment 1.pdf | ||
| B9 Outside elctric panel.jpg | JPG image | |
| T1 Main elelctric panel.jpg | JPG image | |
| RFQ_TM B9 and TM-T1 Renovation.pdf | ||
| Price Sheet.pdf | ||
| Clauses.pdf | ||
| TM-T1 renovation -SOW (1).pdf | ||
| DBA C020260002.pdf | ||
| Wage Determination.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
Table Mountain B9 Renovation
U.S. Department of Commerce
National Telecommunications and Information Administration
Institute for Telecommunication Sciences
1. BACKGROUND
The Institute for Telecommunication Sciences (ITS) provides research and development support for the National Telecommunications and Information Administration (NTIA) by performing basic research in radio science that provides the technical foundation for NTIA’s policy development and spectrum management activities, as well as solving telecommunications challenges for other Federal agencies, state and local Governments, private corporations and associations, and international organizations. Additionally, ITS addresses emerging telecommunications, information technology, and security challenges and contributes to the creation of telecommunications standards that support the full and fair competitiveness of the U.S. communications and information technology business sectors.
2. OBJECTIVE
ITS, as custodians of the Table Mountain Field Site and Radio Quiet Zone, requires B9 renovation to support ITS research activities.
3. REQUIREMENTS
ITS requires The renovation of B9, windows replaced, both doors replaced. The floor needs to be cleaned, and a polymer coating put down. The bathroom needs to be remodeled to accommodate
ADA requirements. The HVAC System replaced it with a high efficient system. The equipment room increased in size to accommodate the HVAC system and the electrical panels. The existing electrical panels are in the main room. Replace the outside electrical panel to support 3 phase 220.
3.1. Replace windows
Window measurements are 49” wide By 35” high. There are 4 windows on the west side of the building and one window on the north side of the building.
3.2. Door Replacment
North door measures 36: wide by 84” high.
South Door is a double door that measures 72” wide by 84” High
3.3. Replace Outside Electrical Panel
The outside electrical panel need to be upgraded to 3 phase power
3.4. Floor covering
The floor will need to be acid cleaned and then a commercial & industrial polymer coating installed.
3.5. Bathroom rebuild
The bathroom need to be brought up to ADA requirements.
3.6. HVAC system
The HVAC system need to be replaced with a high affiant system that is powered by electricity.
3.7. Electrical panels
These panels would like to have these panels moved into a new equipment room that will be built to contain the HVAC System, Cittern water pump and tank.
Remove and replace electrical strip and replace with 3 inch metal wire mold. Replace electrical outlets every 120 inches along each wall. For every 5 outlets there will be a different circuit. Install am extra wire mold above electrical wire mold for data cables.
3.8. Roof gutters
The roof gutters need to be repaired or replaced. They need to be able to stand 110 mph winds and not come off the building.
3.9. Exterior paint
Exterior paint need to be a Rhino shield Elastomeric coating. Color to match existing color.
3.10. Interior paint
Interior paint need to be a Rhino shield Elastomeric coating. Color to match existing color
3.11. Interior ceiling
Paint ceiling with Black Rhino shield Elastomeric coating and install new 12 2x4 Feet LED Troffer
Light- 9400 Lumen.
Contractor shall provide a design build prior to construction. When removing the interior walls to create the ADA bathroom and new equipment room, the walls have been tested for asbestos and asbestos has been determined to be part of the adhesive before the walls were painted.
4. PLACE OF PERFORMANCE
The B9 renovation shall be completed at the following Government location:
NTIA – Table Mountain Field Site
8600 N 39th Street
Longmont, CO 80503
Address is for the facility West gate. North gate access is also available via Nelson Road.
5. PERIOD OF PERFORMANCE
Service starts at the time of the award and does not exceed two years after the award.