Section E_Inspection and Acceptance.pdf

PDF 24 KB Posted

Attached to
REFM Logistics Services
Solicitation number
TIRNO-11-R-00009
Issued by

About this file

Not Listed

View the file

Other files

File Type Posted
TIRNO11R00009-A0006 1 .pdf PDF
TE-6 Transportation Workload Coversheet.pdf PDF
TE-6 Transportation Schedules_Revised Oct202011.xls XLS spreadsheet
TIRNO11R00009-A0005 1 .pdf PDF
TIRNO11R00009-A0004 1 .pdf PDF
WageDetermination_Andover.pdf PDF
Revised Section C_date Oct2011.pdf PDF
TIRNO11R00009-A0003 1 .pdf PDF
TE-2 Building Listing_Revised Oct2011.pdf PDF
Revised Section H_Oct2011.pdf PDF
AMIS INTERFACE SPECS for EXTERNAL VENDOR.docx DOCX document
Revised Section M_date Oct2011.pdf PDF
TE-6 Transportation Schedules_Revised Oct2011.xls XLS spreadsheet
TIRNO11R00009-A0002 1 .pdf PDF
Attachment J-9 Summary Sheet for Cumulative Target NAICS SDB DATA.doc DOC document
TE-2 Building Listing.pdf PDF
Section C_date Sep2011.pdf PDF
Section L_date Sep2011.pdf PDF
Pre-Proposal Slide Show.pdf PDF
TIRNO11R00009-A0001 1 .pdf PDF
TE-12 Government Furnished Facilities_Revised Sep2011.pdf PDF
KC Campus_Aerial View.jpg JPG image
KC Campus_Parking.jpg JPG image
SF33.doc DOC document
Section C_Performance Work Statement.pdf PDF
TE-1 Territory Map.pdf PDF
TE-11 Government Property Furnished.pdf PDF
Section D_Packing and Marking.pdf PDF
Section H_Special Contract Requirements.pdf PDF
TE-8 POD Services Workload w_attachment.pdf PDF
TE-3 Warehouse Workload.pdf PDF
Attachment J-9 Past Performance Information.pdf PDF
Attachment J-5 List of Technical Exhibits.pdf PDF
TE-6 Transportation Workload.pdf PDF
Attachment J-6 Acronyms.pdf PDF
Section F_Delivery Schedule.pdf PDF
Section M_Evaluation Factors for Award.pdf PDF
TE-5 Stored Published Products.pdf PDF
Attachment J-1 3B Office Repairs Sample Quote.xls XLS spreadsheet
Attachment J-1 Pricing Scenarios.pdf PDF
Attachment J-3 Department of Labor Wage Determinations.rtf RTF text file
Attachment J-1 3A Locksmith Sample Quote.xls XLS spreadsheet
Section L_Instructions to Offerors or Respondents.pdf PDF
Attachment J-1 3D Property Moves Sample Quote.xls XLS spreadsheet
Attachment J-7 Definitions.pdf PDF
Section K_Representations Certifications and Other Statements of Respondents.pdf PDF
Attachment J-1 3C Box Moves Sample Quote.xls XLS spreadsheet
Attachment J-1 3F Excessing Sample Quote.xls XLS spreadsheet
TE-4 Stored Property.pdf PDF
Section J_List of Attachments.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REFM LOGISTIC SERVICES TIRNO-11-R-00009

SECTION E – INSPECTION AND ACCEPTANCE

E-1

E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer (CO) will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): https://www.acquisition.gov/far/

E.2 FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1)

CLAUSES INCORPORATED BY REFERENCE

NUMBER TITLE DATE

52.246-2 INSPECTION OF SUPPLIES - FIXED-PRICE AUG 1996

52.246-4 INSPECTION OF SERVICES - FIXED-PRICE AUG 1996

52.246-5 INSPECTION OF SERVICES –

COST REIMBURSEMENT APR 1984

52.246-14 INSPECTION OF TRANSPORTATION APR 1984

52.246-16 RESPONSIBILITY FOR SUPPLIES APR 1984

(End Clause)

E.3 GENERAL ACCEPTANCE CRITERIA

The general quality measures as set forth below will be applied to each written deliverable received from the contractor under this contract. Any perceived conflict between quality measures referenced in Section C of this contract and the quality measures listed below should be immediately reported in writing to the CO and the

COTR.

� Accuracy - Deliverables shall be accurate in presentation, technical content, and adherence to accepted elements of style.

� Clarity - Deliverables shall be clear and concise. Engineering terms shall be used, as appropriate. All diagrams shall be easy to understand and relevant to the supporting narrative.

� Specification Validity - All deliverables shall satisfy the requirements of the Government as specified herein.

� File Editing - All text and diagrammatic files shall be editable by the Government.

� Format - Deliverables shall be submitted as specified in Section C, or subsequent formal written directions, in hard copy where applicable, and electronically via e-mail or digital copies on CD-ROM disk using Microsoft Office Products (e.g., Word and Excel) or Adobe Acrobat file format where applicable.

REFM LOGISTIC SERVICES TIRNO-11-R-00009

SECTION E – INSPECTION AND ACCEPTANCE

E-2

� Timeliness - Deliverables shall be submitted on or before the due dates or submitted in accordance with a later scheduled date established in writing by the

CO.

E.4 INSPECTION

Inspection shall be at the place of performance and delivery as stated herein.

E.3 PERFORMANCE EVALUATION

The Government will use a Quality Assurance Surveillance Plan (QASP) to monitor compliance with contract terms and conditions and identify nonconforming services to determine appropriate action under the Inspection of Services contract clause and if necessary the Termination for Default contract clause. The QASP sets forth the method and manner by which the Government intends to conduct surveillance of work under the contract and is subject to unilateral change by the government without modification to the contract. All work required by the contract is subject to surveillance whether or not specifically included in the QASP.

The Government intends to use a random sampling method of evaluating contractor performance. The EZ-Quant software package will be utilized for the random sampling of work order requests to determine contractor compliance with contract requirements.

If the contractor’s performance fails to achieve the acceptable performance level and is clearly the fault of the contractor, the Quality Assurance Evaluator (QAE) will prepare a Contract Discrepancy Report (CDR) and forward it, with the QAE log recording the unacceptable performance, to the CO. The seriousness of the situation should govern whether the CDR is provided to the CO as soon as unacceptable performance is indicated or wait until not later than the third workday of the month following the surveillance.

File details come from the government source that posted it. Updated .