This is an Invitation for Bid (IFB) issued by Collin County, Texas for Tire Rubber Modified Asphalt and Application Services (Bid #2025-094). The county is seeking an annual pricing contract for the application of Tire Rubber Modified Surface Sealer (TRMSS) to be applied as a fog seal system on county roads on an as-needed basis. The bid was released on June 10, 2025, with a response deadline of July 3, 2025, at 2:00 pm. The contract term is one year, with the option to renew for an additional four one-year terms upon mutual approval. The estimated annual contract value is $5,100,000, though actual usage may vary, and the county will order materials and services on an as-needed basis.
The bid includes detailed specifications for materials, including requirements for emulsified asphalt, crumb rubber modifier, and application methods. Contractors must comply with Texas Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (2024), and provide all necessary equipment, labor, and materials. Insurance requirements include commercial general liability, workers' compensation, commercial automobile liability, and umbrella/excess liability coverage. The county reserves the right to award the contract in whole or in part, and bidders must meet minimum standards for responsible prospective bidders, including adequate financial resources, performance history, and compliance with local, state, and federal regulations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Legal_Notice.doc | DOC document | |
| W9_.pdf | ||
| CIQ_Form.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
For more information, please visit our online supplier portal, located at https://procurement.opengov.com/portal/collincountytx
Collin County, TX
INVITATION FOR BID
2025-094
TIRE RUBBER MODIFIED ASPHALT AND APPLICATION SERVICES
RELEASE DATE: June 10, 2025
RESPONSE DEADLINE: July 3, 2025, 2:00 pm
Please refer to the project timeline in this document for all important deadlines.
Invitation For Bid #2025-094 Title: Tire Rubber Modified Asphalt and Application Services
Table Of Contents
1. INTRODUCTION
2. SPECIAL CONDITIONS AND SPECIFICATIONS
3. INSURANCE REQUIREMENTS
4. PRICING TABLE
5. GENERAL INSTRUCTIONS
6. TERMS OF CONTRACT
7. VENDOR RESPONSE
Attachments:
A - CIQ Form (if applicable)
B - Legal Notice
C - W9
1. INTRODUCTION
1.1. SUMMARY
The intended purpose for this IFB is to provide the specifications to obtain an annual pricing contract for application of Tire Rubber Modified Surface Sealer (TRMSS) which will be applied as a fog seal system on
County roads as needed. A bid bond is not required. This bid is not for a specific project but to obtain pricing for service/materials that will be ordered on an as-needed basis only.
1.2. TIMELINE
Release Project Date: June 10, 2025
Question Submission Deadline: June 24, 2025, 12:00pm
Response Submission Deadline: July 3, 2025, 2:00pm
1.3. POINT OF CONTACT
Information regarding the procurement process and the contents of this IFB may be obtained from the Collin
County Purchasing Department or email gzimmel@co.collin.tx.us, G Zimmel, Buyer II.
2. SPECIAL CONDITIONS AND SPECIFICATIONS
2.1. AUTHORIZATION
By order of the Commissioners Court of Collin County, Texas sealed bids will be received for Tire Rubber
Modified Asphalt and Application Services.
2.2. PURPOSE
The intended use/purpose for this Invitation For Bid:
The intended purpose for this IFB is to provide the specifications to obtain an annual pricing contract for application of Tire Rubber Modified Surface Sealer (TRMSS) which will be applied as a fog seal system on
County roads as needed. A bid bond is not required. This bid is not for a specific project but to obtain pricing for service/materials that will be ordered on an as-needed basis only.
2.3. TERM
Provide for a one (1) year term contract commencing upon award with the option to renew for an additional four (4) one (1) year terms upon the approval of both parties.
2.4. FUNDING
Funds for payment for Collin County expenditures have been provided through the Collin County budget approved by the Commissioners Court for this fiscal year only. All other participating entities expenditures have been provided through their entity’s governing body for this fiscal year only. State of Texas statutes prohibit any obligation of public funds beyond the fiscal year for which a budget has been approved. Therefore, anticipated orders or other obligations that arise past the end of the current fiscal year shall be subject to budget approval.
2.5. PRICE REDUCTION
If during the life of the contract, the vendor's net prices to its customers for the same product(s) and/or services shall be reduced below the contracted price, it is understood and agreed that Collin County shall receive such price reduction.
2.6. PRICE REDETERMINATION
The bidder is to submit a bid that will be fixed for one (1) year. A price re-determination may be considered by
Collin County only at the anniversary date of the contract. On each anniversary date of the contract, the
Contractor may request a price redetermination in their bid, dependent upon fluctuations in the Producer
Price Index (PPI); Group: Maintenance and Repair Construction, Services; Series ID WPUIP2320002, as published by the U.S. Department of Labor, Bureau of Labor Statistics, Washington, D.C. 20212 at https://data.bls.gov/cgi-bin/srgate. Other documented price adjustments such as direct cost, labor, materials, and/or delivery costs may be considered at the County’s discretion.
https://urldefense.proofpoint.com/v2/url?u=https-3A__data.bls.gov_cgi-2Dbin_srgate&d=DwMGaQ&c=D-0IXqICE-NcgAMeQqfUIUglvOFWD-e2JSylf6Ne5tg&r=L2awYgiwG5HcUoNQkYm42rGr1fGN0D0iXsBl4avx_I4&m=QUryU6y_5pCMvCI0LkutKNw7-7mZfpFyPxxmm8w2gsI&s=EbqWqRRyYVsQtCVJ7yvItJ-47Ce4UwpFYAfwok0hCWo&e=
The Contractor has the sole responsibility to request, in letter form, an adjusted rate and shall provide a copy of the index and other supporting documentation necessary to support the redetermination with the request.
This request and documentation must be received at the office of the Purchasing Agent no later than ninety
(90) days before the anniversary date. To ensure timely delivery, certified mail is recommended. If the request is submitted and received within the required time frame, the adjustment will be submitted for processing.
Contractor will be notified in writing upon approval.
Should a contractor fail to submit the request and supporting documentation to the proper location ninety
(90) days before the anniversary date, contractor shall be deemed to have waived its right to any redetermination in price. The anniversary date will be the day the contract was awarded by Commissioners
Court of each year. The ‘base’ month for determining adjustments will be the sixth (6th) month prior to the anniversary date of the contract. The base month is fixed and will not be adjusted year to year. The adjustments will be based on the difference in the base month for each applicable year and will become effective on the first day of the anniversary month. If the contract allows for an adjustment after the first year, it would be based on documented pricing adjustments at the sixth month period compared to the same month of the prior year.
2.7. APPROXIMATE VALUE/USAGE
Estimated annual value of this contract is $5,100,000 but varies per year based on usage. Estimated annual quantities do not constitute an order, but only implies the probably quantity the County will use. Items will be ordered on an as-needed basis only.
2.8. EVALUATION AND AWARD
Award of this contract shall be made to the responsive bidder(s) who submits the lowest and best bid meeting specifications. Collin County reserves the right to award the bid, or reject, by line item, category, or as a whole as the County deems in its best interest. Collin County further reserves the right to make a primary and secondary award on this contract.
2.9. COMPLETION/RESPONSE TIME
Vendor shall complete services at the County's designated location(s) by the date listed on the purchase order.
2.10. SERVICE LOCATIONS
Locations for service within Collin County will be stated on each purchase order.
2.11. TESTING
Testing may be performed at the request of Collin County, by an agent so designated by the County, without expense to Collin County.
2.12. SAMPLES/DEMOS
When requested, samples/demos shall be furnished to the County at no expense.
2.13. PAYMENT
Payment for the work specified herein will be made on the pertinent Purchase Order, after completion and acceptance of required paperwork, at the unit prices specified in the pricing schedule. No additional fees are allowed. Invoices must be fully documented as to labor and materials and must reference the Collin County
Purchase Order number and contain corresponding PO line and item numbers. No payment shall be made on invoices not having the proper inspection forms with the signature of the Collin County Inspector and the signature of the vendor attached.
2.14. OWNER/REPRESENTATIVE
“Owner” shall refer to Collin County. “Representative” in these specifications shall be understood as referring to the Collin County Public Works Department.
2.15. EXISTING STRUCTURES
All existing structures, improvements, and utilities shall be adequately protected, at the expense of the
Contractor, from damage that might otherwise occur due to construction operations. Where construction comes in close proximity to existing structures or utilities, or if it becomes necessary to move services, poles, guy wires, pipe lines, or other obstructions, it shall be the Contractor’s responsibility to notify and cooperate with the utility or structure owner. The utility lines and other existing structures shown on the plans are for information only and are not guaranteed by the County to be complete or accurate as to location and/or depth. It will be the Contractor’s responsibility to verify locations and depths sufficiently in advance of construction such that necessary adjustments may be made to allow for the proper installation. The
Contractor shall be liable for damage to any utilities resulting from this operation.
2.16. RELOCATING OR REPLACING UTILITIES
Unless noted on the plans that utilities are to be moved by others, any cost of temporarily or permanently relocating utilities shall be borne by the Contractor. The cost of these relocations shall be included in the
Contractor’s bid price. In case damage to an existing structure or utility occurs, whether such damage results directly or indirectly from the Contractor’s operations, the Contractor shall restore the structure or utility to its original condition and position without extra compensation.
2.17. WATER FOR CONSTRUCTION
All water required shall be furnished by the Contractor at the Contractor's expense.
2.18. SAFETY RESTRICTION-WORK NEAR HIGH VOLTAGE LINES
The following procedures will be followed on this contract:
A warning sign of not less than five inches (5”) by seven inches (7”) painted yellow with black letters that are legible at twelve feet (12’) shall be placed inside and outside vehicles such as cranes, derricks, power shovels, drilling rigs, pile drivers, hoisting equipment or similar apparatus. The warning sign shall read as follows:
”WARNING-UNLAWFUL TO OPERATE THIS EQUIPMENT WITHIN SIX FEET OF HIGH VOLTAGE LINES.”
Equipment that may be operated within ten feet (10’) of high voltage lines shall have an insulating cage-type of guard about the boom or arm, except back hoes or dippers, and insulator links on the lift hook connections.
When necessary to work within six feet (6’) of high voltage electric lines, notifications shall be given to respective power company who will erect temporary mechanical barriers, de-energize the line, or raise or lower the line. The work done by the power company shall not be at the expense of the Collin County. The notifying department shall maintain an accurate log of all such calls to respective power company, and shall record action taken in each case.
The Contractor is required to make arrangements with the respective power company for the temporary relocation or rising of high voltage lines at the Contractor’s sole cost and expense.
No person shall work within six feet (6’) of high voltage line without protection having been taken as outlined in these specifications.
All Occupational Safety & Hazard Association (OSHA) requirements shall be followed for this and all other construction activity related to this contract.
2.19. NOTIFICATION AND SAFETY OF CITIZEN VEHICLES
It shall be the responsibility of the Contractor to ensure the safety of the citizens’ vehicles. The Contractor should place signs in appropriate places, notify the citizens, have pilot cars and any other applicable means of maintaining the safety of the citizens’ vehicles on the roads where work is being performed. It shall be the responsibility of the Contractor to make all notifications at least forty-eight (48) hours prior to beginning work.
2.20. CONSTRUCTION SCHEDULE
It shall be the responsibility of the Contractor to furnish the County Representative, prior to construction, a schedule outlining the anticipated time each phase of construction will begin and be completed including sufficient time being allowed for clean-up. It shall also be the responsibility of the Contractor to coordinate construction with other contractors involved in this or adjacent projects.
2.21. EXAMINATION OF SITE
Contractor shall make a careful examination of the entire site of the project and shall make such explorations as may be necessary to determine methods of providing ingress-egress to private as well as public property;
methods of handling traffic during construction and maintenance of the entire project as well as any section thereof, protection of all existing structures both above and below ground; how the plans fit the proposed project and especially if any discrepancies exist.
2.22. SUPERVISION AND INSPECTION
The work shall be inspected in accordance with specific requirements herein and any additional requirements imposed by Collin County. Inspection shall be performed by the County. No changes to the plans or specifications shall be authorized without specific approval of the County Representative.
2.23. WASTE MATERIAL
All excess excavation and other waste material shall be disposed of at locations approved by the County at the
Contractor’s expense. All material shall be spread in uniform layers over the area being filled and shall be disposed of in such a manner as to present a neat appearance and to not obstruct property drainage or to cause injury to street improvements or to abutting property. The Contractor shall assume full responsibility for the disposal of the waste material. Waste material shall not be disposed of in FEMA designated floodplain or floodway.
2.24. PERMIT FEES
The Contractor shall be responsible for the payment of any and all required City, County, or State fees as may be required.
2.25. CONTRACTOR’S DUTY
The Contractor is and at all times shall remain an independent contractor, solely responsible for the manner and method of completing his work under this contract, with full power and authority to select the means, method and manner of performing such work, so long as such methods do not adversely affect the completed improvements, the County being interested only in the result obtained and conformity of such completed improvements to the Plans, Specifications and Contract.
Likewise, the contractor shall be solely responsible for the safety of himself, his employees and other persons, as well as for the protection of the safety of the improvements being erected and the property of himself or any other person, as a result of his operations hereunder Contractor shall be fully and completely liable, at his own expense, for design, construction, installation and use, or non-use, of all items and methods incident to performance of the contract, and for loss, damage or injury incident thereto, either to person or property, including, without limitation, the adequacy of all temporary supports, shoring, bracing, scaffolding, machinery or equipment, safety precautions or devices, and similar items or devices used by him during construction.
Any review of work in progress, or any visit or observation during construction, or any clarification of Plans and Specifications, by the County, or any agent, employee, or representative of either of them, whether through personal observation on the project site or by means of approval of shop drawings for temporary construction or construction processes, or by other means or method, is agreed by the Contractor to be for the purpose of observing the extent and nature of work to be completed or being performed, as measured against the purpose of enabling the Contractor to more fully understand the Plans and Specifications so that the completed construction work will conform thereto, and shall in no way relieve the Contractor from full and complete responsibility for the proper performance of his work on the project, including but without limitation of the propriety of means and methods of the Contractor in performing said contract, and the adequacy of any designs, plans or other facilities for accomplishing such performance. Deviation by the
Contractor from Plans and Specifications that may have been in evidence during any such visitation or observation by the Owner, or any of his Representatives whether called to the Contractor’s attention or not shall in no way relieve the Contractor from his responsibility to complete all work in accordance with said
Plans and Specifications.
2.26. SUBCONTRACTORS
Contractor shall state names of all subcontractors and the type of work they will be performing. If a Contractor fails to specify a subcontractor, then he shall be deemed to have agreed that he is fully qualified to perform the contract himself, and that he will fully perform the contract himself.
No Contractor whose bid is accepted shall (a) substitute any subcontractor, or (b) permit a subcontract to be voluntarily assigned or transferred or allow it to be performed by anyone other than the original subcontractor listed in the original bid without approval in writing from the Collin County Purchasing
Department.
The successful Contractor further agrees that Collin County and its agents, servants and employees shall not be liable for any loss or damage resulting from personal injury, physical loss, harassment of or discrimination against employee or other violations of the provisions of this contract occasioned by the acts or omissions of the successful Contractor’s sub-contractors, their agents or employees. The indemnification provisions of this contract shall apply to all sub-contractors.
2.27. CONTRACTOR'S UNDERSTANDING
It is understood and agreed that the Contractor has, by careful examination, satisfied himself as to the nature and location of the work, the conformation of the ground, and character, quality and quantity of the materials to be encountered, the character of equipment and facilities needed preliminary to and during the prosecution of the work, the general and local conditions, and all other matters which can in any way affect the work under this contract. No verbal agreement or conversation with any officer, agent, or employee of the
County whether before or after the execution of this contract, shall affect or modify any of the terms or obligations herein contained.
2.28. HOURS OF WORK
All work shall be done between the hours of 9:00 a.m. and 4:00 p.m. Exceptions to this must be approved by the County’s Representative. No work on Saturday, Sunday, or County Holidays will be permitted, unless approved by the Director of Public Works.
2.29. CLEAN-UP OF THE SITE AND DISPOSAL OF EXCESS MATERIAL
Clean-up of the site and disposal of excess material shall be considered incidental to, and part of the price bid without separate payment. This shall include the clean-up of the area where the Contractor may have stored their material, tools, trucks, etc. (for example Collin County Stockpile, if that is the place that is mutually agreed upon, as well as any other site used).
2.30. CLEANUP FOR FINAL ACCEPTANCE
The Contractor shall make a final cleanup of all parts of the work before final acceptance is made by the
Representative and payment is made by the Owner. This cleanup shall include removal of all objectionable rocks, pieces of asphalt or concrete, and other construction materials, i.e., from the road work site, and in general preparing the site of the work in an orderly manner and appearance.
2.31. ADDITIONAL SPECIFICATIONS
1. The County shall designate a Road and Bridge employee as an inspector that will communicate with
Contractor and inspect work done by the Contractor. Inspector will determine if work is approved according to specifications.
2. The Contractor shall notify abutting property owners of upcoming fog seal operations by means of door hangers. Notification shall be distributed at least forty-eight (48) hours prior to fog seal application.
3. Contractor will coordinate daily with the County for a listing of residences that have received advanced notice of fog seal operations. Contractor shall not begin fog seal operations on streets in which no advanced notice has been provided to the residents.
4. The day of the fog seal applications, all residences shall be informed by the Contractor that the application is about to occur and to relocate their vehicles if they anticipate needing to leave their home in the next 3-4 hours.
5. Contractor shall arrange the fog seal operations in such a manner as to avoid excessive inconvenience to the public.
6. Contractor shall not apply a fog seal the day before or the actual day that a street is to receive garbage, recycling or waste collection. Contractor shall research the applicable garbage, recycling or waste collection schedule for each street prior to bidding.
7. Care shall be exercised to prevent damage to all property in and around the construction zone.
Contractor shall be liable for the repair and restoration of any property damaged as a result of the
Contractor’s prosecution of work.
8. Contractor shall designate a responsible person for receiving and resolving damage claims from the public, including but not limited to, cleaning vehicles. This person must be available to receive calls during normal business hours every day, Monday through Friday, during the course of this project.
Prior to beginning work, this person’s name, mailing address and telephone number will be furnished to the County to be made available to persons who contact the Road and Bridge Department with claims. This shall include but is not limited to, re-vegetation of all areas damaged or destroyed by construction. Contractor will be held liable and responsible for such areas until growth is reestablished to the satisfaction of the County. Ornamental landscape plantings of trees, shrubs and grasses that are damaged or destroyed during construction shall be replaced with plant material of comparable size and quality approved by the County.
9. Contractor shall monitor and prevent its employees and any of its sub- contractors from urinating or defecating on property in, on or adjacent to the areas in which work is being performed.
10. A meeting will be held to discuss traffic control, traffic safety, construction sequences and materials prior to the start of all service periods. The Contractor shall provide the County with contact information for the superintendent over the services for the duration of this contract. Contractor shall coordinate all work schedules with the assigned inspector and update any changes to the schedule with the assigned inspector.
2.32. MATERIALS
1. All materials required for each item of the project(s) shall be provided by the Contractor unless otherwise stated on the purchase order and shall meet all specifications and guidelines in accordance with “Texas Standard Specifications for Construction and Maintenance of Highways, Streets And
Bridges, 2024”. The following items are noted:
o Asphalts, Oils and Emulsions ITEM 300 – Asphalts, Oils and Emulsions: For this project , Item 300, “Asphalts, Oils and Emulsions”, of standard Specifications, is hereby amended with respect to the clauses cited below, and no other clauses or requirements of this item are waived or changed hereby.
o An abrasive fine aggregate shall be applied with the fog seal to all existing fine graded surfaces.
Application of abrasives fine aggregate will not be paid for separately, but should be considered incidental to this item.
o Use emulsified asphalt of the type and grade shown on the plans that meet the plans requirements of item 300, “Asphalts, Oils and Emulsion”.
o Provide water free of industrial wastes and other objectionable matter.
o Use a quality of emulsified asphalt in the mixture, expressed as a percentage of total volume, which meets the percentage shown on the plans or directed.
2.33. MATERIALS
Article 300 2.4 Emulsified Asphalt is supplemented by the following:
2.34. TABLE 8 -- CATIONIC EMULSIFIED ASPHALT
Type–Grade
Property Test
Procedure
Rapid-
Setting
Medium-
Setting
Slow-Setting
CRS-2 CMS-2 CSS-1 CSS-1H
Min Max Min Max Min Max Min Max
Viscosity, Saybolt Furol T 72
77°F, sec. – – – – 20 100 20 100
122°F, sec. 150 400 100 350 – – – –
Sieve test, % T 59 – 0.1 – 0.1 – 0.1 – 0.1
Cement mixing, % T 59 – – – – – 0.2 – 0.2
Coating ability and water resistance:
T 59
Dry aggregate/after spray – Good/Fair – –
Wet aggregate/after spray – Fair/Fair – –
Demulsibility, 35 mL of
0.8% Sodium dioctyl sulfosuccinate, %
T 59 70 – – – – – – –
Storage stability, 1 day, % T 59 – 1 – 1 – 1 – 1
Particle charge T 59 Positive Positive Positive Positive
Distillation test:
T 59
Residue by distillation, % by wt.
65 – 65 – 60 – 60 –
Oil distillate, % by volume of emulsion
– 0.5 – 7 – 0.5 – 0.5
Tests on residue from distillation:
Penetration, 77°F, 100 g, 5 sec.
T 49 90 160 90 200 90 160 40 110
Solubility, % T 44 97.5 – 97.5 – 97.5 – 97.5 –
Ductility, 77°F, 5 cm/min., cm
T 51 100 – 100 – 100 – 80 –
2.35. MATERIALS
Article 300 2.5 Emulsions - Specialty emulsions must contain a minimum of 10% tire rubber content and also must meet the requirements of Table 11 or 11A.
Article 3002.5 is supplemented by the following:
2.36. TABLE 11 - SPECIALTY EMULSIONS
Property
Test Procedure
Type–Grade
Medium-Setting Slow-Setting
AE–P EAP&T PCE1
Min Max Min Max Min Max
Viscosity, Saybolt Furol T 72
77°F, sec. – – – – 10 100
122°F, sec. 15 150 – – – –
Sieve test, % T 59 – 0.1 – 0.1 – 0.1
Miscibility2 T 59 – Pass Pass
Demulsibility, 35 mL of 0.10 N CaCl2, % T 59 – 70 – – – –
Storage stability, 1 day, % T 59 – 1 – 1 – –
Particle size,5 % by volume < 2.5 mm Tex-238-F3 – – 90 – 90 –
Asphalt emulsion distillation to 500°F followed by Cutback asphalt distillation of residue to
680°F:
T 59 and T 78
Residue after both distillations, % by wt. 40 – – – – –
Total oil distillate from both distillations, % by volume of emulsion
25 40 – – – –
Residue by distillation, % by wt. T 59 – – 60 – – – http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/200-F_series/pdfs/bit238.pdf
Residue by evaporation,4 % by wt. T 59 – – – – 60 –
Tests on residue after all distillation(s):
Viscosity, 140°F, poise T 202 – – 800 – – –
Kinematic viscosity,5 140°F, cSt T 201 – – – – 100 350
Flash point C.O.C., °F T 48 – – – – 400 –
Solubility, % T 44 97.5 – – – – –
Float test, 122°F, sec. T 50 50 200 – – – –
1. Supply with each shipment of PCE:
o a copy of a lab report from an approved analytical lab, signed by a lab official, indicating the PCE formulation does not meet any characteristics of a Resource Conservation Recovery Act (RCRA) hazardous waste;
o a certification from the producer that the formulation supplied does not differ from the one tested and that no listed RCRA hazardous wastes or Polychlorinated Biphenyls have been mixed with the product; and o a Safety Data Sheet.
2. Exception to T 59: In dilution, use 350 mL of distilled or deionized water and a 1,000-mL beaker.
3. Use Tex-238-F, beginning at “Particle Size Analysis by Laser Diffraction,” with distilled or deionized water as a medium and no dispersant, or use another approved method.
4. Exception to T 59: Leave sample in the oven until foaming ceases, then cool and weigh.
5. PCE must meet either the kinematic viscosity requirement or the particle size requirement.
2.37. TABLE 11A - HARD RESIDUE SURFACE SEALANT
Property Test Procedure HRSS
Min Max
Viscosity, Krebs unit, 77°F, Krebs units D 562 45 75
Softening point, °F Tex-505-C1 250 –
Uniformity D 2939 Pass2
Resistance to heat D 2939 Pass3
Resistance to water D 2939 Pass4 http://ftp.dot.state.tx.us/pub/txdot-info/cst/TMS/200-F_series/pdfs/bit238.pdf https://ftp.txdot.gov/pub/txdot-info/cst/TMS/500-C_series/pdfs/aph539.pdf
Wet flow, mm D 2939 – 0
Resistance to Kerosene (optional)5 D 2939 Pass6
Ultraviolet exposure, UVA-340, 0.77 W/m2, 50°C chamber, 8 hr. UV lamp, 5 min. spray, 3
hr. 55 min. condensation, 1,000 hr. total exposure7
G 154 Pass8
Abrasion loss, 1.6 mm thickness, liquid only, % ISSA TB-100 – 1.0
Residue by evaporation, % by weight D 2939 33 –
Tests on residue from evaporation:
Penetration, 77°F, 100 g, 5 sec. T 49 15 30
Flash point, Cleveland open cup, °F T 48 500 –
Tests on base asphalt before emulsification
Solubility, % T 44 98 –
1. Cure the emulsion in the softening point ring in a 200 ± 5°F oven for 2 hr.
2. Product must be homogenous and show no separation or coagulation that cannot be overcome by moderate stirring.
3. No sagging or slippage of film beyond the initial reference line.
4. No blistering or re-emulsification.
5. Recommended for airport applications or where fuel resistance is desired.
6. No absorption of Kerosene into the clay tile past the sealer film. Note sealer surface condition and loss of adhesion.
7. Other exposure cycles with similar levels of irradiation and conditions may be used with Department approval.
8. No cracking, chipping, surface distortion, or loss of adhesion. No color fading or lightening.
2.38. MATERIALS
Article 300 2.8 Crumb Rubber Modifier (CRM) - CRM consists of automobile and truck tires processed by ambient temperature grinding.
Article 300 2.8 is supplemented by the following:
2.39. TABLE 14 - CRM GRADATIONS
Sieve Size (%
Passing)
Grade A Grade B Grade C Grade D Grade E
Min Max Min Max Min Max
As shown on the plans
As approved #8 100 – – – – –
#10 95 100 100 – – –
#16 – – 70 100 100 –
#30 – – 25 60 90 100
#40 – – – – 45 100
#50 0 10 – – – –
#200 – – 0 5 – –
2.40. EQUIPMENT
1. Contractor shall furnish the necessary facilities and equipment for determining the temperature of the mixture, regulating the application rate, and securing uniformity at the junction of two distributor loads. The vendor shall ensure that all equipment provided under this contract is in fully operational and functional condition at all times during the service period.
2. All construction equipment involved in roadway work shall be equipped with permanently mounted three-hundred-sixty (360) degree revolving or strobe warning light with amber lens. The light shall have a minimum lens height of five (5) inches. This light shall have a mounting height of not less than six (6) feet above the roadway surface and shall be visible from all sides. This equipment shall have attached at each side of the rear end of the vehicle an approved orange warning flag mounted not less than six (6) feet above the roadway surface.
3. Ensure equipment and materials are a minimum ten (10) feet from the edge of the traveled roadway during non-working hours. The contractor is responsible for obtaining permission to park outside of the right-of-way, on private property, from the property owner.
4. Remove from the roadway and store in a central location approved by the County all temporary traffic control devices, such as cones, barrels, portable signs, vertical panels, etc., which will not be used in twenty-four (24) hours. This includes removal of temporary traffic control devices from the roadway over the weekend.
5. Contactor’s equipment and vehicles shall not be maintained on site during construction, except at designated maintenance sites as approved by the County or the County employee assigned to the projects by the County.
2.41. CONSTRUCTION
1. Remove or protect existing raised pavement markers. Repair any damage incurred by removal as directed. Remove dirt, dust or other harmful material before sealing following “Texas Standard
Specifications for Construction and Maintenance of Highways, Streets And Bridges, 2024” Item 738
Cleaning and Sweeping Highways prior to starting application.
2. Apply the mixture when the air temperature is 60 degrees Fahrenheit and above, or above 50 degrees
Fahrenheit and rising. Measure the air temperature in the shade away from artificial heat. The County will determine when weather conditions are suitable for application. The County will select the application temperature within the limits recommended in Item 300, “Asphalts, Oils and Emulsions”.
Apply the material within 15 degrees Fahrenheit of the selected temperature.
3. Adjust the shot width so operations do not encroach on traffic. Use paper or other approved material at beginning and end of echo shot to construct a straight transverse joint and prevent overlapping applied material. Use sufficient pressure to flare the nozzles fully. Distribute material at the rate shown on the plans or as directed. When an excessive quantity of asphalt is applied, furnish and uniformly distribute clean, fine sand on the surface to blot the excess. Maintain ingress and egress as directed by applying sand to freshly sealed areas.
4. Do not apply asphalt to the roadways until traffic control methods and devices are in place as shown in the plans or as directed. Do not open the treated surface to traffic until directed by the County. Area shall not be opened to traffic until the material is cured and it will not track or get on vehicles.
5. This item will be measured by the square yard of specialty emulsified asphalt used in the specialty emulsified asphalt and water mixture. The work performed and the materials furnished in accordance with this item and measured will be paid for at the unit price bid for fog seal of the type and grade specified. This price is full compensation for materials, equipment, labor, tools and incidentals.
6. Perform all construction work in daylight hours unless the County approves nighttime work in writing.
Remove all construction equipment from the road thirty (30) minutes prior to sunset and determined by National Oceanic and Atmospheric Administration (NOAA).
2.42. TRAFFIC CONTROL PLAN (TCP)
1. Work shall not be permitted without adequate traffic control devices in place. Project site traffic control plan (TCP) shall be the sole responsibility of the contractor which includes the use of flag persons in accordance with the latest version of “2011 Texas Manual on Uniform Traffic Control
Devices, revision 2" (TMUTCD).
2. Barricades and warning signs shall be placed in accordance with the requirements of Collin County and
TMUTCD.
3. The Contractor superintendent and person responsible for TCP compliance must be available by local telephone twenty-four (24) hours a day. The contractor’s responsible person (CRP) must respond on the project to traffic control needs within thirty (30) minutes of being notified.
4. Contractor shall provide all traffic control measures to prosecute the work.
5. Contractor shall assign at least one competent employee to each road that has received a fog seal application but has not yet been opened to traffic. This employee will ensure that traffic does not drive on the non-cured fog seal. Traffic control suitable methods shall be used by the Contractor to protect the fog seal from all types of vehicular traffic without damage. Opening to traffic does not constitute acceptance of the work. The County shall be notified of the methods to be used.
6. In areas which are subject to an increased rate of sharp turning vehicles, additional time may be required for a more complete cure of the fog seal mat to prevent damage. Slight tire marks may be evident in these areas after opening but will diminish over time will rolling traffic. If these areas are not severely rutted, they should be considered as normal characteristics of a fog seal and should be accepted.
7. The Contractor will be required to maintain a minimum of one through lane in each direction during daylight hours, on all roadways, except with the written approval by the assigned County inspector.
8. Two lane roadways shall use single lane traffic control, which will require the use of flagmen. This shall not be paid for directly, but shall be considered subsidiary to bid item emulsified fog seal.
9. Qualify all flaggers used on this project to perform flagging duties as specified in the plans. Provide a list of qualified flaggers, which must all speak and understand English, prior to beginning any road work activities which require flagging. Provide any modifications to the County. Provide flaggers with a slow stop paddle in lieu of the standard flag and with an approved flagging vest and hard hat.
3. INSURANCE REQUIREMENTS
1. Before commencing work, the vendor shall be required, at its own expense, to furnish the Collin County
Purchasing Agent with certified copies of all insurance certificate(s) indicating the coverage to remain in force throughout the term of this contract.
1. Commercial General Liability insurance including but not limited to the coverage indicated below. Coverage shall not exclude or limit Products/Completed Operations, Contractual Liability, or
Cross Liability. Coverage must be written on occurrence form.
Each Occurrence $1,000,000
Personal Injury &Adv Injury $1,000,000
Products/Completed Operation Aggregate $2,000,000
General Aggregate $2,000,000
2. Workers Compensation insurance as required by the laws of Texas, and Employers’ Liability.
Employers Liability
Liability, Each Accident $500,000
Disease - Each Employee $500,000
Disease - Policy Limit $500,000
iii. Commercial Automobile Liability insurance which includes any automobile (owned, non-owned, and hired vehicles) used in connection with the contract.
Combined Single Limit - Each Accident $1,000,000
iv. Umbrella/Excess Liability insurance
Each Occurrence/Aggregate $1,000,000
2. With reference to the foregoing insurance requirement, the vendor shall endorse applicable insurance policies as follows:
i. A waiver of subrogation in favor of Collin County, its officials, employees, volunteers and officers shall be provided for General Liability, Commercial Automobile Liability, and Workers’ Compensation.
ii. The vendor's insurance coverage shall name Collin County as additional insured under the General Liability policy.
iii. All insurance policies shall be endorsed to require the insurer to immediately notify Collin County of any decrease in the insurance coverage limits.
iv. All insurance policies shall be endorsed to the effect that Collin County will receive at least thirty (30) days notice prior to cancellation, non-renewal or termination of the policy.
v. All copies of Certificates of Insurance shall reference the project/contract number.
3. All insurance shall be purchased from an insurance company that meets the following requirements:
i. A financial rating of A-VII or higher as assigned by the BEST Rating Company or equivalent.
4. Certificates of Insurance shall be prepared and executed by the insurance company or its authorized agent, and shall contain provisions representing and warranting the following:
i. Sets forth all endorsements and insurance coverages according to requirements and instructions contained herein.
ii. Sets forth the notice of cancellation or termination to Collin County.
4. PRICING TABLE
TIRE RUBBER MODIFIED ASPHALT AND APPLICATION SERVICES
Line Item Description Quantity Unit of
Measure Unit Cost Total No Bid
1 TRMSS - Vendor performs work with
County provided material
1 SQUARE
YARD
2 TRMSS-FDR Application
- Vendor performs work with County provided material
3 CRS-2TR - Vendor performs work with
County provided material
4 Temporary tabs -
Vendor performs work with County provided material
1 EACH
5 TRMSS - Vendor performs turnkey application
2,800,000 SQUARE
6 TRMSS-FDR Application
- Vendor performs turnkey application
7 CRS-2TR - Vendor performs turnkey application
50,000 SQUARE
8 Temporary tabs -
Vendor performs turnkey application
15,000 EACH
TOTAL
5. GENERAL INSTRUCTIONS
5.1. DEFINITIONS
1. Bidder: refers to submitter.
2. Vendor/Contractor/Provider: refers to a Successful Bidder/Contractor/Service Provider.
3. Submittal: refers to those documents required to be submitted to Collin County, by a Bidder.
4. IFB: refers to Invitation For Bid.
5.2. GENERAL INSTRUCTIONS
1. If Bidder does not wish to submit an offer at this time, please submit a No Bid.
2. Awards shall be made not more than ninety (90) days after the time set for opening of Submittals.
3. Collin County is always conscious and extremely appreciative of your time and effort in preparing your
Submittal.
4. Collin County exclusively uses OpenGov eProcurement for the notification and dissemination of all solicitations. The receipt of solicitations through any other company may result in your receipt of incomplete specifications and/or addenda which could ultimately render your bid non-compliant.
Collin County accepts no responsibility for the receipt and/or notification of solicitations through any other company.
5. A bid may not be withdrawn or canceled by the bidder prior to the ninety-first (91st) day following public opening of Submittals and only prior to award.
6. It is understood that Collin County, Texas reserves the right to accept or reject any and/or all Bids for any or all products and/or services covered in an Invitation For Bid (IFB), and to waive informalities or defects in Submittals or to accept such Submittals as it shall deem to be in the best interest of Collin
County.
7. All IFBs submitted in hard copy paper form shall be submitted in a sealed envelope, plainly marked on the outside with the IFB number and name. A hard copy paper form Submittal shall be manually signed in ink by a person having the authority to bind the firm in a contract. Submittals shall be mailed or hand delivered to the Collin County Purchasing Department.
8. Submittals via email, oral, telegraphic or telephonic will not be accepted. IFBs may be submitted in electronic format via https://procurement.opengov.com/portal/collincountytx/projects/154872.
9. All IFBs submitted electronically via the eProcurement Portal shall remain locked until official date and time of opening as stated in the Special Terms and Conditions of the IFB.
10. Time/date stamp clock in Collin County Purchasing Department shall be the official time of receipt for all IFBs submitted in hard copy paper form only, no flash drives, CD-ROMs or any other form of “plug and play” portable storage device will be accepted as a Submittal. IFBs received in the Collin County
Purchasing Department after submission deadline shall be considered void and unacceptable. Absolutely no late Submittals will be considered. Collin County accepts no responsibility for technical difficulties related to electronic Submittals.
11. For hard copy paper form Submittals, any alterations made prior to opening date and time must be initialed by the signer of the IFB guaranteeing authenticity. Submittals cannot be altered or amended after submission deadline.
12. Collin County is by statute exempt from the State Sales Tax and Federal Excise Tax; therefore, the prices submitted shall not include taxes.
13. Any interpretations, corrections and/or changes to an IFB, and related Specifications or extensions to the opening/receipt date will be made by addenda to the respective document by the Collin County
Purchasing Department. Questions and/or clarification requests must be submitted no later than the date specified in the solicitation. Those received at a later date may not be addressed prior to the public opening. Sole authority to authorize addenda shall be vested in Collin County Purchasing Agent as entrusted by the Collin County Commissioners Court. Addenda may be transmitted electronically via
Collin County eProcurement Portal.
14. Addenda will be transmitted to all that are known to have received a copy of the IFB and related
Specifications. However, it shall be the sole responsibility of the Bidder to verify issuance/non-issuance of addenda and to check all avenues of document availability (i.e. the eProcurement portal, telephoning Purchasing Department directly, etc.) prior to opening/receipt date and time to insure
Bidder’s receipt of any addenda issued. Bidder shall acknowledge receipt of all addenda.
15. All materials and services shall be subject to Collin County approval.
16. Collin County reserves the right to make award in whole or in part as it deems to be in the best interest of the County.
17. Any reference to model/make and/or manufacturer used in specifications is for descriptive purposes only. Products/materials of like quality will be considered.
18. Bidders offering substitutions to the specifications shall do so at their own risk. By offering substitutions, Bidder shall state these in the section provided in the IFB or by attachment. Substitution, if accepted, must meet or exceed specifications stated therein. Collin
County reserves the right to accept or reject any and/or all of the substitution(s) deemed to be in the best interest of the County.
19. Minimum Standards for Responsible Prospective Bidders: A prospective Bidder must meet the following minimum requirements:
i. have adequate financial resources, or the ability to obtain such resources as required;
ii. be able to comply with the required or proposed delivery/completion schedule;
iii. have a satisfactory record of performance;
iv. have a satisfactory record of integrity and ethics;
v. be otherwise qualified and eligible to receive an award.
20. Collin County may request documentation and other information sufficient to determine Bidder's ability to meet these minimum standards listed above.
21. Vendor shall bear any/all costs associated with its preparation of an IFB.
22. Public Information Act: Collin County is governed by the Texas Public Information Act, Chapter 552 of the Texas Government Code. All information submitted by prospective Bidders during the bidding process is subject to release under the Act.
23. The Bidder shall comply with Commissioners Court Order No. 2004-167-03-11, County Logo Policy.
24. Interlocal Agreement: Successful Bidder agrees to extend prices and terms to all entities that has entered into or will enter into joint purchasing interlocal cooperation agreements with Collin County.
Delivery to governmental entities located within Collin County will be at no additional charge or as otherwise provided for in the award document. Delivery charges, if any, for governmental entities located outside of Collin County shall be negotiated between the Vendor and each governmental entity.
25. Bid Openings: All bids submitted will be read at the County’s regularly scheduled bid opening for the designated project. However, the reading of a bid at bid opening should be not construed as a comment on the responsiveness of such bid or as any indication that the County accepts such bid as responsive.
26. The County will make a determination as to the responsiveness of bids submitted based upon compliance with all applicable laws, Collin County Purchasing Guidelines, and project documents, including but not limited to the project specifications and contract documents. The County will notify the successful Bidder upon award of the contract and, according to state law; all bids received will be available for inspection at that time.
27. Bidder shall comply with all local, state and federal employment and discrimination laws and shall not discriminate against any employee or applicant for employment because of race, color, religion, sex, age, national origin or any other class protected by law.
6. TERMS OF CONTRACT
6.1. TERMS OF CONTRACT
1. A bid, when properly accepted by Collin County, shall constitute a contract equally binding between the Vendor/Contractor/Provider and Collin County. No different or additional terms will become part of this contract with the exception of a Change Order.
2. No oral statement of any person shall modify or otherwise change, or affect the terms, conditions or specifications stated in the resulting contract. All Amendments and/or Change Orders to the contract will be made in writing by Collin County Purchasing Agent.
3. No public official shall have interest in the contract, in accordance with Local Government Code Title 5, Subtitle C, Chapter 171.
4. The Vendor/Contractor/Provider shall comply with Commissioners’ Court Order No. 96-680-10-28, Establishment of Guidelines & Restrictions Regarding the Acceptance of Gifts by County Officials &
County Employees.
5. Design, strength, quality of materials and workmanship must conform to the highest standards of manufacturing and engineering practice.
6. Bids must comply with all federal, state, county and local laws concerning the type(s) of product(s)/service(s)/equipment/project(s) contracted for, and the fulfillment of all ADA (Americans with Disabilities Act) requirements.
7. All products must be new and unused, unless otherwise specified, in first-class condition and of current manufacture. Obsolete products, including products or any parts not compatible with existing hardware/software configurations will not be accepted.
8. Vendor/Contractor/Provider shall provide any and all notices as may be required under the Drug-Free
Work Place Act of 1988, 28 CFR Part 67, Subpart F, to its employees and all sub-contractors to insure that Collin County maintains a drug-free work place.
9. Vendor/Contractor/Provider shall defend, indemnify and save harmless Collin County and all its officers, agents and employees and all entities, their officers, agents and employees who are participating in this contract from all suits, claims, actions, damages (including personal injury and or property damages), or demands of any character, name and description, (including attorneys’ fees, expenses and other defense costs of any nature) brought for or on account of any injuries or damages received or sustained by any person, persons, or property on account of Vendor/Contractor/Provider’s breach of the contract arising from an award, and/or any negligent act, error, omission or fault of the
Vendor/Contractor/Provider, or of any agent, employee, subcontractor or supplier of
Vendor/Contractor/Provider in the execution of, or performance under, any contract which may result from an award. Vendor/Contractor/Provider shall pay in full any judgment with costs, including attorneys’ fees and expenses which are rendered against Collin County and/or participating entities arising out of such breach, act, error, omission and/or fault.
10. Expenses for Enforcement. In the event either Party hereto is required to employ an attorney to enforce the provisions of this Agreement or is required to commence legal proceedings to enforce the provisions hereof, the prevailing Party shall be entitled to recover from the other, reasonable attorney's fees and court costs incurred in connection with such enforcement, including collection.
11. If a contract, resulting from a Collin County IFB is for the execution of a public work, the following shall apply:
12. In accordance with section 2253.021 of the Texas Government Code, a governmental agency that makes a public work contract with a prime contractor shall require the contractor, before beginning work, to execute to the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .