Tile_Refractory_Technical_Description.docx
DOCX document 41 KB Posted
- Solicitation number
- 25-P-00198
- Issued by
- Hillsborough County, Florida
About this file
This is a technical specification document for tile and refractory work for the City of Tampa's McKay Bay Waste to Energy (WTE) Facility located in Tampa, Florida. The contract seeks a contractor to provide refractory installation and sandblasting services across eight scheduled maintenance outages per calendar year, involving work on four different boilers. Each outage is estimated to require twelve 12-hour shifts with twelve workers, totaling approximately 13,824 labor hours annually. The work includes refractory demolition, tile installation, plastic ram application, non-code anchor welding, and sandblasting of specific boiler areas. The contractor must have five years of experience in refractory installation and sandblasting for waste-to-energy facilities and be licensed to do business in Florida.
The bid is structured across five divisions: labor costs for scheduled outages, labor costs for emergency/unplanned work, tile/refractory materials, materials cost markup, and rental equipment. The material requirements are extensive, including various types of tiles, anchors, studs, mortar, welding rods, and specialized equipment. The total bid will encompass labor rates (straight time, overtime, and double time), mobilization/demobilization costs, personal protective equipment, per diem expenses, and equipment rental. Contractors are required to submit detailed pricing for each division, with a materials markup not to exceed 10%. The facility reserves the right to modify work scope dates and requires clear communication with maintenance planning staff at least one month prior to each scheduled outage.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS FOR
MCKAY BAY WASTE TO ENERGY (WTE) FACILITY TILE/REFRACTORY WORK
8. PERFORMANCE.
The Contractor will do all work, furnish all labor, materials, tools, construction equipment, transportation, supplies, supervision, permits, organization and other items of work and cost necessary for the proper execution and completion of the work described as in the below scope of work, attachments, and reference specifications.
The Firm must be licensed to do business in the State of Florida. The Firm must have five (5) years’ experience in Refractory Installation and Sandblasting Services for Waste To Energy Facilities.
8.1 General
The Contractor shall furnish all supervision, administration, labor, tools, materials and all necessary supplies and incidentals to complete the service described herein, unless other arrangements are agreed upon in specific work scope. Time sheets including date and shifts work was performed, names and job titles of those performing work, hours worked and under what pay code they were worked under (ST/OT/DT) will be submitted daily in electronic form unless otherwise agreed upon. The time sheet shall be submitted for the previous day prior to the next shift commencing. All time and material pay requests will be processed from these time sheets. All work will be discussed and agreed upon prior to start of work. For reimbursement purposes, any material or incidental purchasing and or procurement shall be pre-approved by the City prior to purchase. All time other than straight time must be pre-authorized by the City. The City and the Contractor will devise a plan acceptable to both parties on all points discussed here prior to work start, any deviations must be pre-authorized.
8.2 Service Description
Provide Refractory Installation and Sandblasting Services for the McKay Bay Waste to Energy (WTE) Facility located at 107 North 34th Street, Tampa, FL 33605. In addition, Contractor may be asked to perform miscellaneous repairs agreed upon by the City representative and Contractor. The Contractor must report to the Control Room located on the 5th floor daily prior to performing any service.
Refractory Installation Services: refractory demo, tile installation, plastic ram, and miscellaneous non-code anchor welding.
Sandblasting Services: Sandblasting of marked tube areas in boiler furnace, 2nd and 3rd passes, and any other necessary areas that may need sand blasting as directed by the City representative.
Provide manpower, equipment, and supervision to do the following:
8.2.1 Refractory Installation and Sandblasting Services as outlined by the City of Tampa McKay Bay (WTE) Facility representative. Bidders should bid the following project durations and manpower expectations based on past outage history: The first four outages of the year run twelve (12) consecutive shifts starting Tuesday morning at 7 am and the last four outages run twelve (12) consecutive shifts starting Monday morning at 7 am.
8.2.2 Refractory contractor will be responsible for the scaffold in the boiler furnace for each outage. Typically, it takes one full shift to erect scaffolding and four hours to dismantle the scaffolding.
8.2.3 Contractor will provide on an as needed basis material (Onyx plastic, flat tile, curved tile, hardware, mortar, and all necessary materials needed to complete the refractory/tile repairs; reference, “Material Information (Quantities per Year – Estimated)” document attached. Provide a materials price breakdown on an item-by-item basis. Tile/refractory drawings are attached for reference.
8.3 Service Schedule:
Historically, based on annual tonnage of Municipal Solid Waste (MSW) received at the City of Tampa McKay Bay (WTE) Facility, the Facility conducts eight (8) scheduled maintenance-related outages per calendar year, of which one will be a Cold Iron outage. A routine scheduled outage is normally a period of 7 days where the boiler is taken off-line early Sunday morning for operational cleaning to get the boiler ready for the contractors starting on Monday morning at 7 am. During the cold iron outage, scheduled maintenance will be performed on one boiler starting on Monday at 7 am. The outages are scheduled as follows:
| 8.3.1 | Boiler 1 February (Tuesday 0700 – Monday 0700): | |
| (Estimated twelve (12) -12-hour Shifts of twelve (12) workers = 1728 hrs.) |
| 8.3.2 | Boiler 3 February (Tuesday 0700 – Monday 0700): | |
| (Estimated twelve (12) -12-hour Shifts of twelve (12) workers = 1728 hrs.) |
| 8.3.3 | Boiler 2 March (Tuesday 0700 – Monday 0700): | |
| (Estimated twelve (12) -12-hour Shifts of twelve (12) workers = 1728 hrs.) |
| 8.3.4 | Boiler 4 April (Tuesday 0700 – Monday 0700): | |
| (Estimated twelve (12) -12-hour Shifts of twelve (12) workers = 1728 hrs.) |
| 8.3.5 | Boiler 1 August (Monday 0700 – Sunday 0700): | |
| (Estimated twelve (12) -12-hour Shifts of twelve (12) workers = 1728 hrs.) |
| 8.3.6 | Boiler 3 August (Monday 0700 – Sunday 0700): | |
| (Estimated twelve (12) -12-hour Shifts of twelve (12) workers = 1728 hrs.) |
| 8.3.7 | Boiler 2 September (Monday 0700 – Sunday 0700): | |
| (Estimated twelve (12) -12-hour Shifts of twelve (12) workers = 1728 hrs.) |
| 8.3.8 | Boiler 4 September (Monday 0700 – Sunday 0700): | |
| (Estimated twelve (12) -12-hour Shifts of twelve (12) workers = 1728 hrs.) |
8.3.9 Emergency Work/Unplanned Outages (minimum response time for emergency work is 24 hours and emergency work cannot be planned so the OT rate should be used for calculating this work) (Estimated four (4) 12-hour consecutive Shifts of four (4) workers x four (4) unplanned outages = 768 hrs.)
In addition, services may be required during unscheduled outages.
City of Tampa McKay Bay (WTE) Facility reserves the right to change the dates of the work scope as needed.
To ensure clear communication Vendor shall be in communication with the Maintenance Planner and Maintenance Supervisor at least one month prior to each scheduled outage date to ensure a clear communication as to what work will be performed and start dates/times.
8.4 Contractor Safety Requirements: See Attachment D -- “City of Tampa McKay Bay Waste-To-Energy Facility Contractor Environmental, Health, and Safety Requirements”
8.5 Contractor Notice: See Attachment E – “City of Tampa McKay Bay Waste-To-Energy Facility Contractor Arsenic, Lead, Cadmium, and Hexavalent Chromium Notice
Bid Response for Division I: Labor Cost for Outages
Each Outage has a time frame of (Estimated twelve (12) -12-hour Shifts of twelve (12) workers = 1728 hrs. per outage)
| a. | Boiler 1 February (Tuesday 0700 – Monday 0700): 1728 hrs. | ||
| b. | Boiler 3 February (Tuesday 0700 – Monday 0700): 1728 hrs. | ||
| c. | Boiler 2 March (Tuesday 0700 – Monday 0700): 1728 hrs. | ||
| d. | Boiler 4 April (Tuesday 0700 – Monday 0700): 1728 hrs. | ||
| e. | Boiler 1 August (Monday 0700 – Sunday 0700): 1728 hrs. | ||
| f. | Boiler 3 August (Monday 0700 – Sunday 0700): 1728 hrs. | ||
| g. | Boiler 2 September (Monday 0700 – Sunday 0700): 1728 hrs. | ||
| h. | Boiler 4 September (Monday 0700 – Sunday 0700): 1728 hrs. |
Total # of Hours: 13,824 hours
Provide breakdown in below table.
| Straight Time Rate |
| Overtime Rate |
| Double Time Rate |
| Labor Classification |
| Straight Time Rate |
| Estimate# of Hrs |
| Total Labor $ |
| Overtime Rate |
| Estimate# of Hrs |
| Total Labor $ |
| Double Time Rate |
| Estimate# of Hrs |
| Total Labor $ |
Supervisor
Foreman
Mason Welder
Mason Tender
Other:
Other:
Other:
2. Mobilization and Demobilization (for all outages in this Division): $
3. PPE (for all outages in this division): $_____________
4. Per Diem (for all outages in this division): $
Total Amount for Division I: $__________________________________
Bid Response for Division II: Labor Cost for Emergency Work/Unplanned Outages
The Department is estimating four (4) 12-hour Consecutive Shifts of four (4) workers x four (4) unplanned outages = 768 hrs. Use OT rate for calculating this labor cost.
Total # of Hours: 768 hours Provide breakdown in below table.
| Straight Time Rate |
| Overtime Rate |
| Double Time Rate |
| Labor Classification |
| Straight Time Rate |
| Estimate# of Hrs |
| Total Labor $ |
| Overtime Rate |
| Estimate# of Hrs |
| Total Labor $ |
| Double Time Rate |
| Estimate# of Hrs |
| Total Labor $ |
Supervisor
Foreman
Mason Welder
Mason Tender
Other:
Other:
Other:
2. Mobilization and Demobilization (for all outages in this Division): $_________________
3. PPE (for all outages in this division): $_________________
4. Per Diem (for all outages in this division): $
Total Amount for Division II: $_________________________________
Bid Response for Division III: Tile/Refractory List
| Material |
| Quantity |
| UOM |
| Price |
| Total |
| 8 "Hidden Clip Nitride Tile T-25932 |
| 5000 |
| Each |
| 9" T SLOT BRICK SIC |
| 500 |
| Each |
| 8" Beveled Repair Tile |
| 700 |
| Each |
| Unigun 60 |
| 400 |
| Bags |
| 2" V-Anchors |
| 2600 |
| Each |
| 3" V-Anchors |
| 2000 |
| Each |
| 4" V- Anchor 310SS |
| 300 |
| Each |
| V-Gun 80 SIC |
| 400 |
| Each |
| V-Ram SIC 80 |
| 800 |
| Box |
| SIC Surebond Mortar |
| 320 |
| Bags |
| SIC V-Bond Mortar |
| 200 |
| Bags |
| 2.5" Y Membrane Anchor Inconel 601 |
| 2500 |
| Each |
| 2.25" x 3/8" Inconel 600 Stud |
| 1500 |
| Each |
| 2.5" x 3/8" Inconel 600 Stud |
| 1500 |
| Each |
| 2 3/8" x 3/8" Inconel 600 Stud |
| 4000 |
| Each |
| 1" Steer Horn Inconel 601 |
| 5000 |
| Each |
| 2" Y Membrane Anchor Inconel 601 |
| 7500 |
| Each |
| 5" V-Anchors |
| 75 |
| Each |
| Left Side Grate Blocks T28181 |
| 60 |
| Each |
| Right Side Grate Blocks T28191 |
| 60 |
| Each |
| Threaded Washers Stainless |
| 4500 |
| Each |
| Ceramic Fiber Blanket 2" 6# |
| 60 |
| Box |
| KOL 20-45 |
| 170 |
| Bags |
| 3/32" 112 Inconel Weld Rod |
| 800 |
| LBS |
| 1/8" 309SS Weld Rod |
| 150 |
| LBS |
| Black Beauty Sandblast Material |
| 800 |
| Bags |
| T&G Slot Brick 12" |
| 130 |
| Each |
| Emerald Ram |
| 160 |
| Each |
| 8" Back Cast Tile |
| 550 |
| Each |
| V-Flow 80 |
| 60 |
| Bags |
Total Amount for Division III: Tile/Refractory List: $_________________________________________
Bid Response for Division IV: Materials Cost
Other refractory materials not listed in the above table:
MATERIALS COST MARKUP PERCENTAGE (Not to exceed 10%): ______% of $50,000: $__________ Example: $3,500 (10% of $35,000) + $35,000 = $38,500
Bid Response for Division V: Rental Equipment
The listed rental equipment is the total needed for all eight (8) scheduled outages, please include all associated cost including mark up and freight in the total cost.
| Rental Equipment |
| Quantity |
| UOM |
| Price |
| Total |
| Sand Blast Equipment (2 Pots) |
| 8 |
| LOT |
| Gunite Equipment |
| 8 |
| LOT |
| Scaffolding |
| 8 |
| LOT |
| Tool Trailer |
| 8 |
| LOT |
| Compressor |
| 8 |
| LOT |
| Dryer-Water Separator |
| 8 |
| LOT |
| DURAFLO |
| 8 |
| LOT |
| Fork Truck |
| 8 |
| LOT |
| 480V Saw |
| 8 |
| LOT |
| Saw Blade SIC RS-30 |
| 8 |
| LOT |
| Rivet Buster |
| 48 |
| Each |
Total Amount for Division V: Rental Equipment $_________________________________________
Grand Total of All Divisions (I, II, III, IV, V): $__________________________________________