This document is an attachment for a state and local contract opportunity issued by the Hawaii Department of Transportation, Highways Division. The attachment provides detailed specifications for the procurement of thermoplastic pavement markings, including striping, arrows, letters, and numbers. The work must conform to the Hawaii Standard Specifications for Road, Bridge and Public Works Construction, and the thermoplastic materials must meet specific requirements for application temperature, drying time, and durability under varying environmental conditions.
The related state and local contract opportunity is for the repair and resurfacing of the roadway and parking lot at the Keaiwa Heiau State Recreation Area, located in Honolulu County, Hawaii. The contract requires the furnishing of all labor, materials, and equipment necessary to complete the project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Section 2.jpg | JPG image | |
| Section 11.jpg | JPG image | |
| Section 4.jpg | JPG image | |
| Section 6.jpg | JPG image | |
| Resurfacing Roadway-Parking Lot Keaiwa Bid Quote.pdf | ||
| Section 10.jpg | JPG image | |
| Section 3.jpg | JPG image | |
| Section 12e.jpg | JPG image | |
| Section 6a.jpg | JPG image | |
| Section 12d.jpg | JPG image | |
| Section 3a.jpg | JPG image | |
| Section 7.jpg | JPG image | |
| Section 2b.jpg | JPG image | |
| Keaiwa map.pdf | ||
| Section 8.jpg | JPG image | |
| Section 5.jpg | JPG image | |
| Resurfacing Roadway-Parking Lot Keaiwa.pdf | ||
| Section 12b.jpg | JPG image | |
| Section 12a.jpg | JPG image | |
| Section 5a.jpg | JPG image | |
| Section 12c.jpg | JPG image | |
| Section 8a.jpg | JPG image | |
| Section 2a.jpg | JPG image | |
| Section 12.jpg | JPG image | |
| Section 11a.jpg | JPG image | |
| Section 9.jpg | JPG image | |
| Section 9a.jpg | JPG image | |
| Section 1.jpg | JPG image | |
| Addendum No. 2 to Solicitation No 18001891.docx | DOCX document | |
| Section 6b.jpg | JPG image | |
| Section 7a.jpg | JPG image | |
| Addendum to Solicitation No 18001891.docx | DOCX document | |
| 103D-1 General Conditions.pdf | ||
| Section 6c.jpg | JPG image |
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
THERMOPLASTIC PAVEMENT MARKINGS
PART 1- GENERAL
1.1 DESCRIPTION OF WORK
Furnish all labor, materials and equipment necessary to provide thermoplastic pavement markings on previously constructed pavement and as specified herein.
1.2 GENERAL REQUIREMENTS
The Dept. of Transportation, Highways Division "Hawaii Standard Specifications for Road, Bridge and Public Works Construction", 2005, including all revisions, shall govern all work except for subsections on Measurement and Payment which shall not be applicable. This publication shall be referred to as State D.O.T.
Standard Specifications hereinafter.
PART 2- PRODUCTS
2.1 MATERIALS
A. Thermoplastic Tape shall conform to the Hawaii Standard Specifications for Road, Bridge and Public Works Construction, latest edition, Section 755.05. Retro-reflective Thermoplastic Compound Pavement Markings.
B. Thermoplastic Pavement Markings shall include but not limited to striping, arrows, letters, and numbers.
PART 3 - EXECUTION
3.1 APPLICATION
A. Compound shall be machine-applied to pavement surface in molten state at temperature range of 4.1255 ± 12.5 degrees F. Material shall not scorch or discolor if kept at molten state temperatures for up to 4 hours.
B After cooling to ambient temperature and without polymerization or other chemical change, compound shall form traffic marking stripe of quality and appearance as specified herein.
C. Material shall show no appreciable deformation or discoloration under local traffic conditions and in ambient or pavement temperatures ranging from 0 degrees F to 120 degrees F.
D. Drying time is defined as minimum elapsed time from marking application to time after which normal local traffic leaves no impression or imprint on applied marking, and after which stripe attains and retains required characteristics, including thickness.
Attachment 1
When applied at temperature range of 412.5 ± 12.5 degrees F and thickness of 1/8 inch to 3/16 inch, material drying time shall not exceed two minutes when the air temperature is 50 ± 3 degrees F. When air temperature is 90 ± 3 degrees F, drying time shall not exceed 10 minutes.
E. Material shall allow stripe to maintain original dimensions and placement. Exposed surface shall be free from tack. Applied marking shall not chip or debond under normal movement of pavement surface.
F. Pigment shall be dispersed evenly throughout material. Materials shall be of uniform density and character, throughout its thickness.
G. Material shall not smear or spread at pavement temperatures of 140 degrees F or less.
2.2 PROTECTION OF WORK
New markings shall be protected from damage by vehicles during the time required for paint to harden sufficiently to withstand traffic. During periods of high winds, painting will be discontinued. Any damage to new markings due to Contractor's failure to provide adequate protection will be repaired by Contractor.