THA-WV-125_Specs.pdf

PDF 387 KB Posted

Attached to
Deck Repairs at Old South Street Bridge in Sturbridge, MA
Solicitation number
W912WJ20Q0104
Issued by

View the file

Other files

File Type Posted
Amendment_W912WJ20Q0104_0002.pdf PDF
Amendment_W912WJ20Q0104_0001.pdf PDF
THA-WV-125_Plans.pdf PDF
Solicitation_W912WJ20Q0104.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

W912WJ-20-Q-0104

DECK REPAIRS

OLD SOUTH STREET

BRIDGE

Westville Lake Sturbridge, MASSACHUSETTS

Construction Solicitation and Specifications

July 2020

Westville Lake – Old South Street Bridge Repairs Sturbridge, Massachusetts STATEMENT OF WORK

Solicitation Number: W912WJ-20-Q-0104 July 2020

A. General Description of the Work to be Performed

The general description below is given to indicate the approximate scope of this project only. It does not limit the work required under the project drawings and specifications.

The Old South Street Bridge at Westville Lake in Sturbridge, Massachusetts was constructed in 1956. The bridge is a two lane bridge (26'-0" wide roadway) and carries Old South Street over the Quinebaug River. The bridge is a simple span, composite steel stringer bridge with a span length of 85'-6 1/8" and a total bridge length of 89'-6". The bridge is affixed with 2'-8" high steel handrails on top of 2'-3" wide by 0'-8" high curbs on each side.

The purpose of this project is to repair/ remove deteriorated concrete, replace broken concrete curb, and install four Object Markers at the Old South Street Bridge located at Westville Lake Dam in Sturbridge, Massachusetts.

The scope of work for this project will focus on concrete repair work which will include the rehabilitation of the concrete bridge deck and curb and as shown on the plans. There is broken concrete curb along the North and South Approach slabs that will be replaced with granite curb. The repair work to be performed by the Contractor requires the removal of unsound and deteriorated concrete on 100% of the deck as shown on the plans. The locations and areas of the concrete repairs shown on the drawings are approximate. Some selective light demolition will be required around the existing expansion joint steel plates to ensure full continuous repair under the expansion plate as shown in the drawings. There is one fixed joint and one expansion joint on the bridge. The extent of the curb repair along the bridge deck will be localized to one area as shown on the plans. The final areas of concrete repairs and depths on the deck shall be based on sounding the concrete and visual inspections performed by the Contractor and the Contracting Officer Representative, also known as (COR). The depth of removal on the deck will be 3” across the entire deck. In areas where the deterioration is below this depth, the removal depth shall be up to 5”. For example, if sound concrete is encountered at 3”, no more removal is required. Alternatively, if sound concrete is not encountered at a depth of 3”, chipping shall continue until sound concrete is encountered or to a maximum depth of 5”, whichever is encountered first. The entire deck shall have a minimum of 3” of concrete removed. During concrete removal, if any areas appear to be unsound below 5”, the Contractor shall notify the COR for guidance.

Surface preparation and concrete removal equipment may be of the following types:

(1) Pneumatic and Power Driven Chipping Hammers: In no event shall any pneumatic or power hammer weighing in excess of twenty-five (25) pounds be used for the removal of concrete.

Pneumatic power hammers heavier than the nominal fifteen (15) pound class shall not be used for removing concrete from below any reinforcing bar.

(2) Hydro-Blasting: The contractor shall be able to contain water and concrete debris during the operation.

Water and concrete debris shall not enter the waterway.

Completion of scope of work may require fall protection. Means of access shall be approved by the Contracting Officer's Representative prior to beginning of work.

Following completion of the work, the area shall be restored by the Contractor to its condition prior to the start of construction. This shall include regrading and seeding disturbed grass embankment areas beyond where granite curb was placed.

B. General Project Requirements

1. Contractor’s Responsibility. The Contractor shall furnish all plant, labor, equipment and materials and carry out all operations as necessary to accomplish the work of this project as described in this document and on the contract drawings.

2. Commencement, Prosecution, Measurement/Payment and Completion of Work. The

Contractor shall commence work under this contract within 15 days after the date of receipt of the Notice to Proceed. Construction activities including closure of the bridge shall commence no earlier than March 1, 2021. All construction activities shall be concluded, and bridge fully open to traffic no later than May 1, 2021. The time included for completion shall include final cleanup of the project site. The Contractor shall attend a Preconstruction Conference prior to the start of on-site construction work (see paragraph entitled "Preconstruction Conference", below).

2.1 UNIT PRICE PAYMENT ITEMS

Payment items for the work of this contract on which the contract unit price payments will be made are listed in the BIDDING SCHEDULE and described below. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.

Submit originals of all field notes and all other records relating to Quantity Surveys.

2.2 BIDDING SCHEDULE – MEASUREMENT/ PAYMENT ITEMS

Payment items for the work of this contract on which the contract progress payments will be based are listed in the BIDDING SCHEDULE and are described below. All costs for items of work, which are not specifically mentioned to be included in a particular Bidding Schedule job or unit price payment item, shall be included in the listed item most closely associated with the work involved.

Base Bid Items

2.2.1 Item Number 0001, "Bridge Deck Concrete Repairs (3" Depth)".

All costs for labor, equipment, and materials for concrete repairs to the bridge deck as shown on the contract drawings and in accordance with, Section 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE, and other appropriate sections of the specifications. Quantities for payment shall be as measured at the project site after removal of deteriorated concrete and prior to placement of repair materials.

Field notes and all other records related to measurement of quantities for payment shall be submitted. This item shall be used for payment for bridge deck repairs. This shall include payment for all reinforcing repairs encountered in this depth and deck sealing compounds. This Base Bid Item also covers repairs to the face of the bridge curbs.

Unit of Measure: Square Foot (SF).

2.2.2 Item Number 0002, " Bridge Deck Concrete Repairs (3" to 5")".

All costs for labor, equipment, and materials for concrete repairs to the bridge deck, as shown on the contract drawings and in accordance with Section 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE, and other appropriate sections of the specifications. This shall include payment for all reinforcing repairs encountered in this depth and deck sealing compounds. Field notes and all other records related to measurement of quantities for payment shall be submitted. This item shall be used for payment for bridge deck repairs.

Unit of Measure: Square Foot (SF).

2.2.3 Item Number 0003, "Object Markers".

All costs for labor, equipment, and materials for Object Markers on the bridge approaches, as shown on the contract drawings and in accordance with the latest Federal Highway Administration (FHWA), Manual for Uniform Traffic Control Devices (MUTCD) Specifications.

Unit of Measure: Lump Sum (LS).

2.2.4 Item Number 0004, "Granite Curb Installation".

All costs for labor, equipment, and materials for demolition and removal of the existing concrete curb along portions of the approach slabs as shown on the contract drawings and in accordance with Section 03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE, and MASSDOT SECTION 500 of the 2020 MASSDOT HIGHWAY

AND BRIDGE SPECIFICATIONS.

Quantities for payment shall be as measured at the project site after removal of deteriorated concrete curb and prior to placement of the granite curb. Field notes and all other records related to measurement of quantities for payment shall be submitted.

This is shall include saw cutting pavement, excavation, concrete installation, granite curb installation, pavement restoration, erosion control and ¾” crushed stone.

Unit of Measure: Linear Foot (LF).

3. Superintendence by the Contractor. At all times during the performance of the contract and until the work is completed and accepted, the Contractor shall directly superintend the work or assign and have on the worksite a competent project superintendent who is satisfactory to the Contracting Officer and has the authority to act for the Contractor. The project superintendent shall maintain a physical presence at the site at all times and be responsible for all construction and related activities at the site, except as otherwise acceptable to the Contracting Officer. Failure to comply with these requirements shall be deemed as cause for a non-compensatory stoppage and suspension of work until the deficiency is remedied.

4. Coordination and Direction During Construction. The Contractor shall not take or accept any direction or instructions issued by any person, employed by the Government or otherwise, other than the Contracting Officer that changes the terms and conditions of contract actions, the scope, or any change that impacts the cost, price, or schedule. Changes authorized by the Contracting Officer will be in the form of a written, official, signed modification to the contract action received by the Contractor before the Contractor will act upon those changes. The Contractor will comply with the changes clause of this contract when the Contractor believes direction has been given from persons other than the Government Contracting Officer that equate to a change by notifying the Contracting Officer as directed by the clause. Any direction given by any Government employee or any other person outside their authority must be reported to the Contracting Officer. The Contracting Officer Representative (COR) is limited to the authorities stated in the COR appointment letter. If a COR is appointed under this contract, they will be appointed by written letter from the Contracting Officer to the Contractor and COR specific to this contract only. COR appointment letters from previous contracts are not valid for this contract.

5. Traffic Regulation and Control. This bridge is intended to be closed during the construction.

Measures for the protection and diversion of traffic, including the provision of watchmen and flagmen, erection of barricades, placing of lights around and in front of equipment and the work, and the erection and maintenance of adequate warning, danger, and direction signs, shall be as required by the State and local authorities having jurisdiction. The traveling public shall be protected from damage to person and property. The Contractor's traffic on roads selected for hauling material to and from the site shall interfere as little as possible with public traffic. The Contractor shall investigate the adequacy of existing roads and the allowable load limit on these roads. The Contractor shall be responsible for the repair of any damage to roads caused by construction operations.

6. Construction Site Plan. Prior to the start of work, the Contractor shall submit a site plan showing the locations and dimensions of temporary facilities including layouts and details, equipment and material storage areas, access and haul routes, avenues of ingress/egress to fenced areas (e.g., the assigned storage and staging area), details of the fence installation (if used), and the number of trailers to be used. Identify any areas which may have to be graveled to prevent the tracking of mud. Indicate if the use of a supplemental or other staging area is desired. Show locations of safety and construction fences, site trailers, construction entrances, trash dumpsters, temporary sanitary facilities, and worker parking areas. The plan shall also show where temporary utility hook-ups are to be located, if required, and how grounding of equipment and trailers will be achieved, as appropriate.

7. Temporary Safety Fencing. Temporary safety fencing shall be used to limit access to active construction areas and areas where materials and equipment are being staged. The safety fencing shall be a high visibility orange colored, high density polyethylene grid or approved equal, a minimum of 42 inches high, supported and tightly secured to steel posts located on maximum 10 foot centers. The temporary safety fencing shall be installed as soon as practicable, but not later than 15 days after the date established for commencement of work.

The safety fencing shall be maintained by the Contractor during the life of the contract, adjusted and moved as appropriate to the progress of the work and, upon completion and acceptance of the work, shall become the property of the Contractor and shall be removed from the work site.

8. Hours of Operation. Unless otherwise authorized in writing by the Contracting Officer, the project site will be available for construction activities between 7:00 a.m. and 3:30 p.m.

Monday through Friday.

The Contractor will not be permitted to work on Saturday, Sunday or legal holidays unless otherwise authorized by the Contracting Officer. The exclusion of work on Saturday, Sunday and legal holidays has been considered in computing the performance time of this contract.

The following legal holidays are observed:

January 1st

Third Monday in January Third Monday in February Last Monday of May July 4th 1st Monday of September 2nd Monday of October 11th of November Fourth Thursday of November 25th of December

When one of the above designated legal holidays falls on a Sunday, the following Monday will be observed as a legal holiday. When a legal holiday falls on a Saturday, the preceding Friday is observed as a holiday.

Work outside the normal hours of operation requires Contracting Officer approval. The request to work outside the hours of operation shall be made in writing to the Contracting Officer 10 calendar days prior to such work to allow arrangements to be made by the Government. The request application shall include specific dates, hours, location, type of work to be performed, contract number and project title, and names of all individuals who will be working outside the hours of operations. During periods of darkness, work shall be lighted in a manner approved by the Contracting Officer.

9. Progress Schedule. The initial project schedule shall be in the form of a chart graphically indicating the sequence proposed to accomplish each work feature or operation. The chart shall be prepared to show the starting and completion dates of all work features on a linear horizontal time scale beginning with date of Notice to Proceed and indicating calendar days to completion.

The Contractor shall indicate on the chart the important work features or operations that are critical to the timely overall completion of the project. Key dates for such important work features and portions of work features are milestone dates and shall be so indicated on the chart. This schedule will be the medium through which the timeliness of the Contractor's construction effort is appraised. Anticipated adverse weather delay days shall be included in the schedule.

An updated schedule showing actual progress shall be submitted monthly or with each pay request. Changes to the base-line schedule shall be outlined in a narrative describing the reason for the change.

10. Rate of Progress. Should the Contractor fail to maintain a satisfactory rate of progress in accordance with the Contractor's approved progress schedule, the Contracting Officer may require that additional personnel and equipment be placed on the work and weekend and overtime work be performed, in order that the work be brought up to schedule and maintained.

11. Preconstruction Conference. The Contracting Officer will conduct a preconstruction conference after receipt of Notice to Proceed by the Contractor and prior to the start of on-site construction activities. The date, time, and place for this conference shall be mutually agreed upon by the Contractor and the Contracting Officer. It is mandatory that the Contractor's project site supervisory personnel assigned to this project attend the conference;

no personnel substitutions will be permitted. The purpose of the conference is to review contract requirements and to establish a working relationship between the Contractor's Staff and the U.S. Army Corps of Engineers personnel who will be closely associated with the project. During the conference, the Contracting Officer's Representative will inform the Contractor concerning job safety, project phasing, work hour restrictions, traffic control, quality control, labor relations, and environmental protection. The Preconstruction Conference will be arranged by the Contracting Officer.

12. Material Substitutions. This contract is based on the materials and methods as shown on the contract drawings and as described in this document and in the technical specifications. The Contractor shall not substitute materials or methods unless such substitution has been specifically approved in writing by the Contracting Officer.

13. Quality Control. The Contractor shall establish a quality control system to perform sufficient inspection of all items of work, including that of any subcontractors, to ensure conformance to this document with respect to materials, workmanship, construction, finish and functional performance. The system shall cover all construction operations, both onsite and offsite. The site project superintendent will be held responsible for the quality of work on the job and is subject to removal by the Contracting Officer for non-compliance with the quality requirements specified in the contract. The site project superintendent in this context shall be the highest level manager responsible for the overall construction activities at the site, including quality and production.

The site project superintendent shall maintain a physical presence at the site at all times, except as otherwise acceptable to the Contracting Officer, and shall be responsible for all construction and construction related activities at the site. The CQC System Manager shall be a construction person with a minimum of three years in related work. This CQC System Manager shall be on the site at all times during construction and shall be employed by the prime Contractor. The CQC System Manager shall be assigned as System Manager but may have other duties in addition to quality control.

14. Quality Assurance. All items of work not addressed in the contract documents shall be completed in strict accordance with the manufacturers’ specifications. The Government is not obligated to inspect the Contractor’s work, or to protect the Contractor from the consequences of its work. Government inspections are a general examination of the Contractor’s conduct and workmanship and are solely for the purpose of the Government.

Government-designated Quality Assurance Representatives (QARs) do not have the authority to accept work, nor is a Government inspection to be construed as conclusive.

Government agents including QARs and project engineers are not authorized to change the contract without the written approval of the Contracting Officer; this lack of authority extends to all situations in which the action of these agents could be construed as constituting a change.

The quality of workmanship is subject to audit by Government or Government-designated QARs at any time during the contract. The Contractor shall cooperate fully and provide all information necessary for this audit. The Contractor shall submit all requests for changes in writing to the Contracting Officer. Do not proceed with changes without possession of written authorization of the Contracting Officer. The Contractor shall not conceal any work unless the Contracting Officer has approved all items of work which are to be concealed. The Contractor shall notify the Contracting Officer of its intention to conceal work at least 24 hours in advance of concealment.

15. Utilities. The Government will not furnish water or electricity as part of this project. Water and electricity required in the prosecution of the work shall be furnished by the Contractor at his own expense.

16. Temporary Electrical Equipment and Connections. The Contractor, at his own expense and in a workmanlike manner satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines. All required temporary electrical equipment and lines shall be furnished, installed, connected, and maintained by the Contractor according to EM 385-1-1, Section 11.E, NFPA 241,and NFPA 70, Article 305- 6(b), "Assured Equipment Grounding Conductor Program". All temporary equipment and lines shall be removed prior to final acceptance of the work. Materials and equipment need not be new, but must be in good repair and serviceable condition. Periodic inspections of systems and devices will be made by the Contractor at intervals not to exceed one week.

17. Location of Underground Facilities. Obtain necessary digging permits prior to the start of excavation. Verify the elevations of existing piping, utilities, or any type of underground obstruction in locations to be impacted by the work. For excavation work in Connecticut call “Call Before You Dig” at 1-800-322-4844. Notification shall not be earlier than 30 days prior, or later than 3 days prior, to the planned excavation.

18. Environmental Protection. The Contractor shall minimize environmental pollution and damage that may occur as the result of construction operations. The environmental resources within the project boundaries and those affected outside the limits of permanent work shall be protected during the entire duration of this contract. Comply with all applicable environmental Federal, State, and local laws and regulations. Any delays resulting from failure to comply with environmental laws and regulations will be the Contractor's responsibility.

A. Environmental Protection Plan: Prior to commencing construction activities or delivery of materials and equipment to the site, the Contractor shall submit an Environmental

Protection Plan for review and approval by the Contracting Officer. The purpose of the Environmental Protection Plan is to present a comprehensive overview of known or potential environmental issues which the Contractor must address during construction.

Issues of concern shall be defined within the Environmental Protection Plan. The Contractor shall address each topic at a level of detail commensurate with the environmental issue and required construction task(s). The Environmental Protection Plan shall be current and maintained onsite by the Contractor.

B. Obtaining and complying with all environmental permits and commitments required by Federal, State, Regional, and local environmental laws and regulations is the Contractor's responsibility.

C. Temporary Erosion and Sediment Controls: The Contractor shall be responsible for providing temporary erosion and sediment control measures for storage and staging areas and other areas as appropriate for the work, in accordance with Federal, State, and local laws and regulations. The erosion and sediment controls selected and maintained by the Contractor shall be such that water quality standards are not violated as a result of the Contractor's construction activities. The area of bare soil exposed at any one time by construction operations should be kept to a minimum. The Contractor shall construct or install temporary and permanent erosion and sediment control best management practices (BMPs. BMPs may include, but not be limited to, vegetation cover, slope stabilization, silt fences, sediment traps, and inlet and outfall protection. Any temporary measures shall be removed after the area has been stabilized.

D. Fuels and Lubricants: Storage, fueling and lubrication of equipment and motor vehicles shall be conducted in a manner that affords the maximum protection against spill and evaporation. Manage and store fuel, lubricants and oil in accordance with all Federal, State, Regional, and local laws and regulations. Used lubricants and used oil to be discarded shall be stored in marked corrosion-resistant containers and recycled or disposed in accordance with State, and local laws and regulations. Storage of fuel on the project site is not allowed. Fuel shall be brought to the project site each day that work is performed. Storage and usage of lubricants and daily fueling of machinery and equipment shall occur at least 50 feet from any drainage inlets, water bodies (rivers, streams, lakes), environmentally sensitive areas (wetlands, vernal pools).

19. Waste. The Contractor shall provide on-site containers for the collection of waste materials, debris, and rubbish. The Contractor shall clean the project site on a daily basis to prevent the accumulation of waste materials and rubbish resulting from construction activities. The Contractor shall transport all solid waste off of the project site and dispose of it in compliance with Federal, State and local requirements for solid waste disposal. Upon completion of the construction work, the project site shall be returned to its pre-work condition.

20. Contract Drawings. Contract drawings showing the work of this project are attached at the end of this document.

21. Damages. The Contractor shall exercise caution and follow sound construction practices in the conduct of the work to avoid construction-related damage to existing features to remain.

22. Sequence of Work. In general, the work shall be performed in the following sequence:

existing conditions verification, preparation of submittals, material procurement, establish traffic control and site safety, construct project features, and project close out.

23. Contractor's Receipt of Supplies. The Contractor shall be responsible for all arrangements for the receipt of materials and supplies at the job site. Government personnel are not permitted to receive or sign for items delivered to the site.

24. Storage/ Laydown Area. The storage/ laydown area for use by the Contractor, for work and storage of equipment, materials, and trailers during the life of this contract are shown on the contract drawings. The Contractor shall confine its storage area to the limits as designated or approved by the Contracting Officer and shall be responsible for the security of the area.

Upon completion of the contract, and at no additional cost to the Government, remove all equipment and materials, except as otherwise specified, and restore the site to its original condition as approved by the Contracting Officer.

Do not stockpile materials outside the storage area in preparation for the next day's work. Park mobile equipment, such as tractors, wheeled lifting equipment, cranes, trucks, and like equipment within the storage area at the end of each work day.

The Contractor may construct a temporary six foot high galvanized chain link fence around trailers and materials at the storage/staging area if desired. Galvanized chain-link fence shall have a minimum height of six feet. The fence posts shall be driven when installed in earth surfaces; concrete bases placed on the ground surface shall be used when installation is in paved or other hard surfaced areas. Except for equipment and materials which are in support of ongoing work on any given day or unless such equipment or materials are assigned a separate and distinct storage area by the Contracting Officer away from the vicinity of the construction site but within the project site boundaries, equipment and materials shall be stored and placed inside the temporary chain-link fencing.

Trailers, if utilized by the Contractor for administrative or material storage purposes, shall present a clean and neat exterior appearance and shall be in a state of good repair. Trailers which, in the opinion of the Contracting Officer, require exterior painting or maintenance will not be allowed on the project site.

The temporary six foot high chain link fence, if used, shall be kept in a state of good repair and proper alignment. Should the Contractor elect to traverse, with construction equipment or other vehicles, grassed or unpaved areas which are not established roadways, such areas shall be covered with a layer of gravel as necessary to prevent rutting and the tracking of mud onto paved or established roadways; gravel gradation shall be at the Contractor's discretion. Grass located within the boundaries of the construction site shall be mowed for the duration of the project. Grass and vegetation along fences, buildings, under trailers, and in areas not accessible to mowers shall be edged or trimmed neatly.

25. Restoration of Storage Area. Upon completion of the project remove barricades, temporary utilities, sanitation facilities, construction vehicles, materials and equipment, temporary chain- link fencing, and any other temporary equipment, materials, or products from within and around the work areas and temporary storage areas. Clean and repair damage caused by installation or removal of temporary materials, equipment, or utilities. Areas used by the Contractor for the storage of equipment or material, or other use, shall be restored to the original or better condition, including pavement repair, or top soil and seeding as necessary.

Gravel used to traverse grassed areas shall be removed and the area restored to its original condition, including top soil and seeding as necessary.

26. Contractor Use of Premises. Work shall be restricted to the areas shown on the contract drawings in addition to storage areas assigned to this Contractor. Access to the project site is currently available for construction traffic. The Contractor shall be responsible for providing and maintaining access necessary for his equipment and plant to and from the work site.

27. Protection and Security. Protection to Contractor personnel or their equipment cannot be provided at the worksite by the Government. The Contractor shall protect all its personnel, government personnel, and the general public from injury. The Contractor shall conduct all its work so as to prevent injury or unsafe conditions during construction.

28. Sanitary Facilities. In accordance with Section 2 of EM 385-1-1, provide, maintain, and make available to all workers provisions for sanitation. Maintain these provisions at all times without nuisance. Upon completion of the work, all sanitary provisions and facilities shall be removed from the premises by the Contractor, leaving the premises clean and free from nuisance.

In accordance with Section 2, Subpart 02.C of EM 385-1-1, provide, maintain, and make available to all workers an adequate supply of potable water for both drinking and personal cleansing. During hot weather, provide cool drinking water.

In accordance with Section 2, Subpart 02.E of EM 385-1-1, provide, maintain, and make available to all workers adequate minimum field-type portable toilets. Portable toilets shall be properly secluded from public observation in such a manner as required or approved by the Contracting Officer. Periodically empty wastes into a municipal, district, or station sanitary sewage system, or remove waste to a commercial facility. Include provisions for pest control and elimination of odors. Any penalties and/or fines associated with improper discharge of wastewater shall be the responsibility of the Contractor. Government toilet facilities will not be provided.

29. Preparation of Record Drawings. Maintain at the jobsite one set of full-size contract drawings marked to show all deviations which have been made from the contract drawings, including buried or concealed construction and utility features revealed during the course of construction. Record the horizontal and vertical location of all buried utilities that differ from the contract drawings. These drawings shall be available for review by the Contracting Officer at all times. Upon completion of the work, submit the original marked set of prints to the Contracting Officer for approval. Requests for partial payments will not be approved if the marked prints are not current, and request for final payment will not be approved until the marked prints are submitted to and approved by the Contracting Officer.

The entries shall be made in the jobsite set of prints at the time field changes are made, pertinent information collected, or need for corrections established, as a continuing process during the life of the contract. As revised drawings are issued by the Contracting Officer, revised prints shall be introduced into the set to replace the superseded drawings and all applicable notations previously made on the superseded drawings transferred to the current prints. Carefully prepared sketches, not less than 8-1/2 inch by 11 inch, may be used to depict changes or added information in lieu of notations on the actual prints. Staple sketches to the prints affected by the change. All plan views, sections, elevations, profiles, diagrams, details, or schedules affected by a change shall be marked up as required to reflect the change. All notations or changes made on the prints shall be in sufficient detail to clearly depict the change. Colored pens or pencils shall be used to make notations on the record prints as follows:

• Red pen or pencil shall be employed to indicate added or corrected work or information.

• Green pen or pencil shall be used to show the deleted or incorrectly depicted work or information.

• Blue or black pen or pencil shall be used to show information not to be recorded on the drawings but included on the marked-up prints for explanatory or clarification purposes for the benefit of the Contracting Officer.

C. Safety

1. Accident Prevention Plan: The Contractor shall prepare an Accident Prevention Plan (APP) specific to the activities being performed. It shall include an Activity Hazard Analysis (AHA) as described in Paragraph "2" below. All work shall be conducted in accordance with the APP, the U.S. Army Corps of Engineers Safety and Health requirements Manual (EM 385- 1-1, 2014 edition), and all applicable Federal, State, and local safety and health requirements.

The APP shall detail how safety and health will be managed during the project. The APP shall address the requirements of applicable Federal, State and local safety and health laws, rules, and regulations.

The Contractor shall comply with Federal Acquisition Regulation Clause No. 52.236-13 for Accident Prevention, which is added by reference. Special attention shall focus on the requirements of EM 385-1-1, specifically Section 01.A.11 through 01.A.18, Figure 1-2 AHA, and Appendix A, (Minimum Basic Outline for Accident Prevention Plan). The APP shall be developed by a qualified person. The Contractor shall be responsible for documenting the qualified person’s credentials. Work shall not proceed until the APP has been reviewed by the Government Designated Authority (GDA) and deemed acceptable for use on the project.

The APP shall interface with the Contractor's overall safety and health program. Any portions of the Contractor's overall safety and health program referenced in the APP shall be included in the applicable APP element and made site-specific. The Government considers the Prime Contractor to be the "controlling authority" for safety and health of the subcontractors.

Contractors are responsible for informing their subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

The Contractor shall conduct a safety meeting at the project site on the first day of work, whenever a new activity or phase of work begins, or at least weekly during the progress of work. All safety meetings shall be documented. A copy of a suggested weekly safety meeting form will be provided by the Contracting Officer’s Representative. Records of the safety briefings shall be submitted to the GDA weekly.

2. AHA: An AHA shall be submitted for each major phase of work. A major phase of work is defined as an operation involving a type of work presenting hazards not experienced in previous operations or where a new subcontractor or work crew is to perform the work. The analysis shall define all activities to be performed, identify the sequence of work, the specific hazards anticipated, and the control measures to be implemented to eliminate or reduce each hazard to an acceptable level. Work shall not proceed on a phase of work until the AHA has been accepted by the GDA. A preparatory meeting shall be conducted by the Contractor to discuss the AHA contents with all engaged in the activity. The preparatory meeting shall be conducted by the prime Contractor and shall include all subcontractors and Government on-site representatives.

The AHA shall be continuously reviewed and revised to address changing site conditions or operations as appropriate.

3. Accident Reporting: All accidents and near misses shall be investigated by the Contractor. All work-related recordable injuries, illnesses and property damage accidents (excluding on-the-road vehicle accidents), in which the property damage exceeds $5,000.00, shall be verbally reported to the GDA within 4 hours of the incident. Serious accidents as described in EM 385-1-1 Section 01.D shall be immediately reported to the GDA. ENG Form 3394 shall be completed and submitted to the GDA within five working days of the incident.

The Contractor shall complete the attached “USACE Contractor Monthly Summary Record of Injuries/Illness and Work Hour Exposure” (for prime and its subcontractors) and forward the completed form to the GDA no later than close of business on the 5th calendar day of the following month. The method of transmission by the prime contractor to the GDA shall be electronically.

4. Site Safety and Health Officer (SSHO): The Contractor shall designate one individual as the SSHO. Documentation of SSHO qualifications shall be submitted for approval prior to initiating work. The SSHO shall have:

a. A minimum of two years experience in implementing safety and health programs at similar projects;

b. Documented experience in personal protective equipment;

c. Working knowledge of construction safety procedures as well as Federal and state occupational safety and health regulations.

d. SSHO should have a 30-hour OSHA training, or equivalent.

The SSHO may have other duties in addition to site safety and health, but may not be the Contractor’s Site Superintendent.

5. Equipment: The Contractor shall submit to the Contracting Officer’s Representative a current written safety inspection for all heavy equipment proposed for use on this contract. The Contractor, upon award of the contract, will be required to make available for suitability and safety compliance inspection all equipment proposed for use to perform the work of this contract. Equipment shall be made available for inspection by the Government Representative five working days prior to the start of construction. Any additional equipment added during the prosecution of the work shall also be made available for inspection prior to its use on the project. The Contractor shall keep equipment available for inspection by the Contracting Officer’s Representative during the construction process. Equipment not accepted by the Contracting Officer’s Representative should be repaired or replaced by the Contractor.

6. Fall Protection: The requirements of this Section are applicable to all contractor personnel when employees are working at heights or are exposed to fall hazards and/or using fall protection equipment. The fall protection threshold height requirement is 6 ft. or more above adjacent floor or ground level that is unprotected. Workers exposed to fall hazards shall be protected from falling to a lower level by the use of standard guardrails (see EM 385-1-1

Section 21.F.01.b), work platforms, temporary floors, safety nets, engineered fall protection systems, personal fall arrest systems, or the equivalent, where a fall hazard exists.

Competent Person, Fall Protection: a person designated in writing by the employer to be responsible for immediate supervising, implementing and monitoring of the fall protection program, who through training, knowledge and experience in fall protection and rescue systems and equipment, is capable of identifying, evaluating and addressing existing and potential fall hazards and, who has the authority to take prompt corrective measures with regard to such hazards.

D. General and Administrative Submittals Required

Items for Submission. The Contractor shall submit the items identified below for approval to the Contracting Officer. Government acceptance, as defined in EM 385-1-1, is required for safety related submittals (identified below with an “S” after the submittal name). The Contractor shall submit an electronic PDF copy and five paper copies of each submittal item. The Contractor will be informed at the Preconstruction Conference to send all submittals to either the project Resident Office or to the project Area Engineer Office, or other office, as applicable

Preconstruction Submittals: The following submittals shall be made by the Contractor and review action completed by the Contracting Officer prior to the commencement of work at the site.

a. Initial Progress Schedule: In accordance with the contract clauses, the

Contractor shall, within five days after receipt of Notice to Proceed (NTP), or as otherwise determined by the Contracting Officer, submit for approval a practicable Initial Project Schedule. When changes are authorized that result in contract time extensions, the Contractor shall submit a revised project schedule for approval by the Contracting Officer.

b. Accident Protection Plan (S): The Contractor shall prepare an Accident

Prevention Plan (APP) specific to the activities being performed. It shall include an Activity Hazard Analysis (AHA) for each major phase of work

c. Silica Exposure Control Plan (S): Develop a written Silica Exposure Control Plan in accordance with applicable OSHA standards (29 CFR 1926) and any other federal, state and local regulatory requirements. The plan shall be developed by a qualified person. Provide the name and qualifications, training, and experience of the qualified person. The Exposure Control Plan shall detail how potential exposure to workers and adjacent areas will be kept below allowable limits.

Submit the plan to the Contracting Officer 15 days prior to initiating work where silica exposure is a potential. A “temporary restricted area” must be established where tasks performed in accordance with Table 1 of 29 CFR 1926.1153 require that respiratory protection be used, or where tasks are performed that are not listed in Table 1, and where no historic or objective data exists to prove exposures will be below the action level. Temporary Restricted Areas must be designated with signs, barriers, or other effective means that will ensure unauthorized persons do not enter.

d. Fall Protection Plan (S): All Contractors must develop and submit a site specific

Fall Protection Plan outlining the implementation of methods, procedures and systems identify and eliminate or control new and existing fall hazards(written Fall Protection Procedures, per ANSI Z359.2) and rescue plan (written Rescue

Procedures, per ANSI Z359.2).

e. SSHO Qualifications (S): Documentation of SSHO qualifications shall be submitted for approval.

f. Safety Inspection for all Heavy Equipment (S): The Contractor shall submit a current written safety inspection for all heavy equipment proposed for use on this contract.

g. Construction Site Plan. Prior to the start of work, the Contractor shall submit a site plan showing the locations and dimensions of temporary facilities.

h. Work Plan: The Contractor shall submit a written Work Plan describing the methods and equipment required to accomplish the work. Work Plan is to include the means and methods of the concrete bridge deck demolition. In addition, provide the required environmental and worker protection.

i. Environmental Protection Plan: The Contractor shall submit an

Environmental Protection Plan for review and approval by the Contracting Officer

j. Traffic Control Plan: The Contractor shall submit a Traffic Control Plan to be reviewed by the Contracting Officer, and surrounding Town’s Traffic Engineer.

Other Submittals: The following submittals shall be made by the Contractor to allow sufficient time for review action to be taken by the Contracting Officer and to comply with the approved Project Schedule, as appropriate. These submittals are found in Section 03 30 53.

Accident Reports (S)

Monthly Summary Record of Injuries/Illness and Work Hour Exposure (S)

Periodic Schedule Updates: An updated schedule showing actual progress shall be submitted monthly or with each pay request.

Record Drawings: Record drawings showing all deviations which have been made from the contract drawings shall be submitted to the Contracting Officer for approval at the completion of work. See paragraph RECORD DRAWINGS for record keeping and submittal requirements.

Approved Submittals. The Contracting Officer's approval of submittals shall not be construed as a complete check, but will indicate only that the general method of construction, materials, detailing and other information are satisfactory. Approval will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor under the Contractor Quality Control (CQC) requirements of this contract is responsible for the satisfactory construction of all work. After submittals have been approved by the Contracting Officer, no resubmittal for the purpose of substituting materials or equipment will be considered unless accompanied by an explanation of why a substitution is necessary.

Disapproved Submittals. The Contractor shall make all corrections required by the Contracting Officer and promptly furnish a corrected submittal in the form and number of copies specified for the initial submittal. If the Contractor considers any correction indicated on the submittals to constitute a change to the contract, a notice shall be given promptly to the Contracting Officer.

E. Technical Submittals Required

Submittals addressing the technical requirements of this project are described in the technical specifications. The Contractor shall follow the procedures outlined in Part D above when making technical submittals.

F. Technical Requirements

All technical requirements for the work of this project are shown on the contract drawings and described in the technical specifications attached to the end of this document.

G. Delivery, Handling and Storage

As appropriate, materials shall be delivered to the project site in the manufacturer’s original packaging with the brand and item identification reference clearly marked. Components shall be stored in a dry location that is adequately ventilated, free from dust, water, or other contaminants, and which is easily accessible for inspection and handling.

H. Material Warranties

Manufacturer’s standard performance guarantees or warranties that extend beyond a 1-year period shall be provided.

I. Coordination

Liaison with the U.S. Army Corps of Engineers, New England District, by the Contractor shall be maintained for the duration of the project by communication with the Contracting Officer’s Representative assigned to this project. All Contractor project related questions, comments, clarifications, etc. shall be directed to the Contracting Officer’s Representative for action.

J. References

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION (OSHA)

9 CFR 1926.1153 - Respirable Crystalline Silica

NATIONAL FIRE PROTECTION ASSOCIATION (NFPA)

NFPA 241 (2009) Standard for Safeguarding Construction, Alteration, and Demolition Operations

NFPA 70 (2014; AMD 1 2013; Errata 1 2013; AMD 2 2013; Errata 2 2013; AMD 3 2014; Errata 3 2014) National Electrical Code

U.S. ARMY CORPS OF ENGINEERS

EM-385-1-1 (2014) Safety and Health Requirements Manual, U.S. Army Engineering Manual

Westville Lake Old South Street Bridge Deck Repairs

TECHNICAL SPECIFICATIONS

PROJECT TABLE OF CONTENTS

DIVISION 03 – CONCRETE

03 30 53 MISCELLANEOUS CAST-IN-PLACE CONCRETE

-- End of Project Table of Contents --

PROJECT TABLE OF CONTENTS Page 1

SECTION 03 30 53 Page 1

SECTION TABLE OF CONTENTS

DIVISION 03 - CONCRETE

SECTION 03 30 53

MISCELLANEOUS CAST-IN-PLACE CONCRETE

PART 1 GENERAL

1.1 SUMMARY

1.2 REFERENCES

1.3 SUBMITTALS

1.4 QUALITY ASSURANCE

1.4.1 Regulatory Requirements

PART 2 PRODUCTS

2.1 SYSTEM DESCRIPTION

2.1.1 Strength

2.1.2 Construction Tolerances

2.1.3 Concrete Mixture Proportions

2.2 MATERIALS

2.2.1 Cementitious Materials

2.2.1.1 Portland Cement

2.2.1.2 Pozzolan

2.2.2 Aggregates

2.2.3 Admixtures

2.2.3.1 Air-Entraining Admixture

2.2.3.2 Accelerating Admixture

2.2.3.3 Water-Reducing or Retarding Admixture

2.2.4 Water

2.2.5 Reinforcing Steel

2.2.6 Expansion Joint Filler Strips, Premolded

2.2.7 Joint Sealants - Field Molded Sealants

2.2.8 Formwork

2.2.9 Form Coatings

2.2.10 Curing Materials

2.3 READY-MIX CONCRETE

2.4 ACCESSORIES

2.4.1 Curing Compound

PART 3 EXECUTION

3.1 PREPARATION

3.1.1 Embedded Items

3.1.2 Formwork Installation

3.1.3 Production of Concrete

3.1.3.1 Ready-Mixed Concrete

3.1.3.2 Concrete Made by Volumetric Batching and Continuous Mixing

SECTION 03 30 53 Page 1

3.1.3.3 Batching and Mixing Equipment

3.2 CONVEYING AND PLACING CONCRETE

3.2.1 Cold-Weather Requirements

3.2.2 Hot-Weather Requirements

SECTION 03 30 53 Page 2

3.3 FINISHING

3.3…

This is the start of the file's text. The full file is on GovTribe.