This is a Task Group Instruction (TGI) for replacing deck covering in compartment 1-174-0-L (Chief Petty Officer Messroom and Lounge) aboard the USS JOHN FINN (DDG-113). The work involves removing 435 SF of existing chemical-resistant flooring system and installing new MIL-PRF-32584 Type IV chemical-resistant flooring in Navy blue with white flake, along with treating 445 SF of deck plating and vertical surfaces. The work period is scheduled for April 21, 2025 through May 12, 2025.

The TGI specifies detailed requirements including installation of a CPO crest (to be provided by Ship's Force) prior to the final clear seal coat application. The work involves potential asbestos hazards and must comply with specifications 009-26 and 009-32. Support services to be provided by SRF-JRMC include crane/rigging services, electrical utilities, air/water/steam supply, safety inspections, gas free inspections, and QA inspections. The work is being performed at Yokosuka Base as part of the USS JOHN FINN's FY25 5A1 Continuous Maintenance Availability (CMAV).

View the file

Other files

File Type Posted
Attachment III Request for Information Form.docx DOCX document
TGI 38BCA63404A01 c0v0.pdf PDF
Attachment II Price Proposal Form N6264925RA029.xlsx XLSX spreadsheet
N6264925RA029.pdf PDF
TGI 38BCA86301A01 c0v0.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOUO

WebAIM Short Form TASK GROUP INSTRUCTION

21-JAN-2025 1615

20.14.15.2.9020 (September 2024) ICN: 38BCA63405 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-174-0-L DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BCA 64121

CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-174-0-L

WORK CERTIFICATION SIGNATURES: DLs

COMPLETION OF WORK REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

RECORDS REVIEW: BADGE NO: SHOP/CODE: PHONE: DATE:

FOUO Pg 1 of 3

SS02L032

PREPARING ACTIVITY: STATUS: APP WORKING STATUS:

PREPARED BY: CODE: PHONE: DATE:

NANBA, RYOUSUKE 231A 3152436141 20-JAN-2025

APPROVED BY: CODE: PHONE: DATE:

NAKAMURA, YUUJI 231A 3152436041 20-JAN-2025

CONCURRED BY: CODE: PHONE: DATE:

REASON FOR WORK/NEED FOR CHANGE:

JCN:

SS02-L032

SPECIAL REQUIREMENTS:

CU PHASE DESCRIPTION:

ZONE MANAGER: ZONE: COMPARTMENT: LEVEL: FRAME: SIDE:

YAGINUMA, TAKEHIDE 1-174-0-L 1 U

JOB SUMMARY ID: TOT MAN HR.: TOT DUR: TOT JML COST: PLANNING ACCEPTANCE:

634A1105

1 SCOPE/PURPOSE:

1.1 Title: Deck Covering in 1-174-0-L; replace

1.2 Location of Work:

1.2.1 Chief Petty Officer Messroom and Lounge (1-174-0-L)

1.3 Identification:

1.3.1 Quantity (435 SF), Chemical-Resistant Floorings System [Existing]

1.3.2 Quantity (435 SF), Chemical-Resistant Floorings System

Specification: MIL-PRF-32584, Type IV Color: 706 Navy blue color coat with white flake

1.3.3 Quantity (445 SF), Deck Plating, including vertical structural surface up to height of One inch from complete chemical-

TGI Short Form

21-JAN-2025 1615

20.14.15.2.9020 (September 2024) (Continued) ICN: 38BCA63405 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-174-0-L DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BCA 64121

CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-174-0-L

FOUO Pg 2 of 3

CU PHASE DESCRIPTION (Cont.)

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

resistant floorings system level Remarks: The area excepts where insulation is installed.

1.4 Security Classification: None.

1.5 Initial Condition:

1.5.1 Potential Asbestos Hazard

1.6 Contractor work start date:

1.7 Contractor work completion date:

2 PROCEDURE:

2.1 Accomplish the requirements of 009-26 of Ref. No. One, including Attachment C, for removal of each existing equipment listed in 1.3.1 and installation of each new equipment listed in 1.3.2. Install the Chief Petty Officer (CPO) crest on the deck prior to application of final clear seal coat. See Notes 2.2.3.

2.1.1 Accomplish the requirements of 009-32 of Ref. No. One, including Table 3, Line(s) 6, Column(s) A, B, and D, for each area listed in 1.3.3. Primer must conform to MIL-PRF-23236, Type V, VI, or VII.

2.2 Notes:

2.2.1 Planner: Code 231A R. Nanba, 243-6141

2.2.2 Work Integration Manager (WIM): Code 333 T. Yaginuma, 080-5419-0598

2.2.3 The CPO crest will be provided by Ship’s Force.

2.2.4 JCN SS02-L032 is related to this TGI.

2.3 Government Furnished Material (GFM): None.

2.4 SRF-JRMC will provide the following service work: (TGI No. 38BCA63405S02)

2.4.1 [C740] Crane and crane rigging service.

2.4.2 [X99E] Utility service, electrical.

2.4.3 [X99M] Utility service, including low pressure air supply, water supply, and steam supply.

2.4.4 [C106.1] Safety inspection for SRF-JRMC employees.

2.4.5 [C106.2] Gas free inspection for SRF-JRMC employees.

2.4.6 [C133] QA inspection for (G) symbol(s).

4/21/2025

5/12/2025

21-JAN-2025 1615

20.14.15.2.9020 (September 2024) (Continued) ICN: 38BCA63405 KeyOp: A01

COMPONENT NAME: TYPE: PHASE: REPEAT: CHG/VER:TGI NO: CMPT 1-174-0-L DC A 0 0/0

SHIP/HULL NO: SHIP/HULL NAME: PROJECT: SYSTEM: PLANT ID: CASREP CAT:

DDG-113 USS JOHN FINN BCA 64121

CU PHASE TITLE: *F/O - REPLACE DECK COVERING IN 1-174-0-L

FOUO Pg 3 of 3

Ref.

No.

Document/Drawing Number DOCUMENT/DRAWING TITLE REV

CHG

NO.

CPY

REQ PARAGRAPH SECT PG CHPT

1 NSI FY-25 NAVSEA Standard Items - 1 N 2 LI FY-25 Local Standard Items - ORG N

TASK NAME / TASK DESCRIPTION

SHOP/

TSD TS

SF

WC

CREW

# MHRS RWRK

22/KE PC N

22/MQ CS N

Process Funding Document 10/CT OM N

MATERIAL LIST

ITEM

NO.

PC

NO.

REF

NO.

M

C DESCRIPTION

STOCK

NUMBER

GENERIC

MATL

TYPE LVL QA

HAZ

MAT

DOC

NO.

QTY

REQD/

UNIT

QTY

USED/

UNIT

MATERIAL REFERENCES

REF

NO.

DOCUMENT/DRAWING NUMBER DOCUMENT/DRAWING TITLE

REV

ICN: 38BCA63405 KEY OP: A01