About this file
This is a Scope of Work document for site development work related to a proposed Megapack project issued by EPB (Electrical Power Board) in Tennessee. The scope of work encompasses erosion control Best Management Practices (BMPs), demolition, clearing, stripping, subgrade preparation including excavation and compacted backfill, trenching, fencing, gates, concrete equipment pad installation, and site stabilization. The document outlines the technical requirements and specifications necessary for bidders to understand the full extent of work required at the project site.
The document establishes the baseline requirements and standards that contractors must meet to be considered for award. Specific details regarding response deadlines, site visit requirements, pre-bid meetings, pricing terms, contract duration, and any small business set-asides are not detailed within this particular scope of work document. Prospective bidders should reference the main bid solicitation for information regarding submission deadlines, bid bond requirements, project timeline, compensation structure, and any applicable small business or minority-owned business enterprise preferences that may apply to this opportunity.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LEGAL NOTICE
Bid Number: 16204
Bids will be received by EPB at the Pur-chasing office at 1350 E 8th Street, Chat-tanooga, Tennessee 37403 until 2:00 PM, January 8, 2027
Bid forms and additional information may be picked up at 12:00 PM on November 23, 2026 at EPB’s Purchasing Department or requested by calling (423) 648-1434 or emailing williamsld@epb.net.
EPB is seeking bids for site development work for proposed megapack. The site de-velopment scope includes but not limited to: Erosion Control BMPs, demolition, clearing, stripping, subgrade preparation (excavation and compacted backfill), trenching, fencing, gates, concrete equip-ment pad and site stabilization.
EPB reserves the right to reject any and / or all bids, waive any informalities in the bids received, and to accept any bid which, in its opinion, may be in the best in-terest of the Board.
Laura Williams Buyer I