Testing_&_Repair_Services_of_Transformers_at_the_HFC_AWTP_-_Tech_Specs.pdf
PDF 177 KB Posted
- Solicitation number
- 26-P-00073
- Issued by
- Hillsborough County, Florida
About this file
This is a Technical Specifications document for the City of Tampa, Wastewater Department, regarding testing and repair services for 54 distribution transformers located at the Howard F. Curren Advanced Wastewater Treatment Plant (AWTP) and the San Carlos Pump Station. The scope of work includes annual testing, preventive maintenance, repair services, laboratory testing, reporting, power factor testing, and associated services for all transformers. Testing must be non-destructive and meet or exceed ANSI Standards Testing Sections C57.10.00 and C57.12.90, while repairs must comply with the National Electrical Code and good electrical maintenance practices. All 54 transformers identified in the specification must be tested, with any discrepancies in manufacturer, model number, or serial number documented and corrected. A map detailing transformer locations is included as an attachment.
Bidders must submit documentation demonstrating capability, including references from five current or former clients within the last three years with complete contact information, current and verifiable laboratory certification, and a list of test equipment with current calibration dates. The awardee shall perform comprehensive services including oil sampling and analysis (measuring dielectric breakdown, neutralization number, power factor, fire and flash points, moisture, dissolved gases, and oxygen inhibitor levels), equipment cleaning, accessory inspection and testing, winding resistance testing, insulation resistance testing, power factor testing, and turn-to-turn ratio testing. Repairs shall be performed on a time and material basis with pre-approval required from the City, with parts and materials meeting or exceeding quality standards of replaced items. Time estimates must be accurate within 20 percent, and all results must be compiled into a comprehensive report delivered within thirty days of field testing completion, provided in both electronic PDF and bound hard copy formats. This is a sheltered market solicitation with no specified set-aside or incumbent information provided in the technical specifications.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS FOR
TESTING AND REPAIR SERVICES OF TRANSFORMERS AT THE HOWARD F. CURREN AWT PLANT
(SHELTERED MARKET SOLICITATION)
9. GENERAL
The City of Tampa, Wastewater Department, Howard F. Curren AWT Plant requires the annual testing, preventive maintenance and repair services of 54 distribution transformers. This work includes all laboratory testing, reporting, repairs, power factor testing and associated services. Testing performed as a result of this specification shall be non-destructive.
All testing shall meet or exceed the requirements of ANSI Standards Testing Section C57.10.00 and C57.12.90. The repairs to be performed are to rectify the problems identified by the inspection and testing. The repairs shall meet or exceed the requirements of the National Electrical Code and standards that are considered good electrical maintenance practice. All labor, equipment, devices, parts and materials necessary to perform the work shall be included whether or not directly specified herein. All 54 transformers located at the sites shall be tested. A list of the transformers is included in Section 6 of the Technical Specifications. Any manufacturers, model numbers, or serial numbers found to be incorrect on the list of transformers shall be noted on reports and correct information provided. Additionally, a map detailing the locations of the fifty-four transformers installed at the Howard F. Curren AWT Plant is included as an attachment 1 to this bid document (1 page).
10. SUBMITTALS
All bidders shall submit with their bid documentation that demonstrates the capability of performing work pertinent to this specification. Such information shall include the following items:
10.1 References from five current or former clients, within the last three years, showing the successful completion of similar testing. These references shall be complete with telephone numbers, email addresses, and contact person(s).
10.2 Certification of the laboratory that is to be used in the execution of this work. This certification shall be current and verifiable.
10.3 A list of test equipment to be used in the completion of the work. The calibration dates for this equipment shall be current when used during the testing.
Failure to submit shall documentation may result in the Bidder being deemed non-responsive.
11. SPECIFIC PROVISIONS
The following services shall be provided by the Awardee:
11.1 An oil sample shall be taken from each transformer using a glass sample syringe. The sample shall be handled carefully and protected from direct sunlight. The level of oil in the transformer shall be measured and filled to the proper level if needed. Ensure that only oil of identical type is used to top-up transformers. Nitrogen shall be added when necessary to maintain one to three pounds per square inch of positive pressure. This oil sample shall be analyzed for dielectric breakdown, neutralization number, power factor, fire and flash points, pour points, viscosity, moisture, interfacial tension, visual and color, specific gravity, dissolved gases and oxygen inhibitor.
11.2 If the oil sample test shows that the oxygen inhibitor level has fallen to 0.1%, sufficient DBPC should be added to the oil to provide a final inhibitor level of 0.3% by weight.
11.3 All cabinets, insulators and bushings shall be cleaned prior to testing. All spider webs, dirt and other debris shall be removed during this cleaning. To avoid dust clouds, a vacuum should be first be used to remove excess dirt. Low pressure (20 to 25 pounds per square inch) dry compressed air may be used for cleaning after most dirt has been removed by vacuum.
11.4 All accessories shall be inspected, tested and/or replaced. These accessories include but are not limited to: load tap changers, gauges, valves, gaskets, radiators, bushings, mechanical relief devices, fault pressure relays and other accessories. Minor adjustments, such as tightening of connections, shall be performed during this inspection. The
City will compensate the Awardee for any items that need to be replaced at the Awardee’s cost plus the mark-up percentage included on the Bid Response Page.
11.5 The Awardee shall perform a winding resistance test. All windings shall be tested and the results recorded.
11.6 An insulation resistance test shall be performed. All electrical points shall be measured to ground as well as the resistance from the primary coil to the secondary coils. The results of this testing shall be recorded.
11.7 A power factor test shall be performed and the results shall be calculated and recorded.
11.8 The Awardee shall perform a turn-to-turn ratio test on all the taps of the transformer being tested; the in-use tap shall be the last tap tested. This test shall include readings over five taps. The results of this testing shall be recorded for all five taps. An excitation current test shall be performed. Do not attempt to conduct test immediately following DC Testing. The results of this test shall be recorded.
11.9 The repairs shall be performed on a time and material basis. Any parts and materials replaced shall meet or exceed the quality standards of the part or material being replaced. Such repairs shall be pre-approved in writing by the City prior to the Awardee commencing the work. The Awardee shall submit a time estimate to the City for all work that is necessary. No compensation shall be paid for travel time to and from the work location. The estimate shall be accurate within 20 percent in terms of the actual hours that are billed to the City. The City reserves the right to exercise the option of soliciting other competitive quotes for any repair work when deemed necessary.
12. REPORTS
All results of the test performed as a result of this specification shall be compiled in the form of a single report, see section 15 for a sample test report.
12.1 Two copies of this report shall be provided: one in electronic format and one hard copy.
12.2 This report shall reference each transformer by the AWT Plant’s equipment number. The information presented in this report shall be displayed in a format that clearly represents the tests performed and the resulting information. The information in this report shall include but is not limited to all items listed in the order as shown in Section 14 of the Technical Specifications.
12.3 A list of the repairs that are performed shall also be included in this report. All deficiencies and repair recommendations shall be clearly identified. This list shall include all information associated with the repairs such as materials used and amount of time expended to perform the repair.
12.4 The hard copy of the report generated shall be contained in a bound booklet that is suitable for becoming a permanent record.
12.5 The electronic copy shall be compiled into one single report in pdf format.
12.6 The reports shall be completed and turned over to the City within thirty days after the field testing and oil sampling is completed.
12.7 All test results obtained as a result of work performed under these specifications shall be deemed the property of the City of Tampa.
13. RESPONSIBILITIES
13.1 The work shall be coordinated with the Treatment Plant's Electrical Maintenance Representative It should be understood that the transformers described herein are presently in service and some delay in the work is to be expected as the equipment is taken out of service for testing. The City will make every effort to make the transformers available to the Awardee in a timely manner.
13.2 The Awardee shall have the oil analysis performed by a laboratory that is certified by the Association for Laboratory Accreditation. These results shall be certified by the laboratory performing the work.
13.3 The Awardee shall always maintain safe working conditions while engaged in the work resulting from this specification. These safety procedures shall be in line with the recommendations of OSHA and those that are considered good electrical maintenance practice.
14. LIST OF TRANSFORMERS
Howard F. Curren AWT Plant
City of Tampa ID# Equipment # Manufacturer Model Number Serial Number
T038-041-01 41-38-1 GENERAL ELECTRIC GEI 65074 L713248THMA
T038-041-02 41-38-2 GENERAL ELECTRIC GEI 65074 L713248THMA
T038-044-01 T-1A-1 COOPER 956002168
T038-044-02 T-1B-1 COOPER 956002167
T038-044-03 T-3A-1 ABB ELECTRIC 3FEE26893D 15JC768810001
T038-044-04 T-3B-1 GENERAL ELECTRIC GEI 79025 0100098TO G
T038-044-05 T-3A-2 ABB ELECTRIC F3EE14819R 14JC701960004
T038-044-06 T-3B-2 ABB ELECTRIC F3EE14819R 14JC701960001
T038-044-07 T-3A-3 ABB ELECTRIC F3EE14819R 14JC701960003
T038-044-08 T-3B-3 ABB ELECTRIC F3EE14819R 14JC701960002
T038-044-09 T-2A-1 ABB ELECTRIC V3EE56819Q 15JC701950003
T038-044-10 T-2B-1 ABB ELECTRIC V3EE56819Q 15JC701950002
T038-044-11 T-4A-2 T038-044-12 T-4B-2
T038-044-13 T-4A-1 ABB ELECTRIC F3EE 1868D 15JC747310001
T038-044-14 T-4B-1 ABB ELECTRIC F3EE 1868D 15JC747310002
T038-044-15 T-2A-2 ABB ELECTRIC 7E778825F 15JC762200002
T038-044-16 T-2B-2 ABB ELECTRIC 7E778825F 15JC762200001
T038-044-17 T-2A-3 ABB ELECTRIC V3EE567TF7 13JC629900001
T038-044-18 T-2B-3 ABB ELECTRIC V3EE56819Q 14JC701950001
T038-044-19 T-5A-1 ABB ELECTRIC F3EE14819R 15JC701960007
T038-044-20 T-5B-1 ABB ELECTRIC F3EE14819R 15JC701960008
T038-044-21 T-5A-3 ABB ELECTRIC F3EE14819R 15JC701960005
T038-044-22 T-5B-3 ABB ELECTRIC F3EE14819R 15JC701960006
T038-044-23 T-5A-5 ABB ELECTRIC V3EE56819Q 15JC701950004
T038-044-24 T-5B-5 ABB ELECTRIC V3EE56819Q 15JC701950005
T038-044-25 T-5A-2 ABB ELECTRIC F37EO18CYQ 15JC791780002
T038-044-26 T-5B-2 ABB ELECTRIC F37EO18CYQ 15JC791780001
T038-044-27 T-4A-3 WESTINGHOUSE RSL PAL 3776-0101
T038-044-28 T-4B-3 WESTINGHOUSE RSL PAL 3776-0102
T038-044-29 T-2A-1A WESTINGHOUSE V37E563R56 90J614176
T038-044-30 T-2B-1A WESTINGHOUSE V37E563R5G 90J614130
T038-044-31 T-8A-1 ABB ELECTRIC F37E143R5H 90J620268
T038-044-32 T-8B-1 ABB ELECTRIC F37E143R5H 90J619266
T038-044-33 T-8A-2 ABB ELECTRIC STYLE V37E563TZK 90J681166
T038-044-34 T-8B-2 ABB ELECTRIC V37E563TZK 90J681107
T038-044-35 T-5A-6 ABB ELECTRIC F37E773TZL 90J682021
T038-044-36 T-5B-6 ABB ELECTRIC F37E773TZL 90J682014
City of Tampa ID# Equipment # Manufacturer Model Number Serial Number
T038-044-37 T-9A-1 SQUARE D N/A 900808-A2
T038-044-38 T-9B-1 SQUARE D N/A 900808-A1
T038-044-39 T-2A-4 ABB ELECTRIC STYLE F3EE0148F1 93J349084
T038-044-40 T-2B-4 ABB ELECTRIC STYLE F3EE0148F1 93J346173
T038-044-41 T-9A-2 SQUARE D N/A 930384-A2
T038-044-42 T-9B-2 SQUARE D N/A 930384-A1
T038-044-43 T-8A-3 WESTINGHOUSE PW-1002 TAA 4059-0102
T038-044-44 T-8B-3 WESTINGHOUSE PW-1002 SBA-4059-0102
T038-044-45 T-8A-4 WESTINGHOUSE PLAZA PAD TAA 4059-0101
T038-044-46 T-8B-4 WESTINGHOUSE PLAZA PAD TAA 4059-0102
T038-044-47 T-8A-5 WESTINGHOUSE PM 100 TAA 4060-0101
T038-044-48 T-8B-5 WESTINGHOUSE PM 1000 TAA 4060-0102
T038-044-49 T-5A-7 CUTTER HAMMER 1500 KVA 05J262166
T038-044-50 T-5B-7 CUTTER HAMMER ILUJ 05J262202
T038-085-01 T-6-1A GENERAL ELECTRIC PROLEC S188-01
T038-085-02 T-6-1B GENERAL ELECTRIC PROLEC S188-02
T038-248-01 TX-P1 EATON (FR3 Oil) 0002NP13XMEA 2050001464 T038-248-02 TX-P2 EATON (FR3 Oil) 0002NP13XMEA 2050001463 IS029-248-01 VFI-1 EATON (FR3 Oil) VFI 5 CP5720048080 IS029-248-02 VFI-2 EATON (FR3 Oil) VFI 5 CP5720048081
REMAINDER OF PAGE INTENTIONALLY LEFT BLANK
15. Sample Test Report
(Company name, phone number, & address) Technician: Location: Equipment No.:
Date of Last test: Begin Time: End Time: Date:
TRANSFORMER DATA
Manufacturer: Year: KVA: Hertz: Primary Model Number: Weight: Class: Temp. Rise: Sec. Vol Serial Number: Tank Type: Phase: Impedance: Pressure Insulation Type: Oil Type: Oil Temp: Tap Settings: As Found: As
INSPECTION LIST
Oil Level: Added: Y N Amount: N Level: Added: Y N Take Oil Sample* Check Radiators Temp. On-line Clean Cabinets Gaskets Temp. Off-line Clean Insulators Fans & Controls Check if Oil Leaks Clean Bushings Grounding Pressure Relief Device Check Gauges Tap Switch Isolation Valves Check Valves Exterior Condition Mechanical Relief Valves Additional Accessories Not Listed:
*Note any problems or corrections completed in spaces beside check boxes
TRANSFORMER TESTING
Insulation Resistance Test Testing Equipment:
Test Voltage: Ambient Temperature:
HV to LV &
Gnd. LV to HV & Gnd. HV to LV Notes 30 seconds 60 seconds 10 minutes 60/30 ratio Polarization Ind.
Turns Ratio Testing Equipment:
Phase 1 Phase 2 Phase 3 Notes H-Volt X-Volt H-Tap 2 H-Tap 1 H-Tap 3 H-Tap 4 H-Tap 5 H-Tap 2 Calculated Ratio Measured Ratio Deviation Phase Angle Power Factor Test Testing Equipment:
Measurement Test kV mA Watts % PF Corr./ Corr. Factor Cap (
CH + CHL
CH
CHL (UST)
CHL
CL + CLT
CL
CLT (UST)
CLT
Winding Resistance Test Testing Equipment:
Terminals H1 - H2 H2- H3 H3 - H1 X1 - X2 X2 -X DC Resistance % Difference