Termite Treatment SOW.docx

DOCX document 363 KB Posted

Attached to
Termite Treatment
Solicitation number
37270PR250000068
Issued by

About this file

This document is a Statement of Work (SOW) for termite treatment services at the U.S. Coast Guard Sector San Francisco, located at Yerba Buena Island. The project scope includes comprehensive termite inspection and treatment for 11 buildings (Buildings 18, 20A, 20B, 21, 23, 22, 24, 25, 26, 27, and 100), involving localized drywood termite treatment, subterranean termite soil treatment, and preventative measures. The contractor must be a licensed and insured pest control technician certified in California, using EPA-registered termiticides and following Integrated Pest Management practices.

The contract is a firm-fixed price purchase order with a 10-calendar day installation period and a 30-calendar day total project completion timeline. Key requirements include daily verbal progress reporting, providing a comprehensive inspection report within 5 business days, submitting MSDS sheets and product labels, and offering a minimum 1-year warranty with 6-month and 12-month reinspections. The contractor must comply with EPA, OSHA, and California safety regulations, coordinate site access with the Contracting Officer (CWO Victor M. Regalado), and follow strict security protocols, including being escorted in restricted areas and providing personnel rosters in advance.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARTMENT OF HOMELAND SECURITY

UNITED STATES COAST GUARD

Sector San Francisco

Scope of Work for

Termite Treatment

PSN:

Work Order:

at

1 Yerba Buena Island, Yerba Buena Island Northgate Rd San Francisco, CA. 94130

Sector San Francisco
Initial
Date

Contracting Officer (KO)

CWO Victor M. Regalado Sector Engineer Officer

VMR

A. GENERAL INFORMATION

1. Title of Project: U.S. Coast Guard (USCG) Termite Treatment

a. Objective: To eliminate active termite infestations and prevent future occurrences across multiple facilities (bldgs. 18, 20A, 20B, 21, 23, 22, 24, 25, 26, 27, and 100.) located at Sector San Francisco. Work includes inspection, localized treatment, preventative soil treatments, and follow-up documentation. The contractor must provide all labor, equipment, materials, safety controls, and qualified personnel.

b. Scope of Work:

1. Inspection:

· Conduct a comprehensive termite inspection of each designated structure, i.e 18, 20A, 20B, 21, 23, 22, 24, 25, 26, 27, and 100.

· Include crawl spaces, attics, foundation areas, wooden siding, trim, beams, floor joists, and exposed framing.

· Use moisture meters, infrared, or probing tools as needed.

· Document presence of:

· Drywood and/or subterranean termites

· Entry points, frass, tunnels, and structural vulnerabilities

· Moisture conditions contributing to infestation

2. Treatment plan execution for localized drywood termite treatment:

· Treat all identified localized infestations with spot applications.

· Access attic and wall voids as required (minimal disruption methods preferred).

· Remove frass and seal accessible galleries.

· Preferred methods:

· Drill-and-inject with non-repellent termiticide (e.g., Termidor Dry)

· Foam injection in wall voids

· Spot surface application to exposed wood members

3. Treatment plan execution for subterranean termite soil treatment (if applicable):

· Apply trench-and-treat method around affected buildings using liquid termiticide (e.g., Termidor SC or approved equal).

· Minimum 4” x 6” trench with termiticide saturation.

· Drill through concrete as required (patch afterward).

· Treat structural voids, pier supports, and utility penetrations.

4. Safety and Notification:

· Provide 48 hours’ notice prior to any treatment.

· Post warning signage during and after treatment.

· Ensure safe application methods for personnel and pets.

· MSDS sheets and product labels must be submitted for COR approval before application.

5. Warranty and re-treatment:

· The contractor must guarantee all work for a minimum of 1 year.

· Provide a written warranty certificate outlining retreatment conditions.

· Reinspect treated areas at 6 months and 12 months post-treatment or upon COR request.

6. Cleanup and restoration:

· Clean all treated areas after work is complete.

· Restore disturbed areas (e.g., patching drill holes, resealing wall access panels).

· Remove all debris and chemical containers from site.

7. Contractor shall provide:

· Provide a licensed and insured pest control technician certified in the State of California.

· Use only EPA-registered termiticides (e.g., Termidor SC or equivalent).

· Follow IPM (Integrated Pest Management) best practices.

· Coordinate access and staging areas with the COR.

· Ensure compliance with Federal, OSHA, EPA, and California DPR regulations.

· Pest control business license and certifications

· Personnel qualifications

· MSDS and labels of products used

· Initial inspection report (within 5 business days of inspection)

· Final treatment documentation

· Warranty certificate

· Invoicing breakdown per building, if requested

8. Optional/separately quoted items:

· Structural wood repair due to termite damage

· Fumigation of sealed buildings (only if recommended by inspection and approved by COR)

· Moisture barrier installation in crawl spaces

2. Type of Contract Contemplated: This will be a firm-fixed priced purchase order.

3. General Requirement: Prior to contract issuance the prospective contractor MUST HAVE completed and/or current enrollment into System Award Management (SAM), enrollment information for which can be found at: https://sam.gov/content/entity-registration, failure to do so WILL result in disqualification and reissuance of the contract. All bids submitted by contractor shall include break down of cost for labor, materials, transportation, O/P, G/A, etc… For any further enrollment assistance and/or questions, please contact CWO3 Tony Ciurlino at Anthony.j.ciurlino@uscg.mil

B. CONTRACTOR REQUIREMENTS

1. During the execution of this contract, the Contractor shall conform to the rules and regulations as set forth by EPA and OSHA Safety and Health Standards, 29 CFR Part 1926 - Safety and Health Regulations for Construction and California Code of Regulations, Title 8, Div. 1, Ch. 4, Subchapter 4 Construction Safety Orders, and EM 385-1. When the standards differ, the more restrictive standard shall apply. The contractor shall provide barriers, temporary fencing, trench covers, etc. wherever work could cause injury to workers, visitors, Coast Guard personnel, or dependents. An Accident Prevention Plan shall be submitted by the contractor prior to any commencement of work.

2. The Contractor and/or its personnel shall refrain from smoking while inside any federal buildings, within 50 feet of any entrance to the buildings, and within 50 feet of any flammables. A designated smoking area is available on-site.

3. The Contractor and/or its personnel are authorized to utilize government building’s restroom facilities.

4. The Contractor shall provide all management, supervision, labor, materials, supplies, and equipment (except as otherwise noted herein).

5. Refuse, excess or waste materials resulting from construction operations shall become the property of the Contractor and shall be recycled and/or disposed of off Government property. All disposals shall be done in accordance with federal, state, and local laws and regulations.

6. The location or lay down area of materials will be available on base with location to be determined by COR and Facilities Engineer depending on size. The Contractor shall be responsible for protecting materials stockpiled against weather, damage, theft, and other risks of loss. The Coast Guard assumes no responsibility for material or equipment left in the storage area.

7. Limited water and standard 120v electricity are available. Cost of these utility connections and disconnections of machinery or equipment shall be the responsibility of the Contractor. Personnel using extension cords to bring power from another location for construction, maintenance, remodeling, etc., shall employ portable ground fault circuit interrupters (GFCIs), even if connecting to building wiring. Use of portable generators is authorized at contractor expense to power portable equipment.

8. The Contractor shall plan, schedule, coordinate and assure effective service to meet U.S. Coast Guard requirements.

9. Investigate the site per FAR 52.236-3 to ascertain the general and local conditions which can affect the work or its cost. It is highly encouraged the contractor field verify to identify all factors or interferences concerning the job being sought.

10. Contractor shall field verify all information provided.

C. GOVERNMENT RESPONSIBILITIES

1. The government will provide Contractor personnel access to all spaces necessary for any component associated with this project during normal business hours. Office building hours are as follows: Monday through Friday 1000 through 1700 (10am – 5 pm) due to watchstander late sleepers. Any scheduled working times outside normal business hours by Contractor personnel shall be coordinated with the Engineer Officer CWO Victor M. Regalado victor.m.regalado@uscg.mil prior to the commencement of said work. At any time, scheduled work needs to go beyond normal business hours, the Contractor shall immediately notify CWO Victor Regalado. No work shall be scheduled during Federal Holidays or Weekends, unless prior approval has been coordinated with the Engineer Officer CWO Victor M. Regalado victor.m.regalado@uscg.mil.

2. All Contractor access to designated restricted and/or controlled access spaces will be coordinated with the Command Security Officer prior to accessing these spaces. Once in these spaces, Contractor personnel will be monitored by Coast Guard personnel with appropriate access and clearance to be inside these designated restricted and/or controlled access spaces throughout the performance of work in these spaces. At no time shall the entry points of these spaces remain unlocked to facilitate ease of installation.

D. REPORTING REQUIREMENTS

1. The contractor is required to provide verbal progress reports daily for the period of project duration. The progress report shall cover all work completed during the day and shall present the work to be accomplished during the subsequent period. This report shall also identify any problems that arose and a statement explaining how the problem was resolved. This report shall also identify any problems that have arisen but have not been completely resolved and provide an explanation.

2. All verbal progress reports shall be provided to the Engineer Officer CWO Victor M. Regalado victor.m.regalado@uscg.mil prior to Contractor departing the premises of Sector San Francisco Area of Responsibility and where the work is being performed.

Notice to Offerors: All information and data related to this project that the contractor gathers or obtains shall be both protected from unauthorized release and considered the property of the government. The contracting officer will be the sole authorized official to release verbally or in writing, any data, the draft deliverables, the final deliverables, or any other written or printed materials pertaining to this contract. Press releases, marketing material, or any other printed or electronic documentation related to this project, must not be publicized without the written approval of the contracting officer.

E. CONTRACTOR EXPERIENCE

1. The Contractor shall provide a Certificate of Insurance to indicate the liability, property, and accident coverage held by the Contractor, as well as any optional insurance recommended by the Contractor. The United States Coast Guard (USCG) shall be listed as “Additional Insured” on all Certificates of Insurances.

2. The Contractor and its personnel shall conform with the same high standards of behavior applicable to the maintenance of government equipment. All individuals performing any portion of maintenance and/or installation associated with this project shall be properly trained and qualified for the work to which that is assigned.

F. SECURITY REQUIREMENTS

1. The Contractor and its personnel performing work under this project shall be always escorted whenever work is to be performed in designated restricted and/or controlled access spaces. At no time shall the Contractor and its personnel be left unattended while working in designated restricted and/or controlled access spaces. Escorts shall be Coast Guard members currently assigned to the designated facility complex with appropriate clearance levels and access to be in the specific designated restricted and/or controlled access space at the time work is to be performed.

2. The Contractor shall provide employee information for all foreign nationals (defined as those employees not currently designated a U.S. Citizen as determined by applicable U.S. law, regulation, or policy) prior to the commencement of any on-site work related to this project and entry onto the premises of the U.S. Coast Guard owned facilities. Individuals determined to meet the criteria to be considered a foreign national will be allowed access to U.S. Coast Guard owned facilities; however, these individuals will be prohibited from accessing the designated restricted and/or controlled access spaces, even when under escort, unless otherwise approved by the Command Security Officer.

3. The Contractor shall provide a personnel alphabetical roster of all individuals assigned to perform work under this project, listing the dates work is to be performed by the individual – daily rosters may be provided for ease of facilitating the next day’s work. Daily rosters shall be provided to the Command Security Officer CWO Issac Mejia at issac.mejia@uscg.mil no later than 1500 the day before work is to be performed.

4. The Contractor and its personnel shall provide a valid non-expired state or federal issued photo identification card or credential upon accessing U.S. Coast Guard owned facilities and whenever entering the main entrance. Identification card or credential shall be handed to the sentry and front desk watch-stander for visual inspection and validation. Failure to provide a valid non-expired state or federal issued photo identification card or credential will prevent your access to U.S. Coast Guard owned facilities, even if under escort.

5. Any U.S. Coast Guard facilities credentials issued to the Contractor and its personnel shall clearly indicate an expiration date no later than the period of this project. Each credential issued will be tracked and surrendered upon request by the Coast Guard or upon completion of this project, whichever occurs first. All issued credentials shall be always worn and visible. Whenever actively working, the credential may be removed as a safety precaution, but shall be immediately returned to a visible location on person when no longer a safety concern.

6. Contractors shall provide the COR with 24 hours of advance notice of every delivery to the site (e.g., concrete, lumber, parts, etc.) and provide the company name, delivery person, and phone number of the firm(s) making deliveries. All vehicle access to government property requires vehicle registration and proof of liability insurance. Otherwise access to the Coast Guard facility may be denied.

G. PLACE AND PERIOD OF PERFORMANCE

1. Place of Performance – All work related to the components of this project shall be performed at the U.S Coast Guard 1 Yerba Buena Island, Yerba Buena Island Northgate Rd. San Francisco, CA. 94130; bldgs. 18, 20A, 20B, 21, 23, 22, 24, 25, 26, 27, and 100.

2. Period of Performance -

a. The installation of all associated components in this project shall be completed within ten (10) calendar days after the award date.

b. This project shall be completed within thirty (30) calendar days after the start date.

c. Work shall not begin until authorization is received from the Contracting Officer (KO). Notify the KO (in writing) one week prior to beginning work. Work shall not commence until all Submittals have been approved.

image1.png