Telfair ES Reno Addendum _4 10_30_23.pdf
PDF 12 MB Posted
- Attached to
- TCES Renovations & Modifications
- Solicitation number
- PE-55390-NONST-2024-000000001
- Issued by
- Treutlen County, Georgia
About this file
This document is an addendum to the Telfair Elementary School Renovation project solicitation issued by the local jurisdiction. The addendum provides updates and clarifications to the original scope of work, including changes to the project timeline and new bid submission requirements.
The renovations will include upgrades to the HVAC system, electrical systems, and interior finishes. The bid due date has been extended to November 15, 2023, and a mandatory pre-bid conference has been scheduled for November 5, 2023. The contract award is expected by December 1, 2023, with the project to be completed within 9 months of the award. The project budget is $8 million, funded through a combination of state and local capital improvement funds.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TCES Advertisement for Bids.pdf | ||
| Telfair ES Reno Addendum _5 11_2_23.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NO. 4
October 30, 2023
RENOVATION AND MODIFICATIONS
to the
TELFAIR COUNTY ELEMENTARY SCHOOL
McRae, Georgia
MANDATORY RE-BID / PRE-BID MEETING
[Attached is the “Sign-In” Sheet for the Mandatory Re-Bid / Pre-Bid Meeting which is included at the end of this Addendum as Attachment #1]
CHANGES TO SPECIFICATIONS:
SECTION 221119 – PLUMBING SPECIALTIES
[REPLACE THIS SECTION IN ITS ENTIRETY WITH THE REVISED SECTION 221119,
dated October 30, 2023, and included at the end of this Addendum as Attachment #2.]
CHANGES TO DRAWINGS:
SHEET A2.01 (Adding a new drinking fountain)
[REPLACE THIS SHEET IN ITS ENTIRETY WITH THE REVISED SHEET A2.01, dated October 30, 2023, and included at the end of this Addendum as Attachment #3.]
SHEET A4.01
FINISH SCHEDULE – (Multipurpose 207)
CLARIFICATION
[The existing ceiling consists of ceiling baffles, super-saver insulation system, ductwork, and exposed structure. Only the ductwork and exposed structure are to be painted.]
SHEET A5.01 (Adding a new drinking fountain)
[REPLACE THIS SHEET IN ITS ENTIRETY WITH THE REVISED SHEET A5.01, dated October 30, 2023, and included at the end of this Addendum as Attachment #4.]
SHEET A5.03 (Adding a new ceramic tile wainscot detail)
[REPLACE THIS SHEET IN ITS ENTIRETY WITH THE REVISED SHEET A5.03, dated October 30, 2023, and included at the end of this Addendum as Attachment #5.]
October 30, 2023
SHEET A6.01 (Adding a new Floor Drains and Floor Clean-outs detail) [REPLACE THIS SHEET IN ITS ENTIRETY WITH THE REVISED SHEET A6.01, dated October 30, 2023, and included at the end of this Addendum as Attachment #6.]
SHEET P1.01 (Adding a new drinking fountain)
[REPLACE THIS SHEET IN ITS ENTIRETY WITH THE REVISED SHEET P1.01, dated October 30, 2023, and included at the end of this Addendum as Attachment #7.]
SHEET P1.02
[REPLACE THIS SHEET IN ITS ENTIRETY WITH THE REVISED SHEET P1.02, dated October 30, 2023, and included at the end of this Addendum as Attachment #8.]
SHEET P1.03
[REPLACE THIS SHEET IN ITS ENTIRETY WITH THE REVISED SHEET P1.03, dated October 30, 2023, and included at the end of this Addendum as Attachment #9.]
SHEET P1.04
[REPLACE THIS SHEET IN ITS ENTIRETY WITH THE REVISED SHEET P1.04, dated October 30, 2023, and included at the end of this Addendum as Attachment #10.]
SHEET P1.05
[REPLACE THIS SHEET IN ITS ENTIRETY WITH THE REVISED SHEET P1.05, dated October 30, 2023, and included at the end of this Addendum as Attachment #11.]
SHEET E3.01 (Adding a new drinking fountain)
[REPLACE THIS SHEET IN ITS ENTIRETY WITH THE REVISED SHEET E3.01, dated October 30, 2023, and included at the end of this Addendum as Attachment #12.]
SHEET E4.03 (Adding a new drinking fountain)
[REPLACE THIS SHEET IN ITS ENTIRETY WITH THE REVISED SHEET E4.03, dated October 30, 2023, and included at the end of this Addendum as Attachment #13.]
INDEX OF ATTACHMENTS:
NO. DESCRIPTION
1 Mandatory Re-Bid / Pre-Bid Sign-In Sheet 2 Section 221119 – Plumbing Specialties (revised 10-30-23) 3 Sheet A2.01 (revised 10-30-23) 4 Sheet A5.01 (revised 10-30-23) 5 Sheet A5.03 (revised 10-30-23) 6 Sheet A6.01 (revised 10-30-23) 7 Sheet P1.01 (revised 10-30-23) 8 Sheet P1.02 (revised 10-30-23) 9 Sheet P1.03 (revised 10-30-23) 10 Sheet P1.04 (revised 10-30-23) 11 Sheet P1.05 (revised 10-30-23) 12 Sheet E3.01 (revised 10-30-23) 13 Sheet E4.03 (revised 10-30-23) END OF ADDENDUM NO. 4
Rex Text Box
ATTACHMENT #1
RENOVATIONS & MODIFICATIONS
PLUMBING SPECIALTIES 221119-1
SECTION 221119
PLUMBING SPECIALTIES
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract apply to this Section.
1.2 SUMMARY
A. This Section includes plumbing specialties for the following:
1. Soil, waste, and vent systems.
1.3 SYSTEM PERFORMANCE REQUIREMENTS
A. Provide components and installation capable of producing piping systems with following minimum working-pressure ratings, unless otherwise indicated:
1. Soil, Waste, and Vent Piping: 10-foot head of water.
1.4 SUBMITTALS
A. Product Data: For each plumbing specialty indicated. Include rated capacities of selected equipment.
Indicate materials, finishes, dimensions, required clearances, and methods of assembly of components, and piping for the following plumbing specialty products:
1. Drain trap seals.
2. Cleanouts.
3. Floor drains
1.5 QUALITY ASSURANCE
A. Product Options: Drawings indicate size, profiles, dimensional requirements, and characteristics of plumbing specialties and are based on the specific types and models indicated. Other manufacturers' products with equal performance characteristics may be considered.
B. Provide listing/approval stamp, label, or other marking on plumbing specialties made to specified standards.
C. Comply with ASME B31.9, "Building Services Piping," for materials, products, and installation.
Rex Text Box
ATTACHMENT #2
Revised 10-30-23
PLUMBING SPECIALTIES 221119-2
PART 2 - PRODUCTS
2.1 MANUFACTURERS
A. Manufacturers: Subject to compliance with requirements, provide products by one of the following:
1. Drain Trap Seals:
a. Proset Trap Guard
b. Rectorseal Sure Seal
c. IPS Green Drain
2. Cleanouts:
a. Josam Co.
b. Mifab
c. Smith: Jay R. Smith Mfg. Co.
d. Tyler Pipe, Wade Div.
e. Watts
f. Zurn Industries, Inc., Hydromechanics Div.
3. Floor Drains:
a. Josam Co.
b. Mifab
c. Smith: Jay R. Smith Mfg. Co.
d. Tyler Pipe, Wade Div.
e. Watts
f. Zurn Industries, Inc., Hydromechanics Div.
2.2 DRAIN TRAP SEALS
A. Drain Trap Seals: Fitting installs in drain body outlets to block sewer gases.
1. ASSE 1072 compliant.
2. HDPE or DBS plastic frame with silicon or EDPM sealing gasket.
2.4 CLEANOUT
A. Cleanout: Where plumbing specialties of this designation are indicated, provide products complying with the following and with the Fixture Schedule on the drawings.
1. Applicable Standard: ASME A112.36.2M. ASME A112.3.1.
2.4 FLOOR DRAIN
A. Floor Drain: Where plumbing specialties of this designation are indicated, provide products complying with the following and with Fixture Schedule on drawings:
1. Applicable Standard: ASME A112.21.1M. ASME A112.21.1M floor drain with ASME
A112.14.1 backwater valve. ASME A112.3.1.
PLUMBING SPECIALTIES 221119-3
PART 3 - EXECUTION
3.1 PLUMBING SPECIALTY INSTALLATION
A. General: Install plumbing specialty components, connections, and devices according to manufacturer's written instructions.
B. Install drain trap seals in drain body outlets as noted.
C. Install cleanouts in aboveground piping and building drain piping as indicated, according to the following:
1. Size same as drainage piping up to 4-inch NPS. Use 4-inch NPS for larger drainage piping unless larger cleanout is indicated.
D. Install cleanout deck plates, of types indicated, with top flush with finished floor, for floor cleanouts for piping below floors.
E. Install cleanout wall access covers, of types indicated, with frame and cover flush with finished wall, for cleanouts located in concealed piping.
F. Install floor drains at low points of surface areas to be drained. Set grates of drains flush with finished floor or as indicated. Size outlets as indicated.
G. Set floor drains below elevation of surrounding finished floor to allow floor drainage. Set with grates depressed.
H. Install individual traps for floor drains connected to sanitary building drain, unless otherwise indicated.
I. Install floor-drain flashing collar or flange so no leakage occurs between drain and adjoining flooring.
Maintain integrity of waterproof membranes where penetrated.
J. Position floor drains for easy access and maintenance.
3.2 CONNECTIONS
A. Piping installation requirements are specified in other Division 22 sections. Drawings indicate general arrangement of piping, fittings, and specialties. The following are specific connection requirements:
1. Install piping connections between plumbing specialties and piping specified in other
Division 22 sections.
2. Install piping connections indicated between appliances and equipment specified in other
Sections; connect directly to plumbing piping systems.
3. Install piping connections indicated as indirect wastes from appliances and equipment specified in other Sections, to spill over receptors connected to plumbing piping systems.
PLUMBING SPECIALTIES 221119-4
B. Drainage Runouts to Plumbing Specialties: Install drainage and vent piping, with approved trap, of sizes indicated, but not smaller than required by authorities having jurisdiction.
3.3 COMMISSIONING
A. Before startup, perform the following checks:
1. System tests are complete.
2. Damaged and defective specialties and accessories have been replaced or repaired.
3. Clear space is provided for servicing specialties.
B. Before operating systems, perform the following steps:
1. Verify that drainage and vent piping are clear of obstructions. Flush with water until clear.
C. Adjust operation and correct deficiencies discovered during commissioning.
3.4 PROTECTION
A. Protect drains during remainder of construction period to avoid clogging with dirt and debris and to prevent damage from traffic and construction work.
B. Place plugs in ends of uncompleted piping at end of each day or when work stops.
END OF SECTION 221119
PLUMBING FIXTURE SCHEDULE KEYNOTES
PROVIDE "TRUEBRO LAV GUARD" PROTECTIVE PIPE COVERS ON WASTE AND SUPPLY PIPING.
IF NO HOT WATER IS PROVIDED, PIPE COLD WATER TO BOTH SIDES OF FAUCET. USE COMPRESSION TEE AND
90° EL.
EWC-2
GENERAL PLUMBING NOTES
THE LOCATIONS OF EXISTING UNDERGROUND UTILITIES ARE SHOWN IN AN APPROXIMATE WAY ONLY. THE CONTRACTOR SHALL DETERMINE THE EXACT LOCATION OF ALL EXISTING UTILITIES BEFORE COMMENCING WORK. HE SHALL BE FULLY RESPONSIBLE FOR ANY AND ALL DAMAGES WHICH MIGHT BE OCCASIONED BY HIS FAILURE TO EXACTLY LOCATE AND PRESERVE ANY AND ALL
UNDERGROUND UTILITIES.
NOT ALL EXISTING WORK IS SHOWN AND THAT SHOWN IS IN ITS APPROXIMATE LOCATION AND ARRANGEMENT. CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING LOCATIONS, ARRANGEMENTS, SIZES AND CONDITIONS AND IN CASE OF DISCREPANCY TO CONTACT THE ARCHITECT FOR RELOCATION AND REMOVAL OF SAID ELEMENTS IN ACCORDANCE WITH THE BASIC INTENTIONS INDICATED BY THE DRAWINGS AND DETAILS. NOT ALL EXISTING WORK IS SHOWN AND THAT SHOWN IS IN ITS APPROXIMATE LOCATION AND ARRANGEMENT. EXACT LOCATION, ARRANGEMENT, AND SIZES SHALL BE VERIFIED ON THE JOB BEFORE PROCEEDING WITH ANY NEW WORK. EXACT LOCATIONS AND ROUGHING REQUIREMENTS FOR ALL FIXTURES AND EQUIPMENT SHALL BE DETERMINED FROM ARCHITECTURAL DRAWINGS, LARGE SCALE ARCHITECTURAL DETAILS AND APPROVED MANUFACTURER'S SHOP DRAWINGS. PARTICULAR ATTENTION SHALL BE DIRECTED TO FIXTURES OR EQUIPMENT FURNISHED
UNDER OTHER DIVISIONS.
EXERCISE CARE SO AS NOT TO CUT ANY EXISTING UTILITIES OR SERVICES. WHERE AN EXISTING UTILITY LINE OR SERVICE LINE IS CUT IT SHALL BE REPAIRED TO "LIKE-NEW" CONDITION. INTERRUPTION OF SERVICE SHALL NOT BE MADE WITHOUT PRIOR
WRITTEN PERMISSION OF THE OWNER.
EXACT LOCATIONS AND ROUGHING REQUIREMENTS FOR ALL FIXTURES, EQUIPMENT AND PIPING SHALL BE DETERMINED FROM ARCHITECTURAL DRAWINGS, LARGE SCALE ARCHITECTURAL DETAILS, APPROVED MANUFACTURER'S SHOP DRAWINGS AND JOB CONDITIONS. CONTRACTOR SHALL COORDINATE THE INSTALLATION OF HIS WORK WITH THAT OF OTHER TRADES AND ARRANGE PIPING TO CLEAR STRUCTURAL MEMBERS AND DUCTWORK. RISERS FOR FIXTURES, UNLESS OTHERWISE NOTED, SHALL BE CONCEALED IN WALLS OR PIPE CHASES. PIPING IS SHOWN IN ITS GENERAL LOCATION (UNLESS DIMENSIONED).
INVERT ELEVATIONS SHOWN SHALL BE VERIFIED ON THE JOB BEFORE INSTALLING ANY NEW PIPE. INSTALL TEST-TEES WHEN THE
SANITARY SEWER SYSTEM IS TO BE TESTED IN SECTIONS.
REFER TO ARCHITECTURAL FINISH SCHEDULE AND ELEVATIONS FOR DETAILS OF FLOORS WHERE FLOOR DRAINS AND CLEANOUTS
ARE LOCATED.
PROVIDE SLEEVES FOR PIPES PASSING THRU FLOORS, MASONRY WALLS AND FIRE OR SMOKE PARTITIONS. PACK ANNULAR SPACE
BETWEEN PIPE WITH MATERIAL APPROVED IN U.L. BUILDING DIRECTORY.
COOLER
FREEZER
MATCHLINE 'E'
MATCHLINE 'A'
MATCHLI
CONFERENCE
RECEP/WAITING
PRINCIPAL
CLOSET
CLOSET
TOILET
VESTIBULE
GENERAL OFFICE
HALL
VAULT
OFFICE
HALL
CLINIC
TOILET
TOILET
OFFICE
MECHANICAL
BOOKKEEPING
DISPLAY
WORK ROOM
SUPPLIES
TEACHER WORK ROOM
TEACHER'S LOUNGE
WAITING
COUNSELOR
CLOSET
WOMEN
TOILET
GIRLS TOILET
CORRIDOR
CORRIDOR
JANITOR
SPECIAL ED
MUSIC
STORAGE
ELECTRICAL
SPECIAL ED
SPECIAL ED
TOILET
BOOKS
STORAGE
CORRIDOR
BOYS TOILET
CAFETERIA
SERVING
KITCHEN
OFFICE
DRY FOOD STORAGE
STORAGE
LOCKERS
LAUN.
TOILET
DISHWASHING
DISH RETURN
ELECTRICAL
317 LOADING DOCK
MECHANICAL
CAN WASH
7/25/2023 23.02
T E
L F
A
IR
C O
U N
T Y
E L
E M
E N
T A
R Y
S C
H O
O L
R E
N O
V A
T
IO
N A
N D
U
PG
R A
D E
S T
O T
H E
F O
R T
H E
T E
L F
A
IR
C O
U N
T Y
B O
A R
D O
F E
D U
C A
T
IO
N M
R . L
E N
A R
D H
A R
R E
L
SO
N , S
U
PE
R
IN
T E
N D
E N
T
M C
R A
E , G
E O
R G
IA
W
RI
TT
EN
P
ER
M
IS
S
IO
N
TH
ES
E
DO
CU
M
EN
TS
A
S
IN
S
TR
UM
EN
TS
O
F
PR
OP
ER
TY
O F
TH
E
A
RC
H
IT
EC
T
A
ND
N O
PA
RT
T H
ER
EO
F M
A Y
BE
US
ED
O
R
RE
PR
OD
UC
ED
S
ER
VI
CE
, R
EM
A
IN
T H
E
IN
A
NY
F
OR
M
W
IT
H
OU
T
RE
VI
S
IO
NS
NO
DA
TE
DATE:
FILE:
SHEET
721 WALNUT STREET
POST OFFICE BOX 6926
MACON GEORGIA 31208
phone 478-742-4999 fax 478-742-5207
DELOACH
ARCHITECTS
PC
arch.group@deloacharchitects.com
SCALE: SEE PLANS
CONSTRUCTION DOCUMENTS
PLUMBING PLAN - AREA A
P1.01
PLOT DATE:
FILENAME:
PLOT SCALE:
AU
GU
ST
A, G A
(7
) 7
-3
CO
PY
RI
GH
T
PF
A
EN
GI
N
EE
RI
N G, IN
C.
10/30/23 23012P1
1 = 96
MFJ/JCP
A
KEYPLAN
N
B
C D E
P1.01 SCALE: 1/8" = 1'-0"
REMOVE & REPLACE EXISTING WATER CLOSET WITH NEW WATER CLOSET. REMOVE FLUSH VALVE TRAP PRIMERS AND TERMINATE PRIMER SUPPLIES FLUSH WITH WALL. CONNECT TO EXISTING PIPING. PROVIDE FLUSH VALVE AND
APPURTENANCES.
REMOVE & REPLACE EXISTING LAVATORY/SINK FAUCET. CONNECT TO EXISTING PIPING. PROVIDE NEW FAUCET, STOPS, SUPPLIES & P-TRAPS DRAIN AT LAVATORY/SINK. CLEAN FIXTURE.
REMOVE & REPLACE EXISTING KOHLER K-5016 URINAL WITH NEW KOHLER K-5016 URINAL. CONNECT TO EXISTING PIPING. PROVIDE FLUSH VALVE AND APPURTENANCES. REPLACE WASTE OUTLET TO ENSURE WATER-TIGHT
CONNECTION. PROVIDE NEW URINAL WALL MOUNTING BRACKETS.
REMOVE & REPLACE EXISTING WATER COOLER WITH NEW WATER COOLER. CONNECT TO EXISTING PIPING. RE-ROUGH
PIPING AS NECESSARY FOR INSTALLATION & FOR REVISED MOUNTING HEIGHT.
PROVIDE NEW SHUTOFF VALVE IN EXISTING COLD WATER MAIN. FIELD VERIFY EXACT SIZE AND LOCATION.
REMOVE & REPLACE EXISTING WATER HEATER. PROVIDE NEW WATER HEATER, EXPANSION TANK & DIELECTRIC
UNIONS. CONNECT TO EXISTING PIPING.
REMOVE AND STORE EXISTING LAVATORY & WALL SUPPORTS. REINSTALL EXISTING LAVATORY & WALL SUPPORTS AFTER NEW WALL TILE WORK IS COMPLETED. REMOVE & REPLACE EXISTING FAUCET, STOPS, SUPPLIES & P-TRAP DRAIN WITH NEW FAUCET, STOPS, SUPPLIES & P-TRAP DRAIN. CONNECT TO EXISTING PIPING.
CHIP OUT EXISTING CLEANOUT AND ADJUST CLEANOUT COVER TO MATCH NEW FLOOR FINISH
CHIP OUT EXISTING FLOOR DRAIN AND ADJUST DRAIN GRATE TO MATCH NEW FLOOR FINISH. PROVIDE DRAIN TRAP SEAL DEVICE EQUAL TO MIFAB MI-GARD IN EXISTING FLOOR DRAIN. ROD OUT AND FLUSH EXISTING FLOOR DRAIN
WITH WATER TO ENSURE IT DRAINS ADEQUATE.Y.
REMOVE AND STORE EXISTING COUNTER MOUNTED LAVATORY. REMOVE & REPLACE EXISTING FAUCET, STOPS, SUPPLIES & P-TRAP DRAIN WITH NEW FAUCET, STOPS, SUPPLIES & P-TRAP DRAIN. CONNECT TO EXISTING PIPING.
1 1
1 1
2 2
EWC-2
EWC-2EWC-1
EWC-1
WC-3
LAV-3
PS-1
WC-1 WC-1
LAV-1
WC-1
LAV-1
WC-1
LAV-1
LAV-3
LAV-3
LAV-3
WC-3
WC-2
WC-2
WC-2
WC-2
WC-2
WC-2
WC-2
WC-3
LAV-3
LAV-3
LAV-3
UR-2
UR-1
UR-1
UR-1
UR-1
WC-1
LAV-1
WC-3
WC-1
WC-1
WC-1
LAV-2
LAV-2
43 "
43 "
2"
2"
3" 3" 3" 3"
ECW ECW ECW ECW
EC
W
EC
W
EC
W
1 "2
ECW
2" 1 "2
N E5
DOMESTIC WATER HEATER SCHEDULE
ITEM
DWH-1
INPUT RECOVERY INLET/OUTLET
(@ 80F RISE) (INCHES)
SOURCE
DWH-4
DWH-3
BASIS OF DESIGN
MODEL NO.
STORAGE
(GALLONS)
ELECTRICITY
ELECTRICITY 4.5 KW 3/4
DWH-2 ELECTRICITY
ELECTRICITY 54 KW 1
BRADFORD WHITE RE130L630
62 GPH
23 GPH
3/410
2"
ECW
N E5
2 S-1
S-1
S-1
DWH-1
DWH-4 6
DWH-5 6
DWH-3
DWH-5 ELECTRICITY
ELECTRICITYDWH-6 ELECTRICITY
DWH-7 ELECTRICITY
S-1
PS-1
S-1
HGT.
RIM
PLUMBING FIXTURE SCHEDULE
SYMBOL FIXTURE VENTBRANCH
CONN.
WASTE
WATER
COLD HOT
WATER BASIS OF DESIGN
APRON
BOTTOM
29"
LAV-1
WC-1
UR-1
WC-2
S-1 SINK 1-1/2"
2"
1-1/2" 1/2" 1/2" DECK
ZURN Z7870C-XL FAUCET
WATER CLOSET
4"
4" 2" 1" - 15"
KOHLER K-96053, SLOAN 111-1.28-YK
F.V., CENTOCO 500STSCCSS WHITE SEAT
URINAL 2"
2" 1-1/2" 3/4" - 18"
WATER CLOSET
(ADA ADULT)
4"
4"
2" 1" - 18" KOHLER K-96057,SLOAN 111-1.28-YK
F.V., CENTOCO 500STSCCSS WHITE SEAT
LAVATORY
(WALL HUNG)
1-1/4"
2"
1-1/2" 1/2"1/2" RE-USE EXISTING LAVATORY
ZURN Z86300-XL-CP4
WC-3
WATER CLOSET
4" 2" 1" 15"
KOHLER K-96053, SLOAN 111-1.28-YK
F.V., CENTOCO 500STSCCSS WHITE SEAT
APRON
BOTTOM
25"
LAV-3 LAVATORY
(WALL HUNG)
1-1/4"
2"
1-1/2" 1/2" -
(ADA STUDENT)
4"
PS-1 PRIMARY SINK 1-1/2"
2"
1-1/2" 1/2" - DECK
ZURN Z825B1-XL-5F FAUCET
& ZURN Z83600-XL BUBBLER,
(ADA STUDENT)
(ADA ADULT)
(STD HEIGHT)
DECKLAV-2 LAVATORY
(DECK MTD)
1-1/4"
2"
1-1/2" 1/2" 1/2"
KOHLER K-5016-ET-0 URINAL
SLOAN 186-0.5-YK FLUSH VALVE
RE-USE EXISTING LAVATORY
RE-USE EXISTING LAVATORY
EXISTING FIXTURE TO REMAIN
4.5 KW 3/4 BRADFORD WHITE RE130L623 GPH
2.5 KW BRADFORD WHITE RE112T612 GPH
3/4102.5 KW BRADFORD WHITE RE112T612 GPH
BRADFORD WHITE CEHD-120-(A)54-3CF
54 KW 162 GPH 119 BRADFORD WHITE CEHD-120-(A)54-3CF
3/4102.5 KW BRADFORD WHITE RE112T612 GPH
LAV-1
ZURN Z81101-XL-16M FAUCET
ZURN Z81101-XL-16M FAUCET
DWH-8 ELECTRICITY 3/4102.5 KW BRADFORD WHITE RE112T612 GPH
EXISTING FIXTURE TO REMAIN
EXISTING TO REMAIN
TURN OVER ANY FIXTURE, FAUCET OR FLUSH VALVE THAT IS REMOVED AND NOT REINSTALLED TO OWNER. DELIVER ITEM TO OWNER'S
LOCAL WAREHOUSE AS DIRECTED BY OWNER.
PROVIDE EXPANSION TANK EQUAL TO AMTROL ST-5 WITH 2.2 GAL ACCEPTANCE.
SCHEDULE NOTES:
PROVIDE EXPANSION TANK EQUAL TO AMTROL ST-12 WITH 2.2 GAL ACCEPTANCE.
(1) (2)
(2)
(2)
(1)
(1)
(1)
(1)
(1)
(1)
EFD
EFD
EFD
EFD
EFD
EFD
GENERAL DEMOLITION NOTE
KEYNOTES:
NOT TO SCALE
EXPANSION TANK
ASME T&P RELIEF VALVE
DIELECTRIC UNION
(TYPICAL)
FINISHED FLOOR
WATER HEATER
THERMOMETER
ROUTE T&P RELIEF
FULL SIZE TO FLOOR
DRAIN OR MOP
RECEPTOR
P1.01
PIPING, IN COPPER,
EXISTING COLD WATER SUPPLY
EXISTING HOT WATER SUPPLY
EXISTING HOT WATER RETURN
EXISTING
RECIRCULATING
PUMP
N E
N E
WATER COOLER
(ADA STUDENT)
1-1/4"
2"
1-1/2" 1/2" - ORIFICE
30"
ELKAY LVRC8WSK
WITH BOTTLE FILLER
WATER COOLER
(ADA STUDENT)
1-1/4"
2"
1-1/2" 1/2" - ORIFICE
30"
ELKAY VRC8S
STAINLESS STEEL FINISH
UR-2 URINAL
(ADA STUDENT)
2"
2"
1-1/2" 3/4" - 15" KOHLER K-5016-ET-0 URINAL
SLOAN 186-0.5-YK FLUSH VALVE
(APPLIES TO SHEETS P1.01, P1.02, P1.03, P1.04 & P1.05)
S-2 SINK 1-1/2"
2"
1-1/2" 1/2" 1/2" DECK ZURN Z7870C-XL FAUCET
JUST SL-ADA-1921-AGR 6"DEEP,18GA
McGUIRE 1151AWC DRAIN
IMB ICE MAKER BOX -
- 1/2" - 12" OATEY 39141 W/FACEPLATE
APRON
BOTTOM
29"
LAV-4 LAVATORY
(WALL HUNG)
1-1/4"
2"
1-1/2" 1/2"1/2" KOHLER K-2032 LAVATORY,
1(ADA ADULT)
ZURN Z81101-XL-16M FAUCET
2 MCGUIRE 155A GRID DRAIN
-1
7-
S
TA
FF
R
ES
TR
OO
M
A
DD
IT
IO
N
-5
-2
UR
IN
A L
RE
VI
S
IO
NS
STORAGE
LOCKERS
TOILET
DISHWASHING
DISH RETURN
4"
ESS
4"
EV
2"
N E
N E
2" 211 "
EWC-1
P1.01 SCALE: 1/8" = 1'-0"
EC
W
EXISTING 1/2" CW
TO TRAP PRIMER
N E
1 "2
1 "2
SAWCUT AND PATCH FLOOR SLAB AS NECESSARY FOR INSTALLATION NEW PIPING. TROWEL TO MATCH EXISTING FINISH.
GENERAL NOTE
-3
-2
OW
NE
R
RE
QU
ES
TE
D
RE
VI
S
IO
N
ECO
ECO
ECO
ECO
ECO
ECO
ECO
ECO 8
ECO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1"
AutoCAD SHX Text 3/4
AutoCAD SHX Text 1/2
AutoCAD SHX Text 1/4
AutoCAD SHX Text
REFERENCE SCALE
AutoCAD SHX Text
PLUMBING PLAN - AREA A
AutoCAD SHX Text N
AutoCAD SHX Text
WATER HEATER PIPING DETAIL
AutoCAD SHX Text
PLUMBING PART PLAN - AREA A
7/25/2023 23.02
T E
L F
A
IR
C O
U N
T Y
E L
E M
E N
T A
R Y
S C
H O
O L
R E
N O
V A
T
IO
N A
N D
U
PG
R A
D E
S T
O T
H E
F O
R T
H E
T E
L F
A
IR
C O
U N
T Y
B O
A R
D O
F E
D U
C A
T
IO
N M
R . L
E N
A R
D H
A R
R E
L
SO
N , S
U
PE
R
IN
T E
N D
E
R A
E , G
E O
R G
IA
W
RI
TT
EN
P
ER
M
IS
S
IO
N
TH
ES
E
DO
CU
M
EN
TS
A
S
IN
S
TR
UM
EN
TS
O
F
PR
OP
ER
TY
O F
TH
E
A
RC
H
IT
EC
T
A
ND
N O
PA
RT
T H
ER
EO
F M
A Y
BE
US
ED
O
R
RE
PR
OD
UC
ED
S
ER
VI
CE
, R
EM
A
IN
T H
E
IN
A
NY
F
OR
M
W
IT
H
OU
T
RE
VI
S
IO
NS
NO
DA
TE
DATE:
FILE:
SHEET
721 WALNUT STREET
POST OFFICE BOX 6926
MACON GEORGIA 31208
phone 478-742-4999 fax 478-742-5207
DELOACH
ARCHITECTS
PC
arch.group@deloacharchitects.com
SCALE: SEE PLANS
CONSTRUCTION DOCUMENTS
PLUMBING PLAN - AREA B
P1.02
A
KEYPLAN
N
B
C D E
P1.02 SCALE: 1/8" = 1'-0"
MATCHLINE 'B'
MATC
HLIN
E 'B
MATC
HLIN
E 'C'
M
AT
CH
LIN
E 'B
M
AT
CH
LIN
E 'A
FRONT CANOPY
LOBBY
BO
CORRIDOR
DISPLAY
DISPL
COMMONS
MEDIA CENTER
CONTROL ROOM
VIDEO PRODUCTION
CONFERENCE
MECHANICAL
MDF ROOM
AV/BOOK STORAGE
WORK ROOM
OFFICE
CLOSET
CORRIDOR
CORRIDOR
SPECIAL ED
STORAGE
COMPUTER SCIENCE
STORAGE
ELECTRICAL
CORRIDOR
B
CORRIDOR
CLASSROOM
KILN
ART
GIRLS
BOYS
STORAGE
MULTI-PURPOSE
PLATFORM
ELECTRICAL
RAMP
STORAGE
OFFICE
PLOT DATE:
FILENAME:
PLOT SCALE:
AU
GU
ST
A, G A
(7
) 7
-3
CO
PY
RI
GH
T
PF
A
EN
GI
N
EE
RI
N G, IN
C.
10/30/23 23012P1
1 = 96
MFJ/JCP
EWC-2
EWC-2
EWC-1
LAV-3
LAV-3
LAV-3
WC-3
WC-2
WC-2
WC-2
WC-2
WC-2
WC-2
WC-2
WC-3
LAV-3
LAV-3
LAV-3 UR-2
UR-1
UR-1
UR-1
UR-1
PS-1
WC-3
12 2"
3"
12 2"
12 2"
2"2"
43 "
3"
ECW
EC
W
ECW ECW ECW
EC
W
EC
W
EC
W
ECW
N E 5
N E5
N E5
12 2"
ECW
12 2"
ECW
2 S-1
DWH-2
2 PS-1
S-1
EC
W
12 2"
12 2"
S-1S-1
S-1
EXISTING TO REMAIN
EFD
EFD
EFD
EFD
-5
-2
UR
IN
A L
RE
VI
S
IO
NS
ECO
ECO
ECO
ECO
ECO
ECO
ECO
-3
-2
OW
NE
R
RE
QU
ES
TE
D
RE
VI
S
IO
N
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING PLAN - AREA B
AutoCAD SHX Text N
AutoCAD SHX Text 1"
AutoCAD SHX Text 3/4
AutoCAD SHX Text 1/2
AutoCAD SHX Text 1/4
REFERENCE SCALE
T E
L F
A
IR
C O
U N
T Y
E L
E M
E N
T A
R Y
S C
H O
O L
R E
N O
V A
T
IO
N A
N D
U
PG
R A
D E
S T
O T
H E
F O
R T
H E
T E
L F
A
IR
C O
U N
T Y
B O
A R
D O
F E
D U
C A
T
IO
N M
R . L
E N
A R
D H
A R
R E
L
SO
N , S
U
PE
R
IN
T E
N D
E
R A
E , G
E O
R G
IA
W
RI
TT
EN
P
ER
M
IS
S
IO
N
TH
ES
E
DO
CU
M
EN
TS
A
S
IN
S
TR
UM
EN
TS
O
F
PR
OP
ER
TY
O F
TH
E
A
RC
H
IT
EC
T
A
ND
N O
PA
RT
T H
ER
EO
F M
A Y
BE
US
ED
O
R
RE
PR
OD
UC
ED
S
ER
VI
CE
, R
EM
A
IN
T H
E
IN
A
NY
F
OR
M
W
IT
H
OU
T
RE
VI
S
IO
NS
NO
DA
TE
DATE:
FILE:
SHEET
721 WALNUT STREET
POST OFFICE BOX 6926
MACON GEORGIA 31208
phone 478-742-4999 fax 478-742-5207
DELOACH
ARCHITECTS
PC
arch.group@deloacharchitects.com
SCALE: SEE PLANS
CONSTRUCTION DOCUMENTS
PLUMBING PLAN - AREA C
P1.03 A
KEYPLAN
N
B
C D E
P1.03 SCALE: 1/8" = 1'-0"
P1.03 SCALE: 1/8" = 1'-0"MATC
HLIN
E 'B
MATC
HLIN
E 'C'
4TH GRADE
CORRIDOR
4TH GRADE
4TH GRADE
4TH GRADE
4TH GRADE
4TH GRADE
4TH GRADE
4TH GRADE
SPECIAL ED
SPECIAL ED
SPECIAL ED
SPECIAL ED
ENTRY
CORRIDOR
ENTRY
GIRLS
BOYS
IDF
JAN
BOOK ROOM
ELECTRICAL
5TH GRADE
5TH GRADE
5TH GRADE
5TH GRADE
5TH GRADE
5TH GRADE
5TH GRADE
5TH GRADE
5TH GRADE
5TH GRADE
ENTRY
CORRIDOR
PLOT DATE:
FILENAME:
PLOT SCALE:
AU
GU
ST
A, G A
(7
) 7
-3
CO
PY
RI
GH
T
PF
A
EN
GI
N
EE
RI
N G, IN
C.
10/30/23 23012P1
1 = 96
MFJ/JCP
PS-1
PS-1
UR-1
3UR-1
UR-1WC-3
WC-2
WC-2
WC-2
WC-2
UR-1
UR-2
LAV-3
LAV-3
LAV-3
WC-3
WC-2
WC-2
WC-2
WC-2
WC-2
LAV-3
LAV-3
LAV-3
WC-3
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
EFD
EFD
EFD
EFD
REPAIR LEAK AT FLUSH VALVE WATER SUPPLY
IN WALL. REPLACE COPPER RUNOUT IN WALL
IF NECESSARY.
REPAIR LEAK AT FLUSH VALVE WATER SUPPLY
IN WALL. REPLACE COPPER RUNOUT IN WALL
IF NECESSARY.
SEE PART PLANS 1/P1.06, 2/P1.06. 3/P1.06
& 4/P1.06 FOR DEMOLITION AND NEW WORK
IN THIS AREA.
-1
7-
S
TA
FF
R
ES
TR
OO
M
A
DD
IT
IO
N
-5
-2
UR
IN
A L
RE
VI
S
IO
NS
ECO
ECO
ECO
ECO
-3
-2
OW
NE
R
RE
QU
ES
TE
D
RE
VI
S
IO
N
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING PLAN - AREA C
AutoCAD SHX Text
PLUMBING PLAN - AREA C
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text 1"
AutoCAD SHX Text 3/4
AutoCAD SHX Text 1/2
AutoCAD SHX Text 1/4
T E
L F
A
IR
C O
U N
T Y
E L
E M
E N
T A
R Y
S C
H O
O L
R E
N O
V A
T
IO
N A
N D
U
PG
R A
D E
S T
O T
H E
F O
R T
H E
T E
L F
A
IR
C O
U N
T Y
B O
A R
D O
F E
D U
C A
T
IO
N M
R . L
E N
A R
D H
A R
R E
L
SO
N , S
U
PE
R
IN
T E
N D
E
R A
E , G
E O
R G
IA
W
RI
TT
EN
P
ER
M
IS
S
IO
N
TH
ES
E
DO
CU
M
EN
TS
A
S
IN
S
TR
UM
EN
TS
O
F
PR
OP
ER
TY
O F
TH
E
A
RC
H
IT
EC
T
A
ND
N O
PA
RT
T H
ER
EO
F M
A Y
BE
US
ED
O
R
RE
PR
OD
UC
ED
S
ER
VI
CE
, R
EM
A
IN
T H
E
IN
A
NY
F
OR
M
W
IT
H
OU
T
RE
VI
S
IO
NS
NO
DA
TE
DATE:
FILE:
SHEET
721 WALNUT STREET
POST OFFICE BOX 6926
MACON GEORGIA 31208
phone 478-742-4999 fax 478-742-5207
DELOACH
ARCHITECTS
PC
arch.group@deloacharchitects.com
SCALE: SEE PLANS
CONSTRUCTION DOCUMENTS
PLUMBING PLAN - AREA D
P1.04 A
KEYPLAN
N
B
C D E
P1.04 SCALE: 1/8" = 1'-0"
P1.04 SCALE: 1/8" = 1'-0"
MATCHLINE 'D'
ENTRY
ENTRY
CORRIDOR
CORRIDOR
2ND GRADE
ENTRY
2ND GRADE
2ND GRADE
2ND GRADE
2ND GRADE
2ND GRADE
2ND GRADE
2ND GRADE
2ND GRADE
2ND GRADE
BOYS
GIRLS
JAN
IDF
BOOK ROOM
ELECTRICAL
MATCHLINE 'D'
MATCHLINE 'B'
MATCHLINE '
MATCHLINE '
3RD GRADE
3RD GRADE
3RD GRADE
3RD GRADE
3RD GRADE
3RD GRADE
3RD GRADE
SPECIAL ED
CORRIDOR
SPECIAL ED
PLOT DATE:
FILENAME:
PLOT SCALE:
AU
GU
ST
A, G A
(7
) 7
-3
CO
PY
RI
GH
T
PF
A
EN
GI
N
EE
RI
N G, IN
C.
10/30/23 23012P1
1 = 96
MFJ/JCP
2PS-1
1 1 1 1
3 77
7 7 7
1 1 1 1 1 1 1
UR-1 UR-2
UR-1 UR-1 UR-1
WC-2
WC-3
WC-2 WC-2
WC-2
WC-2
WC-2 WC-2 WC-2
WC-2
WC-3
WC-3
LAV-3 LAV-3
LAV-3
LAV-3LAV-3
LAV-3
2 PS-1
2PS-12 PS-1
2PS-12 PS-1
2PS-1
2PS-12 PS-1
2PS-12 PS-1
2PS-12 PS-1
2PS-12 PS-1
2PS-12 PS-1
2PS-12 PS-1
EFD 9EFD 9
EFD 9
EFD 9
SEE PART PLANS 5/P1.06, 6/P1.06, 7/P1.06
& 8/P1.06 FOR DEMOLITION AND NEW WORK
IN THIS AREA.
3 3
-1
7-
S
TA
FF
R
ES
TR
OO
M
A
DD
IT
IO
N
-5
-2
UR
IN
A L
RE
VI
S
IO
NS
ECO 8
ECO 8
ECO 8
ECO 8
-3
-2
OW
NE
R
RE
QU
ES
TE
D
RE
VI
S
IO
N
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING PLAN - AREA D
AutoCAD SHX Text
PLUMBING PLAN - AREA D
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text 1"
AutoCAD SHX Text 3/4
AutoCAD SHX Text 1/2
AutoCAD SHX Text 1/4
T E
L F
A
IR
C O
U N
T Y
E L
E M
E N
T A
R Y
S C
H O
O L
R E
N O
V A
T
IO
N A
N D
U
PG
R A
D E
S T
O T
H E
F O
R T
H E
T E
L F
A
IR
C O
U N
T Y
B O
A R
D O
F E
D U
C A
T
IO
N M
R . L
E N
A R
D H
A R
R E
L
SO
N , S
U
PE
R
IN
T E
N D
E
R A
E , G
E O
R G
IA
W
RI
TT
EN
P
ER
M
IS
S
IO
N
TH
ES
E
DO
CU
M
EN
TS
A
S
IN
S
TR
UM
EN
TS
O
F
PR
OP
ER
TY
O F
TH
E
A
RC
H
IT
EC
T
A
ND
N O
PA
RT
T H
ER
EO
F M
A Y
BE
US
ED
O
R
RE
PR
OD
UC
ED
S
ER
VI
CE
, R
EM
A
IN
T H
E
IN
A
NY
F
OR
M
W
IT
H
OU
T
RE
VI
S
IO
NS
NO
DA
TE
DATE:
FILE:
SHEET
721 WALNUT STREET
POST OFFICE BOX 6926
MACON GEORGIA 31208
phone 478-742-4999 fax 478-742-5207
DELOACH
ARCHITECTS
PC
arch.group@deloacharchitects.com
SCALE: SEE PLANS
CONSTRUCTION DOCUMENTS
PLUMBING PLAN - AREA E
P1.05 A
KEYPLAN
N
B
C D E
P1.05 SCALE: 1/8" = 1'-0"
P1.05 SCALE: 1/8" = 1'-0"
MATC
1ST GRADE
ENTRY
1ST GRADE
TOILET
VEST.
TOILET
TOILET
VEST.
TOILET
CORRIDOR
1ST GRADE
1ST GRADE
1ST GRADE
1ST GRADE
TOILET
VEST.
TOILET
TOILET
VEST.
TOILET
1ST GRADE
1ST GRADE
1ST GRADE
1ST GRADE
TOILET
VEST.
TOILET
TOILET
VEST.
TOILET
KINDERGARTEN
KINDERGARTEN
ENTRY
ENTRY
CORRIDOR
MATCHLINE 'E'
KINDERGARTEN
KINDERGARTEN
TOILET
VEST.
TOILET
TOILET
VEST.
TOILET
KINDERGARTEN
KINDERGARTEN
CORRIDOR
KINDERGARTEN
KINDERGARTEN
TOILET
VEST.
TOILET
TOILET
VEST.
TOILET
KINDERGARTEN
KINDERGARTEN
IDF
JAN
ELECTRICAL
BOOK ROOM
PLOT DATE:
FILENAME:
PLOT SCALE:
AU
GU
ST
A, G A
(7
) 7
-3
CO
PY
RI
GH
T
PF
A
EN
GI
N
EE
RI
N G, IN
C.
10/30/23 23012P1
1 = 96
MFJ/JCP
PS-1
PS-1
PS-1
PS-1
PS-1
WC-3
LAV-3
LAV-3
WC-3
WC-3
LAV-3
LAV-3
WC-3
WC-3
LAV-3
LAV-3
WC-3
WC-3
LAV-3
LAV-3
WC-3
WC-3
LAV-3
LAV-3
WC-3
WC-3
LAV-3
LAV-3
WC-3
WC-3
LAV-3
LAV-3
WC-3
WC-3
LAV-3
LAV-3
WC-3
WC-3
LAV-3
LAV-3
WC-3
WC-3
LAV-3
LAV-3
WC-3
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
PS-1
SEE PART PLANS 9/P1.06, 10/P1.06, 11/P1.06
& 12/P1.06 FOR DEMOLITION AND NEW WORK
IN THIS AREA.
-1
7-
S
TA
FF
R
ES
TR
OO
M
A
DD
IT
IO
N
EC
O
EC
O
EC
O
EC
O
EC
O
-3
-2
OW
NE
R
RE
QU
ES
TE
D
RE
VI
S
IO
N
AutoCAD SHX Text
AutoCAD SHX Text
PLUMBING PLAN - AREA E
AutoCAD SHX Text
PLUMBING PLAN - AREA E
AutoCAD SHX Text N
AutoCAD SHX Text N
AutoCAD SHX Text 1"
AutoCAD SHX Text 3/4
AutoCAD SHX Text 1/2
AutoCAD SHX Text 1/4
| 23012 P1.01.pdf |
| Sheets and Views |
| Model |
| 23012 P1.03.pdf |
| Sheets and Views |
| Model |
| 23012 P1.04.pdf |
| Sheets and Views |
| Model |
| 23012 P1.05.pdf |
| Sheets and Views |
| Model |
| 23012 P1.02.pdf |
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .