TEDF-B Grant #735 Road and Water Main Replacement - Bid Plans.pdf
PDF 22 MB Posted
- Attached to
- TEDF-B Grant #735 Road & Water Main Replacement
- Solicitation number
- 20326.02
- Issued by
- Wayne County, Dorr CDP, Michigan
About this file
The file is a comprehensive set of bid plans for the TEDF-B Grant #735 Road and Water Main Replacement project, developed by Giffels Webster for the City of Ecorse in Wayne County, Michigan. The project encompasses road and infrastructure improvements on three street segments: Florence Street from Joseph to Charlotte Avenue, Charlotte Avenue from W. Jefferson Avenue to Eliza Street, and Cherrygrove Street from W. Jefferson Avenue to its dead end. The work includes cold milling existing HMA surface, repaving with non-structural HMA overlay, full-depth pavement repairs, ADA curb ramp upgrades with new detectable warning surfaces, and comprehensive water main replacements. The project involves abandoning existing water mains, transferring services, and replacing some lead service lines. The bid plans are dated 04/21/2025 for bid submission, with the project developed under an EGLE Water Main Permit issued on the same date.
The project is funded through the TEDF-B Grant #735, with an estimated total project scope involving approximately 2,043 square yards of cold milling, 565 square yards of sidewalk removal, 162 linear feet of curb and gutter removal, and multiple water main and service line replacements across the three street segments. The bid documents specify detailed technical requirements, including specific materials (such as Class II granular material, concrete mixes, and ductile iron pipes), installation methods, and restoration standards. The project will require precise utility coordination, with multiple utility crossings and careful management of existing infrastructure. Contractors will need to adhere to Wayne County Department of Public Services standards, MDOT specifications, and include comprehensive erosion and sedimentation control measures throughout the construction process.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| TEDF-B Grant #735 Road and Water Main Replacement - Bid Book.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHARLOTTE AVENUE (W. JEFFERSON AVENUE TO ELIZA STREET)
FLORENCE STREET (CHARLOTTE AVENUE TO JOSEPH STREET)
CHERRYGROVE STREET (W. JEFFERSON AVENUE TO DEAD END)
WAYNE COUNTY, MICHIGAN
\\g we or g.p rv\ Al l_P ro jec ts\
Ma co mb \P ro jec ts\
9.0
0 E co rse W ate r S ys tem
D es ign G ra nt\
De sig n\C
AD
\W or k S he ets \C ha rlo tte A ve \01
C ov er S he et.
dw g
Copyright © 2025 Giffels Webster.
No reproduction shall be made without the prior written consent of Giffels Webster.
Engineers Surveyors Planners
Landscape Architects
1025 East Maple Road Suite 100
Birmingham, MI 48009 p (248) 852-3100 f (313) 962-5068 www.giffelswebster.com
Know what's below.
before you dig.Call
R
Developed For:
Executive:
Manager:
Designer:
Quality Control:
Project:
Sheet:
Scale:
Date:
ISSUE:DATE:
of 20519.00
M.K.
B.K.
J.P.K.
04.10.25
R.D.H.
CITY OF ECORSE
WAYNE COUNTY
MICHIGAN
ECORSE TEDF-B GRANT #735
ROAD & WATER MAIN REPLACEMENT
EGLE WATER MAIN PERMIT03/06/2025
FOR BIDS04/21/2025
NOTE:
ALL WORK SHALL BE PERFORMED
TO THE CURRENT CITY OF ECORSE
STANDARDS AND SPECIFICATIONS
DETROIT
RIVER
SALLIOTTE RD
TH
S T
9T H
ST
W OUTER DR
FL
O
RE
NC
E
ST
TH
S T
TH
S T
TH
S T
TH
S T
TH
S T
8T H
ST
7T
H
ST
EL
IZ
A
ST
JE
FF
ER
SO
N A
VE
TH
S T
TH
S T
C N
R .R
LOCATION MAP
SCALE: NONE
CHARLOTTE AVE.
CHERRYGROVE ST
COVER SHEET
########NONE
CITY OF ECORSE
TEDF-B GRANT #735 ROAD & WATER MAIN REPLACEMENT
THE UNDERGROUND UTILITIES SHOWN HAVE BEEN LOCATED FROM FIELD SURVEY
INFORMATION AND EXISTING DRAWINGS. THE SURVEYOR MAKES NO GUARANTEES
THAT THE UNDERGROUND UTILITIES SHOWN COMPRISE ALL SUCH UTILITIES IN THE
AREA, EITHER IN SERVICE OR ABANDONED. THE SURVEYOR FURTHER DOES NOT
WARRANT THAT THE UNDERGROUND UTILITIES SHOWN ARE IN THE EXACT LOCATION
INDICATED ALTHOUGH HE DOES CERTIFY THAT THEY ARE LOCATED AS ACCURATELY
AS POSSIBLE FROM INFORMATION AVAILABLE.
(R) = UTILITY SHOWN FROM RECORDS OR PLANS, & FIELD LOCATED WHERE POSSIBLE.
PRIOR TO THE PLANNED BUILDING IMPROVEMENTS, AND/ OR CONSTRUCTION, THE
RESPECTIVE UTILITY COMPANIES MUST BE NOTIFIED TO STAKE THE PRECISE LOCATION
OF THEIR UTILITIES.
OWNER/APPLICANT
CITY OF ECORSE
LAMAR TIDWELL, MAYOR
3869 WEST JEFFERSON
ECORSE, MI 48229
(313) 294-3740
ENGINEER
GIFFELS WEBSTER
BRENT KRAFT, PE
6303 26 MILE ROAD, SUITE 100
WASHINGTON, MI 48094
(586) 781-8950
LAMAR TIDWELL - MAYOR
KIMBERLY ALEXANDER - MAYOR PRO TEM
DONALD AGEE, JR. - COUNCILMEMBER
JARED BERRY - COUNCILMEMBER
LATONYA LAMB - COUNCILMEMBER
MONTEL LOVE - COUNCILMEMBER
ROGER PARKER SR. - COUNCILMEMBER
COUNCIL MEMBERS:
ECORSE WATER, SANITARY SEWER, AND STORM SEWER
ECORSE DEPARTMENT OF PUBLIC WORKS
ATTN: DAVID HALL
3869 W JEFFERSON AVE
ECORSE, MI 48229
PHONE: (313) 436-4010
DHALL@ECORSEMI.GOV
TELEPHONE / CABLE
AT&T
ATTN: JEFF HEATH
1700 CICOTTE AVENUE
LINCOLN PARK, MI 48146
PHONE: (248) 975-4588
JH.786@ATT.COM
COMCAST CABLEVISION
ATTN: DARYL WOOD
41112 CONCEPT DRIVE
PLYMOUTH, MI 48170
PHONE: (734) 359-1474
DARYL_WOOD@CABLE.COMCAST.COM
WINDSTREAM COMMUNICATIONS
ATTN: NICOLE HAMLIN
4001 N RODNEY PARHAM ROAD
LITTLE ROCK, AR 722212
PHONE: (319) 790-6683
NICOLE.HAMLIN@WINDSTREAM.COM
ELECTRICITY
DTE ENERGY
ATTN: ROBIN O'CONNELL
8001 HAGGERTY ROAD
BELLEVILLE, MI 48111
PHONE: (734) 397-4321
SWPD@DTEENERGY.COM
DTE ENERGY / MICHCON GAS
EMERGENCY LINE: 1-800-477-4747
ATTN: BASIL DJASMATI
17150 ALLEN ROAD
MELVINDALE, MI 48122
PHONE: (313) 389-7261
BASIL.DJASMATI@DTEENERGY.COM
UTILITY CONTACTS
UTILITY STATEMENT
AGENCY PERMIT # ISSUE DATE
EGLE ACT 399
WAYNE COUNTY DPS - CONSTRUCTION
WAYNE COUNTY DPS - SESC
TABLE OF CONTENTS
1 COVER SHEET
2 NOTES AND LEGEND
3 DETAILS
CHARLOTTE STREET
EXISTING CONDITIONS PLAN
WATER MAIN PLAN & PROFILE
WATER MAIN PLAN & PROFILE
SESC NOTES AND DETAILS
FLORENCE STREET
EXISTING CONDITIONS PLAN
WATER MAIN PLAN & PROFILE
CHERRYGROVE STREET
EXISTING CONDITIONS PLAN
WATER MAIN PLAN & PROFILE
WATER MAIN PLAN & PROFILE
ECORSE STANDARD DETAILS
WATER MAIN STANDARD DETAILS
WATER MAIN STANDARD DETAILS
REMOVAL AND EROSION CONTROL PLAN
REMOVAL AND EROSION CONTROL PLAN
PAVEMENT CORES
REMOVAL AND EROSION CONTROL PLAN
TYPICAL CROSS SECTION
TYPICAL CROSS SECTION
TYPICAL CROSS SECTION
WD-1
WD-2
PROJECT SITES
WAYNE COUNTY SUBDIVISION STANDARDS20
STORM SEWER
SANITARY SEWER
WATER MAIN
GAS MAIN
UNDERGROUND ELECTRIC LINES
UNDERGROUND TELEPHONE LINES
UNDERGROUND CABLE TELEVISION LINES
OVERHEAD LINES
PUBLIC LIGHTING LINES
STEAM LINES
FENCE LINE
PROJECT PHASE LIMIT LINE
CONCRETE CURB AND GUTTER (STANDARD)
CONCRETE CURB AND GUTTER (REVERSED)
THICKENED SLAB CURB/WALK
STORM MANHOLE
CATCH BASIN
YARD BASIN
INLET BASIN
END SECTION
ROOF/DOWN SPOUT
OVERFLOW/OUTLET STRUCTURE
STORM CLEAN OUT
SANITARY MANHOLE
SANITARY CLEAN OUT
SANITARY RISER
SANITARY PUMP STATION
xxx.xx 150.23
EXISTING PROPOSED
GATE VALVE
FIRE HYDRANT
STOP BOX AND VALVE
FDC CONNECTION
WATER METER
POST INDICATOR VALVE
WELL HEAD
IRRIGATION CONTROL BOX
LAWN IRRIGATION HEAD
GAS VALVE
GAS MANHOLE
GAS RISER
GAS METER
ELECTRIC MANHOLE
ELECTRIC RISER
ELECTRIC METER
ELECTRIC TRANSFORMER
LIGHT POLE
TELEPHONE MANHOLE
TELEPHONE RISER
TELEPHONE CROSS BOX
CABLE RISER
TRAFFIC CONTROL BOX
AIR CONDITIONER
PUBLIC LIGHTING MANHOLE
UTILITY POLE
GUY WIRE ANCHOR
UTILITY FLAG
SIGN POST
GUARD POST/BOLLARD
FENCE POST
PAY PHONE
PARKING METER
RESIDENTIAL MAILBOX
U.S. MAILBOX
BLDG CORNER (FIELD LOCATED)
TREE
WETLAND FLAG
SPOT ELEVATION
SOIL BORING
ASPH.
CONC.
A.C.
G.P.
C.L.F.
D.L.
F.F.
O.H.
F.I.
S.I.
F.I.P.
M. R.
F.M.
S.N.
REMOVE UTILITY STRUCTURE
REMOVE UTILITY PIPE
ABANDON UTILITY PIPE
CUT AND BULKHEAD UTILITY PIPE
REMOVE BUILDING
REMOVE CONCRETE PAVEMENT
REMOVE ASPHALT PAVEMENT
REMOVE SIDEWALK
ASPHALT
CONCRETE
AIR CONDITIONER
GUARD POST
CHAIN-LINK FENCE
DOOR LEDGE
FINISHED FLOOR
OVERHANG
FOUND IRON
SET IRON
FOUND IRON PIPE
MEASURED RECORD
FOUND MONUMENT
SET NAIL
COMPACTED SAND BACKFILL (CSB)
AGGREGATE MATERIAL
ASPHALT PAVEMENT
CONCRETE PAVEMENT
GENERAL NOTES
DEMOLITION NOTES
PAVING AND GRADING NOTES
GENERAL LEGEND
DEMOLITION LEGEND
PAVING AND GRADING HATCH LEGEND
EXISTING EXISTINGPROPOSED PROPOSED LEGEND - EXISTING
GROUND LIGHT
REINFORCED CONCRETE
PIPE
CORREGATED METAL PIPE
SURVEY CONTROL POINT
FINISHED FLOOR
SET NAIL
FOUND MONUMENT
OVERHANG
CHAIN-LINK FENCE
DOOR LEDGE
GUARD POST
FOUND IRON PIPE
MEASURED
RECORD
AIR CONDITIONER
FOUND IRON
CONCRETE
ASPHALT
SET IRON
MISC. TOPO. SHOT
FOUND MON.
FOUND PIPE
BENCHMARK
FENCE POST
SECTION COR.
F. CUT CROSS
FOUND NAIL
FOUND IRON
DEAD TREE
PROT. POST/GUARD POST
BLDG. CORNER (FIELD LOCATED)
EXISTING ELEVATION
HANDICAP PARKING
CONIFEROUS TREE
DECIDUOUS TREE
MANHOLE
CENTERLINE R.R. TRACK
PAY PHONE
MONITORING WELL
LAWN IRRIG. HEAD
SOIL BORING
RESIDENTIAL MAILBOX
U.S. MAILBOX
PARKING METER
BUSH/SHRUB
WETLAND FLAG
UTILITY FLAG
GUY
SIGN
CABLE RISER
TELE. MH
TELE. CROSS BOX
TELE. RISER
GAS MH
GAS VALVE
GAS RISER
GAS METER
STEAM MH
COMB. MH
POST INDICATOR VALVE
STORM CLEAN OUT
ROUND CB
TRAFFIC CONTROL BOX
IRRIGATION CONTROL BOX
FDC CONNECTION
ELEC. RISER
ELEC. METER
ELEC. MH
AIR CONDITIONER
ELEC. TRANS.
UTILITY POLE
LIGHT POLE
OVERFLOW/OUTLET STRUCTURE
ROOF/DOWN SPOUT
CULVERT E.S.
BEEHIVE CB
CATCH BASIN
STORM MH
WELL HEAD
WATER METER
WATER VALVE
HYDRANT
GATE VALVE
SAN. PUMP STATION
SAN. RISER
SAN. CLEAN OUT
SAN. MH
WALL
CL DITCH/STREAM
TELEPHONE OVERHEAD
ELECTRIC OVERHEAD
SECTION LINE
TREE LINE
SHRUB LINE
CURB
MISC. LINE
STEAM LINE
PAINT STRIPE
UG CABLE TV LINE
PLD LINE
UG TELE. LINE
UG ELEC. LINE
COMBINED SEWER
OVERHANG LINE
RAILING
E/ BRICK
WATER LINE
SAN. LINE
STORM LINE
GAS LINE
WETLAND LINE
WATER EDGE
B/ BANK
T/ BANK
OVERHEAD WIRES
BLDG. LINE
GUARD RAIL
FENCE
RAILROAD
E/ WALK
CL ROAD
E/ GRAVEL
E/ PAVEMENT
PUBLIC LIGHTING MH
EX PARCEL LINE
EX ROW
1. REFER TO THE GENERAL NOTES FOR ADDITIONAL REQUIREMENTS AND RESPONSIBILITIES.
2. WITH THE EXCEPTION OF AN AMOUNT OF EXCAVATED MATERIALS SUFFICIENT FOR BACKFILLING AND CONSTRUCTION OF FILLS AS CALLED FOR ON THE PLANS AND AS
INDICATED BELOW, ALL BROKEN CONCRETE, STONE AND EXCESS EXCAVATED MATERIALS SHALL BE DISPOSED OF BY THE CONTRACTOR. THE CONTRACTOR WILL BE
REQUIRED TO OBTAIN THEIR OWN DISPOSAL GROUND, AND WILL RECEIVE NO ADDITIONAL COMPENSATION FOR DISPOSING OF ANY OF THE EXCESS MATERIALS. MATERIALS
ACCEPTABLE TO THE ENGINEER MAY BE DISPOSED OF ON-SITE AT THE CONTRACTORS EXPENSE IN A MANNER APPROVED IN ADVANCE BY THE ENGINEER.
3. THE EDGE OF EXISTING PAVEMENT SHALL BE CLEANED OF EARTH AND OTHER FOREIGN MATERIAL BEFORE ADJACENT POURS ARE PLACED.
4. STREET SIGNS IN THE WAY OF CONSTRUCTION WILL BE REMOVED AND RESET IMMEDIATELY IN A TEMPORARY LOCATION, AS APPROVED BY ENGINEER.
5. THE CONTRACTOR SHALL PROTECT ALL EXISTING SIGNS AND POSTS SCHEDULED TO REMAIN, AS DIRECTED BY THE ENGINEER.
6. ALL UNDERGROUND UTILITIES NOT INDICATED FOR REMOVAL SHALL BE PROTECTED THROUGHOUT CONSTRUCTION.
7. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING ALL PRIVATE PROPERTY (INCLUDING BUILDINGS AND FOUNDATIONS) THROUGHOUT CONSTRUCTION AND
SHALL MAINTAIN SAFE PEDESTRIAN ACCESS AT ALL TIMES.
8. THE REMOVAL OF PAVEMENT, CURBS, AND WALKS SHALL INCLUDE ALL REQUIRED SAWCUTTING. CURB REMOVAL IS INCIDENTAL TO PAVEMENT REMOVAL.
1. ALL CONSTRUCTION SHALL BE PERFORMED IN ACCORDANCE WITH THE CURRENT STANDARDS, SPECIFICATIONS AND GENERAL CONDITIONS OF THE CITY OF ECORSE, AND
ANY/OR OTHER AGENCIES HAVING JURISDICTION.
2. UTILITY INFORMATION SHOWN ON THESE PLANS WAS OBTAINED FROM UTILITY OWNERS AND THEREFORE MAY NOT BE ACCURATE OR COMPLETE. THE CONTRACTOR SHALL
VERIFY AND OBTAIN ANY INFORMATION NECESSARY REGARDING THE PRESENCE OF UNDERGROUND UTILITIES WHICH MIGHT HAVE AN IMPACT ON THIS PROJECT, AND SHALL BE
RESPONSIBLE FOR ANY DAMAGE TO ANY PUBLIC OR PRIVATE UTILITIES WHETHER THEY ARE SHOWN OR NOT ON THE PLANS.
3. IT SHALL BE THE CONTRACTORS RESPONSIBILITY TO VERIFY LOCATIONS AND ELEVATIONS OF EXISTING UTILITIES AT PROPOSED CONNECTIONS AND/OR CROSSINGS, AND TO
NOTIFY THE ENGINEER OF ANY DISCREPANCIES TO THESE PLANS.
4. 72 HOURS PRIOR TO EXCAVATION, THE CONTRACTOR SHALL CONTACT MISS DIG AT (800) 482-7171 FOR THE LOCATION OF UNDERGROUND GAS AND CABLE FACILITIES, AND SHALL
ALSO NOTIFY REPRESENTATIVES OF OTHER UTILITIES LOCATED IN THE VICINITY OF THE WORK.
5. ALL PERMITS REQUIRED SHALL BE OBTAINED BY THE CONTRACTOR. ALL PERMIT FEES, BONDS, AND INSURANCE REQUIRED BY THE ISSUING AGENCIES SHALL BE PROVIDED BY
THE CONTRACTOR, AND MUST BE KEPT CURRENT. THE CONTRACTOR IS RESPONSIBLE FOR ALL OTHER FEES, INSPECTION COSTS, ETC., AND SHALL ADHERE TO ALL
REQUIREMENTS SET FORTH IN SAID PERMITS.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR SECURING ALL WORK AREAS TO ENSURE THE SAFETY OF ALL OCCUPANTS, VISITORS, PEDESTRIANS, WORKERS, ETC. THE
CONTRACTOR SHALL REPAIR AND MAINTAIN ALL CONSTRUCTION FENCING AS NECESSARY.
7. THE CONTRACTOR SHALL PROVIDE FOR CONTROLLED ACCESS TO THE SITE FOR USE BY THE VARIOUS WORK FORCES, EMERGENCY VEHICLES, OCCUPANTS, VISITORS, ETC.
THROUGHOUT CONSTRUCTION. THIS ACCESS MUST PROVIDE FOR THE REMOVAL OF MUD FROM VEHICLES TIRES. ROADWAYS AND DRIVEWAYS SHALL BE MAINTAINED OPEN FOR
EMERGENCY VEHICLES AT ALL TIMES. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE RESIDENTS AND BUSINESSES WHOSE DRIVEWAYS ARE AFFECTED BY
THEIR SCHEDULE 24 HOURS IN ADVANCE. CONTRACTOR SHALL SCHEDULE CONSTRUCTION AT NON-PEAK USE HOURS AND SHALL MINIMIZE DRIVEWAY CLOSURE BY EXPEDITING
CONSTRUCTION.
8. THE CONTRACTOR SHALL PROVIDE NECESSARY SIGNS, BARRICADES, AND LIGHTS TO PROTECT THE TRAFFIC AND THE WORK AS DIRECTED BY THE PLANS OR BY THE AGENCY
WITH JURISDICTION. ALL TRAFFIC CONTROLS SHALL BE IN ACCORDANCE WITH THE MICHIGAN MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES (MMUTCD).
9. THE CONTRACTOR IS REQUIRED TO CONFINE CONSTRUCTION ACTIVITIES TO THE LIMITS OF THE SITE AS SHOWN ON THE CONSTRUCTION PLANS. ANY DAMAGE OR DISRUPTION
TO ADJACENT SITES IS THE RESPONSIBILITY OF THE CONTRACTOR TO CORRECT IMMEDIATELY. NO OFF-SITE WORK SHALL BE PERFORMED OUTSIDE OF PUBLIC RIGHTS-OF-WAY
OR DEDICATED EASEMENTS WITHOUT PRIOR WRITTEN APPROVAL OF THE PROPERTY OWNER.
10. GREAT CARE SHALL BE TAKEN TO AVOID DAMAGE TO VEGETATION OUTSIDE THE CLEARING AND GRUBBING LIMITS. NO DRIVING OR PARKING OF VEHICLES AND/OR STORAGE OF
MATERIALS AND SUPPLIES SHALL BE PERMITTED OUTSIDE THE LIMITS OF CONSTRUCTION.
11. ALL ELEVATIONS ON THESE PLANS ARE ON THE NAVD88 (NORTH AMERICAN VERTICAL DATUM OF 1988) DATUM.
12. THE PROTECTION OF EXISTING TREES, AS REQUIRED, SHALL BE SOLELY THE CONTRACTOR'S RESPONSIBILITY.
13. ALL CONSTRUCTION SHALL HAVE INSPECTION PROVIDED BY GIFFELS WEBSTER. THE CONTRACTOR SHALL CONTACT GIFFELS WEBSTER AND THE CITY OF ECORSE DEPARTMENT
OF PUBLIC SERVICES 48 HOURS BEFORE THE START OF CONSTRUCTION.
14. THE CONTRACTOR SHALL BE RESPONSIBLE FOR DUST CONTROL, AND SHALL PROVIDE ALL NECESSARY MATERIAL AND EQUIPMENT TO KEEP DUST IN CHECK AT ALL TIMES. THE
CONTRACTOR SHALL RESPOND IMMEDIATELY TO ANY AND ALL COMPLAINTS. DUST CONTROL SHALL BE INCIDENTAL TO THE PROJECT.
15. DURING CONSTRUCTION, THE CONTRACTOR MAY ENCOUNTER SPRINKLER HEADS, PIPING, LIGHTING AND BURIED ELECTRICAL CABLE, MAILBOXES, FENCES, SIGNS, ETC., THAT
MAY OR MAY NOT BE INDICATED ON THESE PLANS. THE CONTRACTOR SHALL REPLACE AND/OR RESTORE ALL COMPONENTS OF SUCH SYSTEMS. ALL DISTURBED AREAS SHALL BE
RESTORED TO THEIR ORIGINAL CONDITION, MINIMUM STANDARD REQUIREMENTS, OR AS SPECIFIED HEREIN; WHICHEVER IS MORE STRINGENT.
16. ROADWAY, DRIVEWAY, AND PARKING AREA FINAL RESTORATION SHALL BE PERFORMED WITH SURFACE AND BASE MATERIALS MATCHING EITHER THE EXISTING MATERIALS IN
QUALITY AND THICKNESS, PER MINIMUM REQUIREMENTS, OR PER DETAILS ON SHEET 3.
17. ALL LOT MARKERS AND MONUMENT POINTS DISTURBED DURING CONSTRUCTION SHALL BE REPLACED BY A REGISTERED LAND SURVEYOR AT THE EXPENSE OF THE
CONTRACTOR.
18. FINAL CLEANUP AND RESTORATION SHALL CONSIST OF FINE GRADING OF CONSTRUCTION AREAS, REMOVAL OF CONSTRUCTION SIGNS, ETC. TOPSOIL SHALL BE SPREAD OVER
ALL DISTURBED AREAS, FOLLOWED BY SEED, FERTILIZER AND EROSION MAT OR STRAW MULCH, OR AS FURTHER REQUIRED BY THE CONTRACT DOCUMENTS ALL REQUIRED
RESTORATION ITEMS NOT SPECIFICALLY IDENTIFIED AS A PAY ITEM SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT.
19. THE UTILITY POLES SHOWN ON THESE DRAWINGS ARE INTENDED TO SHOW ONLY THE LOCATION OF EXISTING POLES. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE
QUANTITY AND DIRECTION OF OVERHEAD LINES. THE COST FOR SUPPORTING AND RELOCATING POLES SHALL BE INCIDENTAL TO THE PROJECT.
20. THE MEANS AND METHODS OF CONTROLLING GROUNDWATER AND DEWATERING ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ALL COST ASSOCIATED WITH
DEWATERING SHALL BE INCIDENTAL TO THE CONTRACT.
21. ALL ITEMS SHOWN ON THE CONTRACT DRAWINGS THAT NOT SPECIFICALLY IDENTIFIED AS A PAY ITEM SHALL BE CONSIDERED INCIDENTAL TO THE CONTRACT AND WILL NOT BE
PAID FOR SEPARATELY.
1. REFER TO THE GENERAL NOTES FOR ADDITIONAL REQUIREMENTS AND RESPONSIBILITIES.
2. THE PAVING CONTRACTOR SHALL BE REQUIRED TO COORDINATE THE INSTALLATION OF GAS, ELECTRIC, PHONE, CABLE, SPRINKLERS, ETC. IN SUCH A MANNER THAT WILL FACILITATE THEIR PROPER INSTALLATION PRIOR TO
PLACING THE PAVEMENT MATERIALS. ENSURE THAT ALL REQUIRED PIPES, CONDUITS, CABLES AND SLEEVES ARE PROPERLY PLACED AND THAT THE TRENCHES ARE PROPERLY BACKFILLED AND COMPACTED.
3. BUTT JOINTS SHALL BE PLACED AT ALL LOCATIONS WHERE AN EXISTING ASPHALT PAVEMENT SURFACE IS BEING DISTURBED BY REMOVALS AND/OR THE INSTALLATION OF NEW ASPHALT PAVEMENT.
4. ALL PAVEMENT AREAS SHOULD BE CLEARED AND GRUBBED BY REMOVING SURFACE VEGETATION, TOPSOIL, DEBRIS AND OTHER DELETERIOUS MATERIALS.
5. THE PLACEMENT OF THE FINAL ASPHALT LIFT SHALL BE DELAYED UNTIL THE MAJORITY OF THE CONSTRUCTION ACTIVITIES HAVE BEEN COMPLETED, OR AS APPROVED BY THE OWNER. A BOND COAT OF SS-1H EMULSION
6. SHALL BE APPLIED (AT A RATE OF 0.10 GALLONS/S.Y.D.) BETWEEN THE LEVELING AND WEARING COURSE WHEN 48 HOURS HAVE ELAPSED BETWEEN PLACEMENTS.
7. THE FINAL SUB-GRADE SHALL BE THOROUGHLY PROOF-ROLLED UNDER THE OBSERVATION OF THE SOILS ENGINEER.
8. PROPOSED AGGREGATE BASE SHALL EXTEND BEYOND THE PAVEMENT EDGE/BACK OF CURB BY THE FOLLOWING AMOUNTS OR BY THE AMOUNT STATED BY THE AGENCY HAVING JURISDICTION, WHICHEVER IS STRICTER
A. ROADS - 1 FT
B. DRIVES - 0.5 FT
C. PATHS - 0.25 FT
8. ALL TRENCHES WITHIN A ONE-ON-ONE SLOPE OF PAVEMENT SHALL BE BACKFILLED WITH SAND (MDOT CLASS II MINIMUM) AND MECHANICALLY COMPACTED IN NOT MORE THAN 9" LAYER TO
95% MAXIMUM DRY DENSITY PER MODIFIED PROCTER COMPACTION TEST ASTM D-1557.
9. NO FROZEN MATERIAL SHALL BE PERMITTED AS BACKFILL UNDER ANY ROADWAY, DRIVEWAY OR PARKING AREA.
10. PRIOR TO THE START OF ANY FILLING, THE CONTRACTOR SHALL REMOVE ALL TOPSOIL AND ALL OTHER UNACCEPTABLE SOIL FROM THE FILL AREAS, AND PROPERLY BACKFILL WITH ACCEPTABLE SOIL.
11. ALL BARRIER FREE RAMPS TO BE A.D.A. COMPLIANT.
12. GENERAL GRADING REQUIREMENTS ARE AS FOLLOWS:
A. FINISH GRADE AT EXISTING BUILDING SHALL MATCH BRICK LEDGES, DOORWAYS OR BASEMENT WINDOWS
B. MAINTAIN POSITIVE DRAINAGE AWAY FROM ALL BUILDING (± 2%)
C. SIDEWALK CROSS SLOPE ±2% UNLESS OTHERWISE NOTED (EXCLUDING RAMPS)
D. PAVEMENT SLOPES (1.0% MINIMUM, 4.0% MAXIMUM) UNIFORMLY BETWEEN FINISH GRADE ON PLANS
E. LAWN AREAS ± 1% MINIMUM TO 25% (BERMS) MAXIMUM
14. ALL PROPOSED GRADES ARE AT THE GUTTER UNLESS OTHERWISE NOTED. SEE DETAILS FOR FACE OF CURB, TOP OF CURB AND ASPHALT ADJUSTMENTS.
15. PRIOR TO THE PLACEMENT OF ANY BASE ASPHALT OR LEVELING COURSE, THE CURBS SHALL BE PARTIALLY BACKFILLED AND THE SUB-GRADE SHALL BE PROOF-ROLLED UNDER THE SUPERVISION OF THE SOILS ENGINEER.
16. ALL SIDEWALK AND PATHWAYS IN ANY PUBLIC R.O.W. SHALL BE INSPECTED BY THE AGENCY WITH JURISDICTION.
1. ALL WORK WITHIN THE WAYNE COUNTY ROAD RIGHT-OF-WAY (ROW) AND DRAIN EASEMENT SHALL BE IN ACCORDANCE WITH THE CURRENT STANDARDS AND
GENERAL SPECIFICATIONS, INCLUDING SOIL EROSION AND SEDIMENTATION CONTROL OF THE WAYNE COUNTY DEPARTMENT OF PUBLIC SERVICES, AND MDOT 2020
SPECIFICATIONS FOR CONSTRUCTION.
2. THESE PLANS ARE NOT VALID WITHOUT ATTACHMENT OF THE WAYNE COUNTY PERMIT SPECIFICATIONS FOR CONSTRUCTION WITHIN THE ROAD ROW, PARKS, DRAIN
EASEMENT OR SANITARY SEWER UNDER JURISDICTION OF THE WAYNE COUNTY (07/01/93) REVISED 12/15/2004.
3. CONTRACTOR SHALL CONTACT MISS DIG AT 811 TO IDENTIFY AND FLAG / MARK THE LOCATIONS OF ALL UNDERGROUND UTILITIES AT THE PROPOSED CONSTRUCTION
AREAS PRIOR TO START OF CONSTRUCTION, AND SHALL BE RESPONSIBLE FOR DETERMINING THE EXACT LOCATIONS AND ELEVATIONS OF ALL UNDERGROUND UTILITIES, AND RESOLVE ANY CONFLICT BETWEEN THE PROPOSED WORK AND THE EXISTING UNDERGROUND OR ABOVEGROUND UTILITIES.
4. CONTRACTOR SHALL MAINTAIN 18” MINIMUM VERTICAL CLEARANCE AND 3 FEET MINIMUM HORIZONTAL CLEARANCE BETWEEN THE PROPOSED AND EXISTING
UTILITIES. ANY PROPOSED UTILITY PERMITTED TO CROSS UNDER THE ROAD OR DRAIN, MUST BE PLACED A MINIMUM OF 7 FEET BELOW THE LOWEST POINT OF THE ROAD, OR 6 FEET BELOW THE DRAIN BOTTOM. OVERHEAD WIRES/CABLES MUST BE INSTALLED 18 FEET MINIMUM ABOVE THE ROAD CENTERLINE. TO RELOCATE ANY UTILITY
WITHIN THE ROAD ROW, THE CONTRACTOR SHALL COORDINATE THE RELOCATION WITH THE UTILITY COMPANY AND AS DIRECTED BY THE WAYNE COUNTY ENGINEER.
5. ALL SURVEY MONUMENTS / CORNERS AND BENCH MARKS LOCATED WITHIN THE CONSTRUCTION AREA MUST BE PRESERVED IN ACCORDANCE WITH PUBLIC ACT 74
AS AMENDED (INCLUDING ACT 34, P.A. 2000) AND AS PER WAYNE COUNTY PERMIT RULE 1.5. THE PERMIT HOLDER AND CONTRACTOR SHALL COORDINATE THE WORK WITH
A PROFESSIONAL SURVEYOR LICENSED IN THE STATE OF MICHIGAN DURING CONSTRUCTION ACTIVITIES FOR THE PURPOSE OF WITNESSING, PRESERVING OR REPLACING
SURVEY MONUMENTS AND MONUMENT BOXES.
6. EXPOSURE OF ANY UTILITIES UNDER THE PAVEMENT WILL NOT BE PERMITTED, UNLESS APPROVED BY THE WAYNE COUNTY ENGINEER. PAVEMENT REMOVAL AND
REPLACEMENT SHALL BE PERFORMED PER APPLICABLE WAYNE COUNTY STANDARD DETAILS AN AS DIRECTED BY THE WAYNE COUNTY ENGINEER.
7. CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS WITHIN THE WAYNE COUNTY ROAD ROW AND DRAIN EASEMENT WITH 3” TOPSOIL, THM SEED MIX AND MULCH.
SLOPES STEEPER THAN 1 ON 3 SHALL BE RESTORED BY PLACING SOD ON 2” TOPSOIL.
8. ALL BACKFILLS UNDER OR WITHIN 3 FEET OF THE PROPOSED OR EXISTING PAVEMENT, CURB OR SIDEWALK SHALL CONFORM TO THE WAYNE COUNTY TRENCH “B”
BACKFILL REQUIREMENTS. TRENCH “A” BACKFILL MAY BE USED WITHIN THE ROAD ROW AREAS UNDER CONDITIONS OTHER THAN THOSE SPECIFIED FOR TRENCH “B”.
9. CONTRACTOR IS RESPONSIBLE FOR RESTORING OR REPLACING ALL DISTURBED LANDSCAPED AREAS, SPRINKLER SYSTEMS, FENCES, SIGNS, MAIL BOXES, ETC.
WITHIN THE WAYNE COUNTY ROAD ROW AND / OR AS DIRECTED BY THE COUNTY ENGINEER.
10. CONTRACTOR SHALL MAINTAIN TWO-WAY TRAFFIC AT ALL TIMES. OTHERWISE, DETOURING TRAFFIC MUST BE PER APPROVED PLANS. ALL SIGNING AND TRAFFIC
CONTROL DEVICES SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF M.M.U.T.C.D.
11. MAINTAIN A SAFE AND ADEQUATE TRAVEL ROUTE FOR PEDESTRIANS AT ALL TIMES THROUGHOUT THE PROJECT DURATION.
12. TUNNELING, BORING AND JACKING OPERATIONS SHALL BE IN ACCORDANCE WITH THE WAYNE COUNTY SPECIFICATIONS AND DETAILS. BORE PITS SHALL BE PLACED
AT MINIMUM 10 FEET FROM THE BACK OF CURB OR EDGE OF PAVEMENT.
13. REMOVE ALL ABANDONED CONDUITS FROM THE COUNTY ROADS ROW OR AS DIRECTED BY THE WAYNE COUNTY ENGINEER.
14. CONTRACTOR SHALL PROVIDE COLD WEATHER PROTECTION FOR ALL PROPOSED CONCRETE WORK (PAVEMENTS, SIDEWALKS, DRIVE APPROACHES, ETC.) AS
DIRECTED BY THE WAYNE COUNTY ENGINEER.
15. OVERNIGHT VEHICLE PARKING AND STORAGE OF CONSTRUCTION MATERIALS AND EQUIPMENT’S ARE NOT PERMITTED WITHIN THE WAYNE COUNTY ROADS
RIGHTS-OF-WAY.
16. CONTRACTOR SHOULD OBTAIN SOIL EROSION AND SEDIMENTATION CONTROL PERMIT FROM THE WAYNE COUNTY DPS. CONTACT THE WAYNE COUNTY SOIL
EROSION OFFICE AT (734) 326-5565, OR THE COMMUNITY HAVING JURISDICTION OVER THE SOIL EROSION PERMIT.
17. CONTRACTOR SHALL NOTIFY THE WAYNE COUNTY TRAFFIC SIGNAL SHOP AT (734) 955-2161 AT LEAST 72 HOURS PRIOR TO START OF WORK AT OR NEAR ANY
SIGNALIZED INTERSECTIONS.
18. CONTRACTOR SHALL NOTIFY WAYNE COUNTY 72 HOURS PRIOR TO START OF CONSTRUCTION. CONTACT THE PERMIT OFFICE AT (734) 858-2761.
WAYNE COUNTY DPS GENERAL NOTES
1. GATE WELLS SHALL BE CONSTRUCTED AS SHOWN ON THE WATER MAIN STANDARD DETAIL SHEETS. GATE WELL COVERS SHALL BE SET TO
FINISH GRADES CALLED FOR ON THE PLANS OR MATCH THE TOP OF THE EXISTING PAVEMENT GRADE.
2. GATE VALVES SHALL BE OF THE SIZE AND INSTALLED AT THE LOCATION AS SHOWN ON THE PLANS. THEY SHALL BE SET SQUARE WITH THE LINE OF THE MAIN, AND UNLESS OTHERWISE DIRECTED BY THE ENGINEER, ALL GATE VALVES SHALL BE SET WITH STEMS PLUMB. ON EACH SIDE OF EACH NEW GATE VALVE INSTALLED, THE CONTRACTOR SHALL FURNISH AND INSTALL ON THE MAIN A CORPORATION STOP AS SHOWN ON THE
STANDARD DETAILS.
3. HYDRANTS SHALL BE LOCATED AS SHOWN ON THE PLANS AND SHALL BE SET PLUMB. THE HYDRANT AND VALVE SHALL BE SET AS INDICATED ON
THE STANDARD DETAIL DRAWING AND TO THE FINISH GRADE CALLED FOR ON THE PLANS.
4. ALL CONNECTIONS TO EXISTING WATER MAINS SHALL BE MADE AT THE LOCATIONS AS SHOWN ON THE PLANS.
5. NO CONNECTIONS TO EXISTING WATER MAINS SHALL BE MADE UNTIL AFTER THE NEW MAIN HAS PASSED THE BACTERIOLOGICAL AND HYDROSTATIC TESTS, AND WRITTEN VERIFICATION FROM A MICHIGAN CERTIFIED LABORATORY IS PROVIDED.
6. ALL VALVE OPERATIONS SHALL BE OBSERVED BY ECORSE'S DPW.
7. ALL CAPS ON EXISTING WATER MAIN SHALL BE MADE WITH MECHANICAL JOINT CAPS (ANSI/AWWA C110/A21.10 AND ANSI/AWWA C111/A21.11).
8. PRESSURE TESTING SHALL BE IN ACCORDANCE WITH THE CITY OF ECORSE'S LEAKAGE TESTING STANDARDS ON ECORSE'S WATER MAIN
STANDARD DETAILS.
9. CHLORINATION AND BACTERIOLOGICAL TESTING SHALL BE IN ACCORDANCE WITH AWWA C651 AND MICHIGAN SAFE DRINKING WATER ACT R325.11110. CONTRACTOR SHALL BE RESPONSIBLE FOR TESTING BY A MICHIGAN CERTIFIED LABORATORY.
10. SERVICE RECONNECTIONS WILL NOT BE ALLOWED UNTIL THE CITY OF ECORSE HAS RECEIVED WRITTEN VERIFICATION FROM A MICHIGAN CERTIFIED LABORATORY STATING THAT THE NEW MAIN IS CONSIDERED SATISFACTORY FOR PUBLIC USE.
11. WATER MAINS SHALL BE PRESSURE TESTED AND DISINFECTED IN ACCORDANCE WITH AWWA C600 AND C651 STANDARDS.
12. ALL WATER MAIN FITTING (TEES, BENDS, CROSSES, SLEEVES, ETC.) ARE INCLUDED IN THE RESPECTIVE WATER MAIN ITEMS.
13. CONNECTIONS TO EXISTING WATER MAINS ARE INCLUDED IN OTHER WATER MAIN ITEMS LISTED IN THE PROPOSAL.
14. CURB STOPS, BOXES, CORPORATIONS, ETC. ARE INCLUDED IN THE RESPECTIVE WATER SERVICE ITEMS.
15. CONNECTIONS TO EXISTING WATER SERVICES ARE INCLUDED IN THE CORRESPONDING WATER SERVICE ITEMS.
16. BACKFILL OF ABANDONED OR REMOVED WATER MAIN FACILITIES IS INCLUDED IN THE RESPECTIVE REMOVAL ITEMS.
17. RESTORATION OF LAWN AREAS DISTURBED BY WATER SERVICE AND HYDRANT INSTALLATION OR REMOVAL IS INCLUDED IN THE
CORRESPONDING WATER SERVICE OR HYDRANT ITEMS.
18. THE CONTRACTOR SHALL SALVAGE AND DELIVER REMOVED UTILITY ITEMS, EXCLUDING PIPE, TO THE CITY OF ECORSE DPW. THIS WORK SHALL
BE INCLUDED IN THE RESPECTIVE WATER MAIN ITEMS.
19. PROVIDE A MINIMUM COVER OF 5'-6" FEET ABOVE THE WATER MAIN MEASURED FROM THE TOP OF THE PIPE.
20. PROVIDE THRUST BLOCKS AT ALL BENDS, TEES, CROSSES, HYDRANTS AND PLUGS AT THE END OF THE WATER MAIN.
21. ALL WATER SERVICES SHALL BE BORED BENEATH THE EXISTING ROADWAYS, OPEN CUT CONSTRUCTION WILL NOT BE ALLOWED FOR WATER
SERVICES.
22. UTILITIES SHOWN ARE A COMBINATION OF FIELD LOCATION (SURFACE UTILITIES ONLY), GIS, AND SOME UTILITY MAPS (WHERE PROVIDED). ALL OTHERS ARE APPROXIMATE. CONTRACTOR TO VERIFY THE EXACT LOCATION AND DEPTH OF ALL UTILITIES PRIOR TO COMMENCEMENT OF
CONSTRUCTION.
23. PERMIT MUST BE PULLED FOR ALL SERVICE LINE INSTALLATIONS. ALL PERMIT FEES WILL BE WAIVED. THE CONTRACTOR WILL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH REPLACING THE METER IF THE METER IS DAMAGED BY THE CONTRACTOR DURING REPLACEMENT OF THE
SERVICE LINE.
24. HYDRANT, REM SHALL INCLUDE REMOVAL OF THE HYDRANT ASSEMBLY AND TOP 3-FEET OF THE HYDRANT RISER PIPE BELOW GRADE, INCLUDING CAPPING THE EXISTING PIPE AND REMOVAL OF THE TOP 3-FEET OF THE RISER BELOW GRADE FOR THE VALVE BOX. THE REMAINDER SHALL BE FILLED WITH APPROPRIATE SAND FILL. THE HYDRANT ASSEMBLY SHALL BE SALVAGED FOR RE-USE BY THE CITY AND RETURNED TO THE DPW.
25. CONTRACTOR SHALL PROVIDE ONE (1) FULL STICK OF PIPE CENTERED AT EACH CROSSING. IN CASE WHERE THERE IS MORE THAN ONE (1) CROSSING IN THE SAME VICINITY, PIPE SHALL BE LAID IN REGARDS TO THE MOST PREVALENT CROSSING.
26. WHERE THE PROPOSED WATER MAIN IS INSTALLED LESS THAN 10 FEET FROM THE EXISTING CATCH BASINS, THE STORM SEWER AND SANITARY SEWER PIPE MATERIALS SHALL BE PRESSURE RATED AND THE MANHOLES AND INLETS WATERTIGHT OR OTHERWISE SEALED AS APPROVED BY THE REVIEWING AUTHORITY AND SHALL BE PRESSURE AND/OR TESTED TO DEMONSTRATE WATERTIGHTNESS.
WATER MAIN NOTES
Z:
\20
9.0 0 E co rse
W ate r S ys tem D es ign
G ra nt\ De sig n\C
AD
\W or k S he ets
\C ha rlo tte
A ve
\02 -0
3 N ote s & Le ge nd an d D eta ils
.dw g
Copyright © 2025 Giffels Webster.
No reproduction shall be made without the prior written consent of Giffels Webster.
Engineers Surveyors Planners
Landscape Architects
1025 East Maple Road Suite 100
Birmingham, MI 48009 p (248) 852-3100 f (313) 962-5068 www.giffelswebster.com
Know what's below.
before you dig.Call
R
Developed For:
Executive:
Manager:
Designer:
Quality Control:
Project:
Sheet:
Scale:
Date:
ISSUE:DATE:
of 20519.00
M.K.
B.K.
J.P.K.
04.10.25
R.D.H.
CITY OF ECORSE
WAYNE COUNTY
MICHIGAN
ECORSE TEDF-B GRANT #735
ROAD & WATER MAIN REPLACEMENT
EGLE WATER MAIN PERMIT03/06/2025
FOR BIDS04/21/2025
NOTES AND
LEGEND
########NONE
W
EXISTING BUILDING TYP.
REPLACE CURB STOP BOX
REMOVE & REPLACE PAVEMENT
REMOVE & REPLACE SIDEWALK
NOTES:
1. EXCAVATE AT EXISTING CURB STOP BOX A MINIMUM 2 FEET IN EACH DIRECTION. TEMPORARILY
REMOVE CURB STOP BOX/VALVE.
2. SAWCUT/REMOVE 10 FEET OF EXISTING SIDEWALK. PAID AS SIDEWALK, REM. CONTRACTOR SHALL
MAINTAIN THE AREA WITH MAINTENANCE GRAVEL UNTIL NEW CONCRETE CAN BE POURED. COST FOR
MAINTENANCE GRAVEL SHALL BE INCIDENTAL TO THE PROJECT AND NOT PAID SEPARATELY.
3. SAWCUT/REMOVE PAVEMENT OVER EXISTING WATERMAN. PAID FOR AS PAVT, REM, MODIFIED.
CONTRACTOR SHALL MAINTAIN THE AREA WITH MAINTENANCE GRAVEL UNTIL NEW PAVEMENT CAN BE PLACED. COST OF MAINTENANCE GRAVEL SHALL BE INCIDENTAL TO THE PROJECT AND NOT PAID
SEPARATELY.
4. THE CONTRACTOR SHALL ATTEMPT TRENCHLESS INSTALLATION OF NEW WATER SERVICE LINE (CABLE METHOD; THEN BORING METHOD) FIRST. IF THESE METHODS FAIL, THE SERVICE LEAD SHALL BE
PLACED IN AN OPEN TRENCH.
5. ALL NON-PAVED DISTURBED AREAS SHALL BE RESTORED WITH TURF. COST SHALL BE INCLUDED IN THE
WATER SERVICE, SHORT/LONG (_ INCH) PAY ITEM AND NOT PAID SEPARATELY.
4.1. SERVICES INSTALLED USING A BORED METHOD SHALL PASS AN ENGINEER-APPROVED LINE
PRESSURE TEST WITNESSED BY THE ENGINEER PRIOR TO BACKFILLING CONNECTION POINTS.
4.2. OPEN CUT SERVICES SHALL PASS A VISUAL INSPECTION OF AND ENGINEER-APPROVED LINE
PRESSURE TEST WITNESSED BY THE ENGINEER PRIOR TO BACKFILLING.
5. NEW SERVICE SHALL MATCH SIZE SOWN ON PLANS UNLESS OTHERWISE DIRECTED BY THE ENGINEER, MINIMUM SERVICE SHALL BE 1 INCH,
6. ALL NON-PAVED DISTURBED AREAS SHALL BE RESTORED WITH TURF. COST SHALL BE INCLUDED IN THE
PRIVATE WATER SERVICE REPLACEMENT PAY ITEM AND NOT PAID SEPARATELY.
7. ANY SERVICE BORING MORE THAN 10 FEET IN LENGTH SHALL BE PRESSURE TESTED AT 75 PSI FOR A
MINIMUM OF 15 MINS.
SI
D
EW
AL
K
ST
R
EE
T
.0
REMOVE AND REPLACE
PAVEMENT
REMOVE AND REPLACE
SIDEWALK
WATER SERVICE, SHORT/LONG
(_ INCH)
EXISTING WATER METER
EXISTING BUILDING TYP.
CONNECT TO EXISTING METER OR 18
INCHES, WHICHEVER IS LESS
EXISTING CURB STOP BOX
PROPOSED CURB STOP VALVE
AND CURB BOX. COST TO BE
INCLUDED IN THE WATER SERVICE,
SHORT/LONG (__ INCH) PAY ITEM.
.0
SI
D
EW
AL
K
ST
R
EE
T
NOTES:
1. EXCAVATE AT EXISTING CURB STOP BOX A MINIMUM 2 FEET IN EACH DIRECTION.
TEMPORARILY REMOVE CURB STOP BOX/VALVE.
2. SAWCUT/REMOVE 10 FEET OF EXISTING SIDEWALK. PAID AS SIDEWALK, REM. CONTRACTOR
SHALL MAINTAIN THE AREA WITH MAINTENANCE GRAVEL UNTIL NEW CONCRETE CAN BE
POURED. COST FOR MAINTENANCE GRAVEL SHALL BE INCIDENTAL TO THE PROJECT AND
NOT PAID SEPARATELY.
3. SAWCUT/REMOVE PAVEMENT OVER EXISTING WATERMAN. PAID FOR AS PAVT, REM,
MODIFIED. CONTRACTOR SHALL MAINTAIN THE AREA WITH MAINTENANCE GRAVEL UNTL
NEW PAVEMENT CAN BE PLACED. COST OF MAINTENANCE GRAVEL SHALL BE INCIDENTAL
TO THE PROJECT AND NOT PAID SEPARATELY.
4. THE CONTRACTOR SHALL ATTEMPT TRENCHLESS INSTALLATION OF NEW WATER SERVICE
LINE (CABLE METHOD; THEN BORING METHOD) FIRST. IF THESE METHODS FAIL, THE
SERVICE LEAD SHALL BE PLACED IN AN OPEN TRENCH.
4.1. SERVICES INSTALLED USING A BORED METHOD SHALL PASS AN ENGINEER-APPROVED
LINE PRESSURE TEST WITNESSED BY THE ENGINEER PRIOR TO BACKFILLING
CONNECTION POINTS.
4.2. OPEN CUT SERVICES SHALL PASS A VISUAL INSPECTION OF AND ENGINEER-APPROVED
LINE PRESSURE TEST WITNESSED BY THE ENGINEER PRIOR TO BACKFILLING.
5. SERVICES SHALL ENTER A DWELLING AT A MINIMUM DEPTH OF 5.5 FEET BELOW EXISTING
GRADE. ENGINEER TO MAKE FINAL DETERMINATION OF WHERE THE NEW SERVICE SHALL
ENTER THE DWELLING.
6. NEW SERVICE SHALL MATCH SIZE SOWN ON PLANS UNLESS OTHERWISE DIRECTED BY THE
ENGINEER, MINIMUM SERVICE SHALL BE 1 INCH,
7. THE NEW WATER SERVICE LINE SHALL EXTEND TO THE EXISTING WATER METER OR 18
INCHES, WHICHEVER IS LESS. COST SHALL BE INCLUDED IN THE WATER SERVICE PAY ITEM
AND NOT PAID SEPARATELY.
8. ALL NON-PAVED DISTURBED AREAS SHALL BE RESTORED WITH TURF. COST SHALL BE
INCLUDED IN THE PRIVATE WATER SERVICE REPLACEMENT PAY ITEM AND NOT PAID
SEPARATELY.
9. ANY SERVICE BORING MORE THAN 10 FEET IN LENGTH SHALL BE PRESSURE TESTED AT 75
PSI FOR A MINIMUM OF 15 MINS.
WATER SERVICE, SHORT/LONG (_ INCH)
NOTE:
1. THE PLACEMENT OF THE FINAL LIFT OF ASPHALT SHALL BE DELAYED UNTIL
THE MAJORITY OF THE CONSTRUCTION HAS BEEN COMPLETED, OR AS
DIRECTED BY THE ENGINEER.
2. APPLY TACK COAT OF SS-1H EMISSION AT 0.10 GAL/SYD BETWEEN EACH HMA
COURSE AND ON THE AGGREGATE BASE BEFORE THE FIRST COURSE.
ASPHALT ROADWAY
ASPHALT DRIVEWAY
ASPHALT PATHWAY
HMA TYPICAL SECTIONS
GRANULAR MATERIAL,
CL II, CIP
NOT TO SCALE
SHARED USE PATH, HMA,
4 INCH
HMA 36A OR 5EML, 2 INCH
HMA 4EML, 2 INCH
AGGREGATE BASE, 6
INCH (21AA)
GRANULAR MATERIAL, CL
II, CIP
AGGREGATE BASE, 6
INCH (21AA)
HMA 4EML, 2 INCH
HMA 5EML, 2 INCH
HMA 2EML, 4 INCH
HMA 4EML, 2 INCH
HMA 5EML, 2 INCH
GRANULAR MATERIAL, CL
II, CIP
AGGREGATE BASE, 6
INCH (21AA)
WEARING COURSE: 110 LBS/SYD/IN
LEVELING COURSE: 110 LBS/SYD/IN
BASE COURSE: 110 LBS/SYD/IN
COMPACTED IN PLACE EXTEND
BEYOND PAVEMENT EDGE/BACK BY 1
FT
EXISTING SUBGRADE COMPACT TO 98%
MODIFIED PROCTOR
TOP COURSE: 110 LBS/SYD/IN
LEVELING COURSE: 110 LBS/SYD/IN
COMPACTED IN PLACE EXTEND
BEYOND PAVEMENT EDGE/BACK BY 0.50
FT
EXISTING SUBGRADE COMPACT TO 98%
MODIFIED PROCTOR
TOP COURSE: 110 LBS/SYD/IN
LEVELING COURSE: 110 LBS/SYD/IN
COMPACTED IN PLACE EXTEND
BEYOND PAVEMENT EDGE/BACK BY
0.25 FT
EXISTING SUBGRADE COMPACT TO 98%
MODIFIED PROCTOR
CONCRETE TYPICAL SECTIONS
NOT TO SCALE
NOTE:
1. BROOM FINISH SURFACE.
2. SEE MUNICIPAL DETAILS FOR JOINTING PLAN AND PLACEMENT OF
EXPANSION JOINTS
3. SAWCUT JOINTS AS SOON AS PAVEMENT CAN SUPPORT MACHINE
CONCRETE ROADWAY
CONCRETE DRIVEWAY
ROAD, CONC, _INCH
RESIDENTIAL: 7 INCH
COLLECTOR: 8 INCH
INDUSTRIAL: 9 INCH
AGGREGATE BASE, 6
INCH (21AA)
GRANULAR MATERIAL,
CL II, CIP
3,500 PSI MDOT GRADE P1
CONCRETE PAVEMENT
COMPACTED IN PLACE EXTEND
BEYOND PAVEMENT
EDGE/BACK BY 1 FT
EXISTING SUBGRADE
COMPACT TO 98% MODIFIED
PROCTOR
DRIVEWAY, NONREINF
CONC, 6 INCH
AGGREGATE BASE, 6
INCH (21AA)
GRANULAR MATERIAL,
CL II, CIP
3,500 PSI MDOT GRADE P1
CONCRETE PAVEMENT
COMPACTED IN PLACE EXTEND
BEYOND PAVEMENT
EDGE/BACK BY 0.50 FT
EXISTING SUBGRADE
COMPACT TO 98% MODIFIED
PROCTOR
CONCRETE SIDEWALK
CONCRETE SIDEWALK RAMP
SIDEWALK, CONC, 4 INCH
AGGREGATE BASE, 4
INCH (CL II)
GRANULAR MATERIAL,
CL II, CIP
3,500 PSI MDOT GRADE P1
CONCRETE PAVEMENT
COMPACTED IN PLACE EXTEND
BEYOND PAVEMENT
EDGE/BACK BY 0.25FT
EXISTING SUBGRADE
COMPACT TO 98% MODIFIED
PROCTOR
3,500 PSI MDOT GRADE P1
CONCRETE PAVEMENT
COMPACTED IN PLACE EXTEND
BEYOND PAVEMENT
EDGE/BACK BY 0.25 FT
EXISTING SUBGRADE
COMPACT TO 98% MODIFIED
PROCTOR
SIDEWALK, RAMP, CONC, 6
INCH INCLUDES RAMP AND
LANDING
AGGREGATE BASE, 4 INCH (CL
II)
GRANULAR MATERIAL, CL II,
CIP
WATER SERVICE, SHORT/LONG (_ INCH) DETAIL
WATER MAIN TO CURB STOP
NOT TO SCALE
SERVICE LINE REPLACEMENT DETAIL
WATER MAIN TO WATER METER
NOT TO SCALE
MATCH EXISTING
DRIVEWAY WIDTH
(10' MINIMUM)
6" (TYP)
3' FLARE (TYP)
1/2" EXPANSION PAPER
ROLLED EDGE,
TYPICAL
2"
RESTORE GREENBELT AREA
WITH 2" TOPSOIL AND HYDROSEED
POSITIVE DRAINAGE FROM SIDEWALK
TO CURB MUST BE PROVIDED UNLESS
OTHERWISE DIRECTED BY THE ENGINEER
NOTE: SHARED DRIVE APPROACHES MUST
INCLUDE A 1/2 INCH BITUMINOUS FIBER
EXPANSION JOINT AT PROPERTY LINE.
NOTE: THE CONTRACTOR SHALL EXCAVATE
EXISTING AND UNSUITABLE SOIL TO THE
REQUIRED DEPTH AND COMPACT AND
CONDITION SUBGRADE AS DETERMINED BY
THE ENGINEER. EXCAVATION IS INCLUDED IN
AGGREGATE BASE, 4 INCH, MODIFIED.
NOTE: AGGREGATE BASE SHALL BE
PLACED AS DIRECTED AND PAID AS
AGGREGATE BASE, 4 INCH, MODIFIED.
EMBANKMENT, CIP
2% M
AX
. 5' (TYP)
4' (MIN)
6"
GRADE BREAK
RIGHT-OF-WAY LINE
GRADE BREAK
THICKNESS OF KEY FLAG
AND RAMP AS SPECIFIED
4" (TYP)
2% 2%
TOP OF CURB SET AT UNIFORM
GRADIENT, TYPICAL
±1'
ADA RAMP NOTES:
· EXCAVATION OF EXISTING SOIL REQUIRED TO LOWER/WIDEN SIDEWALK RAMP SHALL
BE INCLUDED IN THE CORRESPONDING ITEMS FOR AGGREGATE BASE.
· TREE ROOTS IN CONFLICT WITH THE RAMP CONSTRUCTION SHALL BE CLEANLY
CUT/GROUND BEYOND THE LIMITS/DEPTH OF THE PROPOSED AGGREGATE BASE. THIS
WORK SHALL BE INCLUDED IN THE CORRESPONDING ITEM FOR AGGREGATE BASE.
· CONTRACTOR SHALL OBTAIN APPROVAL FROM THE ENGINEER FOR ALL CONCRETE
FORMS A MINIMUM OF ONE HOUR PRIOR TO PLACEMENT OF CONCRETE.
EXISTING
2% 2%
EXISTING
15' MAX
CURB HEIGHT AS SPECIFIED
(3" MIN / 18" MAX)
1:12 (MAX) 1:12 (MAX)
DETECTABLE WARNING
SURFACE, TYPICAL
1" EXPANSION PAPER, TYPICAL EXPOSED GUTTER, TYPICAL
MAX 1:12 MAX 1:12
EXISTING GRADE
NOTE: THE REMOVAL OF EXCESS SOIL SHALL BE INCLUDED IN
THE PAY ITEM, TOPSOIL SURFACE, FURN, 2 INCH, MODIFIED.
NEW HMA SURFACE3' MIN.
EXISTING CONCRETE
DRIVE APPROACH
EXISTING CURB AND GUTTER
HMA, 36A (PAID AS HAND PATCHING)
NOTE: CONTRACTOR SHALL CLEAN EXISTING
DRIVE APPROACH AND TOP OF CURB TO
REMOVE ANY PREVIOUS PLACED ASPHALT
OVERLAY PRIOR TO PLACING BOND COAT AND
ASPHALT (INCIDENTAL).
NOTE: CONTRACTOR SHALL
PROVIDE POSITIVE DRAINAGE
TOWARD ROAD SURFACE AND
ACROSS DRIVEWAY OPENING.
NOTE: CONTRACTOR SHALL REMOVE
EXISTING WEDGES AS PART OF
MILLING AND/OR HMA SURFACE
REMOVAL OPERATIONS ONLY.
RESIDENTIAL DRIVEWAY REPLACEMENT
NOT TO SCALE
HMA WEDGE FOR DRIVEWAY APPROACH
NOT TO SCALE
GREENBELT RESTORATION
NOT TO SCALE
SIDEWALK RAMP
NOT TO SCALE
L
3' -0
C GATE WELL OPENING & VALVE
LE
AV
E
IN
P
LA
C E
(F
IL
L W
IT
H
S
AN
D
3' -0
R
EM
O
VE
T
O P
PO
R
TI
O
N O
F
ST
R U
C
TU
R E
REMOVE TOP 3' OF
WATER STRUCTURE
FILL REMAINING
STRUCTURE WITH
SAND (APPROVED
BY ENGINEER)
EXISTING
WATER MAIN
EXISTING WATER
MAIN AND GATE
WELL TO REMAIN
GATE WELL, ABANDON DETAIL
NOT TO SCALE
Z:
\20
9.0
0 E co rse W ate r S ys tem
D es ign G ra nt\
De sig n\C
AD
\W or k S he ets \C ha rlo tte A ve \02
-0 3 N ote s &
Le ge nd an d D eta ils .dw g
Copyright © 2025 Giffels Webster.
No reproduction shall be made without the prior written consent of Giffels Webster.
Engineers Surveyors Planners
Landscape Architects
1025 East Maple Road Suite 100
Birmingham, MI 48009 p (248) 852-3100 f (313) 962-5068 www.giffelswebster.com
Know what's below.
before you dig.Call
R
Developed For:
Executive:
Manager:
Designer:
Quality Control:
Project:
Sheet:
Scale:
Date:
ISSUE:DATE:
of 20519.00
M.K.
B.K.
J.P.K.
04.10.25
R.D.H.
CITY OF ECORSE
WAYNE COUNTY
MICHIGAN
ECORSE TEDF-B GRANT #735
ROAD & WATER MAIN REPLACEMENT
EGLE WATER MAIN PERMIT03/06/2025
FOR BIDS04/21/2025
DETAILS
########NONE
MATCH EXISTING
PAVEMENT WIDTH
6" (TYP)
1/2" EXPANSION PAPER
ROLLED EDGE, TYPICAL
TAPERED TO ZERO
HEIGHT OF CURB AT SIDEWALK
ALLEY/COMMERCIAL DRIVEWAY REPLACEMENT
NOTE: THE CONTRACTOR SHALL
PLACE SIDEWALK, CONC, 6 INCH
ACROSS APPROACHES AT 2%
MAX CROSS SLOPE.
1" EXPANSION PAPER, TYPICAL
18" EPOXY COATED #5 BAR, TYPICAL
@ 24" CENTER-TO-CENTER
NOTE: THE CONTRACTOR SHALL EXCAVATE
EXISTING AND UNSUITABLE SOIL TO THE
REQUIRED DEPTH AND COMPACT AND
CONDITION SUBGRADE AS DETERMINED BY
THE ENGINEER. EXCAVATION IS INCLUDED
IN AGGREGATE BASE, 6 INCH, MODIFIED.
NOTE: AGGREGATE BASE SHALL BE
PLACED AS DIRECTED AND PAID AS
AGGREGATE BASE, 6 INCH, MODIFIED. 2%
M
AX
NOT TO SCALE
6'-7"
Z:
\20
9.0
0 E co rse W ate r S ys tem
D es ign G ra nt\
De sig n\C
AD
\W or k S he ets \C ha rlo tte A ve \04
P av em en t C or es .dw g
Copyright © 2025 Giffels Webster.
No reproduction shall be made without the prior written consent of Giffels Webster.
Engineers Surveyors Planners
Landscape Architects
1025 East Maple Road Suite 100
Birmingham, MI 48009 p (248) 852-3100 f (313) 962-5068 www.giffelswebster.com
Know what's below.
before you dig.Call
R
Developed For:
Executive:
Manager:
Designer:
Quality Control:
Project:
Sheet:
Scale:
Date:
ISSUE:DATE:
of 20519.00
M.K.
B.K.
J.P.K.
04.10.25
R.D.H.
CITY OF ECORSE
WAYNE COUNTY
MICHIGAN
ECORSE TEDF-B GRANT #735
ROAD & WATER MAIN REPLACEMENT
EGLE WATER MAIN PERMIT03/06/2025
FOR BIDS04/21/2025
PAVEMENT
CORES
########NONE
1. REFER TO THE GENERAL NOTES FOR ADDITIONAL REQUIREMENTS AND RESPONSIBILITIES.
2. ALL EROSION AND SEDIMENTATION CONTROL WORK SHALL CONFORM TO THE CURRENT STANDARDS AND SPECIFICATIONS OF WAYNE COUNTY DEPARTMENT OF PUBLIC
SERVICES. A PROJECT WITH A DISTURBANCE AREA GREATER THAN 1 ACRE OR OCCURRING WITHIN 500 FEET OF A LAKE OR STREAM REQUIRES A SOIL EROSION PERMIT.CONTACT
THE LAND RESOURCE MANAGEMENT DIVISION AT (734) 326-3936 AT LEAST 48 HOURS BEFORE WORK IS TO BEGIN.
3. ACCESS TO THE SITES WILL BE AT EACH INDIVIDUAL PROPERTY. CONTRACTOR IS TO MINIMIZE DISTURBANCE BY ACCESSING THE EASEMENT AREA THROUGH THE MINIMAL
AMOUNT OF ACCESS POINTS AND REDUCING ANY UNNECESSARY REMOVALS. OWNER TO PROVIDE ASSISTANCE TO THE CONTRACTOR TO COORDINATE WITH INDIVIDUAL
PROPERTY OWNERS.
4. ANY EROSION AND SEDIMENTATION FROM WORK ON THIS SITE SHALL BE CONTAINED WITHIN THE WORK AREA AND NOT ALLOWED TO COLLECT ON ANY OFF-SITE AREAS OR IN
WATERWAYS. (WATERWAYS INCLUDE BOTH NATURAL AND MAN-MADE OPEN DITCHES, STREAMS, STORM DRAINS, LAKES, PONDS AND WETLANDS)
5. THE CONTRACTOR SHALL APPLY TEMPORARY EROSION AND SEDIMENTATION CONTROL MEASURES AS DIRECTED ON THESE PLANS AND WHENEVER OTHERWISE REQUIRED
BY THE WORK. THE CONTRACTOR SHALL REMOVE TEMPORARY MEASURES AS SOON AS PERMANENT STABILIZATION OF SLOPES, DITCHES, AND OTHER CHANGES HAVE BEEN
ACCOMPLISHED.
6. SOIL EROSION CONTROL PRACTICES WILL BE ESTABLISHED IN EARLY STAGES OF CONSTRUCTION BY THE CONTRACTOR. SEDIMENTATION CONTROL PRACTICES WILL BE
APPLIED AS A PERIMETER DEFENSE AGAINST ANY TRANSPORTING OF DIRT OUT OF THE WORK AREA.
7. THE CONTRACTOR SHALL PRESERVE NATURAL VEGETATION AS MUCH AS POSSIBLE.
8. PROTECT ALL EXISTING TREES, INCLUDING THEIR BRANCHES AND ROOTS, FROM DAMAGE DUE TO THIS WORK UNLESS SPECIFICALLY IDENTIFIED FOR REMOVAL.
9. VEGETATION STABILIZATION OF ALL DISTURBED AREAS SHALL BE ESTABLISHED WITHIN 15 DAYS OF COMPLETION OF FINAL GRADING.
10. THE CONTRACTOR SHALL SWEEP THE EXISTING STREETS SURROUNDING THE PROJECT SITE ONCE A WEEK, OR AS DIRECTED BY THE ENGINEER OR INSPECTOR. STREET
SCRAPING SHALL BE PERFORMED IN CONJUNCTION WITH THIS SWEEPING ON AN AS NEEDED BASIS.
11. THE SEDIMENT CONTROL FENCING AND DISTURBANCE AREAS INDICATED ON THIS PLAN ARE NOT INTENDED TO SHOW THE EXACT LOCATION OF THE FENCE. THE
CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION AND MAINTENANCE REQUIRED TO CONTAIN SEDIMENT.
12. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING COMPLIANCE WITH ALL APPLICABLE NPDES REGULATIONS, INCLUDING: INSPECTION, RESTORATION, AND RECORD
KEEPING REQUIREMENTS.
13. THE CONTRACTOR IS RESPONSIBLE FOR ON-GOING MAINTENANCE OF ALL SOIL EROSION CONTROLS AS INDICATED BY THESE PLANS.
14. CONSTRUCTION ACTIVITIES (INCLUDING INSTALLATION OF PIPE AND ASSOCIATED VALVES, STRUCTURES, BACK FILLING, SURFACE RESTORATION, AND REMOVAL OF EXCESS
EXCAVATED MATERIAL) SHALL BE ACCOMPLISHED IN ONE CONTINUOUS OPERATION.
15. PAVEMENT AND/OR VEGETATION SHALL NOT BE STRIPPED FROM AN AREA UNLESS CONSTRUCTION ACTIVITIES ARE TO COMMENCE IN THAT AREA WITHIN THE NEXT THREE
DAYS.
16. IF FOR ANY REASON PERMANENT STABILIZATION CAN NOT BE PROVIDED WITHIN 15 DAYS OF THE COMPLETION OF PIPE LAYING OPERATIONS, TEMPORARY STABILIZATION
SHALL BE PROVIDED AT ALL DISTURBED AREAS. TEMPORARY STABILIZATION SHALL FURTHERMORE BE PROVIDED DURING THE NON-GROWING SEASON (OCTOBER 1 THROUGH
APRIL 20) FOR ALL AREAS TO BE SEEDED.
17. TEMPORARY STABILIZATION SHALL CONSIST OF EITHER SMALL GRAIN STRAW OR GRASS HAY SPREAD AT THE RATE OF 1.5 TO 2 TONS PER ACRE, OR MULCH BLANKETS, WHICH
SHALL BE ANCHORED IN PLACE TO PREVENT DISPLACEMENT FROM WIND AND RAIN. TEMPORARY STABILIZATION SHALL BE REPAIRED AS OFTEN AS NECESSARY, AS DETERMINED
BY THE AGENCY WITH JURISDICTION.
18. ALL DEWATERING SHALL BE ACCOMPLISHED IN A MANNER THAT WILL NOT CONTRIBUTE TO DEPOSITION OF SEDIMENT IN ROAD DITCHES OR OPEN WATER.
19. THIS PROJECT SHALL BE CONSTRUCTED IN COMPLIANCE WITH PART 91 OF ACT 451 OF 1994, AS AMENDED.
20. SEDIMENT CONTROL FENCING SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND SEVERAL TIMES DURING PROLONGED STORM EVENTS. IF THE FENCE IS
SAGGING, OR SOIL HAS REACHED ONE HALF OF THE HEIGHT OF THE FABRIC, THE SOIL BEHIND THE FABRIC SHALL BE REMOVED AND DISPOSED OF IN A STABLE AREA OF THE SITE.
IF WATER IS SEEPING UNDER THE FENCE, OR THE FABRIC IS DECOMPOSED OR OTHERWISE INEFFECTIVE, THE FENCE SHALL BE REMOVED AND PROPERLY REINSTALLED AS
INDICATED ON THESE PLANS.
21. MUD MAT ENTRANCES SHALL BE INSPECTED IMMEDIATELY AFTER EACH STORM RAINFALL. THE SURROUNDING ROADS SHALL ALSO BE INSPECTED AT THIS TIME FOR
EVIDENCE THAT MUD IS BEING TRACKED OFF OF THE SITE. MAINTENANCE SHALL INCLUDE THE INSTALLATION OF ADDITIONAL LAYERS OF STONE WHEN THE ORIGINAL STONE
BECOMES COVERED WITH MUD. ALL SEDIMENT DROPPED OR TRACKED ONTO PUBLIC RIGHT-OF-WAYS SHALL BE REMOVED IMMEDIATELY BY SWEEPING AND SCRAPING (AS MAY
BE REQUIRED BY THE ENGINEER).
22. SEDIMENT INLET FILTERS SHALL BE INSPECTED IMMEDIATELY AFTER EACH RAINFALL AND SEVERAL TIMES DURING PROLONGED STORM EVENTS. THE FILTERS SHALL BE
CLEANED PERIODICALLY THROUGHOUT CONSTRUCTION TO AVOID CLOGGING. FILTERS THAT CANNOT BE MAINTAINED BY CLEANING SHALL BE COMPLETELY REPLACED.
23. DEWATERING IS NOT ANTICIPATED FOR THIS SITE.
24. STOCKPILING IS NOT ANTICIPATED FOR THIS SITE.
1. DURING DRY PERIODS, ALL DISTURBED AREAS SHALL BE WATERED DOWN FOR DUST CONTROL.
2. THE CONTRACTOR SHALL SWEEP THE EXISTING STREETS SURROUNDING THE PROJECT SITE ONCE A WEEK, OR AS DIRECTED BY THE ENGINEER OR
INSPECTOR. STREET SCRAPING SHALL BE PERFORMED IN CONJUNCTION WITH THIS SWEEPING ON AN AS NEEDED BASIS.
DUST CONTROL PROVISIONS
ADDITIONAL EROSION CONTROL NOTES
1. SOIL EROSION CONTROL PRACTICES WILL BE ESTABLISHED IN EARLY STAGES OF CONSTRUCTION BY CONTRACTOR. SEDIMENTATION
CONTROL PRACTICES WILL BE APPLIED AS A PERIMETER DEFENSE AGAINST ANY TRANSPORTING OF DIRT OUT OF THE WORK AREA.
2. CONTRACTOR SHALL PRESERVE NATURAL VEGETATION AS MUCH AS POSSIBLE.
3. PROTECT ALL EXISTING TREES, INCLUDING THEIR BRANCHES AND ROOTS, FROM DAMAGE DUE TO THIS WORK UNLESS SPECIFICALLY
IDENTIFIED FOR REMOVAL.
4. CONTRACTOR SHALL BE RESPONSIBLE FOR ENSURING COMPLIANCE WITH ALL APPLICABLE NPDES REGULATIONS, INCLUDING INSPECTION, RESTORATION, AND RECORD KEEPING REQUIREMENTS.
5. CONSTRUCTION ACTIVITIES (INCLUDING INSTALLATION OF PIPE, ASSOCIATED VALVES, STRUCTURES, BACKFILLING, SURFACE RESTORATION, AND REMOVAL OF EXCESS EXCAVATED MATERIAL) SHALL BE ACCOMPLISHED IN ONE CONTINUOUS OPERATION.
6. IF PERMANENT STABILIZATION CANNOT BE PROVIDED WITHIN 15 DAYS OF THE COMPLETION OF PIPE LAYING OPERATIONS, TEMPORARY
STABILIZATION SHALL BE PROVIDED AT ALL DISTURBED AREAS. TEMPORARY STABILIZATION SHALL FURTHERMORE BE PROVIDED DURING THE
NON-GROWING SEASON (OCTOBER 1 THROUGH APRIL 20) FOR ALL AREAS TO BE SEEDED.
7. TEMPORARY STABILIZATION SHALL CONSIST OF EITHER SMALL GRAIN STRAW OR GRASS HAY SPREAD AT THE RATE OF 1.5 TO 2 TONS PER
ACRE, OR MULCH BLANKETS, WHICH SHALL BE ANCHORED IN PLACE TO PREVENT DISPLACEMENT FROM WIND AND RAIN. TEMPORARY
STABILIZATION SHALL BE REPAIRED AS OFTEN AS NECESSARY, AS DETERMINED BY THE AGENCY WITH JURISDICTION.
EROSION CONTROL NOTES PROJECT INFORMATION
1. A PERFORATED RISER PIPE WITH STONE FILTER JACKET WILL BE REQUIRED ON ALL SEDIMENT BASINS FOR PROJECTS 5 ACRES OR MORE IN SIZE.
2. A TEMPORARY CRUSHED ROCK TRACKING PAD WILL BE INSTALLED AT THE CONSTRUCTION ENTRANCE AND EXIT. THIS TRACKING PAD WILL BE MAINTAINED
WITH FRESH STONE. CONSTRUCTION TRAFFIC WILL BE LIMITED TO THE DESIGNATED ENTRANCE AND EXIT.
3. A STREET SCRAPING AND SWEEPING SCHEDULE (MINIMUM - AT LEAST ONE SWEEPING A WEEK, AND SCRAPING AT THE END OF EACH WORK DAY).
4. INLET PROTECTION
A. PAVED STORM SEWER INLETS SHALL BE PROTECTED BY A HIGH FLOW SACK TYPE INLET FILTER CONFORMING TO ONE OF THE FOLLOWING
I. SILT SACK - HIGH FLOW BY ACF ENVIRONMENTAL
II. INLET PRO - HIGH FLOW SEDIMENT BAG BY HANES GEO COMPONENTS
III. CATCH-ALL INLET FILTER BY MARATHON MATERIALS INC.
IV. DANDY CURB SACK BY DANDY PRODUCTS, INC.
B. REAR YARD (BEEHIVE-TYPE) STORM SEWER INLETS SHALL BE PROTECTED BY ONE OF THE FOLLOWING
I. A SEDCAGE YARD INLET PROTECTION MANUFACTURED BY SEDCATCH ENVIRONMENTAL PRODUCTS.
II. A BOX FILTER FABRIC FENCE CONFORMING TO CSI GEOTURF 36 INCH MDOT SPEC SILT FENCE SECURELY FIXED TO 2" X 2" HARDWOOD STAKES SPACED
NO MORE THAN 6.5 FEET ON CENTER TIED TO 4-FOOT STEEL POSTS AT ALL FOUR CORNERS AND TRENCHED A MINIMUM OF 10 INCHES INTO THE GROUND.
5. ALL EXPOSED EARTH SHALL BE STABILIZED WITH SEED AND MULCH OR SOD WITHIN 5 DAYS OF FINAL GRADE. SEDIMENT BASINS SHALL BE STABILIZED WITH
SEED AND STRAW MULCH BLANKETS. STRAW MULCH BLANKETS SHALL BE STAKED INTO THE GROUND 5 DAYS AFTER THE CONSTRUCTION OF THE SEDIMENT
BASIN.
6. AN UNDISTURBED, VEGETATIVE BUFFER STRIP OF AT LEAST 25 FEET SHALL BE RETAINED AROUND RIVERS, CREEKS, STREAMS, WETLANDS, DRAINS, AND
OTHER SENSITIVE AREAS.
7. STRAW MULCH BLANKETS SHALL BE USED ON 3:1 SLOPES OR GREATER. (THREE FOOT HORIZONTAL, ONE FOOT VERTICAL).
8. DITCHES, SWALES, AND OTHER AREAS THAT WILL CHANNEL CONCENTRATED RUNOFF MUST BE STABILIZED WITHIN 15 DAYS OF CONSTRUCTION. TEMPORARY
ROCK CHECK DAMS WILL BE REQUIRED TO SLOW WATER TO NON-EROSIVE VELOCITIES IN AREA OF CONCENTRATED FLOW.
9. ROAD RIGHT-OF-WAYS MUST BE STABILIZED WITH SEED AND MULCH WITHIN 5 DAYS OF COMPLETING UTILITY WORK IN THE RIGHT-OF-WAY.
10. AREAS OF EARTH CHANGE THAT ARE DISTURBED BEYOND THE FALL SEEDING DEADLINE.
(NOV. 1) MUST BE TEMPORARILY STABILIZED WITH A MINIMUM OF STRAW MULCH SECURELY CRIMPED TO THE GROUND.
11. RIP RAP WILL BE PLACED IMMEDIATELY FOLLOWING INSTALLATION OF POND OUTLETS AND CULVERTS.
WAYNE COUNTY EROSION CONTROL PERFORMANCE REQUIREMENTS
1. TYPE OF DEVELOPMENT: REMOVE AND REPLACE WATER MAIN DESIGN
2. TOTAL AREA OF PROPOSED EARTH DISTURBANCE: 0.34 ACRES
3. TYPE OF SOIL(S): BROWN SAND WITH GRAY SILTY CLAY
4. DESCRIPTION OF PROPOSED EARTH DISTURBANCE: EXCAVATION FOR PROPOSED WATER MAIN TRENCH
5. TYPE OF ULTIMATE DRAINAGE OUTLET
A. COUNTY DRAIN: NORTH NORTH BRANCH OF ECORSE CREEK
B. LAKE/POND: NA
C. RIVER/STREAM: DETROIT RIVER
6. DISTANCE TO NEAREST DRAIN, LAKE/POND, RIVER/STREAM, WETLAND: 3,500 FEET
1. OBTAIN BONDS, SOIL EROSION PERMIT, AND/OR NPDES PERMITS AS REQUIRED.
2. INSTALL MUD MATS, SILT FENCE, AND INLET FILTERS AT LOCATIONS OF DISTURBED AREAS AS SHOWN AND AS REQUIRED TO ACHIEVE ON-SITE CONTAINMENT.
3. CLEAR, GRUB, AND STRIP TOPSOIL IN AREAS ON EARTH DISTURBANCE.
5. PERFORM WORK PERTAINING TO LEAD SERVICE LINE REPLACEMENT.
6. PERFORM WORK PERTAINING TO WATER MAINS.
7. PERFORM WORK PERTAINING TO BACKFILLING, PAVING, SEEDING, AND MULCHING.
8. CLEAR ALL ACCUMULATED SILT AND REMOVE ALL SESC DEVICES.
9. RESTORE ALL DISTURBED AREAS TO ORIGINAL CONDITION OR BETTER, INCLUDING THE INSTALLATION OF LANDSCAPING MATERIALS.
10. REMOVE ALL EROSION CONTROL DEVICES.
MAINTENANCE SCHEDULE
CHECK SILT FENCE AND SEDIMENT CONTROLS WEEKLY AND AFTER SIGNIFICANT RAIN EVENT
STREET SCRAPING DAILY
STREET SWEEPING WEEKLY MINIMUM
EROSION CONTROL SEQUENCE OF CONSTRUCTION
TIMING REQUIREMENTS
PROJECT START: SILT FENCE, INLET FILTER 07/01/2025
LEAD SERVICE LINE REPLACEMENT
WATER MAIN CONSTRUCTION
GRADING AND PAVING CONSTRUCTION
LANDSCAPING/RESTORATION
PROJECT FINISH: REMOVE SESC
x.xx acDRAINAGE AREA
SEDIMENT INLET FILTER
MUD MAT ENTRANCE
CHECK DAM
SEDIMENT CONTROL FENCE
DRAINAGE AREA LINE
EROSION CONTROL LEGEND
OVERFLOW
DUMP LOOPS
1" REBAR FOR BAG
REMOVAL FROM INLET
EXPANSION
RESTRAINT
INSTALLATION DETAIL
EXIST. CATCH BASIN
OR INLET WALL
EXIST. CATCH BASIN
OR INLET
SUPPORT FENCE
SILT FENCE JOINT
SECTION B-B A
A
FENCE POSTS
SHEET FLOW
COMPACTED EARTH
SHEET FLOW
SPACING 6' MAX.
6" ANCHOR TRENCH
GEOTEXTILE FILTER FABRIC
FENCE POSTS DRIVEN
INTO GROUND 1' MIN.
1' MIN.
SUPPORT FENCE
PLAN VIEW
FRONT VIEW
SECTION A-A
UNDISTURBED
VEGETATION
1' MIN
GEOTEXTILE FILTER FABRIC
FASTENED ON UPHILL SIDE,
TOWARDS EARTH DISRUPTION
RIDGE OF COMPACTED EARTH
ON UPHILL SIDE OF FILTER
FABRIC SHEET FLOW
6" X 6" ANCHOR TRENCH
SECTION B-B
SILT FENCE A
SILT FENCE B
SILT FENCE JOINT
COUPLER
FABRIC TO BE WRAPPED
AROUND FENCE POSTSILT FENCE A
SILT FENCE B
GEOTEXTILE FILTER
FABRIC
24 "
SELVAGED EDGE (TYP.)
UNDISTURBED VEGETATION
Z:
\20
9.0
0 E co rse W ate r S ys tem
D es ign G ra nt\
De sig n\C
AD
\W or k S he ets \C ha rlo tte A ve \05
S oil
E ro sio n a nd S ed im en t…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .