TECHNICAL SPECS ARFQ DEP25-10 KUHNS RUN PARK PORTALS.pdf

PDF 1 MB Posted

Attached to
AML - Kuhns Run Park Portals
Solicitation number
ARFQ-0313-DEP2500000010-3
Issued by
Marshall County, West Virginia

About this file

This document contains the construction specifications for the Kuhns Run Park Portals project in Marion County, West Virginia. The project is being managed by the West Virginia Department of Environmental Protection (WVDEP) Office of Abandoned Mine Lands and Reclamation. The work includes excavating and sealing a collapsed portal, repairing a slip area, regrading a spoil area, filling subsidence areas, installing drainage structures, and revegetating the site. The contractor will be responsible for mobilization, construction layout, quality control, site preparation, erosion and sediment control, drainage structures, excavation, mine seals, and other incidental work. The contractor must also maintain traffic control and repair any damage to existing roads during construction. Pricing for the work will be structured as lump sum and unit price items, with the lump sum items for mobilization, construction layout, and site preparation not to exceed certain percentages of the total bid amount. The contractor will be required to follow WVDEP's NPDES stormwater permit requirements and implement an erosion and sediment control plan.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONSTRUCTION SPECIFICATIONS

FOR THE

WVDEP

OFFICEOFABANDONED
MINELANDSANDRECLAMATION

FOR

KUHNSRUNPARKPORTALS
MARIONCOUNTY,WV

MARCH 2024

THE THRASHER GROUP PROJECT #101-030-10429

600 WHITE OAKS BLVD – P.O. BOX 940 – BRIDGEPORT, WV 26330 – (304) 624-4108 – FAX: 624-7831 thrasher@thrashereng.com – www.thrashereng.com

TABLE OF CONTENTS

SECTION PAGE

I. SPECIAL PROVISIONS

1.0 LOCATION / SITE DESCRIPTION

2.0 SCOPE OF WORK

3.0 BORROW (DISPOSAL) AREAS

4.0 DISPOSAL OF UNSUITABLE MATERIAL

5.0 PERMITS, LICENSES, AND FEES

6.0 NPDES STORMWATER REQUIREMENTS

7.0 CONSTRUCTION SIGN

8.0 CONTRACTOR INFORMATION FORM (AVS)

II. TECHNICAL SPECIFICATIONS

1.0 MOBILIZATION AND DEMOBILIZATION

1.1 Description

1.2 Method of Measurement and Basis of Payment

1.3 Pay Item

2.0 CONSTRUCTION LAYOUT

2.1 Description

2.2 Materials

2.3 Construction Methods

2.4 Method of Measurement and Basis of Payment

2.5 Pay Item

3.0 QUALITY CONTROL

3.1 Description

3.2 Materials

3.3 Construction Methods

3.4 Method of Measurement and Basis of Payment

3.5 Pay Item

4.0 SITE PREPARATION

4.1 Description

4.2 Materials

4.3 Construction Methods

4.4 Method of Measurement and Basis of Payment

4.5 Pay Items

5.0 EROSION & SEDIMENT CONTROL

5.1 Description

5.2 Materials

5.3 Maintenance

5.4 Installation

5.5 Removal

5.6 Method of Measurement and Basis of Payment

5.7 Pay Items

6.0 REVEGETATION

6.1 Description

6.2 Materials

6.3 Construction Methods

6.4 Method of Measurement and Basis of Payment

6.5 Pay Item

7.0 DRAINAGE STRUCTURES

7.1 Description

7.2 Materials

7.3 Construction Methods

7.4 Method of Measurement and Basis of Payment

7.5 Pay Items

8.0 UNCLASSIFIED EXCAVATION

8.1 Description

8.2 Materials

8.3 Borrow / Disposal Area

8.4 Soil Cover

8.5 Construction Methods

8.6 Methods of Measurement and Basis of Payment

8.7 Pay Items

9.0 MINE SEALS

9.1 Description

9.2 Materials

9.3 Construction Methods

9.4 Method of Measurement and Basis of Payment

9.5 Pay Items

10.0 ADMINISTRATION

10.1 Description

10.2 Summary

10.3 Method of Measurement and Basis of Payment

10.4 Pay Items

11.0 TRAFFIC CONTROL

11.1 Description

11.2 Materials

11.3 Construction Methods

11.4 Method of Measurement and Basis of Payment

11.5 Pay Items

12.0 ASPHALT PAVING AND MISC ROAD REPLACEMENT

12.1 Description

12.2 Materials

12.3 Construction Methods

12.4 Method of Measurement and Basis of Payment

12.5 Pay Items

KUHNS RUN PARK PORTALS

I. SPECIAL PROVISIONS

1.0 LOCATION / SITE DESCRIPTION

The project is located on the Eastern side of County Route 27, Kuhns Run Road and approximately 6 miles Southwest of Fairmont within Marion County, West Virginia.

The project consists of an existing slip area, a collapsed portal, subsidence depressions, multiple seep areas, and spoil area that needs regraded.

All these features are posing a risk to public safety and need to be repaired. The objective of this project is to excavate and seal the portal, repair the slip area to a stable condition, regrade the spoil area to provide positive drainage, fill the subsidence areas to provide a stable area and positive drainage, collect all underground and surface drainage and convey it to a stable discharge location. These efforts should allow for the site to be more stable and safer for the public and the livestock that is present on the site.

Directions to Site:

From the Exit 132 of I-79, take US Route 250 south for 0.4 miles. Turn right onto County Route 73/Middletown Road. Travel 0.9 miles and turn right onto County Route 58/Industrial Park Road. In 1.6 mile turn left onto county route 58/1/Manley Chapel Road. Continue 1.6 miles and turn left onto County Route 27. The site is 0.7miles on County Route 27.

Approximate GPS Coordinates for Slip Repair is:

39.431826°, - 80.238480°

Approximate GPS Coordinates for Portal #1:

39.430156°, - 80.240414°

2.0 SCOPE OF WORK

The Work consists of furnishing all labor, plant, power, equipment, supplies, and performing all operations necessary for the completion of the project. The Contractor shall perform all operations necessary for:

Mobilization and Demobilization Survey and Construction Layout Installation and Maintenance of Erosion and Sediment (E&S) Controls Temporary Access Road Construction Quality Control Site Preparation, including Clearing and Grubbing Unclassified Excavation / Regrading / Soil Drying Traffic Control, where required Installation of a Culvert under the County Route 27 Installation of Channels Installation of Modified Wet Mine Seal Slip Repair Conveyance Pipe Installations Gate Installation Repaving and Refinishing of Existing Paved Road, if damaged during the Work Gravel Road / Laydown Rehabilitation Revegetation Final Site Cleanup and Removal of E&S Controls

Specifically, the Contractor will be installing their E&S Controls, establishing their Work area and laydown area, clearing, and grading the site as needed to provide space to Work, installing a temporary access road, and any other applicable Site Preparation.

The Contractor will excavate and repair the slip area as shown on the plans. This will include toekey benches, bonding benches, chimney drains, and replacement of soil to meet the design finish grades.

Contractor to install one (1) modified wet mine seal in accordance with the Plans to drain Mine Portal #1.

Traffic Control will be implemented by the Contractor. Contractor is limited to only obstructing one lane of the road at a time – and in compliance with the Traffic Control Section of these Specifications. The expectation is for the Contractor to limit lane closures to the greatest extent practical. The expectation is also for the Contractor to not close lanes – whenever at all practical – during typical rush hour traffic periods.

During the Work, the Contractor is to exercise caution in not disturbing structures or trees to remain.

The Contractor is to repair or reconstruct (full depth) any pavement damaged during the Work by the Contractor to a quality consistent with these Specifications and to a quality at least what was present before the Work started, at the Contractor’s expense, except as otherwise specified or approved. The expectation is that, if the pavement is damaged, that the pavement would be, at a minimum, milled down at least 2” and resurface areas as deemed necessary by the engineer – patches are unacceptable. If damage protrudes into the base or aggregate layer of the existing asphalt, then a full depth repair will be necessary. This will be determined as directed by the Engineer. If nothing is damaged during the Work, then no replacements would be necessary.

Contractor to install farm gates consistent with the Plans.

Contractor is responsible for leaving the site and surrounding area in original condition or better. This includes refurbishing the existing access road to at least as good a condition as was present before the Work started – and additional stone is provided in the estimate for making it nicer than what was present originally. This also includes picking up and disposing of any trash or litter the Work generates in accordance with these Specifications.

Contractor will IMMEDIATELY clean any mud off roadways that the State reasonably believes to be project related.

Contractor is responsible for engaging in soil disturbance only within the Limits of Disturbance shown on the Plans.

The Contractor shall also be responsible for surveying, including establishing construction baseline, measuring, and developing all completed quantities on the job, and the ordering, purchase and delivery of any and all materials required for construction or required for development of support areas. The Contractor shall perform all other operations as incidental to the program as specified herein. The Contractor is responsible to verify all surveying, measurements, estimates, or any other information provided by the State for accuracy.

Any deviation from the Plans or Specifications, not approved in writing by the State Engineer or Contract Administrator, are at Contractor risk. State reserves the right to require Contractor to correct back to Plans – at Contractor cost – any unapproved condition at any time.

The replacement of Culvert #3 is within the FEMA floodplain boundaries. The approval of this work has been granted by Marion County under Permit # 93078172023.

3.0 BORROW (DISPOSAL) AREAS

All borrow (disposal) areas must be approved by the State. The Contractor shall be responsible to obtain from the property owner(s) of the borrow areas, all necessary rights of entry, including rights of entry for the State and OSMRE for inspection purposes. The said rights of entry agreement must state that the property owner(s) indemnify and hold harmless the State for Contractor’s action for any injury or damages whatsoever resulting from the use of the property.

The Contractor also shall submit a borrow / disposal area reclamation plan for prior approval by the State. The Contractor shall observe the following NEPA compliance schedule relative to selecting and utilizing any off site borrow areas and / or any waste disposal areas:

No borrow (disposal) site operations will affect a site listed in, eligible for, or proposed to be listed in the National Register of Historic Places.

No borrow (disposal) operations will be located within one-quarter mile of any Federally listed, established, or prospective component of the National Wild and Scenic River System under 16 USC 1274 and 1276.

Borrow (disposal) site operations will not cause a significant encroachment within the base floodplain (CE.O. 11988: Floodplain Management).

Borrow (disposal) site operations will not be located in or affect a critical habitat of a Federally listed endangered or threatened species under 16 USC 1531, et. seq.

No borrow (disposal) operations will occur in wetland areas which are designated by appropriate agencies.

Borrow (disposal) site operations will be consistent with any approved plans governing ambient air quality.

Adherence to these mitigation measures does not relieve the Contractor of the obligation or responsibility to obtain any other Federal, State, or Local approvals required to use borrow (disposal) areas and conduct such activities.

Documentation: Copies of borrow (disposal) site approvals and concurrences will be submitted to the State prior to the commencement of reclamation activities.

Site Monitoring: Borrow (disposal) activities will be monitored by the State to ensure compliance with contractual requirements, applicable Federal, State, and Local laws, and any permit conditions.

4.0 DISPOSAL OF UNSUITABLE MATERIAL

All waste areas shall be obtained in accordance with these Specifications. All unsuitable materials (wood, trash, debris, and garbage), as determined by the State, shall be wasted by the Contractor outside the limits of work conforming to the requirements of these Specifications at the Contractor’s expense. Wood may be burned, if in conformity with these Specifications and any applicable Federal, State, and Local laws, and any permit conditions. Uncontaminated wood may also be chipped with the chips either buried or broadcasted across the site.

The Contractor shall observe the NEPA compliance schedule relative to selecting and utilizing any off-site disposal areas in accordance with these Specifications.

5.0 PERMITS, LICENSES, AND FEES

The Contractor shall procure all permits and licenses, pay all charges and fees, and give all notices necessary and incidental to the due and lawful prosecution of the Work.

Permits required for this project may include but not be limited to: Water Quality Certification from WVDEP and burning permits from WVDNR and WVDEP Office of Air Quality. A copy of the permit/permits as procured shall be furnished to the State prior to initiation of the Work under this Contract. The State will obtain the Permits from WVDOH and NPDES from WVDEP, if required. Contractor shall be responsible for any Stream Activity Permits necessary to complete the project Work.

6.0 NPDES STORMWATER REQUIREMENTS

The WVDEP-AML has obtained a Construction Storm Water General Permit for this project from the WVDEP Division of Water and Waste Management (WVDEP DWWM).

The registration for this reclamation project will be modified to include the Contractor as Co-Applicant #2, with the WVDEP-AML being Co-Applicant #1. As such, the Contractor shall assume responsibility for compliance with the terms and conditions of the permit including modifications and any future correspondence such as registration renewal invoices, inspection reports, and notices of violation shall be forwarded to the Contractor.

Upon award of the contract, the Contractor shall complete a Co-Applicant #2 signature page and submit the completed form to WVDEP-AML prior to scheduling a Pre- Construction Conference.

Upon receipt of the completed form, WVDEP-AML will request the WVDEP DWWM to modify the existing NPDES registration for this project to make the Contractor the Co- Applicant #2 to the permit.

The WVDEP DWWM will notify the Contractor and WVDEP-AML when the successful transfer of registration under WV/NPDES Storm Water Construction General Permit (No.

WV0115924) is completed. A Notice to Proceed will not be issued until the contractor signs the co-applicant form and submits to the Office of Abandoned Mine Lands. Once the transfer has been completed, the WVDEP will continue to be responsible for any modification fees and annual renewal fees incurred up until the date of the final inspection of the project that occurs after completion of construction activities at the site. The Contractor shall be responsible for any and all costs associated with violations and fines assessed against the project that are a result of the Contractor’s negligence, carelessness, or failure to install permanent controls as part of the work as scheduled.

The WVDEP shall apply for a Notice of Termination (NOT) from WVDEP DWWM via the Construction Storm Water website http://www.dep.wv.gov/Programs/stormwater/csw/Documents/Construction upon completion of construction activities at the site. The NOT shall be issued by WVDEP DWWM upon completion of the project. The Contractor will continue to be bound by the terms and conditions of the permit until the NOT has been approved by WVDEP DWWM.

Once the project is complete, the Contractor will still bear responsibility for the NPDES registration until a NOT is received from the WVDEP DWWM.

Co-Applicant #2 Signature Page

Co-Applicant #2: _____________________________________________

New and/or Modification of NPDES Storm Water of Construction Project Name:

BY COMPLETING AND SUBMITTING THIS APPLICATION, I HAVE REVIEWED AND UNDERSTAND

AND AGREE TO THE TERMS AND CONDITIONS OF THE GENERAL PERMIT (WV0115924) ISSUED ON JANUARY 10, 2019, WITH AN EFFECTIVE DATE OF FEBRUARY 9, 2019, AND EXPIRATION DATE OF

FEBRUARY 9, 2024. I UNDERSTAND THAT PROVISIONS OF THE PERMIT ARE ENFORCEABLE BY

LAW, VIOLATION OF ANY TERM AND CONDITION OF THE GENERAL PERMIT AND /OR OTHER

APPLICABLE LAW OR REGULATIONS CAN LEAD TO ENFORCEMENT ACTION.

I CERTIFY UNDER PENALTY OF LAW THAT I HAVE PERSONALLY EXAMINED AND AM FAMILIAR

WITH THE INFORMATION SUBMITTED ON THIS FORM AND ALL ATTACHMENTS AND THAT, BASED

ON MY INQUIRING OF THOSE INDIVIDUALS IMMEDIATELY RESPONSIBLE FOR OBTAINING THE

INFORMATION. THE INFORMATION SUBMITTED IS, TO THE BEST OF MY KNOWLEDGE AND

BELIEF, TRUE, ACCURATE, AND COMPLETE. I AM AWARE THAT THERE ARE SIGNIFICANT

PENALTIES FOR SUBMITTING FALSE INFORMATION, INCLUDING THE POSSIBILITY OF FINE AND

IMPRISONMENT.

(CO-APPLICANT #2 SIGNATURE) DATE

Print Name: ___________________________________________

Print Title: ___________________________________________

Address: ___________________________________________

City: _____________________State: _______ Zip:___________

Telephone Number: (_____ )________-____________________

Email: ______________________________________________

FEIN: ______________________________________________

7.0 CONSTRUCTION SIGN

The work to be performed under this Section consists of providing all labor, material, and equipment necessary to install a project sign as indicated on the detail included herein and as specified herein.

Sign face shall be 3/4" thick Marine Exterior plywood or aluminum or composite material. Posts and cross-brace shall be No. 2 Grade Pine or Fir: kiln dried and pressure treated.

All hardware shall be manufactured from good, commercial-quality material and meet all applicable ASTM standards. Spikes and nails shall be common wire-type and shall meet AISI steel specifications 1010 or 1020. All hardware shall be hot-dip galvanized in accordance with ASTM A-153.

The sign face shall be cut to the dimensions shown on the detail herein. The sign shall be painted with one (1) coat of primer and two (2) coats of white enamel. All exterior cut edges shall be smooth sanded, prior to painting. All edges shall be double primed.

The letters, border, and strips shall be painted as shown on the detail drawing. Posts and cross-brace shall be painted with two (2) finished coats of brown enamel.

The Contractor shall bolt the sign to posts and provide the required cross-bracing. The posts shall be set in gravel base and sign erected, as shown on the drawing. One (1) sign is required and is to be located at the discretion of the Inspector.

Payment for the Work, which shall include installation of the project sign, shall be part of the lump-sum bid for "Mobilization".

8.0 CONTRACTOR INFORMATION FORM (AVS)

Vendor must complete the Contractor Information Form (AVS) to request an eligibility evaluation from the Office of Surface Mining Reclamation and Enforcement (https://www.osmre.gov/programs/regulating-coal-mines/avs). This requirement applies to Contractors and their Sub-contractors and is found under OSMRE’s regulations at CFR Title 30, Chapter VII, Subchapter R, Part 874.16:

https://www.ecfr.gov/current/title-30/chapter-VII/subchapter-R/part-874

Vendors should submit the most recent version with their bid documents. Form must be signed and dated within the last 30 days for vendors' bid to be considered for any current solicitation.

II. TECHNICAL SPECIFICATIONS

1.0 MOBILIZATION AND DEMOBILIZATION

1.1 Description

This Work shall consist of the performance of construction preparatory operations, including the movement of personnel and equipment to the project sites and for the establishment of the Contractor’s offices, buildings and other facilities including the construction of all temporary access roads as necessary to begin work on a substantial phase of the contract. The location of the Contractor’s office to be established shall be approved by the State. It also shall include all demobilization activities involving the removal from the sites of all plant, equipment, supplies and personnel after completion of the work, including cleanup of all rubbish and waste materials generated during the construction of this project and restoration of any damage to existing site improvements resulting from the Contractor’s activities at the site. This item shall also include the installation of the project sign at the beginning of the project and the removal of the sign, prior to the Final Inspection. All equipment and material storage areas shall be approved by the State.

Upon receipt of a notice to proceed, the Contractor shall initiate and complete measures necessary to commence the Work. Mobilization shall also consist of delivering to the site and assembling in working order all necessary equipment, materials, and supplies to be furnished by the Contractor to complete the work. Demobilization shall consist of the removal from the site of all the Contractor’s equipment and materials after completion of the work and cleanup of the site. Work shall be performed to the satisfaction of the State to be considered complete.

1.2 Method of Measurement and Basis of Payment

There shall be no measurement for the “Mobilization and Demobilization” item as it shall be lump sum. Said lump sum cannot be more than 5% of the TOTAL AMOUNT BID for the project. Partial payments will be as follows:

One-half of the amount bid will be released to the Contractor with the first estimate payable, not less than 15 days after the start of Work at the project site.

The final one-half of the amount bid shall be released with the last estimate payable after the work is accepted by the State and after all Final Inspection submittals are received and approved by the State.

Nothing herein shall be construed to limit or preclude partial payments otherwise provided for by the contract. Neither deduction nor increase will be made in the lump sum “Mobilization and Demobilization” item amount regardless of decreases or increases in the final total contract amount or for any other cause.

1.3 Pay Item

Item 1.0, “Mobilization and Demobilization”, per lump sum cannot be more than 5% of the TOTAL AMOUNT BID for the project.

2.0 CONSTRUCTION LAYOUT

2.1 Description

This item consists of furnishing, placing, and maintaining construction layout stakes, (based on the original baselines and/or control points in the plans), necessary for the proper performance of the work under this contract including borrow/waste areas.

Construction limits must be clearly flagged, and Pre-Construction cross sections must be provided and approved prior to any disturbance or “unclassified excavation”. It shall further consist of determining the exact units of measure for payment. It also consists of checking and making any field adjustment to the plan alignment, grades and elevations as considered necessary by the Engineer. Additionally, this item shall also include the preparation of “As-Built” Plans, including the Reclamation Plan and any others specifically requested by the State. All “As-Built” Plans shall be provided prior to the Final Inspection Meeting.

This item also includes taking photographs (with a date / time stamp) and/or video (where the date and time are indicated) of the entire site – including the road and adjacent structure

– before and after construction. Photos and/or video are to be provided to the State for record, in particular to show that damage did not occur during the course of the Project.

This item will be paid according to the following schedule: 25% initial layout and LODs, 50% for layout throughout/end of construction, and 25% on the acceptance of as-builts.

This layout shall include location stakes and cut-fill lines marked on the stakes for each pre-manufactured or formed on site structures (manholes, drop inlets, headwalls, etc.).

The layout shall also include centerline stakes with cut-fill lines for each channel and any areas of excavation and re-grade. The certified layout and cross-sections surveyed must be submitted to the State for approval prior to beginning construction for each item.

Work shall be performed to the satisfaction of the State to be considered complete.

2.2 Materials

Conventional survey stakes, hubs, batter boards, flagging, templates, straightedges, and other devices necessary for laying out all parts of the work.

2.3 Construction Methods

The Contractor shall be responsible for the proper layout of the Work. The State will provide the Contractor with survey information regarding the baselines and the existing surface features shown on the Construction Drawings. The Contractor shall make all calculations involved and shall furnish and place all layout stakes. The Contractor is responsible to verify all surveying, measurements, estimates, or any other information provided by the State for accuracy.

The Contractor shall provide field forces and shall set all additional stakes as needed, such as offset stakes, reference point stakes, slope stakes, grade stakes, stakes for drainage, or other structures, supplementary benchmarks, and any other horizontal or vertical controls necessary to secure a correct layout of the Work, including the re-establishment of the survey and construction baselines (as necessary), as shown on the Construction Drawings.

The Contractor shall be responsible for assuring the layout staking work is in conformance to the lines, grades, elevations, dimensions, and locations shown on the Construction Drawings, or as required by the Engineer. The Contractor shall furnish a copy of their survey records for review by the Engineer and for the State’s permanent file. These records shall be furnished as they are completed during the progress of the Work.

Any inspection or review of the Contractor's layout by the Engineer and the acceptance of all or any part of it shall not relieve the Contractor of their responsibility to secure the proper dimensions, grades, and elevations of the Work.

The Contractor shall exercise care in the preservation of stakes, monuments, and benchmarks, including existing property line markers, and shall have them reset at their expense if any are damaged, lost, displaced, or removed. The Contractor shall use competent personnel and suitable equipment for the layout work required and shall provide that it be done under the supervision of, or directed by, a Professional Surveyor registered in the State of West Virginia. As the survey is completed, the Professional Surveyor shall certify that the site layout is complete; this includes, at a minimum, all necessary grades (both cut and fill), location and grades of all ditches, and all cross-sections related to cut and fill where grade lines are necessary for construction and or billing. This layout shall include location stakes and cut-fill lines marked on the stakes for each pre-manufactured or formed on-site structures (manholes, drop inlets, headwalls, etc.). The layout shall also include centerline stake with cut-fill lines for each channel and any areas of excavation and re-grade. The certified layout and cross-sections surveyed must be submitted to the State for approval prior to beginning construction for each item.

As-Built plans shall be provided to the State prior to the Final Invoicing. All work completed by the professional surveyor, registered in the state of West Virginia on as-built plans must be certified by said professional as to the completeness and accuracy of content on the plan submittal. The As-Builts shall be provided in two forms of electronic format in PDF and AutoCAD 2013-2017 on either CD-ROM, DVD, or USB memory stick and one paper copy of the plans with the same size and scale as contained on the original plans.

The As-Builts shall include the following:

Show all permanent Work in place, and any deviations from original plans.

The preferred coordinate system and elevation datum by the Contractor need to be specified. The State has a preference for the US State Plane Coordinates of 1983 West Virginia North Zone – SPCS83 Zone 4701 in feet, unless otherwise specified.

Show all horizontal and vertical dimensions (including invert elevations) of all installed components (i.e., pipes, drop inlets, mine seals, drainage channels, splash pads, manholes, etc.), as well as surveyed locations of the installed structures. Any other items deemed necessary (provided in the contract) by the State shall be included in the As-Builts.

Cut-fill sections shall have the area of the section marked by the section for easier calculation, if required.

Have the lines on the plans shown in either color or line type to distinguish between the original plan lines, the contractor’s original survey lines and the final grade lines. This will apply for all cross-sections on the project, if required.

All waste and borrow areas shall be shown and labeled.

Revegetation that is paid for by acreage, shall be per plan view acreage and shall be shown on a separate AutoCAD layer. The enclosed areas shall not include any graveled surfaces, paved surfaces, roads, ponds, treatment components, all non-vegetated channels, buildings, etc. (non-vegetated areas are not to be included in the revegetation acreage calculation or AutoCAD layer).

In AutoCAD, the zero (0) layer shall not be used to draw on other than to insert blocks for future insertion on appropriate layer.

As a standard, new baseline and final contours shall be provided with 2 feet minor contours and 10 feet major contours. Major contours shall have the elevation labeled. Contour Labels shall not break the contour line (setting in AutoCAD).

Any control points shall be shown with coordinates and elevations labeled. If the State has provided control points, the Contractor shall reference elevations and coordinates to them. If no control points were set, then new points shall be set and utilized.

Any seep collectors, curtain drains, or other structures inaccessible after covering, shall be surveyed for location, prior to covering.

Show total quantities for all items on the project. The format shall be in a tabular form (i.e., Bid Schedule or Summary of Quantities).

Changes (deviations) should be on separate “Change” layer, not on the original layers from the original plan.

ITEMS TO BE IDENTIFIED AND LABELED

AUTOCAD LAYER

ITEMS REQUIRED?

☒ Baseline Survey after Clearing & Grubbing, if required YES

☒ Intermediate Surveys, if required YES

☒ Final Survey YES

☒ Revegetation YES

☒ Pipes, Valves, Manholes YES

☒ Mine Seals, Bat Gates YES

☒ Seep Collectors, Curtain Drains, Clean Outs YES

☒ Drainage Channels & Ditches, Splash Pads, Culverts, Drop Inlets YES

☐ Ponds, Wetlands, Water Treatment Structures NO

☐ Sludge Pumps, Sludge Cells, Geo-Tube Pads, Sludge Valves NO

☒ Buildings, Residential / Commercial Structures, Concrete Pads YES

☐ Pump Vaults, Air Release Valves, Pump Line Connections NO

☒ Fencing around Structures and Property Lines YES

☒ Utilities (i.e., Overhead / Underground Electric, Gas, Water, Sewer) YES

☒ Buried Lines (i.e., Electric, Communication, Chemical, Water, Sewer) YES

☒ Gas Vents, Piezometers, Monitoring Wells, Core Drilling YES

☒ Roads, Driveways, Sidewalks YES

☒ Unforeseen Areas (i.e., Slips, Seeps, Subsidence Areas, Boreholes) YES

☐ Other, As Defined: NO

2.4 Method of Measurement and Basis of Payment

There shall be no measurement of the “Construction Layout” item, as it is a lump sum. Said lump sum bid cannot be more than 5% of the TOTAL AMOUNT BID for the project. The lump sum payment shall include furnishing, setting, maintaining, and resetting the stakes when necessary, and for furnishing all personnel, equipment, materials, and all incidentals thereto. The lump sum payment also shall include the cost for providing the Engineer pre-and post- construction ground line cross-sections for all disturbed or re-graded areas, including borrow/waste areas and “As-Built”. All these activities shall be included within the lump sum bid for “Construction Layout”.

Neither deduction nor increase will be made in the lump sum “Construction Layout” item amount regardless of decreases or increases in the final total contract amount or for any other cause. This item will be paid according to the following schedule: 25% initial layout and LODs as outlined in these Specifications, 50% for layout throughout and at the end of construction, and 25% on the acceptance of As-Builts and photos / videos of pre-construction and post-construction conditions.

2.5 Pay Item

Item 2.0, “Construction Layout”, per lump sum cannot be more than 5% of the TOTAL AMOUNT BID for the project.

3.0 QUALITY CONTROL

3.1 Description

This Work shall consist of testing for verification that the materials supplied, and the work performed are in accordance with these Specifications. Work shall be performed to the satisfaction of the State to be considered complete.

3.2 Materials

The Contractor shall submit a minimum of two (2) copies of shop drawings, catalog cuts and material certifications (as applicable) to the Engineer for all offsite materials to be incorporated into the Work. At least 1 copy submitted must be electronic. Written approval from the Engineer will be required prior to incorporation of these items into the Work.

The Contractor shall submit at least two (2) copies of the results of all tests conducted on in-situ material, concrete, and grout to be used in this project. At least 1 copy must be electronic.

Test sampling of concrete shall be in accordance with ASTM C172. Temperature testing of concrete will be in accordance with ASTM C1064. Slump testing of concrete will be in accordance with ASTM C143. Air content of the concrete shall be tested according to ASTM C231, ASTM C173, or ASTM C138. Concrete cylinders formed for compressive strength testing shall be formed in accordance with ASTM C31. Concrete compressive strength testing shall be in accordance with ASTM C39. Four concrete test cylinders shall be made and tested: one test cylinder shall be tested 4 days age, one test cylinder at 14 days age, one test cylinder shall be tested at 28 days age, and one cylinder shall be held as a spare. Concrete must have a compressive strength of at least 4,000psi within 28 days, a slump of 1-4 inches, an air content of 6-7.5%, and a temperature of 50°F-90°F at pouring to be acceptable, unless otherwise specified in the Plans or these Specifications. Concrete used in road crossings, such as headwalls or wingwalls for a culvert crossing a road, must meet the requirements of Section 601 of the WVDOT Standard Specifications for Roads and Bridges, 2023 Edition, and the MM-109. In the event of a conflict between these Specifications, the WVDOT Standard Specifications for Roads and Bridges, 2023 Edition or the MM-109 then the most stringent requirement shall prevail. In the event of a conflict between the above that is more fundamental, such as what material to use or what construction methods to employ, then the order of priority would be the MM-109 (for roads only), then the WVDOT Standard Specifications for Roads and Bridges, 2023 Edition (for roads or bridges only), and then these Specifications. Outside of work on, under, or near roads and bridges, these Specifications prevail entirely. Notwithstanding the above, a conflict in one requirement does not relieve the Contractor of abiding by all other requirements in these Specifications.

For ease of reference, the WVDOT Standard Specifications for Roads and Bridges, 2023 Edition can be found at the below:

https://transportation.wv.gov/highways/TechnicalSupport/specifications/Documents/20 23_Standard_%2812-16-22%29.pdf

These requirements apply to both pre-cast concrete and concrete that is cast in place.

Unacceptable concrete must be replaced at the Contractor’s expense. Custom concrete mixes outside of these tolerances can be approved by the Engineer on a case-by-case basis. The State reserves the right to reject concrete based on a visual inspection without waiting on testing results.

Test sampling and compressive strength testing of grout shall be in accordance with ASTM C1019. Slump testing of grout shall be in accordance with ASTM C143. Grout must have a compressive strength of at least 2,000psi within 28 days and a slump of 8- 11 inches to be acceptable, unless otherwise specified in the Plans or these Specifications.

Unacceptable grout must be replaced at the Contractor’s expense. Custom grout mixes outside of these tolerances can be approved by the Engineer on a case-by-case basis. The State reserves the right to reject grout based on a visual inspection without waiting on testing results.

Test sampling of Controlled Low Strength Material (CLSM) – also known as flowable fill – shall be in accordance with ASTM D5971 and ASTM D4832. CLSM compressive strength testing shall be in accordance with ASTM D4832. CLSM must have a compressive strength of at least 2000 psi within 28 days. CLSM used for road crossings must have a pH of 5.0-13.0 and must meet the requirements of Section 219 of the WVDOT Standard Specifications for Roads and Bridges, 2023 Edition and the MM-109, as applicable. In the event of a conflict between these Specifications, the WVDOT Standard Specifications for Roads and Bridges, 2023 Edition, or the MM-109, then the most stringent requirement shall prevail. In the event of a conflict between the above that is more fundamental, such as what material to use or what construction methods to employ, then the order of priority would be the MM-109 (for roads only) then the WVDOT Standard Specifications for Roads and Bridges, 2023 Edition (for roads or bridges only), and then these Specifications. Outside of work on, under, or near roads and bridges, these Specifications prevail entirely. Notwithstanding the above, a conflict in one provision does not relieve the Contractor of abiding by all other requirements in these Specifications. Unacceptable CLSM must be replaced at the Contractor’s expense.

Custom CLSM mixes outside of these tolerances can be approved by the Engineer on a case-by-case basis, subject to the above MM-109 and WVDOT Standards above. The State reserves the right to reject CLSM based on a visual inspection without waiting on testing results.

At a minimum, the pipe / fill compaction tests will include moisture content and density tests of the soil in accordance with the provisions of ASTM D698 (Standard Proctor) field density tests following compaction. A new Standard Proctor will be run when soil type changes occur on site and/or at the direction of the Engineer or State representative.

Soil tests shall determine the optimal additives required for areas of soil disturbance to be fully re-vegetated (3 tons per acre preferred minimum). Normally, this includes – at a minimum – soil pH test results as well as available nutrients within the soil, including, at a minimum: nitrogen (N), phosphorus (P), potassium (K), calcium (Ca), magnesium (MG), and Sulfur (S). At a minimum, the soil testing report will recommend what soil amendments in which concentrations are ideal for regrowth. If problems with re-vegetation occur, additional, more specialized tests may be required to be performed at the Engineer’s discretion and the Contractor’s expense.

Limestone and Sandstone shall be subjected to a Sodium Sulfate test in accordance with AASHTO T104. All stone shall have a maximum weighted loss of twelve (12) percent when subjected to five (5) cycles of the Sodium Sulfate Soundness Test – ASTM C88 (ASTM C88-05 Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate), as modified by the American Association of State Highway and Transportation Officials (AASHTO) T-104. All Stone shall be commercially supplied and shall be tested for calcium carbonate.

Limestone shall be tested for calcium carbonate equivalency which must be 70% or greater and be certified as such.

Sandstone shall be certified to be non-acid producing. Sandstone to be sound, non-acid producing, durable, non-calcareous sandstone from a State approved source. Shale is not acceptable. The sandstone shall consist of particles of clean, hard, tough, durable rock, free from adherent coating. The State reserves the right to reject sandstone based on a visual inspection without waiting on testing results.

Note that the WVDOT Standard Specifications for Roads and Bridges, 2023 Edition and the MM-109 (if applicable) specify quality control and testing procedures that ARE REQUIRED for any applicable asphalt replacement repaving, shoulder stone, guardrail replacement, etc. The Contractor is to ensure these are implemented, that materials and installations permanently installed meet or exceed all required tests, and the Contractor shall provide the results to the State and the WVDOH for record.

Tests Required

Concrete Tests for Compressive Strength, Slump Test, Air Content, Temperature

Every 50 CY or at least once per day (whichever is greater)

Grout Tests for Compressive Strength and Slump Test

Every 50 CY or at least once per day (whichever is greater)

CLSM Tests for Compressive Strength, pH testing (if under a roadway)

Every 50 CY or at least once per day (whichever is greater)

Pipe Compaction Testing for Backfill Material Density Per Engineer; 1 Lot of 5 tests per day (min)

Fill Compaction Testing for Backfill Material Density 1 Lot of 5 tests per day (min) Soil Test Varies As Needed Material Certification

Manufacturer Certification for all purchased materials

On or Before Delivery

Limestone Sodium Sulfate test, calcium carbonate equivalent

On or Before Delivery

Sandstone Certification that rock is non-acid producing and sodium sulfate test

On or Before Delivery

3.3 Construction Methods

The Contractor shall select an independent testing laboratory for testing. The laboratory shall be under the direct supervision of a Registered Professional Engineer or PhD. The laboratory must be approved by the State, prior to testing.

The Contractor shall furnish a certified technician to perform the required testing at the project site. The certified technician shall submit a copy of their certification, and a copy of that certification shall be submitted to State at the Pre-Construction Conference. The certified technician shall be responsible for chain of custody of any samples that leave the site.

Testing shall be performed as required by these Specifications and or as ordered by the Engineer or State representative in writing. The Engineer will determine the locations and time of any testing herein specified and the need and extent of any testing in addition to that which is herein specified.

The Contractor shall be responsible for performing laboratory tests of the coal, mine spoil, and any natural soil to identify the compaction requirements for their use as fill and cover material, respectively. In addition, field density tests shall be performed in accordance with these Specifications. All test results shall be submitted to the Engineer for approval of compaction criteria prior to finalizing compacting the fill material and after fill material is placed to verify that the required compaction is obtained.

Only new and first-class materials, which conform to the requirements of these Specifications, shall be used unless specified otherwise. When requested by the State, the Contractor shall furnish a written statement of the origin, composition, and manufacturer of any or all materials (manufactured or produced) that are to be used in the work. The sources of supply of each material used shall be approved by the Engineer before delivery is started. If, at any time, sources previously approved fail to produce materials acceptable to the State, the Contractor shall furnish materials from other approved sources.

3.4 Method of Measurement and Basis of Payment

There shall be no measurement of the “Quality Control” item as it is a lump sum. The quality control work done will be paid at the contract lump sum price bid for this item.

Said lump sum bid cannot be more than 3% of the TOTAL AMOUNT BID for the project. Nothing herein shall be construed to limit or preclude partial payments on this item up to 100% of the quality control bid amount. Neither deduction nor increase will be made in the lump sum “Quality Control” item amount regardless of decreases or increases in the final total contract amount or for any other cause.

3.5 Pay Item

Item 3.0, “Quality Control”, per lump sum cannot be more than 3% of the TOTAL AMOUNT BID for the project.

4.0 SITE PREPARATION

4.1 Description

Clearing and Grubbing - Work performed under this section shall include the removal and disposal of all trees, stumps, shrubs, and any other vegetation along with wood, debris, or garbage of any nature. This includes those areas specified below, shown on the Plans, and any other areas as approved by the State via Change Order. This work shall also include the preservation from damage for all vegetation, utilities, or any other object not being specifically removed according to the Specifications and Plans.

Additionally, this work shall include stripping and stockpiling topsoil from the construction area, keeping it separated from other stockpiled soil, and using the topsoil for soil cover and revegetation at the end of the construction.

Demolition of Structures - This Work shall consist of complete demolition and removal of such buildings, mining related structures, equipment and materials, existing ruins and foundation structures and existing AML structures and systems, as are specifically designated on the Plans for removal or encountered during construction, except as is otherwise specified. Demolished concrete and cinder block structures and foundation ruins may be disposed of off-site. Note that any steel or burned (if authorized) wood remnant must still be removed from the site. All on-site garbage (as well as all other debris of any type and quantity), mining equipment, and metal structures encountered shall be removed from the site to an off-site disposal area in accordance with these Specifications to a Landfill approved by the State to accept the applicable waste type.

Certified disposal weight tickets shall be provided to the WVDEP. The Contractor is advised to perform a thorough site reconnaissance to quantify all garbage designated for removal prior to submitting a bid.

Asbestos Material Identification and Removal (if present) - This Work shall consist of a Contractor-provided Competent Person – as defined by Title 29, Subtitle B, Chapter XVII, Part 1926 of the CFR Code – performing a thorough search of all existing structures on the project to ensure that there are no asbestos materials present. If any areas are suspected of containing asbestos, then an inspection would need to occur – at the Contractor’s expense – by a company possessing a valid, current Asbestos Contractor License in the State of West Virginia. Each on-site representative of the company performing the asbestos survey or mitigation would need to be a Licensed Asbestos Contractor in the State of West Virginia. If asbestos was found, an estimate for removal and proper disposal would need to be obtained by the Contractor and submitted for the Engineer’s approval.

At that point, the Contractor would be responsible to perform all notifications as required by all Federal and State law – particularly NESHAP as outlined in Title 40, Chapter I, Subchapter C, Part 61, Subpart M of the CFR Code. No work would be allowed at the location of the asbestos until the removal process was completed. No asbestos mitigation or removal is anticipated for this Work – if the Contractor determines asbestos is present and subsequently receives a positive test for asbestos, a Change Order would be negotiated with the State for the proper mitigation to occur through the Contractor. All mitigation by the Contractor (or their Sub-Contractor) would need to be in accordance with all Federal, State, and Local laws.

Materials and Equipment Storage - The Contractor shall obtain approval from the Engineer for proposed materials and equipment storage areas prior to use. Refueling or fuel storage should not occur within 100ft of a wetland, water body, stream, or ditch leading into the same – see additional requirements for fuel storage in the “Spill Containment Area” below. Areas utilized shall be restored to an “as good as” or “better” condition than existed prior to construction or shall otherwise be reclaimed as directed or approved by the Engineer.

Temporary Access Road Construction - Temporary access roads constructed to gain access to, travel between or otherwise required for equipment/vehicular site access shall be kept to a minimum and only constructed where necessary upon approval from the WVDEP, where applicable. If the Contractor constructs such travel routes, they shall be reclaimed and revegetated according to Section 6 upon completion of the construction activities, as deemed necessary by the WVDEP. Any additional access shall require the Contractor to obtain written permission from the respective landowner. The existing access roads shall be fine graded to provide positive drainage. Ditches and road crossing shall be installed as directed by the Engineer.

Any re-grading necessary for the construction of the Access Road will be incidental to the cost of the work described herein.

Final grading, stabilization, and providing final drainage control for existing access roads shall be performed after reclamation operations for the project have been completed.

Permanent Fencing – Any fencing required to be moved and replaced due to construction activities or newly proposed as shown on the plans. Permanent fencing shall be placed at the completion of construction.

Temporary Fencing –Temporary fencing shall be utilized to remove livestock access to the project site (typically wooden posts and T-posts with wire-mesh barriers in-between keeping livestock off the Work area). It is the Contractor’s responsibility to install, maintain, and remove this fencing on an as-needed basis – or as the State indicates – to remove hazards to the public, livestock, or damage to the project site over the course of the Work. Temporary fencing will be removed by the Contractor prior to Final Inspection, unless indicated otherwise by the State.

Spill Containment Area - Spill containment measures shall be used for fuel and lubricant storage areas. All containers, barrels, buckets, cans, etc., are to be legally disposed of offsite. Used lubricants are to be disposed of according to State law to minimize pollution to the local surface and ground water supplies. Spills are the responsibility of the Contractor and need immediate clean up and maintained at no expense to the State. Fuel tanks manufactured with secondary containment are desirable; the minimum secondary containment shall be 110 percent. Contractor required to have a spill kit, including sorbent pads, at the Spill Containment Area. Spill Containment Area should be at least

100ft from any wetland, water body, stream, or ditch leading into the same. In the event of a spill, the Contractor is required to call the emergency spill line (ph. 1-800-642-3074).

Farm Gate – Farm Gate shall be installed at the location(s) shown on the Plans, and / or as directed by the State. Farm Gate is to be placed and installed such that it adequately restricts traffic through the specified area on the Plans. Farm Gate shall be placed at the completion of the Work and shall comply with the details shown in the Plans.

Gravel Drive Rehabilitation – The gravel roads…