Technical_Specs_All_sections.pdf

PDF 7 MB Posted

Attached to
Berrydale Volunteer Fire Department Administrative Building
Solicitation number
25-039
Issued by
Santa Rosa County, New Port Richey City, Florida

About this file

This is a comprehensive technical specification document for the Berrydale Volunteer Fire Department Administrative Building construction project in Santa Rosa County, Florida, coordinated through the county's procurement office. The project involves demolition of an existing structure and construction of a new 3,720 square foot administrative building located at 13000 Highway 87 in Jay, Florida, with sealed bids due by 10:00 am on Monday, July 21, 2025 (or July 28, 2025 per a subsequent memorandum). The specifications encompass detailed requirements across Division 15 (Mechanical Systems) and Division 16 (Electrical Systems), covering plumbing, HVAC, fire suppression, lighting, power distribution, and building controls. The document specifies compliance with the 2023 Florida Building Code, NFPA standards, and applicable industry standards. Questions from bidders must be submitted by 4:00 pm on Monday, July 7, 2025, through the procurement portal. The contract duration is 240 calendar days from the notice to proceed, with the Board of County Commissioners reserving the right to waive irregularities, reject any or all bids, and award the contract based on best value to the county.

The specifications require bidders to submit a 5% bid guarantee via certified check or bid bond, along with comprehensive documentation including insurance certificates, business authority proofs, and various certifications. No specific project budget is stated in the procurement notice; however, the detailed technical requirements for mechanical and electrical systems suggest significant capital investment. The county explicitly encourages participation from small businesses, minority-owned and women-owned businesses, and disadvantaged business enterprises, with stated non-discrimination policies covering race, color, religion, national origin, disability, sex, and age. Bidders must demonstrate compliance with scrutinized companies list requirements and possess the capability to meet comprehensive technical specifications. The site is zoned HCD (Highway Commercial District) and will require a variance to reduce the front setback from 50 feet to 15 feet. The new facility will include offices, training rooms, bunkrooms, break room, and support areas designed to meet fire department operational needs and accessibility requirements under applicable codes.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

15005 – Mechanical General - 1 Berrydale VFD - New Administration Building

SECTION 15005

MECHANICAL GENERAL

1 GENERAL

1.1 The work covered by this division consists of providing all labor, equipment and materials and performing all operations necessary for the installation of the mechanical work as herein called for and shown on the drawings.

1.2 Related Documents:

1.2.1 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this section.

1.2.2 This is a Basic Mechanical Requirements Section. Provisions of this section apply to work of all

Division 15 sections.

1.2.3 Review all other contract documents to be aware of conditions affecting work herein.

1.2.4 Definitions:

1.2.4.1 Provide: Furnish and install, complete and ready for intended use.

1.2.4.2 Furnish: Supply and deliver to project site, ready for subsequent requirements.

1.2.4.3 Install: Operations at project site, including unloading, unpacking, assembly, erection, placing, anchoring, applying, working to dimension, finishing, curing, protecting, cleaning, and similar requirements.

1.3 Permits and Fees: Contractor shall obtain all necessary permits, meters, and inspections required for his work and pay all fees and charges incidental thereto.

1.4 Verification of Owner's Data: Prior to commencing any work the Contractor shall satisfy himself as to the accuracy of all data as indicated in these plans and specifications and/or as provided by the Owner. Should the Contractor discover any inaccuracies, errors, or omissions in the data, he shall immediately notify the Architect/Engineer in order that proper adjustments can be anticipated and ordered. Commencement by the Contractor of any work shall be held as an acceptance of the data by him after which time the Contractor has no claim against the Owner resulting from alleged errors, omissions or inaccuracies of the said data.

1.5 Delivery and Storage of Materials: Materials delivered to site shall be inspected for damage, unloaded, and stored with a minimum of handling. All material shall be stored to provide protection from the weather and accidental damage.

1.6 Extent of work is indicated by the drawings, schedules, and the requirements of the specifications.

Singular references shall not be constructed as requiring only one device if multiple devices are shown on the drawings or are required for proper system operation.

1.7 Field Measurements and Coordination:

1.7.1 The intent of the drawings and specifications is to obtain a complete and satisfactory installation.

Separate divisional drawings and specifications shall not relieve the Contractor or subcontractors from full compliance of work of his trade indicated on any of the drawings or in any section of the specifications.

15005 – Mechanical General - 2

1.7.2 Verify all field dimensions and locations of equipment to insure close, neat fit with other trades' work. Make use of all contract documents and approved shop drawings to verify exact dimension and locations.

1.7.3 Coordinate work in this division with all other trades in proper sequence to insure that the total work is completed within contract time schedule and with a minimum cutting and patching.

1.7.4 Locate all apparatus symmetrical with architectural elements. Install to exact height and locations when shown on architectural drawings. When locations are shown only on mechanical drawings, be guided by architectural details and conditions existing at job and correlate this work with that of others.

1.7.5 Install work as required to fit structure, avoid obstructions, and retain clearance, headroom, openings and passageways. Cut no structural members without written approval.

1.7.6 Carefully examine any existing conditions, piping, and premises. Compare drawings with existing conditions. Report any observed discrepancies. It shall be the Contractor's responsibility to properly coordinate the work and to identify problems in a timely manner. Written instructions will be issued to resolve discrepancies.

1.7.7 Because of the small scale of the drawings, it is not possible to indicate all offsets and fittings or to locate every accessory. Drawings are essentially diagrammatic. Study carefully the sizes and locations of structural members, wall and partition locations, trusses, and room dimensions and take actual measurements on the job. Locate piping, ductwork, equipment and accessories with sufficient space for installing and servicing. Contractor is responsible for accuracy of his measurements and for coordination with all trades. Contractor shall not order materials or perform work without such verification. No extra compensation will be allowed because field measurements vary from the dimensions on the drawings. If field measurements show that equipment or piping cannot be fitted, the Architect/Engineer shall be consulted. Remove and relocate, without additional compensation, any item that is installed and is later found to encroach on space assigned to another use.

1.8 Guarantee:

1.8.1 The Contractor shall guarantee labor, materials and equipment for a period of one (1) year from

Final Completion, or from Owner's occupancy, whichever is earlier. Contractor shall make good any defects and shall include all necessary adjustments to and replacement of defective items without expense to the Owner.

1.8.2 Owner reserves right to make emergency repairs as required to keep equipment in operation without voiding Contractor's Guarantee Bond nor relieving Contractor of his responsibilities during guarantee period.

1.9 Approval Submittals:

1.9.1 When approved, the submittal control log and submittals shall be an addition to the specifications herewith, and shall be of equal force in that no deviation will be permitted except with the approval of the Architect/Engineer.

1.9.1.1 Shop drawings, product literature, and other approval submittals will only be reviewed if they are submitted in full accordance with the General and Supplementary Conditions and Division 1 Specification sections and the following.

1.9.1.1.1 Submittals shall be properly organized in accordance with the approved submittal control log.

1.9.1.1.2 Submittals shall not include items from more than one specification section in the same submittal package unless approved in the submittal control log.

15005 – Mechanical General - 3

1.9.1.1.3 Submittals shall be properly identified by a cover sheet showing the project name, Architect and

Engineer names, submittal control number, specification section, a list of products or item names with model numbers in the order they appear in the package, and spaces for approval stamps. A sample cover sheet is included at the end of this section.

1.9.1.1.4 Submittals shall have been reviewed and approved by the General Contractor (or Prime

Contractor). Evidence of this review and approval shall be an "Approved" stamp with a signature and date on the cover sheet.

1.9.1.1.5 Submittals that include a series of fixtures or devices (such as plumbing fixtures or valves) shall be organized by the fixture number or valve type and be marked accordingly. Each fixture must include all items associated with that fixture regardless of whether or not those items are used on other fixtures.

1.9.1.1.6 The electrical design shown on the drawings supports the mechanical equipment basis of design specifications at the time of design. If mechanical equipment is submitted with different electrical requirements, it is the responsibility of the mechanical contractor to resolve all required electrical design changes (wire and conduit size, type of disconnect or overload protection, point(s) of connection, etc.) and clearly show the new electrical design on the mechanical submittal with a written statement that this change will be provided at no additional cost. Mechanical submittals made with no written reference to the electrical design will be presumed to work with the electrical design. Any corrections required will be at no additional cost.

1.9.2 If the shop drawings show variation from the requirements of contract because of standard shop practice or other reasons, the Contractor shall make specific mention of such variation in writing in his letter of transmittal and on the submittal cover sheet in order that, if acceptable, Contractor will not be relieved of the responsibility for executing the work in accordance with the contract.

1.9.3 Review of shop drawings, product literature, catalog data, or schedules shall not relieve the

Contractor from responsibility for deviations from contract drawings or specifications, unless he has in writing called to the attention of the Architect/Engineer each such deviation in writing at the time of submission, nor shall it relieve him from responsibility for errors of any sort in shop drawings, product literature, catalog data, or schedules. Any feature or function specified but not mentioned in the submittal shall be assumed to be included per the specification.

1.9.4 Submit shop drawings as called for in other sections after award of the contract and before any material is ordered or fabricated. Shop drawings shall consist of plans, sections, elevations and details to scale (not smaller than ¼" per foot), with dimensions clearly showing the installation.

Direct copies of small scale project drawings issued to the Contractor are not acceptable.

Drawings shall take into account equipment furnished under other sections and shall show space allotted for it. Include construction details and materials.

1.10 Test Reports and Verification Submittals: Submit test reports, certifications and verification letters as called for in other sections. Contractor shall coordinate the required testing and documentation of system performance such that sufficient time exists to prepare the reports, submit the reports, review the reports and take corrective action within the scheduled contract time.

1.11 O&M Data Submittals: Submit Operation and Maintenance data as called for in other sections.

When a copy of approval submittals is included in the O&M Manual, only the final “Approved” or “Approved as Noted” copy shall be used. Contractor shall organize these data in the O&M Manuals tabbed by specification number. Prepare O&M Manuals as required by Division 1 and as described herein.. Submit manuals at the Substantial Completion inspection.

2 PRODUCTS

15005 – Mechanical General - 4

2.1 All materials shall be new or Owner-supplied reused as shown on the drawings, the best of their respective kinds, suitable for the conditions and duties imposed on them at the building and shall be of reputable manufacturers. The description, characteristics, and requirements of materials to be used shall be in accordance with qualifying conditions established in the following sections.

2.2 Equipment and Materials:

2.2.1 Shall be new and the most suitable grade for the purpose intended. Equipment furnished under this division shall be the product of a manufacturer regularly engaged in the manufacture of such items for a period of three years. Where practical, all of the components shall be products of a single manufacturer in order to provide proper coordination and responsibility. Where required, Contractor shall furnish proof of installation of similar units or equipment.

2.2.2 Each item of equipment shall bear a name plate showing the manufacturer's name, trade name, model number, serial number, ratings and other information necessary to fully identify it. This plate shall be permanently mounted in a prominent location and shall not be concealed, insulated or painted.

2.2.3 The label of the approving agency, such as UL, IBR, ASME, ARI, AMCA, by which a standard has been established for the particular item shall be in full view.

2.2.4 The equipment shall be essentially the standard product of a manufacturer regularly engaged in the production of such equipment and shall be a product of the manufacturer's latest design.

2.2.5 A service organization with personnel and spare parts shall be available within two hours for each type of equipment furnished.

2.2.6 Install in accordance with manufacturer's recommendations. Place in service by a factory trained representative where required.

2.2.7 Materials and equipment are specified herein by a single or by multiple manufacturers to indicate quality, material and type of construction desired. Manufacturer's products shown on the drawings have been used as basis for design; it shall be the Contractor's responsibility to ascertain that alternate manufacturer's products, or the particular products of named manufacturers, meet the detailed specifications and that size and arrangement of equipment are suitable for installation.

2.2.8 Model Numbers: Catalog numbers and model numbers indicated in the drawings and specifications are used as a guide in the selection of the equipment and are only listed for the contractor's convenience. The contractor shall determine the actual model numbers for ordering materials in accordance with the written description of each item and with the intent of the drawings and specifications.

2.3 Requests for Substitution:

2.3.1 Where a particular system, product or material is specified by name, consider it as standard basis for bidding, and base proposal on the particular system, product or material specified.

2.3.2 Requests by Contractor for substitution will be considered only when reasonable, timely, fully documented, and qualifying under one or more of the following circumstances.

2.3.2.1 Required product cannot be supplied in time for compliance with Contract time requirements.

2.3.2.2 Required product is not acceptable to governing authority, or determined to be non-compatible, or cannot be properly coordinated, warranted or insured, or has other recognized disability as certified by Contractor.

15005 – Mechanical General - 5

2.3.2.3 Substantial cost advantage is offered Owner after deducting offsetting disadvantages including delays, additional compensation for redesign, investigation, evaluation and other necessary services and similar considerations.

2.3.3 All requests for substitution shall contain a "Comparison Schedule" and clearly and specifically indicate any and all differences or omissions between the product specified as the basis of design and the product proposed for substitution. Differences shall include but shall not be limited to data as follows for both the specified and substituted products:

Principal of operation.

Materials of construction or finishes.

Thickness of gauge of materials.

Weight of item.

Deleted features or items.

Added features or items.

Changes in other work caused by the substitution.

Performance curves.

If the approved substitution contains differences or omissions not specifically called to the attention of the Architect/Engineer, the Owner reserves the right to require equal or similar features to be added to the substituted products (or to have the substituted products replaced) at the Contractor's expense.

3 EXECUTION

3.1 Workmanship: All materials and equipment shall be installed and completed in a first-class workmanlike manner and in accordance with the best modern methods and practice. Any materials installed which do not present an orderly and reasonably neat and/or workmanlike appearance, or do not allow adequate space for maintenance, shall be removed and replaced when so directed by the Architect/Engineer.

3.2 Coordination:

3.2.1 The Contractor shall be responsible for full coordination of the mechanical systems with shop drawings of the building construction so the proper openings and sleeves or supports are provided for piping, ductwork, or other equipment passing through slabs or walls.

3.2.2 Any additional steel supports required for the installation of any mechanical equipment, piping, or ductwork shall be furnished and installed under the section of the specifications requiring the additional supports.

3.2.3 It shall be the Contractor's responsibility to see that all equipment such as valves, dampers, filters and such other apparatus or equipment that may require maintenance and operation are made easily accessible, regardless of the diagrammatic location shown on the drawings.

3.2.4 All connections to fixtures and equipment shown on the drawings shall be considered diagrammatic unless otherwise indicated by detail. The actual connections shall be made to fully suit the requirements of each case and adequately provide for expansion and servicing.

3.2.5 The contractor shall protect equipment, material, and fixtures at all times. He shall replace all equipment, material, and fixtures which are damaged as a result of inadequate protection.

3.2.6 Prior to starting and during progress of work, examine work and materials installed by others as they apply to work in this division. Report conditions which will prevent satisfactory installation.

3.2.7 Start of work will be construed as acceptance of suitability of work of others.

15005 – Mechanical General - 6

3.3 Interruption of Service: Before any equipment is shut down for disconnecting or tie-ins, arrangements shall be made with the Architect/Engineer and this work shall be done at the time best suited to the Owner. This will typically be on weekends and/or holidays and/or after normal working hours. Services shall be restored the same day unless prior arrangements are made. All overtime or premium costs associated with this work shall be included in the base bid.

3.4 Phasing: Provide all required temporary valves, piping, ductwork, equipment and devices as required. Maintain temporary services to areas as required. Remove all temporary material and equipment on completion of work unless Engineer concurs that such material and equipment would be beneficial to the Owner on a permanent basis.

3.5 Cutting and Patching: Notify General Contractor to do all cutting and patching of all holes, chases, sleeves, and other openings required for installation of equipment furnished and installed under this section. Utilize experienced trades for cutting and patching. Obtain permission from Architect/Engineer before cutting any structural items.

3.6 Equipment Setting: Bolt equipment directly to concrete pads or vibration isolators as required, using hot-dipped galvanized anchor bolts, nuts and washers. Level equipment.

3.7 Painting: Touch-up factory finishes on equipment located inside and outside shall be done under

Division 15. Obtain matched color coatings from the manufacturer and apply as directed. If corrosion is found during inspection on the surface of any equipment, clean, prime, and paint, as required.

3.8 Clean-up: Thoroughly clean all exposed parts of apparatus and equipment of cement, plaster, and other materials and remove all oil and grease spots. Repaint or touch up as required to look like new. During progress of work, contractor is to carefully clean up and leave premises and all portions of building free from debris and in a clean and safe condition.

3.9 Start-up and Operational Test: Start each item of equipment in strict accordance with the manufacturer's instructions; or where noted under equipment specification, start-up shall be done by a qualified representative of the manufacturer. Alignment, lubrication, safety, and operating control shall be included in start-up check.

3.10 Climate Control: Operate heating and cooling systems as required after initial startup to maintain temperature and humidity conditions to avoid freeze damage and warping or sagging of ceilings and carpet.

3.11 Record Drawings:

3.11.1 During the progress of the work the Contractor shall record on their field set of drawings the exact location, as installed, of all piping, ductwork, equipment, and other systems which are not installed exactly as shown on the contract drawings.

3.11.2 Upon completion of the work, record drawings shall be prepared as described in the General

Conditions, Supplementary Conditions, and Division 1 sections.

3.12 Acceptance:

3.12.1 Punch List: Submit written confirmation that all punch lists have been checked and the required work completed.

3.12.2 Instructions: At completion of the work, provide a competent and experienced person who is thoroughly familiar with project, for one day to instruct permanent operating personnel in operation of equipment and control systems. This is in addition to any specific equipment operation and maintenance training.

15005 – Mechanical General - 7

3.12.3 Operation and Maintenance Manuals: Furnish four complete manuals bound in ring binders with Table of Contents, organized, and tabbed by specification section. Manuals shall contain:

Detailed operating instructions and instructions for making minor adjustments.

Complete wiring and control diagrams.

Routine maintenance operations.

Manufacturer's catalog data, service instructions, and parts lists for each piece of operating equipment.

Copies of approved submittals.

Copies of all manufacturer's warranties.

Copies of test reports and verification submittals.

3.12.4 Record Drawings: Submit record drawings.

3.12.5 Test and Balance Report: Submit four certified copies. The Report shall be submitted for review prior to the Substantial Completion Inspection unless otherwise required by Division 1.

3.12.6 Acceptance will be made on the basis of tests and inspections of job. A representative of firm that performed test and balance work shall be in attendance to assist. Contractor shall furnish necessary mechanics to operate system, make any necessary adjustments and assist with final inspection.

3.12.7 Control Diagrams: Laminate and mount on equipment room wall.

15005 – Mechanical General - 8

PROJECT NAME

PROJECT NUMBER

ARCHITECT/ENGINEER: Watford Engineering, Inc.

CONTRACTOR: XYZ Construction

SUBCONTRACTOR: ABC Mechanical Contractor

SUPPLIER: Jones Supply Co.

MANUFACTURER: Various

DATE: 2/15/2005

SECTION: 15545/Hydronic Specialties

1. Vent valves - Hoffman No. 62

2. In-line air separators - Bell & Gossett RL-4

3. Diaphragm type compression tanks - Bell & Gossett B-200

4. Pump suction diffusers - Bell & Gossett ED-3

5. Triple duty valves - Bell & Gossett 3D-4S

6. Shot feeders - J. Woods No. 2

7. Pressure relief valves - Watts No. 6

8. Pressure reducing valves - Bell & Gossett No. 7

END OF SECTION 15005

This is a sample cover sheet. Use one for each shop drawing.

Use whatever standard headings you want here

List each item separately

Typical - list mfr name & model number

General Contractor’s APPROVAL stamp must be on submittal.

15020 – Codes and Standards - 1

SECTION 15020

CODES AND STANDARDS

1 GENERAL

1.1 The work covered by this division consists of providing all labor, equipment and materials and performing all operations necessary for the installation of the mechanical work as herein called for and shown on the drawings.

1.2 This is a Basic Mechanical Requirements section. Provisions of this section apply to work of all

Division 15 sections.

2 CODES

2.1 All work under Division 15 shall be constructed in accordance with the codes listed herein. The design has been based on the requirements of these codes; and while it is not the responsibility of the Contractor to verify that all work called for complies with these codes, he shall be responsible for calling to the Architect/Engineer's attention any drawings or specifications that are not in conformance with these or other codes prior to ordering equipment or installing work.

2.2 Comply with regulations and codes of utility suppliers.

2.3 Where no specific method or form of construction is called for in the contract documents, the

Contractor shall comply with code requirements when carrying out such work.

2.4 Where code conflict exists, generally the most restrictive requirement applies. Comply with current code edition, unless noted.

2.5 Additional codes or standards applying to a specific part of the work may be included in that section.

2.6 The following codes govern the work:

1) Florida Building Code Eighth Edition, 2023 Building

2) Florida Building Code Eighth Edition, 2023 Plumbing

3) Florida Building Code Eighth Edition, 2023 Mechanical

4) Florida Fire Prevention Code Eighth Edition, 2023

5) National Electric Code (NFPA 70).

6) Life Safety Code (NFPA 101).

7) Installation of Air Conditioning and Ventilation Systems (NFPA 90A)

8) Florida Building Code Eighth Edition, 2023 Energy

9) Florida Building Code Eighth Edition, 2023 Accessibility

10) Florida Americans with Disabilities Accessibility Implementation Act (October 1, 1993) as described in Accessibility Requirements Manual, Department of Community Affairs (January 1, 1997).

11) Americans with Disabilities Act Accessibility Guidelines (ADAAG), January, 1994.

3 STANDARDS

All mechanical materials, installation and systems shall meet the requirements of the following standards, including the latest addenda and amendments, to the extent referenced:

1) Underwriters' Laboratories (UL)

2) American National Standards Institution (ANSI)

3) American Society of Testing Materials (ASTM)

4) National Fire Protection Association (NFPA)

15020 – Codes and Standards - 2

5) National Electrical Manufacturers Association (NEMA)

6) Air Conditioning and Refrigeration Institute (ARI)

7) Sheet Metal and Air Conditioning Contractors' National Association (SMACNA)

8) American Society of Heating, Refrigeration, and Air Conditioning Engineers (ASHRAE)

9) Air Movement and Control Association (AMCA)

END OF SECTION 15020

15030 – Mechanical Related Work - 1

SECTION 15030

MECHANICAL RELATED WORK

1 GENERAL REQUIREMENTS

1.1 Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification sections, apply to work of this section.

1.2 This is a Basic Mechanical Requirements section. Provisions of this section apply to work of all

Division 15 sections.

1.3 Coordinate with the General Contractor for all cutting and patching. Contractors performing

Division 15 work shall inform the General Contractor of all cutting and patching required prior to bidding and shall coordinate installation.

2 SITE WORK

2.1 Specific requirements for excavation and backfill for underground piping are contained in Section

15190.

2.2 Refer to Division 2, Sitework for:

2.2.1 All water, sewer, and storm water piping greater than five feet from the building.

2.2.2 Site fire protection work.

3 CONCRETE

3.1 Refer to Division 3, Concrete for:

3.1.1 Rough grouting in and around mechanical work.

3.1.2 Patching concrete cut to accommodate mechanical work.

4 METALS

4.1 Refer to Division 5, Metals for:

4.1.1 Framing openings for mechanical equipment.

4.2 The following is part of Division 15 work.

4.2.1 Supports for mechanical work.

4.3 The following is part of Division 15 work, complying with the requirements of Division 7.

4.3.1 Fire barrier penetration seals.

5 FINISHES

5.1 Refer to Division 9, Finishes for:

5.1.1 Painting access panels.

5.1.2 Painting color-coded mechanical work indicated for continuous painting. See color schedule in

Division 15 section, "Mechanical Identification".

15030 – Mechanical Related Work - 2

5.1.3 Installation of access doors in gypsum drywall.

5.2 Colors shall be selected by the Architect for all painting of exposed mechanical work in occupied spaces, unless specified herein. Do not paint insulated or jacketed surfaces.

5.3 Perform the following as part of Division 15 work:

5.3.1 Touch up painting of factory finishes.

5.3.2 Painting of all hangers.

5.4 Provide the following as part of Division-15 work:

5.4.1 All ducts, fans, connections, and related devices to make kitchen hoods operational.

5.4.2 All trim including faucets, waste connections, drain traps, vents, valves, piping, flashing, fittings, strainers, and other materials necessary to make equipment operational. Provide rough-in for all equipment. Provide final connections for all equipment.

5.4.3 All fixtures specified in Section 15430.

6 ELECTRICAL

6.1 Mechanical contractor shall coordinate the exact electrical requirements of all mechanical equipment being provided with the electrical contractor. Where approval submittals are required, this coordination shall be accomplished prior to making the submittals. The electrical design shown on the drawings supports the mechanical equipment basis of design. If mechanical equipment is submitted with different electrical requirements, it is the responsibility of the mechanical contractor to resolve all required electrical design changes (wire and conduit size, type of disconnect or overload protection, point(s) of connection, etc.) and clearly show the new electrical design on the mechanical submittal with a written statement that this design will be provided at no additional cost. Mechanical submittals made with no written reference to the electrical design will be presumed to work with the electrical design. Any corrections required will be at no additional cost.

6.2 Mechanical contractor shall provide all HVAC control wiring including the Energy Management

Control system sensors, alarms, and input/output signals and all relays, interlocks, warning lights, and control devices, in conduit and complying with the requirements of Division 16. The intent is for the mechanical contractor to be responsible for the entire HVAC control system, including point-to-point wiring.

6.3 Electrical contractor shall provide disconnect switches, starters, and contactors for mechanical equipment unless specifically noted as being furnished as part of mechanical equipment.

6.4 Electrical contractor shall provide all power wiring, raceway and devices, and make final electrical connections to all mechanical equipment, switches, starters, contactors, controllers, and similar equipment.

END OF SECTION 15 03 0

15105 – Pipes and Pipe Fittings - 1

SECTION 15105

PIPES AND PIPE FITTINGS

1 GENERAL

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work of this section.

1.2 This section is a Division-15 Basic Mechanical Materials and Methods section, and is part of each

Division-15 section making reference to pipes and pipe fittings specified herein.

1.3 Extent of pipes and pipe fittings required by this section is indicated on drawings and/or specified in other Division-15 sections.

1.4 Codes and Standards:

1.4.1 Brazing: Certify brazing procedures, brazers, and operators in accordance with ASME Boiler and

Pressure Vessel Code, Section IX, for shop and job-site brazing of piping work.

1.5 Test Report and Verification Submittals:

1.5.1 Submit brazing certification for all brazing installers.

2 PRODUCTS

2.1 Piping Materials: Provide pipe and tube of type, joint type, grade, size and weight (wall thickness or Class) indicated for each service. Where type, grade or class is not indicated, provide proper selection as determined by Installer for installation requirements, and comply with governing regulations and industry standards.

2.2 Pipe/Tube Fittings: Provide factory-fabricated fittings of type, materials, grade, class and pressure rating indicated for each service and pipe size. Provide sizes and types matching pipe, tube, valve or equipment connection in each case. Where not otherwise indicated, comply with governing regulations and industry standards for selections, and with pipe manufacturer's recommendations where applicable.

2.3 Piping Materials/Products:

2.3.1 Soldering Materials:

2.3.1.1 Tin-Antimony (95-5) Solder: ASTM B-32, Grade 95TA.

2.3.1.2 Silver-Phosphorus Solder: ASTM B-32, Grade 96TS.

2.3.2 Pipe Thread Tape: Teflon tape.

2.3.3 Protective Coating: Koppers Bitumastic No. 505 or equal.

2.3.4 Gaskets for Flanged Joints: ANSI B16.21; full-faced for cast iron flanges; raised-face for steel flanges, unless otherwise noted.

2.3.5 Welding Materials: Comply with Section II, Part C, ASME Boiler and Pressure Vessel Code for welding materials. Materials shall be determined by installer to comply with installation requirements.

2.3.6 Brazing Materials: Silver content of not less than 15%. Materials shall be determined by installer to comply with installation requirements.

15105 – Pipes and Pipe Fittings - 2

2.4 Copper Tube and Fittings:

2.4.1 Copper Tube:

2.4.1.1 Copper Tube: ASTM B88; Type K or L as indicated for each service; hard-drawn temper unless specifically noted as annealed.

2.4.1.2 ACR Copper Tube: ASTM B280.

2.4.1.3 DWV Copper Tube: ASTM B306.

2.4.2 Fittings:

2.4.2.1 Wrought-Copper Solder-Joint Fittings: ANSI B16.22.

2.4.2.2 Copper Tube Unions: Provide standard products recommended by manufacturer for use in service indicated.

2.4.2.3 Wrought-Copper Solder-Joint Drainage Fittings: ANSI B16.29.

2.4.2.4 Cast-Copper Flared Tube Fittings: ANSI B16.26.

2.5 Plastic Pipes and Fittings:

2.5.1 Pipes:

2.5.1.1 PVC DWV Pipe: ASTM D-2665, Schedule 40.

2.5.1.2 PVC Sewer Pipe: ASTM D-3034.

2.5.2 Fittings:

2.5.2.1 PVC Solvent Cement: ASTM D-2564.

2.5.2.2 PVC DWV Socket: ASTM D-2665.

2.5.2.3 PVC Sewer Socket: ASTM D-3034.

2.5.2.4 PVC Schedule 40 Socket: ASTM D-2466.

3 EXECUTION

3.1 Installation

3.1.1 General: Install pipes and pipe fittings in accordance with recognized industry practices which will achieve permanently-leak proof piping systems, capable of performing each indicated service without piping failure. Install each run with minimum joints and couplings, but with adequate and accessible unions for disassembly and maintenance or replacement of valves and equipment.

Reduce sizes (where indicated) by use of reducing fittings, not bushings. Align piping accurately at connections, within 1/16" misalignment tolerance.

3.1.2 Comply with ANSI B31 Code for Pressure Piping.

3.1.3 Locate piping runs, except as otherwise indicated, vertically and horizontally (pitched to drain) and avoid diagonal runs wherever possible. Orient horizontal runs parallel with walls and column lines.

Locate runs as shown or described by diagrams, details and notations or, if not otherwise indicated, run piping in shortest route which does not obstruct usable space or block access for

15105 – Pipes and Pipe Fittings - 3 servicing building and its equipment. Hold piping close to walls, overhead construction, columns and other structural and permanent-enclosure elements of building; limit clearance to ½" where furring is shown for enclosure or concealment of piping, but allow for insulation thickness, if any.

Where possible, locate insulated piping for 1" clearance outside insulation.

3.1.4 Concealed Piping: Unless specifically noted as “Exposed” on the drawings, conceal piping from view in finished and occupied spaces, by locating in column enclosures, chases, in hollow wall construction or above suspended ceilings; do not encase horizontal runs in solid partitions, except as indicated.

3.1.5 Electrical Equipment Spaces: Do not run piping through transformer vaults and other electrical, communications, or data equipment spaces and enclosures unless shown. Install drip pan under piping that must run through electrical spaces.

3.1.5.1 Cut pipe from measurements taken at the site, not from drawings. Keep pipes free of contact with building construction and installed work.

3.2 Piping System Joints: Provide joints of the type indicated in each piping system.

3.2.1 Solder copper tube-and-fitting joints where indicated, in accordance with recognized industry practice. Cut tube ends squarely, ream to full inside diameter, and clean outside of tube ends and inside of fittings. Apply non-acid type solder flux to joint areas of both tubes and fittings. Insert tube full depth into fitting, and solder in manner which will draw solder full depth and circumference of joint. Wipe excess solder from joint before it hardens.

3.2.2 Thread pipe in accordance with ANSI B2.1; cut threads full and clean using sharp dies. Ream threaded ends to remove burrs and restore full inside diameter. Apply pipe joint compound, or pipe joint tape (Teflon) where recommended by pipe/fitting manufacturer, on male threads at each joint and tighten joint to leave not more than 3 threads exposed. Paint exposed threads to retard rusting.

3.2.3 Flanged Joints: Match flanges within piping system, and at connection with valves and equipment.

Clean flange faces and install gaskets. Tighten bolts to provide uniform compression of gaskets.

Bolts shall project 1/8" to 3/8" beyond nut face when tight.

3.2.4 Plastic Pipe Joints: Comply with manufacturer's instructions and recommendations, and with applicable industry standards.

3.2.4.1 Solvent-cemented joints shall be made in accordance with ASTM D-2235 and ASTM F-402.

3.2.4.2 PVC sewer pipe bell/gasket joints shall be installed in accordance with ASTM D-2321.

3.2.5 Braze copper tube-and-fitting joints where indicated, in accordance with ANSI B.31.

3.3 Piping Installation

3.3.1 Install piping to allow for expansion and contraction.

3.3.2 Isolate all copper tubing from steel and concrete by wrapping the pipe at the contact point, and for one inch on each side, with a continuous plastic sleeve. Isolate all copper tubing installed in block walls with a continuous plastic sleeve.

3.3.3 Underground Piping:

3.3.3.1 Provide plastic tape markers over all underground piping. Provide copper wire over all underground plastic piping. Locate markers 18" above piping.

15105 – Pipes and Pipe Fittings - 4

3.3.3.2 Coat the following underground (uninsulated) pipes with a heavy coat of bitumastic or provide an 8 mil polyvinyl sleeve: black steel pipe, galvanized steel pipe, copper tubing.

END OF SECTION 15105

15110 – Valves - 1

SECTION 15110

VALVES

1 GENERAL

1.1 Drawings and general provisions of Contract, including General and Supplementary Conditions and

Division-1 Specification sections, apply to the work of this section.

1.2 This section is a Division-15 Basic Materials and Methods section, and is part of each Division-15 section making reference to or requiring valves specified herein.

1.3 Extent of valves required by this section is indicated on drawings and/or specified in other Division-15 sections.

1.4 Quality Assurance:

1.4.1 Valve Dimensions: For face-to-face and end-to-end dimensions of flanged or welding-end valve bodies, comply with ANSI B16.10.

1.4.2 Valve Types: Provide valves of same type by same manufacturer.

1.5 Approval Submittals: When required by other Division-15 sections, submit product data, catalog cuts, specifications, and dimensioned drawings for each type of valve. Include pressure drop curve or chart for each type and size of valve. Submit valves with Division-15 section using the valves, not as a separate submittal. For each valve, identify systems where the valve is intended for use.

Gate Valves. Type GA.

Check Valves. Type CK.

Ball Valves. Type BA.

1.6 O&M Data Submittals: Submit a copy of approval submittals. Submit installation instructions, maintenance data and spare parts lists for each type of valve. Include this data in the O&M Manual.

2 PRODUCTS

2.1 General: Provide factory-fabricated valves recommended by manufacturer for use in service indicated. Provide valves of types and pressure ratings indicated; provide proper selection as determined by Installer to comply with specifications and installation requirements. Provide sizes as indicated, and connections which properly mate with pipe, tube, and equipment connections.

2.2 Acceptable Manufacturers: Subject to compliance with requirements, provide valves of one of the producers listed for each valve type. The model numbers are listed for contractor’s convenience only.

In the case of a model number discrepancy, the written description shall govern.

2.3 Gate Valves:

2.3.1 Packing: Select valves designed for repacking under pressure when fully opened, equipped with non-asbestos packing suitable for intended service. Select valves designed so back seating protects packing and stem threads from fluid when valve is fully opened, and equipped with gland follower.

2.3.2 Comply with the following standards:

Cast Iron Valves: MSS SP-70. Cast Iron Gate Valves, Flanged and Threaded Ends.

Bronze Valves: MSS SP-80. Bronze Gate, Globe, Angle and Check Valves.

Steel Valves: ANSI B16.34. Steel Standard Class Valve Ratings.

15110 – Valves - 2

2.3.3 Types of gate (GA) valves:

1 Threaded Ends 2" and Smaller (GA1): Class 125, bronze body, screwed bonnet, rising stem, solid wedge. Stockham B-100. Nibco T-111. Crane 428. Milwaukee 148.

2 Soldered Ends 2" and Smaller (GA2): Class 125, bronze body, screwed bonnet, non-rising stem, solid wedge. Stockham B-108 or B-109. Nibco S-111. Crane 1334. Milwaukee 149.

3 Flanged Ends 2½" and Larger (GA3): Class 125, iron body, bronze mounted, bolted bonnet, rising stem, OS&Y, solid wedge. Stockham G-623. Nibco F617-0. Crane 465½. Milwaukee F2885.

4 Threaded Ends 2" and Smaller (GA4): Class 150, bronze body, screwed bonnet, rising stem, solid wedge. Stockham B-122. Nibco T-131. Crane 431. Milwaukee 1150.

5 Soldered Ends 2" and Smaller (GA5): Class 150, bronze body, screwed bonnet, rising stem, solid wedge. Stockham B-124. Nibco S-134. Milwaukee 1169.

6 Threaded Ends 2" and Smaller (GA6): 175 WWP, bronze body, screwed bonnet, rising stem, OS&Y, solid wedge, UL-listed. Stockham B-133. Nibco T-104-0.

7 Flanged Ends 2½" and Larger (GA7): 175 WWP, iron body, bolted bonnet, rising stem, OS&Y, solid wedge, UL listed. Stockham G-634. Nibco F-607-0TS

8 Threaded Ends 2" and Smaller (GA8): Class 200, bronze body, union bonnet, rising stem, solid wedge, renewable seat. Stockham B-132. Nibco T-154-SS. Milwaukee 1174.

9 Flanged Ends 2½" and Larger (GA9): Class 250, iron body bronze mounted, bolted bonnet, rising stem, OS&Y, solid wedge. Stockham F-667. Nibco F-667-0. Crane 7½E. Milwaukee F-2894.

10 Threaded Ends 2" and Smaller (GA10): Class 300, bronze body, union bonnet, rising stem, solid wedge, renewable seat. Stockham B-145. Nibco T-174-SS. Crane 634E. Milwaukee 1184.

11 Flanged Ends 2½" and Larger (GA11): Class 300, cast steel body, bolted bonnet, rising stem, solid wedge, seal-welded seat rings. Provide trim to match use. Stockham 30-0F.

Crane 33.

12 Flanged Ends 2½" and Larger (GA12): 300 WWP, iron body, bolted bonnet, bronze mounted, rising stem, OS&Y, solid wedge, UL-listed. Stockham F-670. Nibco F-697-0.

2.4 Check Valves:

2.4.1 Construction: Construct valves of castings free of any impregnating materials. Construct valves with a bronze regrinding disc with a seating angle of 40º to 45º, unless a composition disc is specified.

Provide stop plug as renewable stop for disc hanger, unless otherwise specified. Disc and hanger shall be separate parts with disc free to rotate. Support hanger pins on both ends by removable side plugs.

2.4.2 Comply with the following standards:

Cast Iron Valves: MSS SP-71. Cast Iron Swing Check Valves, Flanged and Threaded Ends.

Bronze Valves: MSS SP-80. Bronze Gate, Globe, Angle and Check Valves.

Steel Valves: ANSI B16.34. Steel Standard Class Valve Ratings.

2.4.3 Types of check (CK) valves:

15110 – Valves - 3

1 Threaded Ends 2" and Smaller (CK1): Class 125, bronze body, screwed cap, horizontal swing, bronze disc. Stockham B-319. Nibco T-413-BY. Crane 1707. Milwaukee 509.

2 Soldered Ends 2" and Smaller (CK2): Class 125, bronze body, screwed cap, horizontal swing, bronze disc. Stockham B-309. Nibco S-413-B. Crane 1707S. Milwaukee 1509.

3 Flanged Ends 2½" and Larger (CK3): Class 125, iron body, bronze-mounted, bolted cap, horizontal swing, cast-iron or composition disc. Stockham G-931 or G-932 as applicable.

Nibco F918-B. Crane 373. Milwaukee F2974 as applicable.

4 Threaded Ends 2" and Smaller (CK4): 200 WWP, bronze body, screwed cap, horizontal swing, regrinding type bronze disc, for fire sprinkler use. Nibco KT-403-W.

5 Flanged Ends 2½" and Larger (CK5): 175 WWP, iron body, bolted cap, bronze mounted, composition disc, UL listed, with ball drip if required. Stockham G-940. Nibco F-908-W.

6 Threaded Ends 2" and Smaller (CK6): Class 200, bronze body, screwed cap, Y-pattern swing, regrinding bronze disc. Stockham B-345. Nibco T-453-B. Crane 36. Milwaukee 518/508.

7 Flanged Ends 2½" and Larger (CK7): Class 250, iron body, bronze mounted, bolted cap, cast-iron disc. Stockham F-947. Nibco F-968-B. Crane 39E. Milwaukee F2970.

8 Threaded Ends 2" and Smaller (CK8): Class 300, bronze body, screwed cap, Y-pattern swing, regrinding bronze disc. Stockham B-375. Nibco T-473-B. Crane 76E. Milwaukee 517/507.

9 Flanged Ends 2½" and Larger (CK9): Class 300, cast steel body, bolted cap, horizontal swing, seal welded seat rings, chromium stainless disc. Stockham 30-SF. Crane 159.

2.5 Ball Valves:

2.5.1 General: Select with port area equal to or greater than connecting pipe area, include seat ring designed to hold sealing material.

2.5.2 Construction: Ball valves shall be rated for 150 psi saturated steam and 600 psi non-shock cold water. Pressure containing parts shall be constructed of ASTM B-584 alloy 844, or ASTM B-124 alloy

377. Valves shall be furnished with blow-out proof bottom loaded stem constructed of ASTM B-371 alloy 694 or other approved low zinc material. Provide TFE packing, TFE thrust washer, chrome-plated ball and reinforced teflon seats. Valves 1" and smaller shall be full port design. Valves 1¼" and larger shall be conventional port design. Stem extensions shall be furnished for use in insulated piping where insulation exceeds ½” thickness.

2.5.3 Comply with the following standards:

MSS SP-72. Ball Valves with Flanged or Butt Welding Ends for General Service.

MSS SP-110. Ball Valves Threaded, Socket-Welding, Solder Joint, Grooved and Flared Ends.

2.5.4 Types of ball (BA) valves:

1 Threaded Ends 2" and Smaller (BA1): Bronze two-piece full port body with adjustable stem packing. Nibco T-585-70. Stockham S216-BR-R-T. Milwaukee BA125. Apollo 77-100.

2 Soldered Ends 2" and Smaller (BA2): Bronze three-piece full port body with adjustable stem packing. Nibco S-595-Y-66. Milwaukee BA350. Apollo 82-200.

15110 – Valves - 4

3 Threaded Ends 1" and Smaller (BA3): Bronze two-piece full port body, UL listed (UL 842) for use with flammable liquids and LP gas. Nibco T-585-70-UL.

4 Threaded Ends 2" and Smaller (BA4): 175 WWP, bronze two-piece body, UL listed for fire protection service. Nibco KT-585-70-UL and KT-580-70-UL.

5 Threaded Ends 2" and Smaller (BA5): 400 WWP, bronze two-piece body, for fire protection service. Nibco KT-580.

6 Threaded Ends 2½" and Smaller (BA6): 300 WWP, bronze three-piece body, gear operator with handwheel, indicator flag, accepts tamper switch, for fire protection, UL listed. Nibco T- 505-4 and G-505-4.

7 Flanged Ends 2½” and Larger (BA7): Class 150, carbon steel full bore two-piece body with adjustable stem packing. Nibco F515-CS series. Apollo 88-240.

2.6 Valve Features:

2.6.1 General: Provide valves with features indicated and, where not otherwise indicated, provide proper valve features as determined by Installer for installation requirements. Comply with ANSI B31.1

2.6.2 Valve features specified or required shall comply with the following:

1 Flanged: Provide valve flanges complying with ANSI B16.1 (cast iron), ANSI B16.5 (steel), or ANSI B16.24 (bronze).

2 Threaded: Provide valve ends complying with ANSI B2.1.

3 Solder-Joint: Provide valve ends complying with ANSI B16.18.

4 Trim: Fabricate pressure-containing components of valve, including stems (shafts) and seats from brass or bronze materials, of standard alloy recognized in valve manufacturing industry unless otherwise specified.

5 Non-Metallic Disc: Provide non-metallic material selected for service indicated in accordance with manufacturer's published literature.

6 Renewable Seat: Design seat of valve with removable disc, and assemble valve so disc can be replaced when worn.

7 Extended Stem: Increase stem length by 2" minimum, to accommodate insulation applied over valve.

3.1 Installation:

3.1.1 General: Install valves where required for proper operation of piping and equipment, including valves in branch lines to isolate sections of piping. Locate valves so as to be accessible and so that separate support can be provided when necessary. Install valves with stems pointed up, in vertical position where possible, but in no case with stems pointed downward below horizontal plane.

3.1.2 Insulation: Where insulation is indicated, install extended-stem valves, arranged in proper manner to receive insulation.

3.1.3 Applications Subject to Corrosion: Do not install bronze valves and valve components in direct contact with steel, unless bronze and steel are separated by dielectric insulator.

15110 – Valves - 5

3.1.4 Mechanical Actuators: Install mechanical actuators as recommended by valve manufacturer.

3.2 Selection of Valve Ends (Pipe Connections): Except as otherwise indicated, select and install valves with the following ends or types of pipe/tube connections:

3.2.1 Tube Size 2" and Smaller: Threaded valves.

3.2.2 Pipe Size 2" and Smaller: Threaded valves.

3.2.3 Pipe Size 2½" and Larger: Flanged valves.

3.3 Non-Metallic Disc: Limit selection and installation of valves with non-metallic disc to locations indicated and where foreign material in piping system can be expected to prevent tight shutoff of metal seated valves.

3.4 Renewable Seats: Select and install valves with renewable seats, except where otherwise indicated.

3.5 Installation of Check Valves: Install in horizontal position with hinge pin horizontally perpendicular to center line of pipe. Install for proper direction flow.

END OF SECTION 15110.

15110 – Valves - 6

THIS PAGE INTENTIONALLY LEFT BLANK

15120 – Piping Specialties - 1

SECTION 15120

PIPING SPECIALTIES

1 GENERAL

1.1 Drawings and general provisions of contract, including General and Supplementary Conditions and

Division-1 Specification sections, apply to work of this section.

1.2 This section is a Division-15 Basic Mechanical Materials and Methods section, and is part of each

Division-15 section making reference to or requiring piping specialties specified herein.

1.3 Approval Submittals:

1.3.1 Product Data: Submit product data with installation instructions and UL listing for:

Fire barrier sealants.

2 PRODUCTS

2.1 General: Provide factory-fabricated piping specialties recommended by manufacturer for use in service indicated. Provide piping specialties of types and pressure ratings indicated for each service, or if not indicated, provide proper selection as…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .