East Branch Clarion River Lake
Furnish and Install Spillway Safety Fence
1 GENERAL REQUIREMENTS
1.1 GENERAL
The work shall include the furnishing of all materials, equipment, and supplies and the performance of all labor and all incidentals necessary to install approximately 2,700 feet of minimum 8 foot high galvanized steel woven wire fencing to exclude humans and deer along the dam spillway at East Branch Clarion River Lake. East Branch Clarion River Lake is located in Jones Township, in northeastern Elk County, PA. The dam is located on the East Branch of the Clarion River, 7.3 miles upstream from its junction with the West Branch of the Clarion River at Johnsonburg. The work is located at East Branch Lake, 631 East Branch Dam Road, Wilcox, PA 15870-9748. The site of the work may be reached from state and local roads and streets. The work is located near the spillway at East Branch Dam in Wilcox, PA and is adjacent to PA State Game Lands 25.
Contract drawings have been provided to indicate the location and general orientation of the fencing and details of fence construction. Reference Drawings have been provided to indicate the general terrain conditions including cross sections and profile elevations of the fence alignment. Exact location and orientation of the fence shall be determined in the field by the contractor and Contracting Officer or their designated representative.
1.2 Coordination Meeting and Points of Contact (POCs)
Prior to commencement of any work being performed on site, the contractor shall participate in a teleconference with the Administrative Contacting Officer (ACO) and the East Branch Clarion River Lake POCs:
East Branch Lake Resource Manager – Ms. Autumn Rodden, 814-335-0712 or 814-965-2065, Autumn.L.Rodden@usace.army.mil
Administrative Contracting Officer (ACO) – Mr. David Conrad, 412-395-7679, or 412-600-2045, David.T.Conrad@usace.army.mil
1.3 SUBMITTALS
The Contractor shall provide submittals for Government Approval. The Government reserves the right to require the Contractor to resubmit any item found not to comply with the contract. This does not relieve the Contractor from the obligation to furnish material conforming to the plans and specifications. It will not prevent the Contracting Officer from requiring removal and replacement of nonconforming material incorporated in the work. The Government has the right to reject defective supplies or services within a reasonable time after delivery by written notification to the Contractor. The Contractor shall, in such event, promptly replace, correct, or repair the rejected supplies or services at the Contractor’s expense.
1.3.1 Required Submittals
SD-01 Preconstruction Submittals
Manufacturer's Literature
For all proposed materials to be furnished under this contract the Contractor shall furnish manufacturer’s descriptive literature or catalog cuts, illustrations, specifications, and other data to show the proposed materials meet the specified requirements. All appropriate descriptive data shall be clearly indicated on the submittal.
Quality Control Plan (QCP)
The contractor shall complete and submit a Quality Control Plan. A QCP template is provided as an attachment to the specifications. There shall be one qualified Superintendent and one qualified Contractor Quality Control (CQC) Manager. The SSHO and the Contractor Quality Control Manager may be the same person and may be the designated representative (DR). The quality control system shall consist of plans, procedures, and organization necessary to produce a product that complies with the contract requirements. Cover all construction operations, both onsite and offsite, and be keyed to the proposed construction sequence. The project Superintendent will be held responsible for the quality of work and is subject to removal by the Contracting Officer. The Contracting Officer reserves the right to conduct any inspections or perform any tests deemed necessary at any time during the execution of the contract to determine conformance with the requirements of theses specifications. Superintendent and CQC Manager shall be on site at all times work is being done.
Accident Prevention Plan (APP)
In addition to other requirements, the Accident Prevention Plan shall be coordinated with and refer to the Site Access and Work Plan to ensure proposed equipment can be used in a safe manner on the terrain encountered in the work area, including addressing the work conditions in the Activity Hazard Analysis (AHA).
Project Schedule
Project Schedule must be provided in Excel format and updated as necessary or as required by the ACO.
Site Access and Work Plan
Contractor shall submit for approval a written plan describing in detail all phases fencing operations. Plan shall include all requirements specified in paragraph “Site Conditions and Site Access And Work Plan”. Plan shall address work sequencing, time projections, as well as how each step will be controlled, tested, and evaluated. Plan shall address safety measures, equipment specifications, work scheduling around weather and record keeping.
SD-05 Design Data
Layout Of Fence
Contractor shall provide details for final layout and construction of fence for approval by the Contracting Officer.
SD-11 Closeout Submittals Warranty
Contractor's Warranty
Contractor’s standard one year construction warranty shall be submitted after completion of all work.
1.3.2 Contractor Data Submission
All contractor data submissions shall be submitted electronically to:
David Conrad at David.T.Conrad@usace.army.mil
1.4 SECURITY REQUIREMENTS-AT/OPSEC
1.4.1 Access and General Protection and Security Policy and Procedures
The contractor and all associated subcontractors' employees shall comply with applicable installation, facility, and area commander installation and facility access and local security policies and procedures (provided by the Government Representative).
The contractor shall also provide all information required for background checks to meet installation access requirements to be accomplished by the installation the USACE Security Office. The contractor workforce must comply with all personal identity verification requirements as directed by DOD, HQDA, and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes. The contractor must submit the full name, Social Security Number/or/ valid driver’s license number with state of issue, Date of Birth, and Place of Birth/Citizenship for all associated contractor or subcontractor employees to the USACE Security Office, Joseph M. Bali, 412-395-7162, joseph.m.bali@usace.army.mil. The email name check request must contain the USACE Pittsburgh District contract number and location. The required information may be faxed to 412-395-7173 with a coversheet which identifies the USACE Pittsburgh District contract number and location and an email address for the requesting contractor. The District retains the right to deny any contractor and subcontractor employee from working on one of its contracts based on final background investigation results.
1.4.2 Pre-Screen Candidates Using E-Verify Program
The Contractor must pre-screen Candidates using the E-verify Program (http://www.uscis.gov/e-verify) website to meet the established employment eligibility requirements. The Vendor must ensure that the Candidate has two valid forms of Government issued identification prior to enrollment to ensure the correct information is entered into the E-verify system. An initial list of verified/eligible Candidates must be provided to the Contracting Officer (KO) no later than 3 business days after the initial contract award.
1.4.3 Employee Identification and Background Check
The Contractor shall be responsible for furnishing an identification badge/card to each employee prior to the employee working on-site and for requiring each employee engaged on the work to display identification. Identification shall consist of name tags with the name of the Contractor and the employee's name. Additionally, a valid state driver's license or other Government-issued photo identification card is required for positive identification. Each employee shall be subject to a background check in accordance with "Homeland Security Presidential Directive (HSPD) 12: Policy for a Common Identification Standard for Federal Employees and Contractors" (HSPD- 12).
Only those individual employees that were specifically identified and approved shall be cleared to work on Government property.
1.5 SAFETY REQUIREMENTS
In addition to the detailed requirements included in the provisions of this contract, all work shall comply with the most recent edition of the USACE Engineering Manual (EM) 385-1-1, “Safety and Health Requirements Manual”, and all applicable federal, state, and local laws, ordinances, criteria, rules, and regulations. If there are any standards that require interpretation, submit matters to the appropriate administrative agency for resolution before the commencement of work. Where the requirements herein, applicable laws, criteria, ordinances, regulations, and referenced documents vary, the most stringent requirements govern. The Superintendent, CQC Manager, and SSHO are subject to dismissal if any of the required regulatory requirements are not being effectively carried out. If dismissal occurs, project work will be stopped and no work shall proceed until a suitable replacement is approved and the appropriate requirements are assured to be effectively carried out. The latest version of the EM 385-1-1 is available online at:
https://www.publications.usace.army.mil/Portals/76/Publications/EngineerManuals/EM_ 385-1-1.pdf.
1.5.1 Accident Prevention Plan (APP)
An Accident Prevention Plan (APP) is a safety and health policy and program document that shall be contract- and/or job-specific. The APP shall be developed by the Contractor and shall interface with the Contractor's overall Safety and Health Program, such that any portions of the Contractor's overall program referenced in the APP shall be included as appropriate. The Contractor shall develop the APP in accordance with EM 385-1-1, Appendix A, and shall address each of the elements/sub-elements in the outline contained in the appendix in the order that they are provided in the manual, and as supplemented herein. If an item is not applicable because of the nature of the work to be performed, the Contractor shall state this exception and provide a justification. The APP shall be written in English by the Prime Contractor and shall articulate the specific work, work processes, equipment to be used, and hazards pertaining to the contract.
The non-mandatory APP Checklist, Form A-2 of the EM 385-1-1, may be used to ensure each area of required information has been provided as part of the APP to the Contracting Officer. The APP shall be submitted to the COR for review and acceptance within 15 calendar days after receipt of the Notice to Proceed (NTP) and prior to any commencement of work. Work cannot begin without an accepted APP. Once accepted by the Contracting Officer, the APP and all attachments will be enforced as part of the contract. Disregarding provisions of this contract or the accepted APP is a cause for stopping of that portion of the work at the direction of the Contracting Officer until the matter has been rectified. Each sub-contractor shall be provided a copy of the accepted APP and a copy shall be available on the worksite at all times. A signature log shall be completed by each sub-contractor supervisor attesting that they have read and understand the APP. All sub-contractors shall comply with the APP. The Contractor shall provide on-going evaluations of the APP throughout the life of the project.
Changes, revisions, and updates to the APP shall be reviewed and accepted by the Contracting Officer, project Superintendent, SSHO, and Contractor Quality Control Manger.
1.5.1.1 Infectious Disease Exposure Prevention, Preparedness, and Response Plan
Due to the recent COVID-19 pandemic, all Contractors that perform operations on LRP USACE-owned/operated facilities are to include an Infectious Disease Exposure Prevention, Preparedness, and Response Plan as an addition to their overall APP. The plan shall describe how the Contractor will implement the requirements and best practices issued by Federal, State, and Local authorities in order to prevent the spread of COVID and/or other infectious diseases.
1.5.2 Risk Management
A risk management assessment tool, such as activity hazard analysis (AHA), job safety analysis (JSA), or job hazard analysis (JHA) shall be developed by the contractor performing the work for each activity, task, or defined feature of work (DFOW). The assessment shall identify the work sequence, specific anticipated hazards, site conditions, equipment, materials, personnel, and the control measures to be implemented to control the hazards. If Qualified or Competent Persons are required for a particular activity, they shall be identified and included in the assessment, and their competency/qualification identified. Work shall not begin until the assessment has been accepted by the Contracting Officer and discussed with all engaged in the activity.
These risk assessment tools are considered living documents and shall be updated as needed. If the RAC increases from what was originally accepted by the Contracting Officer, the assessment shall be re-submitted for acceptance prior to work proceeding.
Changes that do not increase the RAC are not required to be resubmitted for acceptance. The risk assessment shall be developed in accordance with EM 385-1-1 Section 1, or as specified by the Contracting Officer. The Contractor may use the Attached Activity Hazard Analysis (AHA) form to assist with completion of their risk assessments. Risk assessments shall be submitted for review at least 15 working days prior to the start of the activity, task, or defined feature of work is set to begin. The Government reserves the right to require the Contractor to revise and resubmit any documents if they fail to effectively identify the work sequence, specific anticipated hazards, site conditions, equipment, materials, personnel, and the control measures to be implemented. Each employee performing work as part of an activity, task, or defined feature of work shall review the risk assessment for the activity and sign the signature log designated for the assessment prior to beginning work. A signature log shall be maintained for each risk assessment.
1.5.3 Implementation of Safety and Occupational Health (SOH) Program
The Contractor shall employ a minimum of one Competent Person at each project site to function as the primary Site Safety and Health Officer (SSHO) to implement and administer the Contractor’s safety program and the Government-accepted Accident Prevention Plan (APP). The SSHO is a full-time responsibility and shall be an employee other than the supervisor (unless specified differently in the contract and coordinated with the local SOH Office), that reports directly to a senior project, or corporate, official.
The SSHO shall be present at the project site and be located so they have full mobility and reasonable access to all major work operations during the shift. The SSHO shall meet all training and experience qualifications as outlined in EM 385-1-1 Section 01, Paragraph A.17. The SSHO may also serve as the Quality Control Manager. The SSHO may not serve as the Superintendent. SSHO shall attend the pre-construction conference, pre-work meetings, including preparatory and periodic in-progress meetings.
1.5.4 Mishap Reporting
A mishap is any unplanned, undesired event that occurs during the course of work being performed, to include, accidents, incidents, and near misses. All mishaps shall be reported to the Contracting Officer within 24-hours after notification from the affected employee(s). Contractors are responsible for maintaining an OSHA Log of Work- Related Injuries and Illnesses (Form 300) and complying with all reporting and recordkeeping requirements specified in 29 Code of Federal Regulations (CFR) 1904.
1.5.5 Damage Reports
All instances where Government materials, supplies, property, and/or equipment are damaged shall be reported immediately to the Contracting Officer and Resource Manager.
1.5.6 Minimum Personal Protective Equipment
Personal Protective Equipment (PPE) is governed in all areas by the nature of work personnel are performing based on conducted hazard evaluations. AHAs shall detail the PPE to be used that will provide appropriate protection for the work to be performed when required. All PPE shall be provided by the Contractor, used, and maintained in a sanitary and reliable condition whenever the hazard dictates use.
Mandatory PPE, at minimum, shall include hardhat (construction sites), long pants, short sleeve shirts, and leather or protective work shoes or boots. Personal Floatation Devices (PFDs) shall be worn at all times when working above or near water in which other fall protection methods do not provide the appropriate protection.
1.5.7 Designated Persons
The Contractor shall provide Qualified and/or Competent Persons in accordance with EM 385-1-1, OSHA, ANSI, and where specified herein. All Qualified and Competent Persons shall be designated in writing and shall meet the requirements for the specific activity for which they are designated. Competent Persons identified in the Contractor’s Safety and Health Program and Government-accepted APP shall be onsite at all times when the work that presents the hazards associated with the competency is being performed. Certificates of Qualification/Competency shall be provided to the Contracting Officer for review and provided as part of the applicable AHAs and appendices of the APP.
1.5.8 Hazardous Material Exclusion
Notwithstanding any other hazardous material used in this contract, radioactive materials or instruments capable of producing ionizing/non-ionizing radiation (with the exception of radioactive material and devices used in accordance with EM 385-1-1 such as, nuclear density meters for compaction testing and laboratory equipment with radioactive sources) as well as materials which contain asbestos, mercury, polychlorinated biphenyls (PCBs), Diisocyanates, lead, lead-based paint (LBP), and hexavalent chromium, are prohibited. The Contracting Officer, upon written request by the Contractor, may consider exceptions to the use of any of the above excluded materials. Low mercury lamps used within fluorescent lighting fixtures are allowed as an exception without further Contracting Officer approval. Notify the Radiation Safety Officer (RSO), Safety Office, and the Contracting Officer prior to excepted items of radioactive material and devices being brought on site.
1.5.9 Unforeseen Hazardous Materials
All known hazardous materials will be identified by the Government to the contractor. If materials that may be hazardous to human health upon disturbance are encountered during the performance of contract work, that portion of the work shall be stopped, and the COR immediately notified.
1.6 PROJECT/SITE CONDITIONS
1.6.1 Photos and Fence Alignment Terrain and Cross Sections
Photos and Fence Alignment Terrain and Cross Sections have been provided to show existing conditions to the best knowledge of the Government. The photos and fence alignment terrain and cross sections are intended to assist the Contractor in evaluating how to perform the work safely and in accordance with Paragraph “Site Conditions and Site Access And Work Plan”. The Government cannot guarantee the accuracy of the dimensions, elevations, and features shown or stated, and it shall be the responsibility of the Contractor, if necessary, to verify all elevations and the dimensions by measurements in the field. The Contractor shall verify elevations and dimensions before laying out the work. The Contracting Officer shall be notified of any discrepancies prior to commencing work.
1.6.2 Verification of Field Conditions
The Contractor shall verify all dimensions and conditions in the field and shall advise the Contracting Officer of any discrepancy before performing any work. Prior to mobilization, the Contractor and the Contracting Officer or their designated representative shall conduct a joint inspection of access routes to the construction site, work areas, and the construction site.
1.6.3 Work Areas
The Contractor shall ensure that his operations will not interfere with the operation of the project or the duties of project personnel. The drainage ditch near the fence alignment shall remain open during the work. Transport of materials and equipment shall be the responsibility of the Contractor. The Contractor shall be fully responsible for determining the methods used to transport materials and equipment to and from the areas as well as the removal of waste materials from such spaces. The work area will be coordinated and agreed on with the ACO.
1.6.3.1 Site Conditions and Site Access And Work Plan
The site of the work is located in an area above the spillway that generally follows the path of a rough “bench” that was formed from the material that was excavated to construct a gutter along the side of the mountain. The excavated material was left in place and now forms a path that is generally clear of large trees, and is vegetated mostly with weeds and shrubs and some small trees. The fence alignment is intended to follow this “bench.” It is brought to the contractor’s attention that grades along the fence alignment are estimated to run as high as approximately 20% to 25%. In addition, the “bench” is not level as indicated on the Reference Drawings. The contractor shall be responsible for determining how to perform the work safely and in accordance with published performance specifications for any proposed equipment to be used to perform the work. The contractor shall be responsible to develop and submit for approval a Site Access And Work Plan that will clearly show how the contractor intends to perform the work, and shall include at a minimum, the following:
Proposed fence alignment and layout, noting any abrupt changes in alignment requiring adjustment of post spacing or additional corner posts.
Proposed methods for accessing the work areas and narrative describing how the work is to be performed, including methods for delivering materials, method for driving posts and backfilling details, and shall address the need for any additional clearing or other site improvements.
Proposed equipment listing for all self-propelled equipment which contains manufacturer and model number of each proposed piece of equipment and the manufacturer’s published performance data relating to maximum permissible grade to ensure the equipment can be used in a safe manner.
It is noted for the contractor’s information that the grassy area below the downstream end of the spillway is perpetually wet, soft and unusable for equipment access.
1.6.4 Time of Performance
The Contractor shall notify the Points of Contact prior to start of work. The Contractor shall schedule work through the ACO. The Contractor shall coordinate work with the ACO at least 3 days before starting work. The Contractor shall confine all operations at the work site between the hours of 7:30 AM and 4:00 PM, Monday through Friday, unless otherwise approved by the ACO. Work will not be permitted on weekends or Federal holidays unless otherwise approved. The following is a list of Federal Holidays:
New Year's Day January 1 Birthday of Martin Luther King, Jr. Third Monday in January Washington's Birthday Third Monday in February Memorial Day Last Monday in May Juneteenth National June 19 Independence Day
Independence Day July 4 Labor Day First Monday in September Columbus Day Second Monday in October Veterans Day November 11 Thanksgiving Day Fourth Thursday in November Christmas Day December 25
1.6.5 Period of Performance
The Contractor shall complete all work within 120 calendar days after receipt of Notice to Proceed.
1.6.6 Protection of Government Property
The contractor shall protect all government property during the performance of this contract. All damage to existing government property as a result of the contractors work shall be repaired or replaced to the satisfaction of the Contracting Officer.
1.6.7 Protection of Personnel
The Contractor shall ensure that adequate measures are in place to protect workers, facility operation personnel and the public from injury due to the operations being performed. All protective measures shall be in accordance with EM 385-1-1.
1.8 QUALITY ASSURANCE
1.8.1 Daily Inspection Report
Submit one copy of the daily inspection report to the Contracting Officer within 24 hours of the date recorded.
1.8.2 Pre-work Conference
After approval of submittals and before performing the fencing work, hold a Pre-work conference to review the following:
Drawings, specifications, and submittals related to the work;
Site access and work plan Fencing system components installation;
Safety requirements; and Proposed schedule.
Coordinate pre-work conference scheduling with the Contracting Officer. The conference must be attended by the Contractor, the Contracting Officer's designated personnel, personnel directly responsible for the fencing work.
1.9 UAI 5122.1302-100 EQUAL OPPORTUNITY FOR VETERANS
In addition to complying with the requirements outlined in FAR Part 22.13, FAR Provision 52.222-38, FAR Clause 52.222-35, FAR Clause 52.222-37, DFARS 222.13 and Department of Labor regulations, U.S. Army Corps of Engineers (USACE) contractors and subcontractors at all tiers are encouraged to promote the training and employment of U.S. veterans while performing under a USACE contract. While no set-aside, evaluation preference, or incentive applies to the solicitation or performance under the resultant contract, USACE contractors are encouraged to seek out highly qualified veterans to perform services under this contract. The following resources are available to assist USACE contractors in their outreach efforts:
U.S. Department of Labor Veterans employment:
https://www.vets.gov/
Veterans' Employment and Training Service (VETS):
https://www.dol.gov/vets/
Federal veteran employment information:
https://www.fedshirevets.gov/index.aspx
Veterans Opportunity to Work (VOW) Program:
https://benefits.va.gov/vow/
U.S. Army Warrior Transition Command Employment Index:
https://wtc.army.mil/modules/employers/index.html
Hiring Our Heroes initiative:
https://www.uschamberfoundation.org/hiring-our-heroes
Guide to Hiring Veterans:
(Link Must be Copied and Pasted into Browser):
https://obamawhitehouse.archives.gov/sites/default/files/docs/white_house_busin ess_council_-_guide_to_hiring_veterans_0.pdf
1.10 MEASUREMENT AND PAYMENT
1.10.1 JOB PAYMENT ITEMS
Payment items for the work of this contract for which contract job payments will be made are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular job item, shall be included in the listed job item most closely associated with the work involved. The job price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for which separate payment is not otherwise provided.
1.10.1.1 Vegetation Clearing
A) Payment: Payment shall constitute full compensation for all costs in connection with completing this item of work as specified in paragraph 3.1
“VEGETATION CLEARING.”
B) Unit of Measure: Unit of measure: Job C) Payment Item: 0002 VEGETATION CLEARING
1.10.2 UNIT PRICE PAYMENT ITEMS
Payment items for the work of this contract on which the contract progress payments will be based are listed in the PRICE SCHEDULE and described below. All costs for items of work, which are not specifically mentioned to be included in a particular unit price item, shall be included in the listed unit price item most closely associated with the work involved. The unit price and payment made for each item listed shall constitute full compensation for furnishing all plant, labor, materials, and equipment, and performing any associated Contractor quality control, environmental protection, meeting safety requirements, tests and reports, and for performing all work required for each of the unit price items.
1.10.2.1 Fence Fabric
connection with furnishing and installing fence fabric, except for posts and braced assemblies which will be paid for separately.
B) Measurement: Measurement shall be based on the actual length of fence fabric furnished and installed in the completed work.
C) Unit of Measure: Unit of measure: Linear Foot (LF) D) Payment Item: 0003 FENCE FABRIC
1.10.2.2 Line Posts
connection with furnishing and installing line posts, including costs of driving the posts in the ground or auguring and backfilling the posts in the ground.
B) Measurement: Measurement shall be based on the actual number of line posts furnished and installed in the completed work.
C) Unit of Measure: Unit of measure: Each (EA) D) Payment Item: 0004 LINE POSTS
1.10.2.3 Brace Assemblies
connection with furnishing and installing end brace and corner assemblies, including posts, horizontal bracing posts and connecting pins, brace wires and strainers, costs of driving the posts in the ground or auguring and backfilling the posts in the ground.
B) Measurement: Measurement shall be based on the actual number of brace assemblies furnished and installed in the completed work.
C) Unit of Measure: Unit of measure: Each (EA) D) Payment Items: 0005 CORNER BRACE ASSEMBLIES
0006 END BRACE ASSEMBLIES
1.10.2.4 Gates
connection with furnishing and installing gates and required hardware, except for end brace assemblies which will be paid for separately.
B) Measurement: Measurement shall be based on the actual number of gates furnished and installed in the completed work.
C) Unit of Measure: Unit of measure: Each (EA) D) Payment Item: 0007 GATES
2 MATERIALS
2.1 FENCE FABRIC
Fence fabric shall be constructed of galvanized steel, fixed-knot woven wire, 23/96/6, 12½ Ga (23 horizontal lines, 96" height, 6" vertical spacing, 12½ gauge high-tensile) , conforming to ASTM A116 Class 3 galvanized.
2.2 AND HARDWARE
All fence hardware including but not limited to mechanical strainers, staples, pins, fasteners and tension springs shall conform to ASTM A153, Class 3 galvanized.
2.3 POSTS
All posts shall be pressure treated southern yellow pine or other wood of equal life and strength. The posts shall be treated with CCA or ACZA chemical compounds to a minimum of 0.40 lb/ft3 (pcf). The wood posts shall be new, sound, free of bark, and free from decay with all limbs trimmed substantially flush with the body. They shall be substantially straight throughout their length.
2.3.1 Line Posts
Line posts shall be a minimum of 4 inches in diameter (actual dimensions) or at the contractor’s option a minimum of 6 inches square (nominal).
2.3.2 Brace Assemblies
Bracing is required at all corners, ends and gates and every 1,000 linear feet from the next braced assembly. Brace assemblies shall consist of wood posts with a minimum diameter of 6 inches (actual dimensions) or at the contractor’s option a minimum of 8 inches square (nominal). Horizontal bracing shall be a minimum of 4 inches in diameter (actual dimensions) or at the contractor’s option a minimum of 6 inches square (nominal).
2.4 SWING GATES
Each gate shall be a single swing gate fabricated of min 1-3/4: diameter galvanized steel tubing of the size indicated on the contract drawings. All components shall be Class 3 galvanized, with 4” x 4” x 6 Ga/6 Ga mesh panels welded at the gate frame.
Standard factory fabricated tubular fence gate meeting these specifications may be proposed for use by the Contractor. Gate hinges, with J-Hook bolts with hinge clamps shall be provided to securely mount the gate to a wood post. All gate bars shall be saddle notched and welded. Each gate shall be furnished with a heavy duty galvanized two-way lockable slam latch. Locks will be furnished by the Government.
2.5 POST HOLE BACKFILL
Backfill shall be crushed stone aggregate conforming to PennDOT 2A or 2RC.
2.6 ALTERNATIVE MATERIALS
The Contractor may submit for approval alternative materials such as galvanized steel posts or alternative systems, such as steel posts and driven steel post sleeves. Such alternates may be approved if the fence height of 8 ft is maintained and incorporates the gates as shown. Shorter posts may be proposed that include the use of bolted on galvanized steel extensions to maintain the fence height. Contractor shall submit manufacturer’s information that substantiates the proposed materials or systems are products of standard manufacture and are suitable for their intended use. All parts and materials shall be compatible and shown to provide the same level of performance as that specified.
3 EXECUTION
3.1 VEGETATION CLEARING
A path of between 6 to 8 feet in width has been cleared along the alignment of the fence, and consisted of the hand removal of shrubs and small trees. The contractor shall be responsible for removal of any vegetation that has regrown and interferes with the contractor’s operations. Grubbing will not be required. Large trees that cannot be avoided by slight changes in the fence alignment shall be the contractor’s responsibility to cut and lay aside. Removal and disposal of vegetation or trees will not be required, and such material shall be allowed to remain on site away from the fence alignment.
3.2 SPILLWAY SAFETY FENCING
The fence shall be installed at the approximate alignment indicated on the contract drawings. The ACO or designated representative and the Contractor shall mutually inspect the alignment location and agree on any changes to the final alignment. The alignment may be modified to accommodate unforeseen abrupt changes in terrain or obstacles, but shall minimize the need for bracing. All excess fence material at the completion of the work shall be removed from the work site.
3.2.1 Post Placement
Post placement shall be a maximum of 20 feet on centers. Spacing shall be adjusted for abrupt changes in terrain that make it impossible to maintain proper clearance between ground level and bottom of fence. Bracing shall be required at all corners, ends and gates in the fence. Posts shall be set at a minimum depth of 36 inches.
3.2.1.1 Corner Brace Assemblies
Corner brace assemblies shall be required at all points where the changes 15 degrees or more. Three vertical posts and two horizontal braces are required for each corner (two H-Braces).
3.2.1.2 End Brace Assemblies
End brace assemblies shall be required where the fence ends and at each side of a gate opening. Two vertical posts and one horizontal brace are required for each end brace (single H-Brace).
3.2.1.3 Post Installation
Posts may be driven by use of a mechanical post driver without damaging the posts to a minimum depth of 36 inches, or the posts may be set by auguring a 12” diameter hole a minimum depth of 36 inches depth, setting the post with backfill material, and firmly hand tamping. All posts shall be set plumb and in straight lines.
3.2.2 Wire Fabric Installation
Woven wire fabric shall be installed to provide a maximum of 6 inches above ground level or as directed by the Contracting Officer to accommodate terrain conditions. To maintain this clearance, existing on site soil may need to be placed below the fabric or post spacing may need to be adjusted to suit terrain. After the wire fabric is permanently tied off at one end of a braced assembly, the fabric can be stretched, spliced, and permanently stapled to the line posts. Staples shall be installed on the line posts loose enough to allow the woven wire to slide to allow for expansion and contraction.
3.2.3 Gate Installation
Gates shall be installed at the approximate locations shown at a corner post to minimize the need for additional bracing as directed by the Contracting Officer.