This is a bid solicitation document from the Michigan Department of Technology, Management and Budget (DTMB) for a housing unit security level conversion project at the Baraga Correctional Facility in Baraga, MI. The project involves removing and salvaging existing segregation cages, fenced walkways, gates, posts, ceilings, connectors, and pull-up bars from Housing Unit #3, and installing approximately 310 linear feet of new 16-foot-high yard security fence with one 14'x14' access gate and 36-inch diameter detainer hook razor ribbon. The bid submission deadline is November 4, 2020 at 2:00 PM local time, with a mandatory virtual pre-bid meeting scheduled for October 21, 2020 at 9:00 AM. The contract requires substantial completion within 60 days of Notice to Proceed, with final completion 30 days after substantial completion.
The project includes a $2,000 allowance amount in the base bid and requires a 5% bid security. Performance and payment bonds are required for all bids over $50,000. Liquidated damages are set at $100 per day for both substantial completion and final completion delays. The contractor must maintain specific insurance requirements including commercial general liability insurance of $1,000,000 per occurrence, vehicle liability insurance, and worker's compensation coverage. The project includes a one-year warranty on workmanship and materials from the date of final acceptance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Advertisement.pdf | ||
| Addendum No. 1.pdf | ||
| Plans.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT MANUAL
BARAGA CORRECTIONAL
FACILITY HOUSING UNIT
SECURITY LEVEL
CONVERSION
DEPARTMENT OF TECHNOLOGY,
MANAGEMENT AND BUDGET
DTMB FILE NO. 472/19480.JBB
OHM PROJECT NO. 7136-19-0150
DATE: October 8, 2020
DTMB-0415 (R 11/19)
PROJECT ADVERTISEMENT
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN & CONSTRUCTION DIVISION
This form is required for the advertisement of all construction projects. (1984 PA 431)
TO:
DESIGN & CONSTRUCTION DIVISION
DATE
October 8, 2020
FROM:
DTMB/DOC
PROJECT MANAGER
Jeff Barsch
DTMB FILE NUMBER
472/19480.JBB
ACCOUNTING TEMPLATE
472AMFMAINTPROJ
ADVERTISEMENT DATE
October 8, 2020
ELECTRONIC BID DUE DATE
Wednesday, November 4, 2020 at 2:00 p.m.
PROJECT NAME AND LOCATION (INCLUDE STREET ADDRESS)
Baraga Correctional Facility Housing Unit Security Level Conversion 13924 Wadaga Road Baraga, MI 49908
WALK-THROUGH INSPECTION DATE, TIME, AND LOCATION
A mandatory prebid meeting will be held virtually on Wednesday, October 21, 2020 at 9:00 a.m. Any contractor participating in the prebid walk thru needs to e-mail the company name, name of person attending and e-mail address to Deana Wuori at deana.wuori@ohm-advisors.com one day prior to the prebid walk thru. The meeting link is provided below:
Join Zoom Meeting https://ohm-advisors.zoom.us/j/99217920139?pwd=cHdpeFo4SDN6Ynl0c0xYY0ZlQjdJUT09
Password: 177952
One tap mobile
+16468769923,,99217920139# US
Join by Telephone
+1 646 876 9923 US
Meeting ID: 992 1792 0139 Password: 177952
Mandatory Yes No
NOTE: An individual is only permitted to represent one bidder at a mandatory walk-through.
DESCRIPTION OF WORK:
At Housing Unit #3, remove and salvage the existing segregation cages and fenced walkway to the cages including all gates, posts, ceilings, and connectors. Remove and salvage the existing pull-up bars that are fastened to the concrete inside of the cages. Transport the salvaged materials to the Owner’s laydown area and store them as directed by the Owner. Provide approximately 310 LF of new 16’-high yard security fence to create a yard area for Housing Unit 3 with one 14’x14’ access gate. Fence posts will be set in 18” diameter, 60” deep concrete footings. Provide 36” diameter detainer hook razor ribbon with 12" loop spacing on top of the new fence. Restore all disturbed areas with topsoil, seed and mulch.
Please NOTE:
• Masks MUST be worn at the prebid walk thru.
• Prebid walk thru will comply with all federal and state COVID19 requirements and guidelines, including, but not limited to, the most recent State of Michigan Executive Order, OSHA, MiOSHA, and CDC guidelines.
• All Bid Attachments MUST be uploaded to SIGMA VSS.
• Please remember that individual attachments can be no larger than 6 mb
• If you experience issues or have questions regarding your electronic submission, bidders must contact the SIGMA Help Desk for assistance. Bidders can contact the Help Desk by calling 888-734-9749 or emailing sigma-procurement-helpdesk@michigan.gov or sigma-vendor@michigan.gov
• Bidders are reminded to keep our office apprised of SIGMA VSS issues and to include your SIGMA ticket number when communicating with our office. Emailed submissions will need prior DCD approval and will be handled on a case by case basis.
Approved emailed submissions MUST be received prior to the 2:00 p.m. deadline to be considered.
5% Bid Security:
Required
Not Required
NIGP CODES: 90977, 91200, 98815
mailto:deana.wuori@ohm-advisors.com https://ohm-advisors.zoom.us/j/99217920139?pwd=cHdpeFo4SDN6Ynl0c0xYY0ZlQjdJUT09 mailto:sigma-procurement-helpdesk@michigan.gov mailto:sigma-procurement-helpdesk@michigan.gov mailto:sigma-vendor@michigan.gov
ACCEPTING QUESTIONS UNTIL: Wednesday, October 28, 2020 at 12:00 p.m.
Documents may be obtained from: https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService
PSC/Agency: OHM Advisors
Address: 424 Hancock Street, Hancock, MI 49930
Phone: (906) 482-0535
Email: deana.wuori@ohm-advisors.com
Fax: (906) 482-6453
Approved by:
https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService mailto:deana.wuori@ohm-advisors.com
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
State of Michigan Department of Technology, Management and Budget
State Facilities Administration Design and Construction Division
DCSPEC
Bidding and Contract Document Minor Projects
File No. 472/19480.JBB 472AMFMAintProj19AMF15
DTMB/DOC
Baraga Correctional Facility Housing Unit
Security Level Conversion Baraga, MI
October 8, 2020
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
DTMB-0401D (R 05/19)
BID SUMMARY
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
STATE FACILITIES ADMINISTRATION
DESIGN AND CONSTRUCTION DIVISION
3111 W. St. Joseph Street Lansing, Michigan 48917
Bids must be submitted electronically through the SIGMA VSS website at
FILE NUMBER
472/19480.JBB
FUNDING CODE
472AMFMainProj19AMF15
DEPARTMENT/AGENCY
DTMB/DOC
CONTRACT TIME(S)
Substantial Completion: 60 Days after a Notice to Proceed. Final Completion: 30 Days after Substantial Completion
PROJECT NAME
Baraga Correctional Facility Housing Unit Security Level Conversion
LOCATION
Baraga, MI
BID OPENING DATE
Wednesday, November 4, 2020 at 2:00 pm Local Time
FOR AN EXAMINATION OF THE SITE CONTACT:
Attend Mandatory Prebid Meeting
SEE SECTION 00100 INSTRUCTIONS TO BIDDERS AND SECTION 00700 GENERAL CONDITIONS PROVIDED WITH THE BIDDING DOCUMENTS.
BID: WE PROPOSE TO FURNISH, PERFORM AND COMPLETE THE ENTIRE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS
IN CONSIDERATION OF THE BID PRICE (S) STATED BELOW.
FIRM NAME AND COMPLETE ADDRESS TELEPHONE NUMBER and E-MAIL ADDRESS
□ Qualified Disabled Veteran
SIGMA VENDOR NUMBER
(protected information required for processing payments)
BIDDER'S SIGNATURE AND TITLE DATE
WITNESS' SIGNATURE
DATE
By signing this bid above, bidder certifies their enclosed Qualified Disabled Veteran and Michigan-Based Business Certifications.
BASE BID FROM BID SCHEDULE (Include specified Allowances):
____________________________________________________________________________Dollars $____________________ (use words) (in figures)
Alternate1: (Add/Subtract) ______________________________________________________ Dollars $ ____________________ (use words) (in figures)
Alternate 2: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)
Alternate 3: (Add/Subtract) ______________________________________________________Dollars $ ____________________ (use words) (in figures)
Builder’s Risk Insurance is NOT provided by the State of Michigan.
A PERFORMANCE BOND AND A PAYMENT BOND ARE REQUIRED FOR ALL BIDS OVER $50,000.00. EACH BID MUST BE
ACCOMPANIED BY A FIVE (5) PERCENT BID GUARANTEE.
BIDDERS ARE ALSO CAUTIONED TO FAMILIARIZE THEMSELVES WITH ALL OF THE OTHER CONDITIONS OF THE CONTRACT.
Project Scope of Work:
At Housing Unit #3, remove and salvage the existing segregation cages and fenced walkway to the cages including all gates, posts, ceilings, and connectors. Remove and salvage the existing pull-up bars that are fastened to the concrete inside of the cages.
Transport the salvaged materials to the Owner’s laydown area and store them as directed by the Owner. Provide approximately 310 LF of new 16’-high yard security fence to create a yard area for Housing Unit 3 with one 14’x14’ access gate. Fence posts will be set in 18” diameter, 60” deep concrete footings. Provide 36” diameter detainer hook razor ribbon with 12" loop spacing on top of the new fence. Restore all disturbed areas with topsoil, seed and mulch.
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
The Bidder must figure its Base Bid on the specified, or Addendum-approved, materials and equipment only. No “or equal” or substitution proposals will be permitted after Bid opening, except as provided in the General Conditions.
Addenda: Bidder acknowledges receipt of Addenda: No. ___ dated: ________, No. ___ dated: ________ No. ___ dated: ________ FIRM NAME TELEPHONE NUMBER and E-MAIL ADDRESS
BID SCHEDULE
Base Bid Schedule - The Bidder will complete the Work and accept as full payment, for the Work items listed, the following Unit Prices and/or Item Bid Prices, as applicable:
Base Bid Item No.
Bid Quantity
Description (Bidder to write price in Words)
Unit Price
Item Bid Price
1 1 Project Scope of Work
2 1 ALLOWANCE AMOUNT 2,000.00 2,000.00
TOTAL (This amount should equal the Base Bid amount on the Bid Summary Form) $
Base Bid (Sum of Item Bid Prices for all Base Bid Items):
__________________________________________________________________ Dollars $__________________________ (use words) (in figures)
Schedule of Alternates - The Bidder will complete (or deduct from the Contract) the parts of the Work designated by the Alternates that follow and accept in full payment (or allow in full credit) for those parts of the Work the following Item Bid Prices:
Alternate Item No.
Bid Quantity
Description (Bidder to write price in Words)
Unit Price
Item Bid Price
None
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
The Bidder further acknowledges and agrees that the separate prices bid on this “Schedule of Alternates,” where they are applicable and deemed acceptable by the Owner, will be used if incorporated into the Contract when the Owner issues the Notice of Award.
Schedule of Unit Prices or Contingent Change Order Prices - The Bidder shall use this “Schedule” to quote unit prices identified in the bid documents or propose other contingent Change Order prices. The proposed Unit Prices or contingent Change Order prices set forth in this schedule, at the sole discretion of the Owner, may, or may not be incorporated into the Contract Documents. The Owner reserves the right to negotiate Unit Prices or contingent Change Order prices set forth herein prior to their possible incorporation into the Contract Documents.
Item No.
Units or Quantity
Description
(Bidder to write price in Words)
Bidder’s Bid
Price
Price Proposed
By The Owner
None
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
DEPARTMENT OF TECHNOLOGY, MANAGEMENT AND BUDGET
State Facilities Administration
Design & Construction Division
Qualified Disabled Veteran (QDV) Business Representation
‘Qualified Disabled Veteran,’ means a business entity that is 51% or more owned by one or more veterans with a service-connected disability.
‘Qualified Disabled,’ means a business entity that is 51% or more owned by one or more with a service-connected disability.
The vendor represents that it IS _____, a qualified disabled veteran.
The contractor represents and warrants that the company meets the above (when checked) and has attached supporting documentation per the following:
Each bid requesting the Qualified Disabled Veterans (QDV) preference, in accordance with Public Act 22 of 2010, MCL 18.1241.3 shall include a DD214 Proof of Service and Discharge, a Veterans Administration rating decision letter, proof of disability (if the disability is not indicated on the DD214), and appropriate legal documents setting forth the 51% natural persons QDV ownership.
Fraudulent Certification as a Qualified Disabled Veteran may result in debarment under MCL 18.264.
Certification of a Michigan Based Business
(Information Required Prior to Contract Award for Application of State Reciprocity Provisions)
To qualify as a Michigan Based Business:
Vendor must have, during the 12 months immediately preceding this bid deadline:
or If the business is newly established, for the period the business has been in existence, it has:
(check all that apply):
Filed a Michigan single business tax return showing a portion or all of the income tax base allocated or apportioned to the State of Michigan pursuant to the Michigan Single Business Tax Act, 1975 PA 228, MCL
208.1 – 208.145; or
Filed a Michigan income tax return showing income generated in or attributed to the State of Michigan; or
Withheld Michigan income tax from compensation paid to the bidder’s owners and remitted the tax to the
Department of Treasury; or
I certify that I have personal knowledge of such filing or withholding, that it was more than a nominal filing for the purpose of gaining the status of a Michigan business, and that it indicates a significant business presence in the state, considering the size of the business and the nature of its activities.
I authorize the Michigan Department of Treasury to verify that the business has or has not met the criteria for a Michigan business indicated above and to disclose the verifying information to the procuring agency.
Bidder shall also indicate one of the following:
Bidder qualifies as a Michigan business (provide zip code: ________________)
Bidder does not qualify as a Michigan business (provide name of State: _____________).
Principal place of business is outside the State of Michigan, however service/commodity provided by a location within the State of Michigan (provide zip code: (___________).
Fraudulent Certification as a Michigan business is prohibited by MCL 18.1268 § 268. A BUSINESS THAT PURPOSELY OR WILLFULLY SUBMITS A FALSE CERTIFICATION THAT IT IS A MICHIGAN BUSINESS OR FALSELY INDICATES THE STATE IN WHICH IT HAS ITS PRINCIPAL PLACE OF BUSINESS IS GUILTY OF A FELONY, PUNISHABLE BY A FINE OF NOT LESS THAN $25,000 and subject to debarment under MCL 18.264.
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
BID BOND
BID SUBMITTED ON the _______ day of ________________, 20____.
Bid Security is in the form of: a Bid Bond _______ Bid Bond form has been duly executed _______; or
A Bank Certified or Cashier's check ___ or Money Order ___ is attached to this page ____ (If Bid Security is by Check or Money Order, the original check or money order must be delivered to the issuing office before Bid Due Time. ALL other SIGMA bid submittals are also still to be made).
If the Bidder is an Individual:
Name of Individual: _________________________________________________________
Name & Title of Person Authorized to sign: ___________________________________________
Signature: _________________________________________________________ (If not the Individual, Attach Power of Attorney) Date
Doing Business as: _________________________________________________________
Business Address: _________________________________________________________
County of registration _________________________
Telephone: _________________________ FAX: ______________________
If the Bidder is a Partnership:
By: _________________________________________________________ (True Name of the Partnership)
Partner Authorized to Sign Date
Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date
Business Address: _________________________________________________________
County of registration _________________________
Telephone: _________________________ FAX _______________________
If the Bidder is a Corporation:
By: _________________________________________________________ (Legal Corporation Name)
Name & Title of Authorized Officer: __________________________________________________
Signature: _________________________________________________________ (Attach evidence of Authority to sign) Date
Name & Title of Officer Attesting: __________________________________________________
Signature: _________________________________________________________ Date
Business Address: _________________________________________________________
Telephone: _________________________ FAX _______________________
(State of Incorporation): _________________________________________________________
If The Bidder is A Joint Venture: JOINT VENTURE SIGNATURES MUST BE AS PROVIDED IN INSTRUCTIONS TO BIDDERS.
EACH JOINT VENTURER SIGNING THE BID MUST SIGN IN THE MANNER INDICATED FOR AN INDIVIDUAL, A PARTNERSHIP OR A CORPORATION. IF MORE THAN TWO JOINT VENTURERS OF THE SAME TYPE ARE INCLUDED, USE ADDITIONAL PAGES. JOINT VENTURE STATE OF INCORPORATION ___________________ OR COUNTY OF REGISTRATION
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
POST-BID SUBMITTALS
The PSC will request this submittal after bid opening. Complete and submit these items within two business days after the request.
BIDDER’S EXPERIENCE MODIFICATION RATING (EMR) ____________
Attach letter of explanation if the Bidder does not have an EMR.
PROPOSED PROJECT SUPERINTENDENT _______________________________
Attach brief resume or list of similar successful projects.
LIST OF SIMILAR PROJECTS COMPLETED BY THE BIDDER
Please list at least three completed projects of similar size and complexity to the project being bid, with reference contact information
REFERENCE #___
Owner: _____________________________________________________________________________________
Project/Contract Name: ________________________________________________________________________
Location of Project/Contract: ____________________________________________________________________
Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________
Owner's Representative (Name and Telephone): _____________________________________________________
Scope of Project/Contract: ______________________________________________________________________
REFERENCE #___
Owner: _____________________________________________________________________________________
Project/Contract Name: ________________________________________________________________________
Location of Project/Contract: ____________________________________________________________________
Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________
Owner's Representative (Name and Telephone): _____________________________________________________
Scope of Project/Contract: ______________________________________________________________________
REFERENCE #___
Owner: _____________________________________________________________________________________
Project/Contract Name: ________________________________________________________________________
Location of Project/Contract: ____________________________________________________________________
Contract Price: _______________________ Project/Contract Started: ____________ Completed: ____________
Owner's Representative (Name and Telephone): _____________________________________________________
Scope of Project/Contract: ______________________________________________________________________
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
POST BID SUBMITTALS: LIST OF SUBCONTRACTORS
The Apparent Low Bidder shall nominate for each Division of Specification and/or trade category, the Subcontractor to be awarded Sub-agreements, including the apparent Low Bidder if work is to be self-performed. Nominated subcontractors shall not be removed, replaced or added to except by written request for good reason, subject to Owner acceptance.
Division, Specification Section Nominated Amount of Subcontract Minority, Woman, and/or Trade Subcontractor(s) Handicapped?
1.________________________ _________________________ __________________ ______________
2.________________________ _________________________ __________________ ______________
3.________________________ _________________________ __________________ ______________
4.________________________ _________________________ __________________ ______________
5.________________________ _________________________ __________________ ______________
6.________________________ _________________________ __________________ ______________
7.________________________ _________________________ __________________ ______________
8.________________________ _________________________ __________________ ______________
9.________________________ _________________________ __________________ ______________
10._______________________ _________________________ __________________ ______________
11._______________________ _________________________ __________________ ______________
12._______________________ _________________________ __________________ ______________
13._______________________ _________________________ __________________ ______________
14._______________________ _________________________ __________________ ______________
The undersigned Apparent Low Bidder _____________________________________________________________ certifies that all the information and data furnished in this List of Subcontractors are current, accurate and complete as of the date stated below.
Signed by:____________________________Name_______________________________ Title ________________________ on this __________ day of ____________________, 20_______.
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
PERFORMANCE BOND
SURETY COMPANY REFERENCE No. __________________________________
That "the Contractor," ___________________________________________________, a corporation ___, individual ___, partnership ___, joint venture ___ of the State of __________________, qualified to do business in the State of Michigan, as Principal, and "the Surety," ____________________________________________________________________, of the State of _________________, as surety, are held and bound unto the State of Michigan, "the Owner," as Obligee, in the amount of __________________________________________________________________________ Dollars ($_________________), for the payment of which the Contractor and Surety bind themselves, their respective heirs, successors, legal representatives and assigns, jointly and severally, in compliance with 1963 PA 213, as amended, MCL 129.201 et seq.
The Contractor has entered into "the Contract" with the Owner for _______________________________________________ _______________, "the Work," covered by the Contract Documents, which are incorporated into this Performance Bond by this reference;
If the Contractor faithfully performs and fulfills all the undertakings, covenants, terms, conditions, warranties, indemnifications and agreements of the Contract Documents within the Contract Time (including any authorized changes, with or without notice to the Surety) and during the Correction Period, and if the Contractor also performs and fulfills all the undertakings, covenants, terms, conditions, warranties, indemnifications and agreements of any and all duly authorized modifications of the Contract Documents, then THIS
OBLIGATION IS VOID, OTHERWISE TO REMAIN IN FULL
FORCE AND EFFECT.
A. No change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion or other revision) releases the Surety of its obligations under this Section 00610 Performance Bond. The Surety expressly waives notice of any such change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion or other revision).
B. This Performance Bond must be solely for the protection of the Owner and its successors, legal representatives or assigns.
C. It is the intention of the Contractor and Surety that they must be bound by all terms and conditions of the Contract Documents (including, but not limited to General Conditions and this Performance Bond). However, this Performance Bond is executed pursuant to 1963 PA 213, as amended, MCL 129.201 et seq., and if any provision(s) of this Performance Bond is/are illegal, invalid or unenforceable, all other provisions of this Performance Bond must nevertheless remain in full force and effect, and the Owner must be protected to the full extent provided by 1963 PA 213, as amended, MCL 129.201 et seq.
IMPORTANT: The Surety must be authorized to do business in the State of Michigan by the Department of Licensing and
Regulatory Affairs − Insurance Bureau, must be listed on the current U.S. Department of the Treasury Circular 570, and, unless otherwise authorized by the Owner in writing, must have at least an A− Best's rating and a Class VII or better financial size category per current A. M. Best Company ratings.
Name, Address and Telephone of the Surety:
Address and Telephone of Agent, who is either a resident of, or whose principal office is maintained in, the State of Michigan
Signed and sealed this __________ day of _______________________, 20_____.
THE CONTRACTOR: (Print Full Name and Sign) By:___________________________________________________________
WITNESS ______________________________ Name & Title: __________________________________________________
Telephone No. _________________________________________________
THE SURETY: (Print Full Name and Sign) Agent: ________________________________________________________
WITNESS ______________________________ Attorney-in-Fact: ________________________________________________
Telephone No. _______________________________________________
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
PAYMENT BOND
SURETY COMPANY REFERENCE No.___________________________________
"the Contractor," ___________________________________________________, a corporation ___, individual ___, partnership ___, joint venture ___ of the State of __________________, qualified to do business in the State of Michigan, as Principal, and "the Surety," ____________________________________________________________________, of the State of _________________, as surety, are held and bound unto the State of Michigan, "the Owner," as Obligee, in the amount of __________________________________________________________________________ Dollars ($_________________), for the payment of which the Contractor and Surety bind themselves, their respective heirs, successors, legal representatives and assigns, jointly and severally, in compliance with 1963 PA 213, as amended, MCL 129.201 et seq.
The Contractor has entered into "the Contract" with the Owner for _____________________________________________ __________________, "the Work," covered by the Contract Documents, which are incorporated into this Payment Bond by this reference;
If the Contractor promptly pays all claimants supplying labor or materials to the Contractor or to the Contractor's Subcontractors in the prosecution of the Work, then THIS
OBLIGATION IS VOID, OTHERWISE TO REMAIN IN FULL
FORCE AND EFFECT.
A. All rights and remedies on this Payment Bond are solely for the protection of all claimants supplying labor and materials to the Contractor or the Contractor's Subcontractors in the prosecution of the Work, and must be determined in accordance with Michigan Law.
B. No change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion or other revision) must release the Surety of its obligations under this Payment Bond. The Surety hereby expressly waives notice of any such change in Contract Price or Contract Time, "or equal" or substitution or modification of the Contract Documents (including addition, deletion or other revision).
C. It is the intention of the Contractor and Surety that they must be bound by all terms and conditions of the Contract Documents (including, but not limited to this Payment Bond). However, this Payment Bond is executed pursuant to 1963 PA 213, as amended, MCL 129.201 et seq., and if any provision(s) of this Payment Bond is/are illegal, invalid or unenforceable, all other provisions of this Payment Bond must nevertheless remain in full force and effect, and the Owner must be protected to the full extent provided by 1963 PA 213, as amended, MCL 129.201 et seq.
IMPORTANT: The Surety must be authorized to do business in the State of Michigan by the Department of Licensing and Regulatory
Affairs − Insurance Bureau, must be listed on the current U.S. Department of the Treasury Circular 570, and, unless otherwise authorized by the Owner in writing, must have at least an A− Best's rating and a Class VII or better financial size category per current A. M. Best Company ratings.
Name, Address and Telephone of the Surety:
Address and Telephone of Agent, who is either a resident of, or whose principal office is maintained in, the State of Michigan
Signed and sealed this __________ day of _______________________, 20_____.
THE CONTRACTOR: (Print Full Name and Sign) By:___________________________________________________________
WITNESS ______________________________ Name & Title: __________________________________________________
Telephone No. _________________________________________________
THE SURETY: (Print Full Name and Sign) Agent: ________________________________________________________
WITNESS ______________________________ Attorney-in-Fact: ________________________________________________
Telephone No. ____________________________________________________
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
TABLE OF CONTENTS
CONTRACT FORMS
BID SUMMARY FORM
BID SCHEDULE
QUALIFIED DISABLED VETERAN (QDV) BUSINESS REPRESENTATION
CERTIFICATION OF A MICHIGAN BASED BUSINESS
BID BOND
POST-BID SUBMITTALS
PERFORMANCE BOND
PAYMENT BOND
TABLE OF CONTENTS
DIVISION 00 BIDDING REQUIREMENTS AND CONTRACT CONDITIONS
SECTION TITLE PAGES THRU
00010 PRE-BID INFORMATION 00-1
00100 INSTRUCTIONS TO BIDDERS 00-5 TO 00-8
00120 SUPPLEMENTARY INSTRUCTIONS 00-8
00200 INFORMATION TO BIDDERS 00-8 TO 00-9
00700 GENERAL CONDITIONS 00-9 TO 00-19
00750 SPECIAL WORKING CONDITIONS 00-19 TO 00-20
00800 SUPPLEMENTARY CONDITIONS 00-20
00900 ADDENDA 00-20
DIVISION 01 - GENERAL REQUIREMENTS
01010 SUMMARY OF WORK 01-1
01020 ALLOWANCES 01-1
01025 MEASUREMENT AND PAYMENT 01-1
01030 ALTERNATES 01-1
01040 COORDINATION 01-1 TO 01-2
01050 FIELD ENGINEERING 01-2
01060 REGULATORY REQUIREMENTS 01-2 TO 01-4
01090 REFERENCES 01-4
01100 PROJECT PROCEDURES 01-4 TO 01-5
01200 PROJECT MEETINGS 01-5
01300 SUBMITTALS 01-5 TO 01-6
01400 QUALITY CONTROL 01-6 TO 01-7
01500 CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS 01-7 TO 01-8
01600 MATERIAL AND EQUIPMENT 01-8
01650 FACILITY START-UP 01-8
01700 CONTRACT CLOSE-OUT 01-8 TO 01-9
01800 MAINTENANCE 01-9
APPENDIX I – GLOSSARY
APPENDIX II – SPECIAL WORKING CONDITIONS
APPENDIX III – SPECIAL PROJECT PROCEDURES
CLOSEOUT REQUIREMENTS
DRAWINGS - BOUND SEPARATELY
TITLE SHEETS THRU
Title Sheet DT
General Notes, Symbols and Details G001
Demolition Plan D101
Fencing Layout Plan A101
Fencing Details A201
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
TECHNICAL SPECIFICATIONS
Selective Demolition 02 41 19 Cast-In-Place Concrete 03 30 00 Earth Moving 31 20 00 High-Security Chain Link Fences and Gates 32 31 13.53 Turf and Grasses 32 92 00
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
DIVISION 00
BIDDING REQUIREMENTS AND CONTRACT CONDITIONS
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
00-1
SECTION 00010 PRE-BID INFORMATION
1. Invitation to Bid (ITB) − Your firm is invited to submit a Bid. The State of Michigan as the Owner will receive bids electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService, for the Baraga Correctional Facility Housing Unit Security Level Conversion until 2:00 p.m., local time, on Wednesday, November 4, 2020. The State reserves the right to cancel this Invitation to Bid (ITB) or change the date and time for submitting Bids by announcing same at any time before the established date and time for Bid opening. Bids must remain open for acceptance by the Owner for no less than the Bid hold period. Contractor may agree to extend the Bid hold period. However, any such extension must be based upon no increase in the Bid Price and/or Contract Time.
Bids shall be electronically submitted via the State of Michigan SIGMA VSS site as identified in the Project Manual. If you encounter any issues with submitting your bid and SIGMA representatives are not able to be reached or assist you, please e-mail your bid to Linda Feldpausch at FeldpauschL1@michigan.gov prior to the bid due time and immediately inform the DTMB Project Director of the issue.
Work Description − The Work, Baraga Correctional Facility Housing Unit Security Level Conversion, Agency No. 472, Funding Code 472AMFMaintProj19AMF15, DTMB File No. 472/19480.JBB includes, but is not necessarily limited to:
At Housing Unit #3, remove and salvage the existing segregation cages and fenced walkway to the cages including all gates, posts, ceilings, and connectors. Remove and salvage the existing pull-up bars that are fastened to the concrete inside of the cages. Transport the salvaged materials to the Owner’s laydown area and store them as directed by the Owner. Provide approximately 310 LF of new 16’-high yard security fence to create a yard area for Housing Unit 3 with one 14’x14’ access gate.
Fence posts will be set in 18” diameter, 60” deep concrete footings. Provide 36” diameter detainer hook razor ribbon with 12" loop spacing on top of the new fence. Restore all disturbed areas with topsoil, seed and mulch.
The site is located at 13924 Wadaga Road, Baraga, Michigan 49908, as shown on the Drawings.
2. Bidding Documents − Sets of Bidding Documents may be obtained at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService .
3. Bid Security − Each Bid must enclose Bid Security, in the amount of five percent (5%) of the Bidder's Base Bid, paid to the “State of Michigan” in the form of a certified or cashier’s check or money order drawn upon a bank insured by an agency of the Federal Government or a bid bond with an authorized surety company. If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to:
State Facilities Administration Design & Construction Division
3111 W. St. Joseph Street
All other Bid information must be submitted via SIGMA as per standard bidding procedure
4. Pre-Bid Conference − A mandatory prebid meeting will be held virtually on Wednesday, October 21, 2020 at 9:00 a.m.
Addenda may be issued, in response to issues raised at the pre-bid conference, or as the Owner and/or Professional may otherwise consider necessary.
The purpose of the pre-bid conference is to answer questions at the scheduled time on the day of the meeting.
6. SIGMA VENDOR NUMBER: If you are bidding a State job for the first time, visit the State of Michigan SIGMA website, https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService, and follow the “SOM VSS User Guide for New Vendors” instructions, located under Forms and Reference Documents. Registration is required for bid submission. Do not wait until the last minute to submit a proposal, as the SIGMA system requires the creation of an account and entry of certain information, in addition to uploading and submitting the materials. The SIGMA system will not allow a proposal to be submitted after the proposal deadline, even if a portion of the proposal has been updated.
Questions on how to submit information or how to navigate in the SIGMA VSS system can be answered by calling (517) 373-4111 or
(888) 734-9749.
7. Equal Employment Opportunity − Covenants to not discriminate in employment by Contractors, Subcontractors and Suppliers required by Law are contained in Instructions to Bidders and General Conditions and are applicable to the Work and any Sub-agreement under the Contract.
8. Contract Times − The Contract Times and the associated liquidated damages are specified in the Contract.
9. Contact Person − All requests or inquiries concerning the Bidding Documents or the Work must be addressed to: Jared Hyrkas, PE, OHM Advisors, telephone number (906) 482-0535. Questions will be accepted until Wednesday, October 28, 2020 at 12:00 p.m., Local Time.
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
00-2
10. Award − Subject to any agreed extension of the period for holding Bids, Bids must remain valid for acceptance by the Owner for 60 Calendar Days after the date of Bid opening. In addition, the Owner expressly reserves the right, within the Owner's sole discretion, to reject any or all Bids, to waive any irregularities, to issue post-Bid Addenda and re-bid the Work without re-advertising, to re-advertise for Bids, to withhold the award for any reason the Owner determines and/or to take any other appropriate action.
11. Performance and Payment Bonds – A performance bond and a payment bond are required for all contracts over $50,000.00.
END OF SECTION 00010
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
00-3
SECTION 00100 INSTRUCTIONS TO BIDDERS
1. PREPARATION OF BID: Execute Bid fully and properly. Bid Summary Form (DTMB -0401D) and Bid Form Attachments must be used and completely filled out for the Bid to be considered responsive and meeting the requirements of the contract solicitation.
All Bid prices must be printed or typed in both words and figures.
2. BID CHECKLIST: Submit Bid Summary Form with original signatures plus Bid Form Attachments in accordance with the electronic bidding procedures on the SIGMA VSS website.
A complete Bid will consist of the following forms, which are included immediately following the Bid Summary Form:
Bids SUBMIT THESE Bid Forms and Bid Form Attachments
All Bids □ Signed and completed Bid Summary Form (DTMB-0401D);
□ Bid Schedule;
□ Qualified Disabled Veteran (QDV) Business Representation;
□ Bid Security in the amount of 5% of Base Bid Price;
If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to:
State Facilities Administration Design & Construction Division
3111 W. St. Joseph Street
All other Bid information must be submitted via SIGMA as per standard bidding procedure
□ Signature Authorization or copy of the partnership agreement if signed by all partners;
□ Other Forms;
Over $50K □ Forms listed under All Bids;
□ Payment and Performance Bond (upon issuing the Notice of Award).
Over $100K □ Forms listed under All Bids;
□ Certification of a Michigan Based Business;
Over $250K □ Forms listed under All Bids;
□ Certification of a Michigan Based Business;
Apparent Low Bidders ONLY (upon request from the Professional)
□ Experience Modification Rating (EMR), or a letter stating why the Bidder does not have one.
□ Identification of the proposed project superintendent, with a resume or list of similar projects handled by that individual.
□ A list of at least three (3) projects completed by the Bidder, within the last three (3) years of similar size and complexity, with contact information for references for each.
□ A list of nominated sub-contractors, including proposed self-performed categories, for each
Division/Trade/etc.
3. BID SUBMISSION: Bids must be submitted electronically through the SIGMA VSS website at https://sigma.michigan.gov/webapp/PRDVSS2X1/AltSelfService.
4. BID GUARANTEE: Each proposal must be accompanied by either a bank certified or cashier's check on an open, solvent bank or a bid bond with an authorized surety company (the surety must be listed on the current U.S. Department of the Treasury Circular 570) in the amount of five percent of the base bid payable to the State of Michigan, as a guarantee of good faith. If the successful Bidder fails to furnish satisfactory bonds and insurance within fifteen Calendar Days after Notice of Award, such guarantee must be forfeited to the State as liquidated damages. If Bid Security is by check or money order, such certified or cashier’s check or money order must be delivered in original copy before the Bid Due Time to the Issuing Office. The bid security, exclusive of
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
00-4 bid bonds, of all unsuccessful Bidders will be returned when an award is made or upon substitution of a bid bond. The bid security of the successful Bidder will be returned when the performance bond and labor and material bond are approved.
5. Left Blank Intentionally.
6. MICHIGAN BASED BUSINESS CERTIFICATION: All Bidders submitting Bids in excess of $100,000.00 must complete the
Certification of Michigan Based Business. This information will determine if a Bidder qualifies as a "Michigan" business for purposes of application of reciprocity where applicable.
7. POST-BID SUBMITTAL: For all projects, the Professional may request a Post-Bid Submittal from the Apparent Low
Bidders. The Apparent Low Bidders must submit to the Professional, within two Business Days after receipt of the Professional’s request,
• Experience Modification Rating (EMR), or a letter stating why the Bidder does not have one.
• Identification of the proposed project superintendent with a resume or list of similar projects managed by that individual.
• A list of at least three (3) projects completed by the Bidder, within the last three (3) years of similar size and complexity, with contact information for references for each.
Failure to provide the submittals may disqualify the Bid.
8. SIGNATURES: All Bids, notifications, claims, and statements must be signed as follows:
(a) Corporations: Signature of official must be accompanied by a certified copy of the Resolution of the Board of Directors authorizing the individual signing to bind the corporation.
(b) Partnerships: Signature of one partner must be accompanied by a signed copy of the legal document (e.g. Power of Attorney or partnering agreement) authorizing the individual signing to bind all partners. If Bid is signed by all partners, no authorization is required.
(c) Individual: No authorization is needed. Each signature must be witnessed.
9. BID PRICES: The Bidder’s Base Bid and Alternate Bid prices must include, and payment for completed Work will compensate in full for: all services, obligations, responsibilities, management, supervision, labor, materials, devices, equipment, construction equipment, general conditions, permits, patent fees and royalties, testing, inspection and approval responsibilities, warranties, temporary facilities, small tools, supplies, Bonds, insurance, taxes, mobilization, close-out, overhead and profit and all connections, appurtenances and any other incidental items of any kind or nature, as are necessary to complete the Work, in a neat, first quality, workmanlike and satisfactory manner in accordance with the Drawings and Specifications and as otherwise required to fulfill the requirements of the Bidding Documents. For each Cash Allowance item, the Bidder must include, within the Bid, all labor costs, construction equipment costs, insurance and Bond premiums and other general conditions costs and Fees (Bidder’s and Subcontractors’) to complete Work associated with the material, equipment or other designated item to be furnished under the Cash Allowance. For each Provisionary Allowance, the Bidder must include, within the Bid, insurance, premiums (not recoverable as labor burden) and Bond premiums required to complete Work that may be ordered under a Provisionary Allowance.
10. INSPECTION OF BIDDING DOCUMENTS AND SITE CONDITIONS: The Bidder must carefully review and inspect all documents referenced and made part of this ITB, site conditions, all applicable statutes, regulations, ordinances and resolutions addressing or relating to the goods and services under this contract. Failure to do so or failure to acquire clarifications and answers to any discovered conflicts, ambiguities, errors or omissions in the Bidding Documents will be at the Bidder’s sole risk.
11. SAFETY REQUIREMENTS AND LAWS: The Bidder awarded the Contract must comply with all applicable federal, state and local Laws including health and safety regulations, environmental protection, permits and licensing.
12. INTERPRETATIONS AND ALTERATIONS TO THE BID AND BIDDING DOCUMENTS: All requests for clarification or interpretation of the Bidding Documents, all proposals for any modifications to the Bidding Documents, all requests for information and all other questions or inquiries about the Bidding Documents and/or the Work shall be submitted in writing to the Contact Person identified in the Bid Documents. Requests or inquiries received less than seven Calendar Days before the date of Bid opening will be answered only if (a) the response can be given through an Addendum made available at least seventy-two hours before Bid opening (counting Business Days only), (b) the Bid opening is postponed by Addendum, or (c) the Work is rebid without readvertising following the issuance of post-Bid Addenda.
Bidders must not rely upon any oral statements or conversations regarding interpretations, clarifications, corrections, additions, deletions or other revisions or information to the Bidding Documents. Any addition, limitation or provision made with or attached to the Bid may render it non-responsive and/or irregular and be a cause for rejection. The Owner reserves the right to issue a post-Bid Addendum after opening the Bids and set a new date for the receipt and opening of sealed Bids. The Bidder acknowledges that any quantities of Unit Price Work given in this ITB are approximate only and payments will be made only for actual quantities of Unit Price Work completed in accordance with the Contract Documents.
13. MODIFICATION OF BID: The entire bid must be resubmitted on the SIGMA VSS website.
Bidding and Contract Document (R 08/20) Baraga CF Housing Unit Security Level Conversion File No. 472/19480.JBB
00-5
14. BID WITHDRAWAL: Except for timely filed claims of mathematical or clerical errors granted by the State, no Bid may be withdrawn within sixty Calendar Days after the Bid Opening time and date or before the Bid expiration date without forfeiting Bid security. The request to withdraw a Bid due to error must be submitted in writing along with the supporting documents within two Business Days after the date of Bid Opening. The claim must describe in detail the error(s), include a signed affidavit stating the facts of the alleged error(s) and request that the Bidder be released from its Bid. The review of the claim and its supporting documents by the State is only for the purpose of evaluating the Bidder’s request and must not create duty or liability on the State to discover any other Bid error or mistake. The sole liability of any Bid error or mistake rests with Bidder.
15. OBJECTION TO THE AWARD: A Bidder may file a written protest with the Director-SFA to object to the Apparent Low Bidder. This objection must be filed within seven Calendar Days after the date of Bid opening and must describe in detail the basis for the protest and request a determination. The Director-SFA will either dismiss or uphold the protest and notify the protestor within ten Calendar Days after receipt of the written protest.
16. BID IRREGULARITIES: The following irregularities on any Bid Form or Bid Form Attachment must be resolved as follows:
(a) between SIGMA entry and signed Bid Summary attachment, the signed Bid Summary attachment will be used;
(b) between words and figures, the words must be used;
(c) between any sum, computed by the Bidder, and the correct sum, the sum computed by the Bidder must be used;
(d) between the product, computed by the Bidder, of any quantity and Bid Unit Price and the correct product of the Unit Price and the quantity of Unit Price Work, the product extended by the Bidder must be used;
(e) between a stipulated Allowance and the amount entered, the Allowance must be used;
(f) any mobilization pay item exceeding the maximum specified must be ignored and the Bid must remain unchanged;
(g) if any Bidder fails or neglects to bid a Unit Price for an item of Unit Price Work but shows an "Bid Price" for that item, the missing unit price must be computed from the respective quantity and the Item Bid Price shown;
(h) if any Bidder fails or neglects to show a "Bid Price" for an item of Unit Price Work but bids a unit price, the missing Bid Price must remain as “zero”; and
(i) if any Bidder fails or neglects to enter a Bid Price in both words and figures, the Bid Price printed or typed, whether in words or figures, must be used.
17. CERTIFICATION: The bidder certifies to the best of its knowledge and belief that, within the past three (3) years, the bidder, an officer of the bidder, or an owner of a 25% or greater interest in the bidder:
(a) Has not been convicted of a criminal offense incident to the application for or performance of a contract or subcontract with the State of Michigan or any of its agencies, authorities, boards, commissions, or departments.
(b) Has not had a felony conviction in any state (including the State of Michigan).
(c) Has not been convicted of a criminal offense which negatively reflects on the bidder’s business integrity, including but not limited to, embezzlement, theft, forgery, bribery, falsification or destruction of records, receiving stolen property, negligent misrepresentation, price-fixing, bid-rigging, or a violation of state or federal anti-trust statutes.
(d) Has not had a loss or suspension of a license or the right to do business or practice a profession, the loss or suspension of which indicates dishonesty, a lack of integrity, or a failure or refusal to perform in accordance with the ethical standards of the business or profession in question.
(e) Has not been terminated for cause by the Owner.
(f) Has not failed to pay any federal, state, or local taxes.
(g) Has not failed to comply with all requirements for foreign corporations.
(h) Has not been debarred from participation in the bid process pursuant to Section 264 of 1984 PA 431, as amended, MCL
18.1264, or debarred or suspended from consideration for award of contracts…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .