This is a Technical Specifications document for the FY 2027 Sidewalk, Curb & Gutter Project issued by the City of Palo Alto Public Works Engineering. The project encompasses removal and reconstruction of sidewalks, driveways, curbs, gutters, ADA curb ramp improvements, curb ramp retrofits, asphalt pavement, and adjustment of existing catch basins and utility boxes across multiple locations within Palo Alto's residential neighborhoods, specifically in City Sidewalk Districts 1, 6, 17, and 20, with additional repair locations throughout the city. The estimated quantities include approximately 20,514 square feet of sidewalk at 4-inch thickness, 1,953 square feet of driveway at 6-inch thickness, 1,543 linear feet of curb, 1,160 square feet of gutter, 2,205 square feet of asphalt concrete pavement, 36 curb ramps, 7 utility box adjustments, and 5 catch basin resets across 180 identified locations. The specifications require the contractor to submit detailed construction schedules, traffic control plans, and submittal packages within 14 days of contract award, with weekly project meetings and three-week look-ahead schedules required throughout construction.
The project specifications establish concrete mix requirements with maximum ordinary Portland cement content limits per the Low Carbon Concrete Code Compliance Pathway, with concrete strength specifications of 3,500 psi for curbs, gutters, sidewalks, and curb ramps, and 4,500 psi for driveways, all containing two pints of lamp black per cubic yard. Contractors must comply with comprehensive environmental and traffic control requirements, including notification of Underground Service Alert five working days prior to excavation, distribution of door-hanger notifications to residents and businesses 72 to 120 hours before work commencement, posting of "No Parking" signs 72 hours in advance, and adherence to traffic control standards per Caltrans specifications. The contract includes provisions for reclaimed water use, storm water pollution prevention, site maintenance and cleanup, and tree protection, with daily inspections to verify compliance. Quantity variations up to 125 percent of estimated bid quantities are included in the lump sum price without additional compensation; quantities exceeding 125 percent require mutual agreement on unit price adjustments through a Change Order Request prior to execution. The contract specifies that inert recycling solids must be transported to recognized recycling facilities with documentation submitted daily, and all work must be completed with minimal disruption to residents, including closure of all open sections before City holidays and Halloween.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2027_Sidewalk,_Curb_and_Gutter_Project.pdf | ||
| Special_Provisions.docx | DOCX document | |
| Special_Provisions_-_Attachment_C_-CDBG_Labor_Compliance_Bid_Forms.pdf | ||
| Special_Provisions_-_Attachment_B_-_HUD-4010_.pdf | ||
| Construction_Contract,_General_Conditions,_and_Change_Orders.pdf | ||
| Bid_Bond_Form.docx | DOCX document | |
| Payment_Bond.docx | DOCX document | |
| Performance_Bond.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FY 2027 SIDEWALK, CURB & GUTTER PROJECT
TECHNICAL SPECIFICATIONS
Docusign Envelope ID: 9B1AA9BA-7839-8524-8399-C16A2BF7BB39
9/29/2026
10/1/202610/6/2026
TABLE OF CONTENTS
FY 2027 Sidewalk, Curb & Gutter Project
GENERAL REQUIREMENTS AND TECHNICAL SPECIFICATIONS
Division 1 GENERAL REQUIREMENTS
Section 01010 Summary of Work Section 01200 Project Meetings Section 01402 Survey Work Section 01410 Testing Section 01450 Quality Control Section 01500 Temporary Utilities/Facilities Section 01540 Security Section 01570 Notifications and Traffic Control Section 01710 Site Maintenance and Cleanup Section 01900 Estimated Quantities
Division 2 SITE WORK
Section 02050 Demolition Section 02090 Inert Recycling Solids Section 02100 Tree Trimming Section 02110 Storm Water Pollution Prevention Section 02515 Concrete
Appendices
A Sidewalk Location Maps B Project Drawings C Federal Wage Determinations D Build America, Buy America Requirements
SUMMARY OF WORK SECTION 01010
FY 2027 Sidewalk, Curb & Gutter Project 01010 - 1
SECTION 01010
SUMMARY OF WORK
PART 1 – GENERAL
1.01 DESCRIPTION
A. The work to be performed under this Contract shall consist of furnishing all tools, equipment, materials, supplies, and manufactured articles and for furnishing all transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents.
B. The work shall be complete, and all work, materials, and services not expressly shown or called for in the Contract which may be necessary for the complete and proper construction of the Work in good faith shall be performed, furnished and installed by the Contractor, at no increase in cost to the City. The Contractor shall also be responsible for construction coordination with other construction activities within the City.
1.02 WORK COVERED BY CONTRACT
A. The work of this Contract comprises the FY 2027 Sidewalk, Curb & Gutter Project, CIP Nos.
PO-89003 & PO-12001, located in the City of Palo Alto, California for the City of Palo Alto Public Works Engineering. The work can be described in general terms as follows:
1. Work under this contract includes, but is not limited to, removal and reconstruction of sidewalks, driveways, curbs, gutters, ADA curb ramp improvements, curb ramp retrofits, asphalt pavement, and adjusting existing catch basins and utility boxes.
2. Also included in this Project is the hand distribution of the furnished notifications to all residents and businesses affected by the work; posting “No Parking” signs; and furnishing of lighted barricades, cones, flashers, signs, flag persons as necessary for the protection of the public and the work in accordance with the City's Traffic Control Manual, the Project Specifications, and the Contractor's Traffic Control Plans as approved by the Engineer.
END OF SECTION
PROJECT MEETINGS SECTION 01200
FY 2027 Sidewalk, Curb & Gutter Project 01200-1
SECTION 01200
PROJECT MEETINGS
A. Work Included:
1. Pre-Construction Conference
2. Weekly Project Meetings
B. Related Work:
1. The Contractor's relations with his subcontractors and materials suppliers and discussions relative thereto, are the Contractor's responsibility as described in the General Conditions and are not part of project meetings content.
1.02 QUALITY ASSURANCE
A. Persons designated by the Contractor to attend and participate in project meetings shall have all required authority to commit the Contractor to solutions as agreed upon in the project meetings.
1.03 SUBMITTALS
A. To the maximum extent possible, advise the Engineer at least 24-hours in advance of the project meeting regarding all items to be added to the agenda.
PART 2 – PRODUCTS (Not Required)
PART 3 – EXECUTION
3.01 MEETING SCHEDULE
A. A Pre-construction conference will be held prior to the start of construction to discuss the scope of work and sequence of operations. The Contractor, together with the person to be designated as the Contractor's superintendent for the Work, shall be present at this meeting. In addition, the Contractor may request the attendance of other project supervisory personnel.
B. At this Pre-construction meeting, the Contractor shall present:
1. A detailed construction schedule indicating the posting and distribution of all notifications, completion dates of the various stages of the work, and dates of construction. The preferred submittal shall be per Microsoft Project.
2. Traffic control plans for any site-specific work. Typical plans will not be accepted.
PROJECT MEETINGS SECTION 01200
FY 2027 Sidewalk, Curb & Gutter Project 01200-2
3. The Contractor will not be allowed to proceed with construction until the above items are submitted in an acceptable form to the Engineer.
C. Weekly Project Meetings:
1. The Engineer will conduct weekly project meetings throughout the construction period.
The purpose of the weekly project meetings is to review progress and resolve problems that might arise between the City and the Contractor relative to execution of the Work.
2. The Contractor shall provide an updated three-week schedule at each weekly project meeting.
3. Work shall be stopped at the cost of the Contractor if a 3-week look ahead schedule is not provided to the City.
3.02 MEETING MINUTES
A. The Contractor shall compile minutes of each project meeting and will distribute copies to the City.
PART 4 – MEASUREMENT AND PAYMENT
4.01 PROJECT MEETINGS
A. MEASUREMENT AND PAYMENT
Payment for work required in this section shall be included in the prices paid for the various items of work involved.
SUBMITTALS SECTION 01340
FY 2027 Sidewalk, Curb & Gutter Project 01340-1
SECTION 01340
SUBMITTALS
A. Work included: Make submittals required by the Contract, and revise and resubmit as necessary to reestablish compliance with the specified requirements.
1. Documents affecting work of this Section include, but are not limited to General Conditions, Supplementary Conditions, and Sections in Division 1 of these Specifications.
2. Individual requirements for submittals are also described in pertinent Sections of these Specifications.
C. Work not included: Submittals not specifically required by the Project Specifications of the Engineer will not be reviewed by the Engineer.
A. Coordination of Submittals:
1. Prior to each submittal, carefully review and coordinate all aspects of each item being submitted.
2. Verify that each item and the submittal conform in all respects with the specified requirements.
3. By affixing the Contractor’s signature to each submittal, certify that this coordination has been performed.
B. “Or equal”
1. All “or equal”, or “equal as approved by the Engineer”, must be approved as equal prior to the use of materials, equipment or method by the Engineer. “Or equal” items will be considered only when substantiated by the Contractor’s submittal of required data within fifteen (15) calendar days after award of the Contract.
2. The decision of the Engineer shall be final.
1.03 SUBMITTAL
FY 2027 Sidewalk, Curb & Gutter Project 01340-2
A. Make submittal of samples, and other items in accordance with the provisions of this Section.
B. Within fourteen (14) days of the award of contract, the Contractor shall provide the
Engineer a completed Submittal package.
1. A detailed construction schedule indicating the dates of posting and distribution of all notifications, completion dates of the various stages of the work, and dates of closures/detours.
2. The proposed traffic control plans.
3. The detailed construction schedule showing the distinct phases as described in Section 01200.
PART 2 – PRODUCTS
2.01 MANUFACTURERS’ LITERATURE
A. Where contents of submitted literature from manufacturers include data not pertinent to the submittal, clearly show which portions of the content are being submitted for review.
B. Submit the number of copies which are required to be returned, plus two (2) copies which will be retained by the Engineer.
2.02 SAMPLES
A. Provide Sample or Samples identical to the precise article proposed to be provided.
Identify as described under “Identification of Submittals” below.
B. Number of Samples required:
1. Unless otherwise specified, submit Samples in the quantity, which is required to be returned, plus two which will be retained by the Engineer.
2. By pre-arrangement in specific cases, a single Sample may be submitted for review and, when approved, be installed in the Work at a location agreed upon by the Engineer.
3.01 IDENTIFICATION OF SUBMITTALS
A. Consecutively number all submittals utilizing the submittal document provided by the City only upon Contractor’s request.
FY 2027 Sidewalk, Curb & Gutter Project 01340-3
1. When material is being resubmitted for any reason, transmit under a new letter of transmittal and with a new transmittal number.
2. On re-submittals, cite the original submittal number for reference.
B. Accompany each submittal with a letter of transmittal showing all information required for identification and checking.
C. On at least the first page of each submittal, and elsewhere as required for positive identification, show the submittal number in which the item was included.
D. Maintain an accurate submittal log for the duration of the Work, showing current status of all submittals at all times. Make the submittal log available to the Engineer for his review upon request.
3.02 GROUPING SUBMITTALS
A. Unless otherwise specified, make submittals in groups containing all associated items to assure that information is available for checking items when it is received.
1. Partial submittals may be rejected as not complying with the provisions of the
Contract.
2. The Contractor may be held liable for delays so occasioned.
3.03 TIMING OF SUBMITTALS
A. Unless specifically stated elsewhere in these Specifications make submittals in advance of ordering the materials to provide time required for reviews, for securing necessary approvals, for possible revisions and re-submittals, and for placing orders and securing delivery.
B. In scheduling, allow at least twenty-one (21) calendar days for review by the Engineer following his receipt of the submittal.
3.04 ENGINEER’S REVIEW
A. Review by the Engineer does not relieve the Contractor from responsibility for errors which may exist in the submitted data.
B. Revision:
1. Make revisions required by the Engineer.
2. Make only those revisions directed or approved by the Engineer.
FY 2027 Sidewalk, Curb & Gutter Project 01340-4
A. DESCRIPTION
Work for this bid item shall include all the work necessary to compile all documentation and data required to complete a completed submittal package, including all submittals from the various Project Specification sections.
B. MEASUREMENT AND PAYMENT
The cost of this item shall be included in the prices paid for the various items of work related. Payment shall include full compensation for furnishing all labor, materials, tools, and equipment necessary to complete this item.
SURVEY WORK SECTION 01042
FY 2027 Sidewalk, Curb & Gutter Project 01402-1
SECTION 01402
SURVEY WORK
1.01 DESCRPTION
A. Work to be performed by the Contractor shall include establishing line and grade for all improvements (curb and gutter, sidewalk, valley gutter, driveway, median island curbs, and handicap ramps).
PART 2 – PRODUCTS (Not Required)
3.01 SURVEY WORK
A. Contractor shall set all stakes at 25-feet per station maximum.
B. Contractor shall provide grades at every corner return for all concrete work.
C. Contractor shall verify that all gutters will be constructed with a slope that will allow proper drainage.
D. Contractor shall verify benchmark and existing utility elevations, establish elevations, control lines and grades for all construction, street restoration, paving work, and aggregate base conform and shoulder work, as necessary.
E. The Contractor shall verify benchmark, establish elevations, control lines and grades for grinding/excavation work, paving, sidewalk, driveway, curb and gutter, and conform work.
F. Any additional new staking or re-staking, as deemed necessary by the City to perform Contract work, will be performed at the expense of the Contractor, including cost of providing new stakes.
G. The Contractor is responsible to verify grades of all new concrete work and to provide adequate flow in the flowline, regardless of the City providing new elevations or not. If the Contractor determines that the section of concrete being replaced is insufficient to correct drainage issues, they must bring it to the inspector’s attention immediately.
H. The Contractor shall replace curb and gutters that are in alignment with the roadway (are straight) and shall not be replaced out of alignment. The Contractor shall pull a string line at a minimum to ensure the new alignment matches the existing concrete to remain.
4.01 SURVEY WORK
Work for this bid item shall include all the work necessary to complete the work as
SURVEY WORK SECTION 01042
FY 2027 Sidewalk, Curb & Gutter Project 01402-2 specified in this Project.
The cost for needed survey work shall be included in the individual cost of the bid items for which the survey is completed. No additional payment will be made for survey work.
TESTING LABORATORY SERVICES SECTION 01410
FY 2027 Sidewalk, Curb & Gutter Project 01410-1
SECTION 01410
TESTING LABORATORY SERVICES
A. Work Included:
1. Cooperate with the City's selected testing agency and all others responsible for testing and inspecting the Work.
2. Provide "Certificates of Compliance" when required and such other testing and inspecting as are specified to be furnished by the Contractor in this Section and/or elsewhere in the Contract.
1. Documents affecting Work of this Section include, but are not necessarily limited to, General Conditions, Special Provisions, and Sections in Division 1 of these Specifications.
2. Requirements for testing are described in various Sections of these Specifications.
3. Where no testing requirements are described, but the City decides that testing is required, the City may require such testing to be performed under current pertinent standards for testing. Payment for such testing will be made as described in this Section.
C. Work Not Included:
1. Selection of testing laboratory: The City will select a pre-qualified independent testing laboratory.
2. Payment for initial testing: The City will pay for initial services of the testing laboratory as further described in Part 4 of this Section.
A. The testing laboratory will be approved by the City.
B. Testing, when required, will be in accordance with the selected standards of either the American Society for Testing and Materials or the State of California, Department of Transportation, Transportation Laboratory Testing Manual when specified (latest edition).
1.03 PRODUCT HANDLING
FY 2027 Sidewalk, Curb & Gutter Project 01410-2
A. Contractor shall promptly process and distribute required copies of test reports and related instructions for the "Certificate of Compliance" to allow necessary retesting and/or replacement of materials with the least possible delay in progress of the Work.
PART 2 – PRODUCTS (not required)
3.01 COOPERATION WITH TESTING LABORATORY
A. Representatives of the testing laboratory shall have access to the work at all times and all locations where the Work is in progress. Contractor shall provide such access to enable the laboratory to perform its functions properly.
3.02 TAKING SPECIMENS
A. All specimens and samples for testing, unless otherwise provided in the Contract, shall be taken by the testing personnel. All sampling equipment and Personnel will be provided by the testing laboratory. All deliveries of specimens and samples to the testing laboratory will be performed by the testing laboratory.
3.03 SCHEDULES FOR TESTING
A. Establishing Schedule:
1. By advance discussion with the testing laboratory selected by the City, determine the time required for the laboratory to perform its tests and to issue each of its findings.
2. Provide no less than 48-hours’ notice to the Engineer that testing will be required and provide all required time within the construction schedule to perform necessary testing.
B. Revising schedule: When changes of construction schedule are necessary during construction, coordinate all such changes with the testing laboratory as required.
C. Adherence to schedule: When the testing laboratory is ready to test, but is prevented from testing or taking specimens due to incompleteness of the Work, all extra charges for test is attributable to the delay may be back-charged to the Contractor and shall not be borne by the City.
4.01 INITIAL TESTING SERVICE
Except where testing needs to be performed by the Contractor (for example, for a "Certificate of Compliance"), the City will pay for initial testing services request by the City.
FY 2027 Sidewalk, Curb & Gutter Project 01410-3
4.02 RETESTING
When initial tests indicate non-compliance with the Contract, subsequent retesting required by the non-compliance shall be performed by the same testing agency, and costs thereof will be deducted by the City from the Total Contract Amount.
4.03 CONTRACTOR'S CONVENIENCE TESTING
Inspecting and testing performed exclusively for the Contractor's convenience shall be the sole responsibility of the Contractor.
QUALITY CONTROL SECTION 01450
FY 2027 Sidewalk, Curb & Gutter Project 01450-1
SECTION 01450
QUALITY CONTROL
A. Drawings and requirements of the Contract, including General Conditions, Special Provisions and other Division 1 Project Manual Sections, apply to this Section.
B. These requirements are in addition to Article 3.6, “Construction Methods and Procedures”, of the City of Palo Alto General Conditions.
1.02 SECTION INCLUDES
A. Administrative and procedural requirements for quality control services.
B. Quality control services include inspections and tests and related actions including reports performed by independent agencies, governing authorities, and the Contractor.
They do not include Contract enforcement activities performed by the Owner’s Representative.
C. Inspection and testing services are required to verify compliance with requirements specified or indicated. These services do not relieve the Contractor of responsibility for compliance with Contract Document requirements.
1. Specific quality control requirements for individual construction activities are specified in the Sections that specify those activities. Those requirements, including inspections and tests, cover production of standard products as well as customized fabrication and installation procedures.
2. Inspection, test and related actions specified are not intended to limit the Contractor’s quality control procedures that facilitate compliance with Contract Document requirements.
3. Requirements for the Contractor to provide quality control services required by the Owner’s Representative or authorities having jurisdiction are not limited by provisions of this section.
1.03 RESPONSIBILITIES
A. Associated Services: The Contractor shall cooperate with agencies performing required inspections, tests and similar services and provide reasonable auxiliary services as requested. Notify the agency sufficiently in advance of operations to permit assignment of personnel.
B. Coordination: The Contractor and each agency engaged to perform inspections, tests and similar services shall coordinate the sequence of activities to accommodate required services with a minimum of delay.
1. In addition, the Contractor and each agency shall coordinate activities to avoid
FY 2027 Sidewalk, Curb & Gutter Project 01450-2 the necessity of removing and replacing construction to accommodate inspections and tests.
2. The Contractor is responsible for scheduling times for inspections, tests, taking samples and similar activities.
1.04 QUALITY CONTROL OF INSTALLATION
A. Monitor quality control over suppliers, manufacturers, Products, services, site conditions, and workmanship, to produce Work of specified quality.
B. Comply fully with manufacturers' Instructions, including each step in sequence.
C. Should manufacturers' instructions conflict with Contract Documents, Contractor shall request clarification from Owner’s Representative before proceeding.
D. Comply with specified standards as a minimum quality for the Work except when more stringent tolerances, codes, or specified requirements indicate higher standards or more precise workmanship.
E. Perform work by persons qualified to produce workmanship of specified quality.
F. Secure Products in place with positive anchorage devices designed and sized to withstand stresses, vibration, physical distortion or disfigurement.
1.05 INSPECTIONS
A. General: All construction work shall be subject to inspection by the Owner’s Representative and the Engineer and all such construction or work shall remain accessible and exposed for inspection purposes until approved by the Engineer.
1. The Owner will provide project personnel, including inspectors, to be available at the project site on an as-needed basis.
2. Approval as a result of an inspection shall not be construed to be an approval of a violation of the provisions of the building code or of other ordinances of the jurisdiction, including plans and specifications. Inspections presuming to give authority to violate or cancel the provision of code, or of plans and specifications shall not be valid.
3. It shall be the duty of the Contractor to cause the work to remain accessible and exposed for inspection purposes. Neither the Inspector nor the Engineer shall be liable for expense entailed in the removal or replacement of any material required to allow inspection.
B. Inspection Requests: It shall be the duty of the Contractor doing the work to notify the Inspector that such work is ready for inspection. The Owner requires that such work is ready for inspection.
1. The Owner requires that every request for inspection be filed at least two working days (48 hours) before such inspection is desired and/or in accordance with permitting requirements. Such requests shall be in writing.
FY 2027 Sidewalk, Curb & Gutter Project 01450-3
2. Following each site inspection, Inspector shall provide to Contractor, for his permanent record, a signed/approved/dated copy of the “Request for Inspection.”
C. Approval Required: Work shall not be done beyond the point indicated in each successive inspection without first obtaining the approval of the Inspector.
1. The Inspector, upon notification, shall make the requested inspections and shall either indicate in writing (within 24 hours) that portion of the construction is satisfactory as completed, or shall notify the Contractor that same fails to comply with plans and specifications.
2. Any portion of the Work that does not comply shall be corrected by the Contractor, and such portion shall not be covered or concealed until authorized by the Inspector.
3. There shall be final inspection and approval of all buildings and structures when completed and ready for occupancy and use.
D. Inspection Coordination: Contractor shall provide, on a weekly basis, an anticipated Inspection Requirements Schedule, showing anticipated inspection needs for the following three weeks to facilitate appropriate Owner coordination and interface as well as mobilization of required inspection staffing.
PART 2 – PRODUCTS (not used)
3.01 INSPECTIONS
A. General: Upon completion of inspection, testing, sample-taking and similar services, repair damaged construction and restore substrates and finishes to eliminate deficiencies, including deficiencies in visual qualities of exposed finishes. Protect construction exposed by, or for quality control service activities; also, protect repaired construction.
B. Repair and protection are the Contractor’s responsibility, regardless of the assignment of responsibility for inspection, testing or similar services.
A. Payment for work required in this section shall be included in the prices paid for the various items of work involved.
TEMPORARY UTILITIES / FACILITIES SECTION 01500
FY 2027 Sidewalk, Curb & Gutter Project 01500-1
SECTION 01500
TEMPORARY UTILTIES / FACILITIES
1.01 REQUIREMENTS INCLUDED:
A. This section describes temporary construction facilities including:
1. Water and sanitation facilities
2. Shutdown of existing utilities
3. Removal at completion
4. Equipment parking area and material storage
1.02 WATER AND SANITATION FACILITIES
A. The Contractor shall provide and maintain adequate drinking water facilities during the life of the Contract as may be required by the work force employed.
B. The Contractor must use reclaimed water for construction use whenever possible. When reclaimed water is utilized, the Contractor shall place a sign on the truck stating that "Non potable reclaimed water is being used" and the water shall not be used as drinking water.
The Contractor shall apply for a permit to purchase reclaimed water at the Water Quality Control Plant, 2501 Embarcadero Way in Palo Alto or call (650) 329-2598 for an application.
The use of reclaimed water shall be in accordance to the California Health Department.
Potable water shall not be used to clean streets, sidewalks, walkways, driveways, patios, parking lots, fill pavement rollers, fill asphalt concrete grinders and other hard surfaced areas or building structures. The Contractor may NOT use potable water from City hydrants.
Proof of permit for use of reclaimed water shall be submitted as part of the Submittal process, prior to the start of any work. Discovery of potable water use regardless of source will result in a complete shutdown of the Construction work until a permit and temporary non-potable water source are provided, without any additional cost to the Contract.
The City will test all water being used on this project. The conductivity test will determine if the water in use is actually from reclaimed sources or not. Discovery of potable water use on the construction Contract will result in termination of work till such time the Contract is in Compliance.
FY 2027 Sidewalk, Curb & Gutter Project 01500-2
C. Contractor shall primarily use street sweepers for dust alleviation and control instead of water, unless directed otherwise by the Engineer. All sweepers must use reclaimed or be filled from non-potable sources from within the City.
D. The Contractor shall provide and maintain at its sole cost and expense adequate portable facilities for sanitation. Contractor shall comply with all local rules and regulations governing sanitation for workers and any directives of the Engineer in this regard.
1.03 SHUTDOWN OF EXISTING UTILITIES
A. The Contractor shall not shut down or disconnect any part of the existing utility system without expressed permission of the Engineer. Contractor shall give such notice of approved utility shutdowns as may be required by the Engineer.
1.04 REMOVAL AT COMPLETION
A. Upon completion of the Work, or prior thereto when so directed by the Engineer, Contractor shall remove all temporary facilities, structures, and installations from the site and return all areas used or occupied to their original state to the satisfaction of the Engineer.
1.05 EQUIPMENT PARKING AREA AND MATERIAL STORAGE
A. Contractor is not authorized to park equipment overnight or stockpile on the street. The contractor may park equipment and stockpile at locations approved by the Engineer.
B. Upon the approval of the Engineer the Contractor may store equipment at the approved location and shall comply with the following requirement:
1. Equipment, pipe, structures and granular materials shall be placed within one (1) block of the location where it is to be used but no less than three (3) blocks or 1000-feet from an adjacent non-related project.
2. Equipment, pipe, structures and granular materials shall not block access to or visibility of any fire hydrants, driveways, traffic signs, utilities, intersections, sidewalks, pavement markings, bike lanes, crosswalks or drainage paths.
3. No equipment, pipe, structures or granular materials shall extend more than eight
(8) feet into the street from the face of curb and in no case shall extend more than one third of the roadway. A minimum lane width of 24-feet shall be maintained for traffic purposes.
4. Two (2) type II barricades with working flashers shall be placed at each end of the storage area. Type II barricades with working flashers shall be placed at 25-foot intervals along the street side of the storage area.
FY 2027 Sidewalk, Curb & Gutter Project 01500-3
5. The Contractor shall hand deliver advance notice door hangers to businesses, residents or others at the locations where equipment, pipe, structures and granular materials will be stored at least seven (7) days in advanced of the storage date. The City shall provide the notices.
6. Granular materials shall not be allowed to enter the storm drain or sanitary sewer systems. A tarpaulin covering the granular material and sandbag berms placed around the granular material shall be used as required by the Engineer during the rainy periods.
7. The job site shall be swept clean at the end of each working day. An Athey Mobile
Street Sweeper Model AHL M9, or approved equal, shall be used.
PART 2 – MEASUREMENT AND PAYMENT
2.01 TEMPORARY UTILITIES/FACILITIES
No separate payment will be made for this item. Full compensation for furnishing all labor, materials, tolls, equipment and incidentals, and for doing all work involved in completing this item as shown on the Plans and in the Specifications shall be included in the prices paid for the various related items of work involved.
SECURITY SECTION 01540
FY 2027 Sidewalk, Curb & Gutter Project 01540 - 1
SECTION 01540
SECURITY
1.01 SECTION INCLUDES:
A. Public safety and convenience
B. Protection of properties
C. Protection of utilities
D. Correct punch lists
2.01 MATERIALS
A. Barricades: Type II conforming to Section 5-05.6 of Caltrans Traffic Control Manual. Each barricade shall be equipped with a Type A low intensity flashing warning light conforming to Section 5-05.8 of the Caltrans Traffic Control Manual. Broken barricades shall not be used.
B. Tape: 3-inches wide, yellow vinyl barrier tape with black lettering stating “Caution”.
C. Signs: Portable signs and bases conforming to Section 12-3.06 of the Caltrans Standard
Specifications and Section 5-05.2 of the Caltrans Traffic Control Manual.
3.01 PUBLIC SAFETY AND CONVENIENCE
A. The Contractor shall fully secure and surround with tape and barricades all locations under construction including, but not limited to, those locations where concrete has been removed or freshly placed. Barricading shall remain in place until restoration is complete and hazards to pedestrians, bicyclists, and motorists no longer exist.
B. The Contractor shall ensure pedestrian and vehicular access to both public and private property adjacent to the work area to the maximum extent practicable. Prior to work that will restrict access to a driveway or walkway, the Contractor shall take reasonable steps to ascertain those residents or businesses are aware of notification. When necessary to restrict access to a driveway or walkway, the Contractor shall limit the duration of such restriction to the minimum necessary to complete the specific stage of work.
C. The Contractor shall ramp with aggregate base material or other method approved by the
Engineer on all driveways that have been removed and not reconstructed at the end of the
FY 2027 Sidewalk, Curb & Gutter Project 01540 - 2 working day. With specific approval of the Engineer, the Contractor may omit such ramps if the affected resident agrees that vehicular access to the driveway is not needed.
D. The Contractor shall fully cooperate with all directives of the Engineer regarding accommodations provided to qualified individuals under the Americans with Disabilities Act
(ADA).
3.02 PROTECTION OF PROPERTIES
A. The Contractor shall be responsible for the protection of all existing improvements on both public and private property within and adjacent to the work area and shall take all precautions necessary to prevent damage to such improvements. The Contractor shall repair or replace, at no cost to the City, all existing improvements, other than those scheduled and marked for removal, which are damaged or removed as a result of its operations. Improvements shall include, but not be limited to, the following: irrigation systems, brick, pavers, landscaping, fences, City trees, windows, and roof drains.
B. The Contractor shall immediately remove any splashed concrete slurry (if any) on fences, walls, parked vehicles, and other improvements.
C. All encroaching or adjacent vegetation that will interfere with any step of the work shall be trimmed or pruned by the Contractor in a near workmanlike manner prior to proceeding with that step. Any plant removed, damaged, or destroyed accidentally or intentionally, other than the minimum required to excavate for forms shall be replaced at the Contractor’s sole expense.
D. The Contractor will be assessed charges for any damage to City trees including, but not limited to, broken limbs and damaged trunks and barks. The City will deduct the charges from the Contractor’s progress payments.
3.03 PROTECTION OF UTILITIES
A. The Contractor shall be responsible for the protection of all existing utilities on both public and private property within and adjacent to the work area and shall take all precautions necessary to prevent damage to such utilities.
Utilities shall include, but not be limited to, the following: water, gas, sanitary sewer, electrical power, street lighting, traffic signals, signal detector loops, telephone, cable television, and storm sewer.
B. The Contractor shall ascertain the existence of such utilities on both public and private property as indicated by an above ground and/or ground level utility facility (such as water
FY 2027 Sidewalk, Curb & Gutter Project 01540 - 3 and gas meter boxes, sanitary sewer cleanout, traffic signal or street lighting boxes, etc.)
and/or USA field markings.
C. The Contractor shall proceed with caution during all operations to avoid damage to existing utilities. Locator devices, careful probing, potholing, and/or hand methods of excavation shall be employed whenever the exact horizontal or vertical alignment of a utility is unknown.
D. The Contractor shall immediately notify the Engineer if any utility is disturbed or damaged.
E. The Contractor shall immediately notify the Engineer if any utilities damaged by its operations but shall not perform repair on damaged City utilities.
F. The City will perform repairs to City utilities damaged by the Contractor operations and assess charges for the repairs performed. The cost of repairs performed by the City will not be deducted from the Contract progress payments but shall be paid by the Contractor to the City.
3.04 CORRECT PUNCH LISTS
A. The Contractor shall correct all punch list items within fourteen (14) calendar days of Contractor's receipt of the punch list from the Engineer. The Contractor shall notify in writing to the Engineer following completion of the punch list.
B. Uncorrected punch list items from the previous punch lists will be carried over to the next punch list. All punch list items shall be corrected before “Notice of Completion” will be filed with the Santa Clara County.
4.01 SECURITY
materials, tools, equipment and incidentals, and for doing all work involved in completing this item as shown on the plans and in the Specifications shall be included in the prices paid
NOTIFICATIONS AND TRAFFIC CONTROL SECTION 01570
FY 2027 Sidewalk, Curb & Gutter Project 01570 - 1
SECTION 01570
NOTIFICATIONS AND TRAFFIC CONTROL
1.01 WORK INCLUDED:
A. Traffic Control Plans
B. Notify Underground Service Alert (USA)
C. Door Hanger Notifications
D. “No Parking” Signs
E. Traffic Control Devices
F. Removal of USA Markings
1.02 SUBMITTALS
A. Traffic Control Plan
1. A licensed or certified C-31 traffic control agency shall prepare site-specific traffic control plans for each type of traffic control required in accordance with these project specifications and submit these plans for review by the City.
2. The Contractor shall submit all traffic control plans within five (5) days of issuance of the Notice to Proceed for review by the City Transportation Engineer. The City will review the traffic control plans within 21 calendar days of the submittal unless re-submittal is required. The Engineer will approve Traffic Control plans once the City Transportation Engineer has reviewed and accepted them, including resubmittals.
3. The Contractor is required to submit site-specific traffic control plans for each type of traffic control required for all locations. This plan shall be designed to maintain traffic circulation to abutting streets within the limits of the project.
The plans should show the following:
a. Signage and work area typical safety design for non-street closure situations.
b. Signage and detour design for partial/full closure situations.
c. Proposed detour routing, if applicable.
FY 2027 Sidewalk, Curb & Gutter Project 01570 - 2
4. These site-specific traffic plans are required to detail all construction situations planned on a given project location. If adjustment to these plans is required by the Project Inspector or Engineer due to safety concerns, it shall be considered as conforming to the requirements of this Contract and is included in the lump sum price of this bid item.
2.01 CONES, DELINEATORS, AND BARRICADES
A. Cones, delineators, and barricades used to direct traffic flow shall conform to Caltrans Standard Specifications, Sections 12-3.02, 3.04, and 12-3.10. They are to be in good condition and sufficiently clean to be easily visible to traffic.
B. Type II barricades with working flashers shall be used in locations of grade changes, open pits, and at non-controlled traffic intersections. Type II non-flashing barricades shall be used for posting of “No Parking” signs.
C. At least one working flashing light must be installed on each barricade. Flashing lights must be maintained in good working order throughout the duration of the work.
D. Cones shall be 28-inches in height conforming to Section 12-3.10 of the Caltrans Standard
2.02 TRAFFIC CONTROL SIGNS
A. Signs used for traffic control shall conform to the requirements of the Caltrans Traffic Manual.
B. Signs that are attached to existing poles shall not cause any damage to the poles when they are attached or removed.
C. All hardware used when attaching signs to existing poles shall be completely removed from the poles when the signs are removed.
D. If a construction sign is required in an area where it cannot be attached to an existing pole, it shall be attached to a pole that is connected to a moveable concrete block. The distance from the ground surface to the bottom of the sign shall be 7-feet.
E. For construction sign identification, refer to the most recent edition of the “Work Area
Traffic Control Handbook” published by the APWA.
F. For regulatory sign identification, refer to the most recent edition of the “Uniform Sign
Chart”, published by Caltrans.
2.03 FLASHING ARROW BOARDS
FY 2027 Sidewalk, Curb & Gutter Project 01570 - 3
A. Flashing arrow boards shall be Type A or Type II as described in Section 5-06.9 of the
Caltrans Traffic Control Manual.
B. Portable signs and bases shall conform to Section 12-3.06 of the Caltrans Standard Specifications and Section 5-05.2 of the Caltrans Traffic Control Manual.
C. Flashing arrow boards must be included in traffic control plans for all lane closure work.
3.01 NOTIFY UNDERGROUND SERVICE ALERT (USA)
A. The Engineer will mark the limits of work with white paint arrows in conformance with the requirements of USA in advance of the work.
B. The Contractor shall notify USA North at (800) 227-2600 five (5) workings days prior to sawcutting, root pruning, demolition, or excavation. Notification shall include specific address of the work. Each notification is active for 28-calendar days from the date it is called
in. The Contractor shall be responsible to contact USA to extend the ticket, if work continues beyond the 28-calendar day period.
3.02 NOTIFICATIONS
A. The Contractor shall deliver the City furnished notifications of construction to each residence and business on streets within or adjacent to the work area not less than 72-hours and not more than 120-hours in advance of the start of work. Thus, for example, if the start of work is on a Monday the notification shall be delivered the preceding Thursday. The Contractor shall notify the City Inspector on what locations he is going to distribute the notification.
B. The Contractor shall fill in the appropriate blanks on the notification, including the notification date (maximum 7-calendar days) and time, and the preparer's initials using an ink pen. Dates and times shall be in neat and clear block lettering.
C. If work is not completed as indicated on the notifications the Contractor shall redistribute new notifications with updated information to affected residences and businesses.
D. In downtown area, the Contractor shall notify the business owner or manager of the businesses within or adjacent to the work area regarding the type and schedule of construction, and the method of accessibility in the building and to the parking lot.
3.03 “NO PARKING” SIGNS
FY 2027 Sidewalk, Curb & Gutter Project 01570 - 4
A. Dated "No Parking - Tow Away" signs shall be posted a minimum of 72-hours in advance of all work which requires that cars not be parked in the construction area. The Contractor shall notify the CPA Police Department and the Project Engineer of this posting at the time of posting. The date and time of work shall be written on these signs in 1-inch high black letters with a ¼-inch felt marker. These signs shall be placed on either the barricades per these Specifications or tied to street trees located near the curb and gutter, no higher than 3-feet from sidewalk. Nails or staples may not be used to attach the signs to the trees. All signs must be removed immediately after the specific Work has been completed and is ready for release to the public. Any cars which remain parked on the street in violation of the posted "No Parking Tow Away" sign shall be towed away under direction of the Palo Alto Police Department. The Contractor shall be responsible for notifying the Police Department at the Communications Dispatch Center at (650) 329-2413 of all vehicles that are to be towed away. The owner of the towed vehicle may contact the Police Department at (650) 329-2406. If the "No Parking Tow Away" signs have not been posted for the required 72-hours and the car is towed, the Contractor shall be liable for all cost(s) associated with the towing.
B. The Contractor shall post “No Parking” signs on barricades placed at intervals of no greater than 50-feet. Barricades shall be placed in the street or in the planter as close to the street as possible.
3.04 PROVIDE TRAFFIC CONTROL DEVICES
A. The Contractor shall provide and follow the approved traffic control plans. The Contractor shall supply, place, and maintain all necessary traffic control devices during construction needed in accordance with the applicable requirements of the City of Palo Alto Traffic Control Manual and the Caltrans Traffic Control Manual. The Contractor shall remove all traffic control devices when they are no longer needed.
B. The Contractor shall provide and post signs at the corners of each block under construction, which state: "Sidewalk Closed. Pedestrian Use Other Side of Street", or other clear indication of the alternate route. Where applicable, the Contractor shall provide and post signs stating alternate routes of access at all locations where access is blocked.
C. Where work requires restricting any portion of a bike lane, the Contractor shall post the
“Road Work Ahead” and “Share the Road” signs.
D. Flashing arrow signs shall be used for lane closures on multilane streets. The lane closure shall be coned off, and a flashing arrow sign and cone taper shall be used to shift traffic into an adjacent lane.
E. The Contractor shall not close any lane between 8:00 a.m. and 9:00 a.m., and between 4:00 p.m. and 6:00 p.m.
F. The Contractor shall obtain a special parking permit and shall be responsible for all fees for parking of construction and worker vehicles during the work hours on any off-street or on-
FY 2027 Sidewalk, Curb & Gutter Project 01570 - 5 street “time limited” parking spaces especially in downtown University Avenue and California Avenue. The Contractor shall obtain the special parking permit at the Palo Alto Development Center, 285 Hamilton Avenue, ground floor.
3.05 REMOVAL OF USA MARKINGS
A. The Contractor shall remove all USA markings, which remain after completion of the work.
USA markings shall be removed by high-pressure water washing or by other methods approved by the Engineer. Removal of remaining USA markings by painting over the USA markings will not be allowed.
4.01 NOTIFICATIONS AND TRAFFIC CONTROL
Work for this bid item includes all traffic control signage, traffic control plans, notifying USA, delivering of door hanger notifications, posting of “No Parking” signs, providing traffic control, and removing USA markings as required in these Specifications and in preparing the traffic control plans to be approved by the City Transportation Engineer and providing all the traffic controls required for the project as required in these Specifications.
This item will be paid for by a lump sum basis. Payment will include full compensation for furnishing all labor, materials, tools, equipment and incidentals, and for doing all work involved in completing this item as shown on the Plans and in the Specifications.
CONTRACT CLOSEOUT SECTION 01700
FY 2027 Sidewalk, Curb & Gutter Project 01700-1
SECTION 01700
CONTRACT CLOSEOUT
1.01 WORK INCLUDED
A. This Section describes contract closeout procedures including:
1. Substantial completion
2. Final cleaning
3. Final completion
3.01 SUBSTANTIAL COMPLETION
A. When Contractor considers the Work to be substantially completed, the contractor shall submit a written notice to the City.
B. Within a reasonable time, the Engineer will review the project for conformance to these specifications. If the Engineer determines Work is substantially complete, a Certificate of Substantial Completion with a punch list of items to be completed or corrected prior to a final inspection will be issued.
1. If the Engineer determines Work is not substantially complete, City will notify
Contractor in writing a list of item(s) that are not substantially complete. Contractor shall remedy deficiencies and send a second written notice of substantial completion;
Engineer will re-inspect Work.
2. The Contractor shall pay for Engineer's time and direct expenses when more than two substantial completion inspections are required.
3.02 FINAL CLEANING
A. The Contractor shall complete a final cleaning prior to final inspection.
1. The site shall be cleaned.
2. All waste, surplus materials, and rubbish shall be removed from the project site.
3.03 FINAL COMPLETION
CONTRACT CLOSEOUT SECTION 01700
FY 2027 Sidewalk, Curb & Gutter Project 01700-2
A. When the Work is complete, the Contractor shall submit a written certification that:
1. Work has been completed in accordance with Contract Documents, and deficiencies listed with Certificate of Substantial Completion have been corrected, and
2. Work is complete and ready for final inspection.
B. Special Submittals: In addition to submittals required by Contract, the Contractor shall submit the following:
1. A final statement of accounting giving total adjusted Contract Amount, previous payments, and sum remaining due.
C. Within a reasonable time, the Engineer will make the final inspection.
D. Should the Engineer determine that the work is not complete, Contractor will be promptly notified with a written punch list of items that are not acceptable.
E. When the Engineer determines work is complete, the final payment to the Contractor will be made.
A. Payment for work required in this section shall be included in the prices paid for the various
SITE MAINTENANCE AND CLEANUP SECTION 01710
FY 2027 Sidewalk, Curb & Gutter Project 01710 - 1
SECTION 01710
SITE MAINTENANCE AND CLEANUP
1.01 DESCRIPTION:
A. Work Included:
1. Throughout the construction period, the site shall be maintained in a standard of cleanliness as described in this Section.
B. Related Work
1. Documents affecting work of this Section include, but are not necessarily limited to, the General Conditions, Supplementary Conditions, and Sections in Division 1 of
2. In addition to the standards described in this Section, the site must also comply with the requirements for cleaning as described in other pertinent Sections of these
A. A daily inspection, and more often if necessary, shall be conducted by the Engineer to verify that requirements for cleanliness are being met.
B. In addition to the standards described in this Section, the Contractor shall comply with pertinent requirements of other governmental agencies having jurisdiction over this Work.
2.01 CLEANING MATERIALS AND EQUIPMENT
A. The Contractor shall provide required personnel, equipment, and materials needed to maintain the specified standard of cleanliness.
3.01 PROGRESS CLEANING
A. General
1. Any stored items shall be placed in an orderly arrangement allowing maximum access, not impeding traffic or drainage, and providing required protection of materials.
FY 2027 Sidewalk, Curb & Gutter Project 01710 - 2
2. The accumulation of scrap, debris, waste material, and other items not required for construction of the Work shall not occur.
B. Site
1. The Contractor shall inspect the site on a daily, and more often if necessary, basis to ensure that all scrap, debris, and waste material is removed.
2. The Contractor shall always maintain the site in a neat and orderly condition. Both public and private areas shall be cleaned of all materials attributed to or involved with the Work daily. The Contractor to ensure that the site is left in a safe condition daily, especially performing concrete work, from loose lumber and nails.
3. The…