Love Park Renovation - Technical Specifications Summary
This is a comprehensive technical specifications document prepared by Applied Sciences for the City of Bradenton's Community Redevelopment Agency detailing the complete construction requirements for Love Park Renovation (Project CRA-25-001) located at 181 11th Avenue West, Bradenton, Florida. The project encompasses renovation and construction of a 0.78-acre neighborhood park including removal of existing improvements, site grading, installation of concrete curbs and sidewalks, asphalt milling and resurfacing, installation of playground equipment with engineered wood fiber surfacing, landscape planting with irrigation systems, hardscape features including composite pavers and fencing, exterior lighting, decorative metal structures, and public art installations. The specifications are organized into 32 divisions covering general requirements, site work, concrete, metals, electrical systems, and landscape improvements, with detailed technical requirements referencing FDOT standards, ASTM specifications, ACI standards, and Florida Building Code requirements including ICC 500 hurricane-resistant design standards.
The specifications establish comprehensive quality assurance, testing, and warranty requirements throughout the project execution. Contractors must comply with all local, state, and federal environmental protection regulations, maintain traffic flow and utility services, and execute work according to detailed technical standards for materials and workmanship. Key contract administration requirements include submission of schedules of values, monthly progress reports with photographs, record drawings signed and sealed by a Florida-registered professional surveyor, and a Quality Control Plan with designated personnel responsible for compliance. The project includes lump-sum items for mobilization/demobilization (not to exceed 8% of bid), maintenance of traffic (not to exceed 5%), record drawings, and environmental protection (not to exceed 1% of bid), with unit-price and cash-allowance items for various construction components. Contractor responsibilities include obtaining all permits, protecting existing utilities, managing stormwater and erosion control, providing temporary facilities, and maintaining all work through the warranty period, which extends one year from substantial completion for most installed items.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
CRA-25-001-LOVE PARK
LOVE PARK RENOVATION
ADDRESS: 181 11TH AVENUE WEST, BRADENTON, FL 34205
FOLIO NUMBER: 025994-0000
Prepared for:
Owner’s Representative: Chris A. Munyon, CRA manager, Community Redevelopment Agency of the City of Bradenton, 101 Old main street – City Hall, Bradenton, FL 34205
Prepared by:
Landscape Architect: Brian R. Cook Engineer In Charge: Christina M. Newcomb
1000 N Ashley Drive, Suite 500, Tampa, Florida 33602
Phone: 813.228.0900 | Fax: 813.434.2454 | info@appliedfl.com | www.appliedfl.com mailto:info@appliedfl.com http://www.appliedfl.com/
TECHNICAL SPECIFICATIONS
GENERAL REQUIREMENTS
SECTION 01000 - PROJECT REQUIREMENTS
SECTION 01100 - SUMMARY OF WORK
SECTION 01200 - MEASUREMENT AND PAYMENT
SECTION 01290 - SCHEDULE OF VALUES
SECTION 01300 - CONTRACT ADMINISTRATION
SECTION 01310 - CONSTRUCTION COORDINATION
SECTION 01325 - CONSTRUCTION PHOTOGRAPHS
SECTION 01330 - SUBMITTALS AND ACCEPTANCE
SECTION 01350 - ENVIRONMENTAL PROTECTION PROCEDURES
SECTION 01400 - QUALITY REQUIREMENTS
SECTION 01450 - TESTING AND TESTING LABORATORY SERVICES
SECTION 01500 - TEMPORARY FACILITIES AND CONTROLS
SECTION 01600 - MATERIALS AND EQUIPMENT
SECTION 01650 - DELIVERY, STORAGE, AND HANDLING
SECTION 01720 - FIELD ENGINEERING
SECTION 01730 - CUTTING, CORING, AND PATCHING
SECTION 017350 - CONTROL OF WORK
SECTION 01740 - CLEANING
SECTION 01745 - MISCELLANEOUS WORK, RESTORATION AND CLEANUP
SECTION 01770 - PROJECT CLOSEOUT
SECTION 01780 - WARRANTIES AND BONDS
SECTION 01785 - RECORD DOCUMENTS
SITE WORK
SECTION 02220 - DEMOLITION AND REMOVAL
SECTION 02230 - SITE PREPARATION
SECTION 02240 - DEWATERING
SECTION 02300 - EARTHWORK FOR STRUCTURES
SECTION 02370 - EROSION AND SEDIMENTATION CONTROL
SECTION 02511 - MILLING AND RESURFACING OF EXISTING ASPHALTIC CONCRETE
PAVEMENT AND ROADWAY BASE
SECTION 02513 - PAVEMENT MARKING AND STRIPING
SECTION 02515 - TEMPORARY ROADWAY RESTORATION
SECTION 02523 - SIDEWALKS, DRIVEWAYS AND CURBS
SECTION 02531 - CONNECTIONS TO AND WORK ON THE EXISTING WATER SYSTEM
SECTION 02920 - SODDING
CONCRETE
SECTION 03200 - CONCRETE REINFORCEMENT
SECTION 03360 - CONCRETE FINISHES
SECTION 03400 - PRECAST CONCRETE CONSTRUCTION
METALS
SECTION 05 77 00 - DECORATIVE EXTRUDED METAL
SPECIALITIES
SECTION 10 14 23 - PANEL SIGNAGE
SPECIAL CONSTRUCTION
SECTION 13 34 00 - FABRICATED ENGINEERED STRUCTURES
SECTION 265600 - EXTERIOR LIGHTING
EXTERIOR IMPROVEMENTS
SECTION 32 1400 - UNIT COMPOSITE PAVERS
SECTION 32 31 00 - FENCES AND GATES
SECTION 32 84 00 - PLANTING IRRIGATION
SECTION 32 93 00 - LANDSCAPE PLANTING
SECTION 32 94 13 - LANDSCAPE EDGING
DIVISION 1
GENERAL REQUIREMENTS
LOVE PARK RENOVATION | BRADENTON CRA
SEPTEMBER 2025
6 Section 01000
PROJECT REQUIREMENTS
SECTION 01000 - PROJECT REQUIREMENTS
PART 1 GENERAL
1.1 SCOPE OF WORK
A. The Work to be done consists of the furnishing of all labor, materials, and equipment and the performance of all Work included in this Contract. The summary of the Work is presented in Section 01100, Summary of Work.
B. Work Included:
1. The Contractor shall furnish all labor, superintendence, materials, power, light, heat, fuel, water, tools, appliances, equipment, supplies, and means of construction necessary for proper performance and completion of the Work. The Contractor shall obtain and pay for all necessary local building permits.
2. The Contractor shall perform and complete the Work in the manner best calculated to promote rapid construction consistent with safety of life and property and to the satisfaction of the Engineer and in strict accordance with the Contract Documents.
3. The Contractor shall clean up the Work and maintain the Work site, stockpile site and construction trailer site during and after construction, until project final completion and shall do all Work and pay all costs incidental thereto. He shall repair or restore all structures and property that may be damaged or disturbed during performance of the Work.
4. The cost of incidental work described in these Project Requirements for which there are no specific Contract Items shall be considered as part of the general cost of doing the Work and shall be included in the prices for the various Contract Items. No additional payment will be made therefore.
5. The Contractor shall provide and maintain such modern tools, and equipment as may be necessary, in the opinion of the Engineer, to perform in a satisfactory and acceptable manner all the Work required by this Contract. Only equipment of established reputation and proven efficiency shall be used. The Contractor shall be solely responsible for the adequacy of his workmanship, materials, and equipment, prior approval of the Engineer notwithstanding.
7 Section 01000
C. Public Utility Installations and Structures:
Public utility installations and structures shall be understood to include all poles, tracks, pipes, wires, conduits, vaults, manholes, and all other appurtenances and facilities pertaining thereto whether owned or controlled by the Owner, other governmental bodies, or privately owned by individuals, firms, or corporations used to serve the public with transportation, traffic control, gas, electricity, telephone, sewerage, drainage, water, or other public or private property which may be impacted by the Work shall be deemed included hereunder.
1. The Contract Documents contain data relative to existing public utility installations and structures above and below the ground surface. These data are not guaranteed as to their completeness or accuracy and it is the responsibility of the Contractor to make his own investigations to inform himself fully of the character, condition, and extent of all such installations and structures as may be encountered and as may affect the construction operations.
2. The Contractor shall protect all public utility installations and structures from damage during the Work. Access across any buried public utility installation or structure shall be made to avoid any damage to these facilities. All required protective devices and construction shall be provided by the Contractor at his expense. All existing public utilities damaged by the Contractor shall be repaired by the Contractor, at his expense. No separate payment shall be made for such protection or repairs to public utility installations or structures.
3. Public utility installations or structures owned or controlled by the
Owner or other governmental body which are shown on the Drawings to be removed, relocated, replaced, or rebuilt by the Contractor shall be considered as a part of the general cost of doing the Work and shall be included in the prices bid for the various Contract Items. No separate payment shall be made therefor.
4. Where public utility installations of structures owned or controlled by the Owner or other governmental body are encountered during the Work and are not indicated on the Drawings or in the Specifications, and when, in the opinion of the Engineer, removal, relocation, replacement, or rebuilding is necessary to complete the Work under this Contract, such Work shall be accomplished by the utility having jurisdiction, or such Work may be ordered, in writing by the Engineer, for the Contractor to accomplish. If such work is accomplished by the
8 Section 01000 utility having jurisdiction it will be carried out expeditiously, and the Contractor shall give full cooperation to permit the utility to complete the removal, relocation, replacement, or rebuilding as required. If such work is accomplished by the Contractor, it will be paid for as extra work as provided in the Agreement.
5. At all times in performance of the Work the Contractor shall employ acceptable methods and exercise reasonable care and skill so as to avoid unnecessary delay, injury, damage, or destruction of public utility installations and structures and shall at all times in the performance of the Work avoid unnecessary interference with or interruption of public utility services and cooperate fully with the owners thereof to that end.
6. The Contractor shall give written notice to the Owner and other governmental utility departments and other owners of public utilities of the location of his proposed construction operations at least 48-hours in advance of breaking ground in any area or on any unit of the Work.
7. The maintenance, repair, removal, relocation, or rebuilding of public utility installations and structures, when accomplished by the Contractor as herein provided, shall be done by methods approved by the owners of such utilities.
1.2 RELATED WORK (NOT USED)
1.3 SUBMITTALS (NOT USED)
1.4 WORK SEQUENCE (NOT USED)
1.5 REFERENCE STANDARDS (NOT USED)
1.6 QUALITY ASSURANCE (NOT USED)
1.7 WARRANTIES
A. Warranties shall be in accordance with General Conditions, Supplementary Conditions, and Specification Section 01780, Warranties and Bonds.
1.8 DELIVERY, HANDLING, AND STORAGE
9 Section 01000
A. The Contractor shall adhere to the requirements specified in Section 01650, Delivery, Storage, and Handling, for storing and protecting the items specified in this Section.
1.9 QUALIFICATIONS (NOT USED)
1.10 DRAWINGS AND PROJECT MANUAL
A. Drawings: When obtaining data and information from the Drawings, figures shall be used in preference to scaled dimensions and large-scale drawings in preference to small-scale drawings.
B. Supplementary Drawings:
1. When, in the opinion of the Engineer, it becomes necessary to explain more fully the Work to be done or to illustrate the Work further or to show any changes which may be required, the Engineer will prepare drawings known as Supplementary Drawings, with specifications pertaining to such Drawings, and the Contractor will be furnished one complete set of reproducible black line prints (22 inches by 34 inches) and one reproducible copy of the specifications.
2. The Supplementary Drawings shall be binding upon the Contractor with the same force as the Contract Drawings. Where such Supplementary Drawings require either less or more than the estimated quantities of Work, credit to the Owner or compensation therefor to the Contractor shall be subject to the terms of the Agreement.
C. Contractor to Check Drawings and Data:
1. The Contractor shall verify all dimensions, quantities, and details shown on the Drawings, Supplementary Drawings, Schedules, Specifications, or other data received from the Engineer, and shall notify the Engineer of all errors, omissions, conflicts, and discrepancies found therein. Failure to discover or correct errors, conflicts, or discrepancies shall not relieve the Contractor of full responsibility for unsatisfactory work, faulty construction, or improper operation resulting therefrom, nor from rectifying such conditions at his own expense. He will not be allowed to take advantage of any errors or omissions, as full instructions will be furnished by the Engineer should such errors or omissions be discovered.
10 Section 01000
2. All schedules are given for the convenience of the Engineer and the Contractor and are not guaranteed to be complete. The Contractor shall assume all responsibility or the making of estimates of the size, kind, and quality of materials and equipment included in Work to be done under the Contract.
D. Specifications: The Technical Specifications each consist of three parts:
General, Products, and Execution. The General part of a Specification contains General Requirements that govern the Work. The Products and Execution parts modify and supplement the General Requirements by detailed requirements for the Work and shall always govern whenever there appears to be a conflict.
E. Intent:
1. All Work called for in the Specifications applicable to this Contract, but not shown on the Drawings in their present form, or vice versa, shall be of like effect as if shown or mentioned in both. Work not specified in either the Drawings or in the Specifications but involved in carrying out their intent or in the complete and proper execution of the Work is required and shall be performed by the Contractor as though it were specifically delineated or described.
2. The apparent silence of the Specifications as to any detail or the apparent omission from them of a detailed description concerning any work to be done and materials to be furnished shall be regarded as meaning that only the best general practice is to prevail and that only material and workmanship of the best quality is to be used. The interpretation of these Specifications shall be made upon that basis.
1.11 MATERIALS AND EQUIPMENT
A. Manufacturer:
1. All transactions with the manufacturers or subcontractors shall be through the Contractor, unless the Contractor shall request and at the Engineer’s option that the manufacturer or subcontractor deal directly with the Engineer. Any such transactions shall not in any way release the Contractor from his full responsibility under this Contract.
2. Any two or more pieces of material or equipment of the same kind, type, or classification, and being used for identical types of service, shall be made by the same manufacturer.
11 Section 01000
B. Delivery:
1. The Contractor shall deliver materials in ample quantities to ensure the most speedy and uninterrupted progress of the Work so as to complete the Work within the allotted time.
2. The Contractor shall also coordinate deliveries in order to avoid delay in or impediment of the progress of the work of any related Contractor.
C. Tools and Accessories:
1. Spare parts shall be furnished as specified herein and as recommended by the manufacturer.
D. Service of Manufacturer’s Engineer:
1. The Contract Prices for equipment shall include the cost of furnishing a competent and experienced engineer or superintendent who shall represent the manufacturer and shall help the Contractor, when required, install, adjust, test, and place in operation the equipment in conformity with the Contract Documents.
2. After the equipment is placed in permanent operation by the Owner, the engineer or superintendent shall make all adjustments and tests required by the Engineer to prove that the equipment is in proper and satisfactory operating condition and shall instruct such personnel as may be designated by the Owner in the proper operation and maintenance of such equipment.
1.12 INSPECTION AND TESTING
A. General:
1. For tests specified to be made by the Contractor, the testing personnel shall make the necessary inspections and tests, and the reports thereof shall be in such form as will facilitate checking to determine compliance with the Contract Documents. Three copies of the reports shall be submitted and authoritative certification thereof must be furnished to the Engineer as a prerequisite for the acceptance of any material or equipment.
2. If, in the making of any test of any material or equipment, the Engineer
12 Section 01000 ascertains that the material or equipment does not comply with the Contract Documents, the Contractor will be notified thereof and he will be directed to refrain from delivering said material or equipment, or to remove it promptly from the site or from the Work and replace it with acceptable material without cost to the Owner.
3. Tests of electrical and mechanical equipment and appliances shall be conducted in accordance with the recognized test codes of the ANSI, ASME, or the IEEE, except as may otherwise be stated herein.
4. The Contractor shall be fully responsible for the proper operation of equipment during testing and instruction periods and shall neither have nor make any claim for damage which may occur to equipment before the time when the Owner formally takes over the operation thereof.
B. Costs:
1. The Contractor shall be responsible for payment of all testing of materials and equipment. The costs associated with this testing shall be incorporated into the unit prices as provided in Section 00410 within the Basis for Bid.
2. The Contractor shall provide all inspection and testing of materials furnished under this Contract, unless otherwise expressly specified.
3. The Contractor shall bear the cost of shop and field tests of equipment and of certain other tests specifically called for in the Contract Documents, and such costs shall be deemed to be included in the Contract Price.
4. The Owner may test materials and equipment submitted by the
Contractor as the equivalent to those specifically named in the Contract for compliance. The Contractor shall reimburse the Owner for the expenditures incurred in making such tests of materials and equipment that are rejected for non-compliance.
C. Certificate of Manufacture:
1. The Contractor shall furnish the Engineer with authoritative evidence in the form of a certificate of manufacture that the materials to be used in the Work have been manufactured and tested in conformity with the Contract Documents.
13 Section 01000
2. These certificates shall be notarized and shall include copies of the results of physical tests and chemical analyses, where necessary, that have been made directly on the product or on similar products of the manufacturer.
D. Shop Tests:
1. Each piece of equipment for which pressure, duty, capacity, rating, efficiency, performance, function, or special requirements are specified shall be tested in the shop of the maker in a manner which shall conclusively prove that its characteristics comply fully with the requirements of the Contract Documents.
2. Two copies of the manufacturer’s actual test data and interpreted results thereof, accompanied by a certificate of authenticity sworn to by a responsible official of the manufacturing company and/or independent laboratory, shall be submitted to the Engineer for approval.
3. The Contractor shall bear the cost of shop tests and of furnishing manufacturer’s preliminary and shop test data of operating equipment.
E. Start-up Tests:
1. As soon as conditions permit, the Contractor shall furnish all labor, materials, and instruments and shall make start-up tests of equipment.
2. If the start-up tests disclose any equipment furnished under this
Contract which does not comply with the requirements of the Contract Documents, the Contractor shall, before demonstration tests, make all changes, adjustments, and replacements required. The furnishing contractor shall assist in the start-up tests as applicable.
F. Demonstration Tests:
1. Before the Contractor’s request for a Substantial Completion inspection, all equipment and piping installed under this Contract shall be subjected to demonstration tests as specified or required to prove compliance with the Contract Documents.
2. The Contractor shall furnish labor, fuel, energy, water, and all other
14 Section 01000 materials, equipment, and instruments necessary for all demonstration tests at no additional cost to the Owner. The Contractor shall assist in the demonstration tests as applicable.
1.13 LINES AND GRADES
A. Grade:
1. All work under this Contract shall be constructed in accordance with the lines and grades shown on the Drawings or as given by the Engineer. The full responsibility for keeping alignment and grade shall rest upon the Contractor.
2. The Engineer will establish benchmarks and baseline controlling points.Reference marks for lines and grades as the Work progresses will be located by the Contractor to cause as little inconvenience to the prosecution of the Work as possible. The Contractor shall place excavation and other materials so as to cause no inconvenience in the use of the reference marks provided. He shall remove any obstructions he places contrary to this provision.
B. Surveys:
1. At his own expense, the Contractor shall furnish and maintain stakes and other such materials.
2. The Contractor shall check such reference marks by such means as he may deem necessary and, before using them, shall call the Engineer’s attention to any inaccuracies.
3. At his own expense, the Contractor shall establish all working or construction lines and grades as required from the reference marks set by the Engineer and shall be solely responsible for the accuracy of these lines and grades. He shall, however, be subject to check and review by the Engineer.
C. Safeguarding Marks:
1. The Contractor shall safeguard all points, stakes, grade marks, monuments, and bench marks made or established on the Work, bear the cost of re-establishing them if disturbed, and bear the entire expense of rectifying work improperly installed due to not maintaining or protecting or to removing without authorization such established
15 Section 01000 points, stakes, and marks.
2. The Contractor shall safeguard all existing and known property corners, monuments, and marks adjacent to but not related to the Work and shall bear the cost of re-establishing them if they are disturbed or destroyed.
PART 2 PRODUCTS (NOT USED)
PART 3 EXECUTION (NOT
USED)
END OF SECTION
16 Section 01100
SUMMARY OF WORK
SECTION 01100 - SUMMARY OF WORK
Unless otherwise expressly provided in the Contract Documents, the Work must be performed in accordance with best modern practice, with materials and workmanship of the highest quality to the satisfaction of the Owner.
A. The Project title is:
Love Park Renovation City of Bradenton Project No. CRA-25 001-Love Park Bradenton, Florida
The Work is generally described as renovation and construction of a dilapidated neighborhood park of approximately 0.78 Acres in size while providing amenities such as playground equipment, shade structures, bike racks, site furniture, and all associated components. Construction to include but not limited to removal and installation of concrete curb and sidewalk, grading, milling, resurfacing and paving. All work shall be in accordance with the construction drawings, specifications, and contract documents.
B. The Specification divisions and Drawings are an integrated part of the Contract
Documents and, as such, will not stand alone if used independently as individual sections, divisions, or drawing sheets. The Drawings and Specifications establish minimum standards of quality for this project. They do not purport to cover all details entering into the design and construction of materials and equipment.
1.5 REFERENCE STANDARDS
Reference standards and recommended practices referred to herein shall be the latest revision of any such document in effect at the bid time. The following documents are a part of this Section. Where this Specification section differs from these documents, the requirements of this Section shall apply.
17 Section 01100
A. American Association of State Highway and Transportation A. Officials (AASHTO) Formerly (AASHO)
B. American Concrete Institute (ACI) C. American Institute of Steel Construction (AISC) D. American Iron and Steel Institute (AISI) E. American National Standards Institute (ANSI) F. American Standards Association (ASA) G. American Society of Mechanical Engineers (ASME) H. American Society of Testing and Material (ASTM) I. American Water Works Association (AWWA) J. American Welding Society (AWS) K. Anti-Friction Bearing Manufacturer's Association (AFBMA) L. Building Officials and Code Administrators International, Inc. (BOCA) M. Construction Specifications Institute (CSI) N. Federal Specification (FS) O. Florida Department of Transportation (FDOT) Standard Specifications for
Road and Bridge Construction, Latest English Edition (Standard Specifications)
P. FDOT Roadway and Traffic Design Standards Latest English Edition (FDOT Index)
Q. Geosynthetics Institute (GSI) R. National Bureau of Standards (NBS) S. National Electrical Manufacturer's Association (NEMA) T. National Fire Protection Association (NFPA) U. Portland Cement Association (PCA) V. Occupational Safety and Health Act (Public Law 91-596), U.S. Department of Labor (OSHA) W. Steel Structures Painting Council (SSPC) X. Southern Standard Building Code (SSBC) Y. Underwriters' Laboratories, Inc. (UL) Z. United States of America Standards Institute (USASI) AA. Regulations of Florida Industrial Commission Regarding Safety BB. All local, state, county, or municipal building codes requirements of the
Owner's Insurance
A. Warranties shall be in accordance with General Conditions, Supplementary Conditions, and Specifications Section 01780, Warranties and Bonds.
1.8 DELIVERY, STORAGE, AND HANDLING
A. The contractor shall adhere to the requirements specified in section 01650, Delivery, Storage, and Handling, for storing and protecting the items specified in
18 Section 01100 this Section.
19 Section 01100
1.10 GENERAL REQUIREMENTS
A. Unless otherwise specified on the Construction Drawings or Specifications, all work and the quality of materials shall conform to the referenced sections of the current version(s) of the Florida Department of Transportation (FDOT) “Standard Specifications for Road and Bridge Construction”, “Supplemental Specifications,” and “Roadway and Traffic Design Standards.” Contractor shall retain on the job site copies of these FDOT documents. Basis of payment shall conform to Section 01200, Measurement and Payment.
1.11 WORKING HOURS
A. Workdays shall consist of ten (10) hours maximum, between 6:00 am and 6:00 pm, Monday through Friday. Construction and installation work shall be limited to eight (8) hours maximum, between 7:00 am and 5:00 pm. The remaining two
(2) hours may be worked at the Contractor’s discretion in staging areas only or for site clean-up.
B. If the Contractor deems it necessary to work on Saturdays, Sundays, holidays, or beyond daylight hours to comply with his construction schedule or because of an emergency, the Contractor shall request permission of the Owner to do so. If, in the opinion of the Owner, the need is bona fide, the Owner will authorize the Contractor to work such hours as may be necessary. City staff will be on site for the hours worked if performed outside a normal workday. The Contractor is responsible for reimbursing the City for the payroll expense at a rate of $50.00 per hour.
PART 2 PRODUCTS (NOT
USED) PART 3 EXECUTION
(NOT USED)
20 Section 01200
MEASUREMENT AND PAYMENT
SECTION 01200 - MEASUREMENT AND PAYMENT
A. This Section covers methods of measurement and payment for items of work under this Contract.
B. The total Contract Price shall cover all work required by the Contract
Documents. All cost in connection with the proper and successful completion of the work, including furnishing all materials, equipment, and tools and performing all necessary labor and supervision to fully complete the work, shall be included in the unit price and lump-sum Bid prices. All work not specifically set forth as a pay item in the Bid Form or Bid Schedule shall be considered a subsidiary/ancillary obligation of the Contractor and all costs in connection with these subsidiary/ancillary obligations shall be included in the Bid(s) to provide a complete and functional Project.
1.3 SUBMITTALS (NOT USED) (Check if this needed for sample submittals?)
A. Warranties shall be in accordance with General Conditions, Supplementary
Conditions, and Specification Section 01780, Warranties and Bonds.
Delivery, Storage, and Handling, for storing and protecting the items specified in this Section.
21 Section 01200
1.10 EXCAVATION, TRENCHING, AND CLEARING
A. Except where otherwise specified, the unit price or lump-sum price bid for each item of work which involves excavation, trenching, clearing, grubbing, or disposal of cleared and grubbed materials shall include all costs for such work. No direct payment shall be made for clearing, grubbing, disposal of cleared or grubbed materials, excavation, trenching, disposal of surplus excavated material, handling water (and groundwater), and purchasing and hauling of required fill material. All excavation and trenching shall be unclassified as to materials which may be encountered; in addition, trenches shall be unclassified as to depth, unless otherwise stated.
1.11 LUMP SUM
A. For lump-sum items, payments shall be made to the Contractor in accordance with an accepted Progress Schedule of Values on the basis of actual work completed and accepted by the Owner at the final completion of the Project.
1.12 UNIT PRICE
A. For unit price items, payment shall be made based on the actual amount of work accepted by the Owner and for the actual amount of materials in place at the final completion of the Project, as confirmed by the final measurements.
B. After the work is completed and before final payment is made, the Engineer will make final measurements, with all required assistance from the Contractor, to determine the quantities of various items of work accepted as the basis for the final unit price payment.
1.13 CASH ALLOWANCE
A. For cash allowance items, payment shall be made based on invoices for approved work that are submitted by the Contractor for payment in each monthly estimate. No Contractor markup shall be allowed for cash allowance Bid items.
1.14 PAYMENT FOR INCREASED OR DECREASED QUANTITIES
A. When alterations in the quantities of unit price work not requiring a Change
Order(s), as herein provided for, are ordered and performed, the Contractor
22 Section 01200 shall accept payment in full at the Contract unit price multiplied by the actual quantities of work constructed and accepted by the Owner at the completion of the project.
B. The actual percentage of each lump sum bid item completed by the
Contractor and accepted by the Owner at the final completion of the Project will be paid to the Contractor.
1.15 DELETED ITEMS
A. Should any items contained in the Bid Schedule(s) be found unnecessary for the proper completion of the work contracted, the Engineer may eliminate such items from the Contract. This action shall in no way invalidate the Contract and no financial allowance or compensating payment for anticipated profit, overhead, etc. will be made for items so eliminated in making final payment to the Contractor.
1.16 PARTIAL PAYMENTS
A. Partial payments shall be made monthly as the work progresses. Partial payment shall be made subject to the provisions of the General and Supplementary Conditions.
B. Contractor shall send Applications for Payment to the Engineer and the Owner along with all required supporting documentation with each Application for Payment.
1.17 PAYMENT FOR STORED MATERIAL DELIVERED TO THE PROJECT
A. When requested by the Contractor and at the discretion of the Owner, payment may be made for all or part of the value of acceptable materials and equipment to be incorporated into bid items, which have not been used, and which have been delivered to the construction site or placed in storage places acceptable to the Owner. The Contractor shall provide receipts for all stored material items requested for reimbursement which clearly identify the stored material item, where it is to be constructed, the unit cost of the item, as well as the total cost of the delivered item(s), the quantity of the item, the brand name of the item, and the supplier. Note that there are additional documentation requirements and storage requirements within the Contract Documents that must also be met before the Contractor can be reimbursed for these stored materials.
23 Section 01200
B. No payment shall be made for fuels, supplies, installation or connection hardware, lumber, false work, or other similar materials or on temporary structures or other work (items) of any kind which are not a permanent part of the Contract. Items having a value of less than $2,500 shall not be compensated for as a stored material item.
1.18 FINAL PAYMENT
A. If requested by the Engineer, the Contractor shall field verify all quantities in dispute by using visual observation, taped measurements, or other methods designated by the Engineer. The field verification shall be made in the presence of the Engineer and agreed to by both the Engineer and the Contractor. The Engineer will prepare a final adjusting Change Order which will adjust the final quantities of the project Bid Schedule to reflect the actual work accepted by the Owner and for which the Contractor will be compensated.
1.19 SCHEDULE OF VALUES
A. A schedule of values for the lump-sum bid items and some of the unit price bid items as required by the Engineer shall be submitted and accepted before the first pay request is approved by the Engineer. The schedule of values shall be based on the prices bid in the Bid Schedule(s). Prices bid in the Bid Schedule(s) cannot be changed in the schedule of values; they can only be broken down into more detail so that the Engineer can more accurately review and approve the Contractor’s pay application for the completed work.
B. Mobilization/demobilization shall not exceed 8% of the Bid. Initial mobilization shall not exceed 40% on the first Contractor’s Application for Payment, and 20% shall be retained until Final Payment.
C. Maintenance of Traffic shall not exceed 5% of the Bid. Maintenance of Traffic shall be paid in conformance with Section 00520 as contained herein.
1.20 MISCELLANEOUS CONSTRUCTION ITEMS
A. The Contractor shall take all precautions necessary to protect existing utilities, roads, and miscellaneous items from damage during construction.
B. The Contractor shall repair, relocate, or replace existing utilities, roadways, and miscellaneous items to pre-construction conditions.
C. All repairs, relocations, and replacements necessary are considered incidental
24 Section 01200 to the work and will be at the Contractor’s cost, with no cost to the Owner.
D. The unit-price bid items and lump-sum bid items for all pipe items shall constitute full compensation for furnishing, laying, jointing, and testing of pipe; dewatering; excavation and backfill; and cleanup. All pipe lines, including but not limited to sewer lines, concentrate disposal lines, water lines, force mains and gravity sewer lines, which are to be paid for per linear foot in the Bid Schedule, will be measured for payment only on a horizontal plane after installation, unless otherwise noted.
E. The Contractor shall have the Engineer observe and document the installation of each underground fitting on the project. If the installation of any fitting is not confirmed and documented by the Engineer, it shall not be paid for by the Owner.
PART 2 PAY ITEM DESCRIPTIONS
The descriptions provided in the following Paragraphs are to be used by the Bidder in preparing the Bid Schedule(s). They generally indicate how the major work scope items and their respective costs are to be separated into the line items listed in the Bid Schedule(s).
These descriptions are not fully representative or all-inclusive of the work required to complete the project in accordance with the Contract Documents. It is the Bidder's responsibility to include all required costs within the most appropriate line item(s).
1.1 LUMP SUM SCHEDULE
Item 1a. Mobilization/Demobilization —This item shall include and cover the costs for performing construction, preparatory, and overhead operations, including but not limited to movement of personnel and equipment to and from the site, sanitary facilities, project administration and management, insurance, bonds, Owner and Engineer indemnification, temporary utilities, project signs, permits related to construction, and all other similar activities and facilities necessary for executing this project. This item shall not exceed 8% of the Total Bid. The Contractor shall be paid 40% of this item upon completion of mobilization, 3% per month for general conditions up until 80% of the total is reached, with the remaining 20% paid upon demobilization.
Item 1b. Maintenance of Traffic—The Contractor shall furnish all labor, signage, barricades, and other equipment necessary to provide traffic control in accordance with FDOT Standard Index 600 Series for all phases of work and prepare and implement Maintenance of Traffic (MOT) plans in accordance with City of Bradenton requirements and all other MOT plans as may be required by local, county, or state agencies. The MOT
25 Section 01200 plan shall be submitted to the City of Bradenton for review and approval. This item shall not exceed 5% of the Total Bid. The Contractor shall be paid 50% upon initial delivery and set-up of the materials, and the remaining 50% shall be pro-rated equally over the construction duration.
Item 1c. Record Drawings—Payment of the lump-sum bid in the Bid Form shall be full compensation for furnishing all labor, materials, equipment, transportation, tools, surveying, and incidentals required to complete and provide Record Drawings in accordance with the Contract Documents (Sections 01330 and 01785) including updating electronic versions of the Drawings in AutoCAD 2023, identifying items that were revised during the project or addenda, having all Drawings signed and sealed by a Florida-registered professional land surveyor, and providing signed-and-sealed copies of the Record Drawings. Once the Record Drawings have been reviewed and determined to be complete according to the Specifications requirements, the entire lump-sum price will be paid to the Contractor.
Item 1d. Environmental Protection—This item shall include but is not be limited to all costs for providing a comprehensive environmental protection program for the project site and other areas that may be affected by the construction. This includes providing labor and materials necessary to prevent environmental damage to the ground, water, and air in conformance with all local, state, and federal laws. Examples include control of stormwater, erodible soils, noise, dust, pollutants, trash, waste, pumping discharge, and any other substance or activity that may adversely impact the environment. The Contractor shall be paid 40% upon delivery and setup of the material, and the remainder will be prorated equally over the construction period. This item shall not exceed 1% of the total bid price. In case of a mathematical error on the Bidder’s part in calculating the environmental protection that exceeds the stated percentage, the item shall be adjusted to equate to 1%.
UNIT PRICE SCHEDULE
The contractor to determine the unit price schedule as required by the plan drawings/standard details
26 Section 01290
SCHEDULE OF VALUES
SECTION 01290 - SCHEDULE OF VALUES
1.1 SCOPE OF WORK (NOT USED)
1.2 RELATED WORK
A. Section 00520 Agreement, for information on Application for Payment.
B. Section 00700, Standard General Conditions of the Construction Contract.
1.3 SUBMITTALS
The Contractor shall submit shop drawings in accordance with Section 01330, Submittals and Acceptance:
A. To the Engineer, a proposed Schedule of Values allocated to the various portions of the Work, in accordance with Section 01000, Project Requirements, and Section 01200, Measurement and Payment.
B. Upon request of the Engineer, supporting data that will substantiate the values’ correctness.
C. The accepted Schedule of Values shall be used only as the basis for the Contractor’s Applications for Payment.
D. An update and resubmittal of the Schedule of Values when Change Orders affect the listing or when the actual performance of the Work involves necessary changes of substance to values previously listed and approved.
E. Schedule of Values
1. Submit typed schedule on EJCDC 1910-8-E forms provided by
Engineer. The Contractor’s standard form or electronic media printout will be considered.
2. Submit Schedule of Values in duplicate within 10 days after the date of
Owner-Contractor Agreement.
3. Format – Use the schedule of prices in the Bid Proposal. Show cost breakdown for each lump-sum item. The lump-sum breakdown shall, at a minimum, use the Table of Contents of this manual outline. Identify
27 Section 01290 each line item with number and title of the major Specification Section.
28 Section 01290
Identify site mobilization and demobilization, bonds and insurance, record drawings, photographs, operations and maintenance manuals, etc.
4. For unit cost allowances, identify quantities taken from the Contract
Documents multiplied by the unit cost to achieve the total for the item.
5. Include within each line item a direct proportional amount of the Contractor’s overhead and profit.
6. Revise schedule to list approved Change Orders with each Application for Payment.
Supplementary Conditions, and Specifications Section 01780, Warranties
1.10 CASH ALLOWANCES
A. Costs Included in Allowances – The cost of the product to the Contractor or subcontractor, less applicable trade discounts and applicable taxes.
B. Costs Not Included in the Allowance, But Included in the Contract Price – Product handling at the site, including unloading, uncrating, and storage;
protection of products from elements and from damage and labor for installation and finishing.
29 Section 01290
C. Contractor Responsibilities:
1. Execute purchase agreement with designated supplier.
2. Arrange for and process shop drawings, product data, and samples.
Arrange for delivery.
3. Promptly inspect products upon delivery for completeness, damage, and defects. Submit claims for transportation damage.
D. Differences between allowance amounts and actual costs will be adjusted by Change Order before final payment.
E. Cash Allowances Schedule.
1. .
2. Contractor to submit expected cash allowance and schedule
(NOT USED)
LOVE PARK RENOVATION | BRADENTON CRA 30 Section 01300
CONTRACT ADMINISTRATION
SECTION 01300 - CONTRACT ADMINISTRATION
1.1 SCOPE OF WORK (NOT USED)
A. Section 01330, Submittals and Acceptance.
A. The Contractor shall furnish the Engineer with revised progress schedules with each Application for Payment.
B. The Contractor shall furnish the Engineer with required photographs to accompany each Application for Payment.
C. The Contractor shall furnish the Engineer with a copy of the job site “red lines” to indicate progress and accompany each Application for Payment as support documentation.
D. The Contractor shall furnish the Engineer with two copies of the Application for Payment.
E. At Contract closeout, the Contractor shall transmit Record Documents and samples with cover letter to the Engineer listing the following:
1. Date.
2. Project title and number.
3. Contractor's name, address, and telephone number.
4. Number and title of each Record Document.
5. Signature of Contractor or authorized representative.
LOVE PARK RENOVATION | BRADENTON CRA 31 Section 01300
Supplementary Conditions, and Specifications Section 01780, Warranties
A. The contractor shall adhere to the requirements specified in Section 01650, Delivery, Storage, and Handling, for storing and protecting items specified in this Section.
1.10 FORMAT
A. The Contractor shall prepare schedules as a time scale logic diagram and bar chart unless otherwise approved by the Engineer. Each major and minor portion of work or operation shall be clearly identified and tied by logical sequence to the shop drawing schedule and schedule of values. All schedules shall be prepared and submitted on 11-inch-by-17-inch paper. Schedules shall be printed using a size 10 font as a minimum. An electronic version of the most up to date schedule in PDF format shall accompany each pay application sent via email.
B. The Contractor shall provide construction photographs electronically in JPG or JPEG format with each pay application. Photos shall have a filename which indicates the date taken and a brief description of the location and activity, using the following format:
YYYY.MM.DD.location and activity.jpg
An example of a correctly named photo is as follows: 2024.05.12.Lift Station 47 Pump 2
Installed.jpeg
Construction photographs shall be provided to the Engineer on a USB flash drive or external hard drive with USB connection. The drive shall be labeled with the name of the project and Contractor.
1.11 SCHEDULE CONTENT
A. The Contractor shall show the complete sequence of construction by activity, with dates for beginning and completion of each element of construction and
LOVE PARK RENOVATION | BRADENTON CRA 32 Section 01300 provide sub-schedules to define critical portions of the entire schedule.
Schedules shall also show accumulated percentage of completion of each item and total percentage of work completed as of the first day of each month.
1.12 REVISIONS TO SCHEDULES
A. The Contractor shall indicate the progress of each activity to the date of submittal and the projected completion date of each activity. Revised schedules shall identify activities modified since previous submittal, major changes in scope, and other identifiable changes. The Contractor shall also provide a narrative report to define problem areas, anticipated delays, and impact on schedule. The Contractor shall also report corrective action taken or proposed and its effect, including the effect of schedule changes on other contractors.
1.13 PROGRESS MEETINGS
A. The Owner/Engineer will organize and conduct progress meeting at least once a month to discuss the progress of the Work. The Contractor and any subcontractors the Contractor deems necessary shall attend these meetings. At the Engineer's discretion, the frequency of the meetings may be increased if the progress of the Work is not satisfactory or if coordination problems should arise.
B. The contractor shall present the following hard copy materials at each progress meeting:
1. Revised Schedule
2. Release of Liens
3. Photos
4. Red line drawings of completed work to date
5. Field Notes
An electronic version of the most up to date schedule in PDF format shall be emailed along with the meeting agenda to all attendees prior to each progress meeting.
1.14 RECORD DOCUMENTS
A. The Contractor shall adhere to the requirements specified in Section 01785, Record Documents.
PART 2 PRODUCTS (NOTUSED)
PART 3 EXECUTION (NOT US
33 CONSTRUCTION COORDINATION
SECTION 01310 - CONSTRUCTION COORDINATION
A. The Contractor shall coordinate Work with that of other construction projects as needed.
1. The Contractor is responsible for all signing and temporary and permanent striping as detailed in Section 02513 Pavement Marking and Signing.
B. Before starting Work and from time to time as the Work progresses, the
Contractor and each subcontractor shall examine the work and materials installed by others as it applies to its own work and shall notify the Engineer immediately in writing if any conditions exist which will prevent satisfactory results in the installation of the system. Should the Contractor or subcontractor start work without such notification, it shall be construed as an acceptance of all claims or questions as to the suitability of the work of others to receive its Work. The Contractor shall remove and/or replace, at its own expense, all work under this Contract which may have to be removed on account of such defects or omissions.
A. Section 01000, Project Requirements.
B. Section 01300, Contract Administration.
C. Section 01770, Project Closeout.
The Contractor shall submit shop drawings in accordance with Section 01330, Submittals and Acceptance:
A. The Contractor shall ensure that all drawing, product data, and samples comply with Contract Documents and field dimensions and clearances.
B. The Contractor shall submit requests for interpretation of Contract
Documents in a timely fashion to ensure there are no disruptions with the Work as
34 CONSTRUCTION COORDINATION
scheduled. Obtain instructions through the Engineer to resolve all queries.
C. Process requests for substitutions and Change Orders through the Engineer.
D. Deliver close-out submittals to the Engineer.
1.4 WORK SEQUENCE
A. The Contractor shall submit a preliminary Progress Schedule, in accordance with Section 01300, Construction Administration, to the Engineer. After review the Contractor shall revise and resubmit the Progress Schedule to comply with requested revisions.
Supplementary Conditions, and Specification Section 01780, Warranties and Bonds.
1.10 CONSTRUCTION
MOBILIZATION The Contractor shall do the following:
A. Cooperate with the Owner in allocating mobilization areas on site for field offices and sheds, access, traffic, and parking facilities. During construction, the Contractor shall coordinate the use of the site and facilities through the Engineer.
B. Comply with the Engineer's procedures for intra-project communications:
35 CONSTRUCTION COORDINATION
submittals, reports and records, schedules, coordination drawings, recommendations, and resolution of ambiguities/conflicts. Comply with the
36 CONSTRUCTION COORDINATION
Engineer’s instructions for use of temporary utilities and construction facilities.
C. Coordinate field engineering and layout work under instructions of the Engineer.
D. Coordinate scheduling, submittals, and work of the various Sections of Contract Documents to ensure the efficient and orderly sequence of installation of construction elements, with provisions for accommodating items to be installed later.
E. Coordinate the sequence of Work to accommodate the Owner occupancy as specified in the Contract Documents.
F. In addition to Progress Meetings specified in Section 01300, Contract Administration, hold pre-construction conferences with personnel and Subcontractors to ensure coordination of Work. The Engineer shall be informed of such meetings and shall be allowed to attend.
G. Coordinate the Work of various sections having interdependent responsibilities for installing equipment, connecting equipment, and placing such equipment in service.
H. Coordinate the use of project space and the sequence of installing civil, architectural, mechanical, structural, instrumentation, systems, and electrical work. Follow practicable routings for pipes, ducts, and conduits, with due allowance for available physical space; make runs parallel with lines of building. Use space efficiently to maximize accessibility for other installations, maintenance, and repairs.
I. Coordinate Work at existing facilities to minimize disruption of the
Owner’s operations.
J. Assemble and coordinate close-out submittals specified in Section 01770, Project Closeout.
1.11 COORDINATION DRAWINGS
A. The Contractor shall provide information required by the Engineer for preparing coordination drawings.
B. The Contractor shall review drawings before submitting them to the Engineer.
1.12 CLOSE-OUT PROCEDURES
37 CONSTRUCTION COORDINATION
The Contractor shall do the following:
A. Notify the Owner when Work is considered ready for Substantial…