- Unit Price Contract (UPC) for the Cleaning, Televising, & Assessment of Sanitary Infrastructure
- Solicitation number
- 252784FB
- Issued by
- Sarasota County, Florida
About this file
These Technical Specifications detail a Unit Price Contract (UPC) for Cleaning, Televising, and Assessment of Sanitary Infrastructure for Sarasota County Capital Projects, located at 1001 Sarasota Center Boulevard in Sarasota, Florida. The project involves comprehensive pipeline inspection and maintenance services, including cleaning, closed-circuit television (CCTV) inspections, and comprehensive assessment of underground wastewater piping systems. The contract covers multiple pipeline segments, with work including standard cleaning, root removal, lateral protrusion removal, tuberculation removal, defective liner removal, and concrete removal at various locations. Contractors will be required to perform detailed inspections using NASSCO-certified personnel, document findings with digital video records, and provide electronic inspection data in specific formats.
The contract is structured as a unit price contract with pricing based on linear footage and specific service types, such as standard cleaning, heavy cleaning, and specialized removal services. Bidders must submit detailed documentation, including personnel qualifications, equipment specifications, and sample inspection data. The contractor will be responsible for all aspects of the work, including maintaining traffic flow, implementing bypass pumping systems, hauling wastewater, and ensuring minimal disruption to public services. Costs associated with mobilization, equipment, labor, and disposal are considered incidental to the primary cleaning and televising services. The specifications outline strict requirements for equipment, documentation, safety protocols, and post-inspection reporting, with final payment contingent upon County approval of the comprehensive assessment reports.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 252784FB_Solicitation_Documents.pdf | ||
| Sample_WO_Form.pdf | ||
| Vendor_Outreach.pdf | ||
| Special_Conditions.pdf | ||
| UPC_General_Conditions.pdf | ||
| Other_Contract_Forms.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL
SPECIFICATIONS
Technical Specifications for
Unit Price Contract (UPC) for Cleaning, Televising and Assessment of Sanitary
Infrastructure
CIP #: 55957
Sarasota County Capital Projects
1001 Sarasota Center Boulevard Sarasota, FL 34240
TECHNICAL SPECIFICATIONS
TABLE OF CONTENTS
01026 Measurement and Payment
01310 Construction Schedule
01505 Mobilization
01550 Maintenance of Traffic
02400 Sod Restoration
02539 Pipeline Cleaning, Televising, and Assessment
02540 Ancillary Services
TABLE OF CONTENTS Page ii
Section 01026
SECTION 01026
MEASUREMENT AND PAYMENT
PART 1 - GENERAL
1.1 EXPLANATION AND DEFINITIONS
A. The following explanation of the Measurement and Payment for the pricing table items is made for information and guidance. The omission of reference to any item in this description shall not, however, alter the intent of the pricing table or relieve the Contractor of the necessity of furnishing such as a part of the Contract at no additional cost to the County.
1.2 MEASUREMENT
A. The quantities set forth in the pricing table are approximate and are given to establish a uniform basis for the comparison of bids. The County reserves the right to increase, decrease, or eliminate the quantity of any class or portion of the work during the progress of construction in accordance with the terms of the Contract.
1.3 PAYMENT
A. Payment for each Work Assignment shall be made at the Contract unit or negotiated unit price per item of work on the basis of the work actually performed, completed, and accepted by the County. Such work includes but is not limited to, the furnishing of all necessary plant, labor, materials, appurtenances, equipment, transportation, clean up, disposal, restoration of disturbed areas, and all other expenses to complete the construction and placing the work into operation, as described in the Work Assignment and Technical Specifications, and as directed by the County.
B. Payment for each item includes compensation for cleanup, disposal, and restoration.
Cleanup, disposal, and surface restoration will be considered as ten percent (10%) of each pay item in the Work Assignment, and complete payment of each item will not be made until cleanup and restoration have been completed, and the final videos and logs are delivered on a USB flash drive for approval by the County.
1.4 MEASUREMENT AND PAYMENT OF LUMP SUM ITEMS
A. Measurement and Payment for Lump Sum bid items will be made based on the approved Schedule of Values submitted by the Contractor. Monthly progress payments will be based on a percentage of the work completed, as approved by the County.
PART 2 – PRODUCTS (NOT USED)
PART 3 - EXECUTION
3.1 PAY ITEMS
Specifications, and as directed by the County. Price includes all necessary plant, labor, tools, equipment, and materials required for the Cleaning and Televising Operations and for the removal and proper disposal of the debris resulting from the Cleaning Operation. Price also includes supplying the County with two (2) copies of the Digital Video Record in mpg or mp4 format on a USB flash drive including Electronic Inspection Data generated by certified NASSCO software (Version 7 or later) as a database in PACP Exchange format; and one (1) copy of the Final CCTV Assessment Reports in PDF
A. Cleaning and Televising (Bid Items 1-45): Measurement and Payment for Cleaning, Televising, and Assessment of the existing sanitary facilities will be made at the Contract unit price per Linear Foot or per Each for the various pipeline diameters, pipeline size ranges, manholes and structures, and work classifications indicated on the Price Schedule of the pricing table and as defined in the Technical format, as specified in the Technical Specifications.
Measurements should follow these guidelines:
• Cleaning and televising shall each be to the nearest foot from centerline of structure to centerline of structure for the actual surveyed length of each pipeline segment cleaned and televised by the Contractor, as approved by the County.
• Manhole and structure cleaning and televising shall be per each
• Standard cleaning shall be per linear foot
• Root ball per NASSCO PACP standards by cutting shall be per linear foot
• Lateral protrusion removal shall be per each
• Tuberculation removal shall be per linear foot
• Defective liner removal shall be per linear foot
• Heavy Cleaning (roots, grease, settled deposits removal) shall be per linear foot
• Concrete removal at manhole shall be per linear foot
• Concrete removal w/milling machine shall be per linear foot and based on actual work performed and approved, as determined by the televising of the main line.
All linear footage measurements shall be horizontal.
Mobilization and Demobilization activities shall be considered incidental to the “Cleaning and Televising” bid items and included as part of those line item prices.
B. Ancillary Main Lining and Repair Services (Bid Items 46-54):
Hauling Bypass Water (Bid Items 46-48): Measurement and Payment for Pumper Truck, Vac- Truck and Tanker Truck will be made at the Contract unit price per Hour the trucks are on the project site for operations as approved by the County. This price shall include mobilizing and demobilizing equipment and hauling sanitary wastewater bypassing for the time period the vehicles are required on-site; there will be no compensation for idle time. This price shall also include all necessary labor, equipment, tools, material, fuel, and proper disposal of wastewater (at County designated site) as necessary for an approved bypass system for sanitary wastewater flow around the segments to be cleaned and televised in accordance with the Technical Specifications.
The time to mobilize, demobilize and dispose of wastewater will not be paid separately and will be considered incidental to the pay items established.
Bypass Pumping (Bid Items 49-51): Measurement and Payment for bypass pumping will be made at the Contract unit price per Day for the various pump sizes indicated on the Price Schedule of the pricing table, as approved by the County, and as defined in the Technical Specifications. This price shall include mobilizing and demobilizing the bypass pumping system and providing sewage bypass pumping for the distance pumped over the time period required to clean and televise the pipeline segments indicated in each Work Assignment. This price shall also include all necessary labor, equipment, including back-up pumps, tools, material, including pressure rated conduit, and power, including fuel, necessary for furnishing, installing, operating, maintaining, decommissioning and removing an approved bypass pumping system to divert sewage flow around the pipeline segments to be clean and televised, in accordance with the Technical Specifications. The Contractor is responsible for all costs for the cleanup, disposal, and or fines imposed for any spills that should occur during the bypass pumping operation.
Maintenance of Traffic (MOT) Bid Items 52-53): Measurement and Payment shall be made at the Contract unit price per Each for the Maintenance of Traffic (MOT) Plan associated with each Work Assignment. The Contractor will be paid no more than one
(1) Maintenance of Traffic (MOT) Plan for each Work Assignment. Work components listed on the Price Schedule of the pricing table will be measured and paid as indicated. This price includes preparing a maintenance of traffic plan for each project work site affected by the Contractor’s operations. The price also includes obtaining construction permits and approvals; construction and maintenance of any necessary detour facilities; providing of personnel and facilities to guide traffic safely around the work; providing access to residences and businesses along the project; furnishing, installing and maintaining of traffic control barricades, railings, warning lights, and other safety devices during construction; the control of dust; the immediate clean-up of any spills; and any other special requirements needed for the safe and expeditious movements of traffic as defined in the Technical Specifications, as directed by the County, and as approved by the agency(s) governing traffic safety in specific work areas. Payment will be made for MOT for arterial and FDOT roadways.
These roadway systems are defined as follows:
• Arterial roadways are streets with speed limits higher than 35 mph and up to including 50 mph. Arterial roadways may be two lane or multilane highway
• FDOT roadways are streets within FDOT right-of-way or with speed limits above 50 mph.
• Maintenance of Traffic for residential streets (speed limits 35 mph or less) shall be considered incidental to other work and shall be included in the provided pay items above. No separate payment will be made for MOT for residential streets.
Emergency Mobilization (Bid Item 54): Measurement and Payment for emergency mobilization will be made at the Contract unit price per Each as indicated on the Price Schedule of the pricing table, as approved by the County, and as defined in the Technical Specifications. This price shall include mobilizing and demobilizing all equipment and materials required to complete the emergency work, in accordance with the Technical Specifications.
END OF SECTION
Section 01310
SECTION 01310
CONSTRUCTION SCHEDULE
PART I - GENERAL
1.1 DESCRIPTION OFREQUIREMENTS
A. Within ten days of the issuance of the Notice to Proceed for each Work Assignments, the Contractor shall prepare and submit to the County for review and approval, a construction progress schedule for the work. This schedule shall be based on calendar days, with sub- schedules of related activities, which are essential to its progress. The project duration shown on the schedule shall not exceed the time indicated on the individual Work Assignment.
B. Contractor shall submit revised progress schedules on a monthly basis. No partial payments shall be approved until there is an approved updated construction progress schedule in hand.
C. The Contractor shall designate an authorized representative of his firm who shall develop and maintain the construction schedule and progress and payment reports.
This representative of the Contractor shall be responsible to the Contractor’s Representative, who shall have the authority to act on behalf of the Contractor in fulfilling the commitments of the Construction schedules.
D. The project scheduling software shall be compatible with the latest County software.
E. The progress schedule shall follow a Critical Path Method (CPM) to coordinate, plan, schedule, and perform the work (including the activities of subcontractors and suppliers).
1.2 FORM OF SCHEDULES
A. The Contractor shall prepare schedules in the form acceptable to the County.
1) Provide a separate horizontal bar for each activity of the Work Assignment.
2) Horizontal time scale: In weeks from start of construction and identify the first workday of each month. The schedule shall identify the day, month, and year of starting and finishing each activity.
3) Scale and spacing: To allow space for notations and future revisions.
4) Minimum sheet size: 8 1/2 inches X 11 inches.
5) Maximum sheet size: 11 inches X 17 inches.
B. Format of listings: The chronological order of the start of each item of work for each Work Assignment.
1.3 CONTENT OF SCHEDULES
A. Show the complete sequence of construction by activity including:
1) Activity beginning and ending date
2) Duration
3) Early start date
4) Early finish date
5) Activity float and total float
6) Predecessor
7) Successor
Section 01310
B. Show the dates for the beginning of and completion of each major element of construction in no more than a one-week increment scale.
C. Show projected percentage of completion for each item, as of the first day of each month.
D. The schedule shall clearly identify the project's critical path. Provide a list of all long lead items (equipment, materials, etc.) with anticipated delivery dates to the County.
1.4 PROGRESS REVISIONS
A. Indicate progress of each activity as of the date of revision.
B. Show changes occurring since previous revision of schedule:
1) Major changes in scope.
2) Activities have been modified since previous revision.
3) Revised projections of progress and completion.
4) Other identifiable changes.
C. Provide a narrative report as needed to define:
1) Problem areas, anticipated delays, and the impact on the schedule.
2) Corrective action recommended and its effect.
3) The effect of changes on schedules of sub-contractor(s) and others.
1.5 DISTRIBUTION
A. Distribute copies of the schedules to:
1) County (two hard copies, one electronic copy)
2) Subcontractors (as needed)
B. Instruct recipients to report promptly to the Contractor, in writing, any problems anticipated by the projections shown in the schedules.
Section 01505
SECTION 01505
MOBILIZATION
PART 1 - GENERAL
1.1 GENERAL
A. Contractor shall mobilize as required for the proper performance and completion of each Work Assignment.
B. Mobilization shall include the following items, as applicable to each Project:
1) Move plant and equipment onto the Project Site necessary for Contractor's operation
2) Install temporary power, wiring, and lighting facilities
3) Establish fire protection system
4) Provide field office complete with furnishings, equipment, and utility services
5) Provide on-site communication facilities
6) Provide on-site sanitary facilities and potable water facilities
7) Arrange for storage yard
8) Obtain required permits
9) Post OSHA required notices and established safety programs
10) Contractor's superintendent shall be on site full time
11) Obtain Builders Risk Installation Floater when applicable
12) Provide submittals
13) Install/remove silt fencing as necessary in unstabilized areas.
14) Install/remove soil tracking prevention devices per FDOT index 106 in unstabilized areas
1.2 PAYMENT FOR MOBILIZATION
A. Payment for mobilization and demobilization incidental to the scheduled “Cleaning, Televising, and Assessment” activities shall be submitted as part of the final payment request for that individual Work Assignment.
1.3 PAYMENT FOR EMERGENCY MOBILIZATION
A. The costs of bonds, permits, and any additional required insurance over and above the Contractor’s standard insurance as specified in Article V of the Construction Contract, and any other pre-construction expense necessary for the start of the Project, excluding cost of construction materials, shall also be included in the payment for Emergency Mobilization.
B. Payment for emergency mobilization will be made when the Contractor has completed the required mobilization items and will not exceed 75% of the Item Bid for Emergency Mobilization.
C. The work involved in the demobilization is included in the Emergency Mobilization Bid Item.
Section 01505
D. Payment for demobilization (25% of the Item Bid for Emergency Mobilization), will be made at such time that the Contractor has completely demobilized from the site.
Section 01550
SECTION 01550
MAINTENANCE OF TRAFFIC (MOT)
PART 1 – GENERAL
1.1 DESCRIPTION
A. Work under this Section consists of maintaining traffic within the project limits for each Work Assignment, including any temporary suspensions of work, and includes all traffic control plans, facilities, devices, and operations as required for the safety and convenience of the public and to minimize public nuisance, as specified herein.
B. The Contractor’s work includes preparing approved traffic control plans; construction and maintenance of approved detour facilities (where required); providing necessary facilities for access to residences and businesses along the project; furnishing, installing, and maintaining traffic control markings, signs, and safety devices; and any other special requirements for safe and expeditious movement of traffic in the project area and other impacted areas as specified herein.
1.2 STANDARD REQUIREMENTS FOR MAINTENANCE OF TRAFFIC
A. All MOT work shall conform to the latest editions of the Florida Department of Transportation (FDOT) Design Standards, the Manual on Uniform Control Devices (MUTCD) Part VI, the FDOT Standard Specifications for Road and Bridge Construction, Section 102, and Sarasota County Mobility Standards. Regardless of the MOT standards and specific traffic control plan used, it is the Contractor’s responsibility to maintain the work zone in a safe condition.
1.3 SUBMITTALS
A. Traffic Control Plan - Prepare detailed work zone traffic control plans for County review and approval. The traffic control plan shall apply specifically to each phase of the Contractor’s activities for each Work Assignment. The Contractor may not begin work until a traffic control plan is approved by the County. Except in an emergency, modifications to the traffic control plans require the County’s written approval.
1.4 SPECIFIC REQUIREMENTS
A. The work for MOT may include the following:
1) All roads will be kept open to two-way traffic during construction, except one-way roads and where otherwise approved in the MOT. Except in approved detoured areas, the Contractor will maintain one lane of traffic in each direction (each lane 11-foot wide minimum) at all times by using existing or constructing temporary pavement.
2) Portions of work phases may be worked concurrently with the approval of the County, provided traffic is properly maintained.
3) Temporary pavement will consist of six-inch thick suitable base and one-inch-thick asphalt concrete surface; cost is included in MOT.
4) Construction of major side streets can be phased similarly to maintain one lane of traffic in each direction (each lane 11-foot wide minimum) at all times by using existing or constructing temporary pavement.
5) Unless provided for under the Items Bid, all cost of all barricades, signing, flagmen, and temporary pavement marking are included in the cost of MOT. The Contractor will erect and maintain all barricades, warning signs, and delineators.
Section 01550
6) Detouring of traffic to other roads to bypass the project area must be approved by the Sarasota County Capital Projects Department, before implementation.
7) The Contractor shall remove any existing striping conflicting with the MOT plan during construction and provide adequate signing and/or striping. Advanced "road closed" warning signs shall be placed at side streets at the direction of the Construction Manager.
8) Paved temporary connections shall be provided at intersections as directed by the Construction Manager.
9) Alternate access will be provided to all residences and businesses whenever construction interferes with the existing means of access. The Contractor is not permitted to isolate residences or businesses.
10) Major intersections shall have through movements maintained at all times during construction except during short periods of time approved by the County.
11) Traffic shall be maintained on paved, dust-free surfaces at all times.
12) The resetting of traffic signs on side streets and the resurfacing and/or pavement marking on detour roads and/or side streets before and after construction is completed shall be included in the cost of Maintenance of Traffic.
13) The County shall approve any alteration of approved traffic patterns prior to implementation.
14) The Contractor is responsible for establishing a work schedule so that any location under construction will not be left in hazardous condition at the completion of any work period.
15) When construction activities require flagmen for traffic control, the Contractor will employ the appropriate number of trained, competent flagmen, and will provide them with appropriate equipment in good condition.
16) Temporary approaches or crossings and intersections with trails, roads, streets, businesses, residences, and parking lots and parking garages will be provided and maintained in a safe condition by the Contractor. The Contractor shall take precautions to protect the work and the safety of the public.
17) Removal of any temporary pavement and the complete restoration of the disturbed areas shall be included in the cost of Maintenance of Traffic.
Section 02400
SECTION 02400
SOD RESTORATION
PART 1 - GENERAL
1.1 DESCRIPTION OF REQUIREMENTS
A. Work under this Section consists of furnishing all labor, material and equipment to replace and maintain all grassed areas disturbed during construction of each Work Assignment by the furnishing and placing sod, as directed by the County.
1.2 REFERENCE DOCUMENTS
A. Materials used in this work shall conform to the following requirements of Florida Department of Transportation Standard Specifications for Road and Bridge Construction, current edition:
1) Sod - Section 981-3
2) Fertilizer - Section 982
3) Water - Section 983
1.3 SUBMITTALS
A. Submit certifications and identification labels for all sod and fertilizer supplied.
PART 2 – PRODUCTS
2.1 SOD
A. Grassed areas disturbed by the Contractor’s operation shall be restored with sod of the same type as the existing lawn grass type.
B. The sod shall be taken up in commercial-size rectangles, preferably 12-inch by 24-inch or larger, except where 6-inch strip sodding is called for.
C. The sod shall be sufficiently thick to secure a dense stand of live grass. The sod shall be live, fresh and uninjured at the time of planting. It shall have a soil mat of sufficient thickness adhering firmly to the roots to withstand all necessary handling. It shall be reasonably free of weeds and other grass varieties. It shall be planted as soon as possible after being dug and shall be shaded and kept moist from the time it is dug until it is planted.
D. Sod should be handled in a manner to prevent breaking or other damage. Sod shall not be handled by pitch forks or by dumping from trucks or other vehicles. Care shall be taken at all times to retain the native soil on the roots of each sod roll during stripping and handling. Sod that has been damaged by handling during delivery, storage or installation will be rejected.
2.2 FERTILIZER
A Chemical fertilizer shall be supplied in suitable bags with the net weight certification of the shipment. Fertilizer shall be 12-8-8 and comply with Section 982 of the FDOT Standard Specification for Road and Bridge Construction.
B. The numerical designations for fertilizer indicate the minimum percentages (respectively) of (1) total nitrogen, (2) available phosphoric acid and (3) water soluble potash, contained in the fertilizer.
Section 02400
C. The chemical designation of the fertilizer shall be 12-8-8, with at least 50 percent of the nitrogen from a non- water-soluble organic source. The nitrogen source may be a urea-formaldehyde source provided it is not derived from a waste product of the plastic industry.
2.3 EQUIPMENT
A. The device for spreading fertilizer and seed shall be capable of uniformly distributing the material at the specified rate.
PART 3 - EXECUTION
3.1 SOD BED PREPARATION
A. Areas to be restored shall be cleared of all rough grass, weeds, and debris, and brought to an even grade.
B. The soil shall then be thoroughly tilled to a minimum 6-inch depth.
C. The areas shall then be brought to proper grade, free of sticks, stones, or other foreign matter over ½-inch in diameter or dimension. The surface shall conform to finish grade, less the thickness of the sod, free of water-retaining depressions.
3.2 INSPECTION
A. The County shall verify that soil preparation and related preceding work have been completed. Work will not begin until conditions are satisfactory.
3.3 SOD HANDLING AND INSTALLATION
A. During delivery, prior to planting, and during the planting of sod areas, the sod panels shall at all times be protected from excessive drying and unnecessary exposure of the roots to the sun. All sod shall be stacked during construction and planting so as not to be damaged by sweating or excessive heat and moisture.
B. After completion of soil conditioning as specified above, sod panels shall be laid tightly together so as to make a solid sodded lawn area. On mounds and other slopes, the long dimension of the sod shall be laid perpendicular to the slope. Immediately following sod laying the lawn areas shall be rolled with a lawn roller customarily used for such purposes, and then thoroughly watered.
C. Sod shall be placed to restore all areas where grass existed prior to construction; on all slopes of 3 horizontal on 1 vertical (3:1) or greater; in all areas where erosion of soils will occur; along edge of roads, driveways, and structures; and as directed by the County.
3.4 SOD MAINTENANCE
A. The sod shall produce a dense, well-established growth. The Contractor shall be responsible for the repair, mowing (6" maximum height) and re-sodding of all eroded or bare spots until project acceptance. Sod repair shall be accomplished as in the original work
B. Sufficient watering shall be done by the Contractor to maintain adequate moisture for optimum development of the sodded areas. Sodded areas shall receive no less than
1.5 inches of water per week for at least 2 weeks. Thereafter, the Contractor shall apply water for a minimum of 60 days as needed until the sod takes root and starts to grow or until final acceptance, whichever is latest.
Section 02539
SECTION 02539
PIPELINE CLEANING, TELEVISING,
AND ASSESSMENT
PART 1 GENERAL
1.1 DESCRIPTION
A. Work to be performed under this Section includes cleaning, televising, and assessing underground wastewater piping systems located throughout Sarasota County, Florida.
1.2 SUMMARY
A. The Contractor shall perform the flushing, cleaning, closed circuit televising (digital format), and assessment of each pipeline segment, and manholes/structures specified in the Work Assignment. This includes pipeline segments at the upstream end of the system which dead-end at a fitting other than a manhole.
B. Cleaning shall include, as required, root removal, service/lateral protrusion removal, tuberculation, defective liner removal, grease removal, concrete removal at manholes, concrete removal with milling machine and collection and legal disposal of the debris.
C. Televising shall include producing and supplying the deliverables noted in the final acceptance Section 02539.3.6.
D. Assessment shall include a rating and ranking system for all pipeline segments and manholes/structures cleaned and televised, conducted by personnel certified by the National Association of Sewer Service Companies (NASSCO) Pipeline Assessment and Certification Program (PACP) and Manhole Assessment and Certification Program
(MACP).
1.3 REQUIREMENTS
A. The Contractor shall conduct his operations in strict accordance with all applicable Federal, State, and Local safety codes and regulations, and shall be responsible to maintain and ensure the safety of the public and work personnel at the project site.
The Contractor shall, at all times, conform to all applicable Occupational Safety and Health Administration (OSHA)Standards.
B. Television inspection video operators shall comply with the National Association of Sewer Service Companies (NASSCO). The Contractor shall have television inspection personnel certified in NASSCO’s Pipeline Assessment and Certification Program (PACP) and Manhole Assessment and Certification Program (MACP).
C. The Contractor shall be responsible for the loading, transportation, and disposal of all waste materials generated by its operations, to the nearest approved landfill, meeting all Local, State, and Federal rules and regulations.
D. The Contractor shall ensure compliance with the latest editions of Chapter 40 CFR Part263.
“Standards Applicable to Transporters of Hazardous Waste” and Chapter 17-730, Part 3 of the Florida Administrative Code (FAC), as applicable.
E. The Contractor shall conform to traffic control and maintenance of traffic (MOT) requirements of the State of Florida Department of Transportation (FDOT), and the Sarasota County Capital Projects, Mobility Standards, when working within public roadways and rights-of-ways.
F. The Contractor shall mobilize and be on site within thirty (30) days following issuance of the Notice to Proceed for each Work Assignment by the County, unless otherwise agreed to by the Contractor and the County. In the case of an emergency, the Contractor shall respond within twenty-four (24) hours of the telephone notification by the County, to be followed by the issuance of a written Work Assignment. The Work Assignment will identify a clearly defined area of work using the County geographic information system (GIS) framework. Contractor will utilize County provided reference material as needed to report utility infrastructure characteristics identified as part of the Work Assignment. No other format will be accepted.
G. The Contractor shall inform the County in writing of its planned work schedules and shall afford the County reasonable opportunity to observe and inspect the Contractor’s work in progress. The County will be advised of all scheduling changes. Once work has begun in an area, the Contractor shall complete the work without interruption.
H. The Contractor shall provide the County with forty-eight (48) hours’ notice prior to the start of work.
1.4 SUBMITTALS
A. Contractor shall submit to the County for review and approval:
1) Names and qualifications of sub-contractor, personnel and equipment to be assigned to the cleaning and televising work. No cleaning or televising work shall commence until this submittal has been approved.
2) Two (2) copies of the Electronic Inspection Data generated by certified NASSCO software (Version 7.0 or later) as a database in PACP Exchange format for each pipeline segment specified shall be submitted with each payment application.
3) Two (2) copies of the Digital Video Record of the television inspections performed for each pipeline segment specified in the Work shall be submitted with each payment application.
4) One (1) copy of the Final CCTV Assessment Reports shall be provided to the County at the time of the Work Assignment completion. Final payment will not be made until the final assessment report is received and approved by the County.
1.5 CLEANING
A. The pipelines and manholes/structures shall be cleaned by removing dirt, rock, sand, roots and other deleterious materials from the pipeline and manholes/structures. The cleaning equipment shall be capable of removing grease, roots, protrusions, scale and corrosion (tuberculation), concrete and defective liner in order to restore at least ninety
(90) percent of original pipeline inside diameter. The cleaning process may be accomplished while the pipeline is flowing; however, bypass pumping may be required.
B. All necessary precautions are to be taken to protect the pipelines from damage resulting from the cleaning process. Damage to the lines or flooding of private or public property, resulting from the cleaning operation, shall be the responsibility of the Contractor to correct.
C. Pipeline Cleaning shall be classified as follows:
1) Standard Cleaning: Cleaning to remove dirt, rock, sand and other deleterious materials from the pipeline and manhole/ structures.
2) Root Removal: Removal of roots to within ¼” of the inside pipeline wall, using standard robotic or mechanical equipment specific for the purpose
3) Lateral Protrusion Removal: Removal of protruding pipe to within ¼” of the inside pipeline wall, using standard mechanical equipment specific for the purpose.
4) Tuberculation Removal: Tubercles (scales and corrosion build-up) shall be removed with standard mechanical equipment to restore pipeline to at least 90% of its original inside diameter.
5) Defective Liner Removal: Liner shall be removed using standard mechanical equipment specific for the purpose.
6) Heavy Cleaning: This cleaning will be considered necessary for roots, grease, and other settled deposits which are greater than 25% by height and/or cross-sectional area within the pipeline. Heavy Cleaning is defined as requiring 50% more time to clean than under normal conditions. This must be supported by visual proof or approval by County inspector. Grease shall be removed using standard mechanical equipment specific for the purpose.
7) Concrete Removal at Manhole: Concrete shall be removed using standard mechanical equipment specific for the purpose.
8) Concrete Removal w/ Milling Machine: Concrete shall be removed with milling equipment to restore pipeline to its original inside diameter.
1.6 CLEANING EQUIPMENT
A. The cleaning system shall utilize a device capable of dislodging sediments found in pipelines without damaging the structural integrity of the pipeline.
B. The cleaning device shall have sufficient power to force and move the debris for extraction.
C. Where required, equipment shall remove roots and lateral protrusions to within ¼” of the inside pipeline wall without damage to the pipeline.
D. Where required, equipment shall remove scale and rust build-up (tuberculation) to restore at least 90% of the pipeline inside diameter without damage to the pipeline.
E. The cleaning method employed shall maintain normal pipeline flows during the cleaning process.
F. Solids shall be removed by vacuuming the debris to the surface. Approved equipment shall decant and separate the water from the solids before it is transported to an approved disposal site. Liquid decanted from the solids shall be returned to the pipeline system.
1.7 REMOVAL OF DEBRIS
A. Materials generated by the cleaning operation shall be removed by vacuuming at the upstream or downstream manhole of the segment being cleaned. Suitable traps, screens and weirs shall be used to prevent the movement of solids to adjacent segments of pipeline.
B. Waste materials and debris resulting from the pipeline cleaning operations, shall be removed, drained of excess fluid, and conveyed by the Contractor to an approved waste disposal site. The disposal site shall be accessible during Contractor working hours. All permits required for loading and transporting the waste material shall be the responsibility of the Contractor. Under no circumstances shall the debris removed for the pipelines be discharged onto the streets or into ditches, catch basins, or stormwater system.
C. Unless otherwise provided for in the price schedule of the pricing table, all costs associated with the removal, draining, loading, transporting, and disposal of debris and waste materials generated by the cleaning operation shall be considered incidental to the cleaning of the pipelines, and; therefore, considered included in the Unit Prices bid for cleaning.
1.8 TELEVISION INSPECTION
Equipment and TV Picture Quality: The TV camera must be specifically designed for pipe inspection, small, rugged and waterproof. The camera must have its own light source suitable to provide a clear bright, color picture of the entire periphery of the pipeline.
The camera shall have the ability to turn and view into each service/lateral and focus on any pipeline damage and defect. Contractor should also have self-propelled crawlers with lateral launch cameras, push cameras, and crawlers capable of inspecting pipeline diameter 6” and greater. The camera, television monitor, and other components of the video system shall be capable of producing picture quality adequate for the purposes of the inspection. The County shall determine the adequacy of the picture quality when the work is started.
A. TV Inspection Procedures:
1) The camera system shall be capable of assessing (making visible) 75% of the pipeline at any time during the inspection. Excessive water in the line shall be removed by the Contractor for proper inspection of the pipeline.
2) The camera system shall be capable of moving through the pipeline in either direction at a moderate rate, stopping when it is necessary to permit proper documentation of the pipeline’s condition on the Digital Video Record, in the database, and for the CCTV Assessment Report. The camera shall not travel at a speed greater than thirty (30) feet per minute.
3) If, during the inspection operation, the television camera will not safely pass through the entire pipeline segment, the Contractor shall set up the equipment so that the inspection can be performed from the opposite manhole or other end of the pipeline segment. If, again, the camera fails to pass through the pipeline segment, the Contractor shall notify the County for further directions.
4) In the event that the TV camera encounters broken pipeline and there is a possibility that continuation of the inspection could cause the TV camera to become lodged in the pipeline or result in additional pipeline damage or collapse, the County may elect to discontinue the inspection of that pipeline segment, and to affect repairs to the damaged pipeline.
B. Measurements: The video equipment used shall provide accurate distance measurements, in feet, for locating laterals, infiltration points, roots, pipeline damage and defects, and other unusual conditions, relative to the reference pipeline end segment (0.00’). The accuracy of the measuring device shall be verified by taking a reading at the entrance of the away manhole or pipeline end and comparing it with a surface measurement made between manholes or end points, with a steel tape or walking meter (Roll-A-Tape). The accuracy of the recorded distance measurements must be satisfactory to the County.
C. Documentation: Documentation of the television inspection shall be prepared by the Contractor at the site on a daily basis. The County shall observe that documentation (entering voice data on the audio-video USB Drive and preparing computer generated inspection logs) is being properly, accurately and legibly done during the TV inspection of each pipeline segment.
D. Operating Personnel: Television inspection video operator shall comply with the National Association of Sewer Service Companies (NASSCO). The Contractor shall have television inspection personnel certified in NASSCO’s Pipeline Assessment and Certification Program (PACP) and Manhole Assessment and Certification Program (MACP).
E. Payment Request Submittals: The Contractor shall provide copies of the video USB Drive containing the Digital Video Record of inspections, as well as the Electronic Inspection Data. The Final CCTV Assessment Reports are to be provided electronically also. All submittals are to be delivered to the County with each Pay Request.
1.9 WATER
The water present in the pipelines may be utilized to provide necessary fluid for the cleaning devices. The use of potable water from a public, private, or reclaimed water system for pipeline cleaning shall be permitted and may be required. The cost of any water used for pipeline cleaning shall be the Contractor’s responsibility.
PART 2 PRODUCTS – NOT USED
PART 3 EXECUTION
3.1 SYSTEM FLOW CONTROL
A. The Contractor shall divert the upstream system flow around the segment(s) of pipeline being cleaned and televised, as necessary, and discharge the intercepted flow to a downstream manhole or other suitable outlet. Bypass set-up and operation shall be as specified in the Technical Specifications.
B. Where lines are determined by the County to be of a critical nature and cannot be by-passed during normal work hours, cleaning and televising work shall be required at low flow periods, which may include nighttime hours.
C. If system flow is minimal and cleaning and televising can be performed in a timely manner, bypassing may not be required.
D. Where maximum water level is 25% by height, a jetter should be used to temporarily displace water from sags as necessary to permit inspection.
E. Interruption of Sanitary Sewer Flows:
1) The Contractor shall place informational door hangers provided by the County, on customer’s doors forty-eight (48) hours prior to commencement of work in a particular area. The Contractor shall make every effort possible to notify each customer whose service may be affected by the cleaning and televising operations.
2) At no time will any service lateral remain inoperative for more than an eight (8) hour period. Any service outage for more than 8 hours will be temporarily by- passed into the mainline sanitary sewer in a manner approved by the County and at the Contractor’s expense.
F. The Contractor shall be responsible for any system back-up or any damage that m a y be caused by the Contractor’s operations.
3.2 CLEANING AND TELEVISING
A. The Contractor shall clean and televise the indicated pipeline segments. The interior surface of the pipeline shall be cleaned with high pressure water jet equipment. In- line cutters shall be used by the Contractor to remove waste product build- up, hard scales (tuberculation), roots, debris, grease, service/lateral projections, and resin slugs. Use of root saws are permitted, as necessary. Contractor shall pan, tilt, and zoom all connections and at both the upstream and downstream manholes to provide video evidence of condition. All service/lateral locations and obstructions, such as dropped joints and protruding services, pipeline damage, and infiltration points shall be noted on the Digital Video Record and recorded in the CCTV Assessment Reports.
B. The Contractor shall notify the County if any severe problems are discovered during televising. If conditions such as a broken pipeline or major blockages are found that will prevent proper cleaning, or where additional damage would occur if cleaning is attempted or continued, the Contractor shall notify the County and request further direction on how to proceed. All cross bores are to be indicated on the survey using NASSCO PACP Condition Code ‘OBI’.
C. Any damage caused by the Contractor to any existing pipeline or structure will be immediately repaired to a condition equal to or better than its original condition at the Contractor’s expense.
3.3 PROTRUDING SERVICE/LATERAL CONNECTIONS AND ROOTS: When directed by the County, existing service/lateral connections and roots that protrude into the main pipeline shall be removed to within one-quarter (1/2”) inch of the inside wall of the main line pipeline by means of robotic and/or mechanical equipment if the crawler is unable to pass by the lateral connection. When necessary, service/lateral connection and root protrusions shall be ground using grinding tools specifically designed for this purpose. The finished product shall be uniform and smooth.
3.4 TRAFFIC CONTROL AND MAINTENANCE OF TRAFFIC: Pipelines to be cleaned and televised may be in backyard easements; or in light traffic subdivision roadways, collector roads, or highways requiring Maintenance of Traffic plans conforming to Florida Department of Transportation and Sarasota County requirements
3.5 CLEANUP: Cleanup is an essential part of the work. As the work progresses and is completed, the Contractor shall clean the various work sites of all excess materials and debris, completely restoring all work areas to the satisfaction of the County. This cleanup shall be done as promptly as practicable and shall not be left until the end of the project.
3.6 FINAL ACCEPTANCE
A. Inspection of pipeline segments cleaned shall be by television inspection. The Contractor shall provide the County with two (2) copies of the Digital Video Record in mpg or mp4 format on a USB flash drive. Electronic Inspection Data generated by certified NASSCO software (Version 7 or later) as a database in PACP Exchange format on the same USB flash drive.
1) Contractor shall collect the following header fields per PACP standards, at a minimum and as required by the County:
• Surveyed By
• Certificate No.
• Owner
• P/O Number
• Project
• Time
• Weather
• Pre-Cleaning
• Date Cleaned
• Flow Control
• Purpose of Survey
• Direction of Survey
• Inspection Technology Used
• Inspection Status
• Drainage Area
• Pipeline Segment Reference
• Street (Name & Number)
• City
• Pipeline Use
• Height (Diameter)
• Width
• Shape
• Material
• Lining Method
• Total Length
• Length Surveyed
• Upstream MH No.
• Upstream MH Rim to Invert
• Downstream MH No.
• Downstream MH Rim to Invert
2) Lateral connection locations, right or left, with camera head rotated at each service location to view into lateral
3) Defect/ Lateral clock position
4) Any noted pipeline defect or damage, with assessment of damage
5) Any visible infiltration with an assessment and estimates of inflow rate
6) All distances between manholes/ structures
7) Provide to the county one (1) set of maps in hard copy and in pdf format which includes re-line updates
B. One (1) copy of the Final CCTV Assessment reports shall be provided to the County at the time of the Work Assignment completion for all pipeline segments identified. Final payment will not be made until the final assessment report is received and approved by the County.
Section 02540
SECTION 02540
ANCILLARY SERVICES
PART 1 GENERAL
1.1 SCOPE
A. The Contractor shall provide for the mobilization of plant, personnel, and equipment;
bypass pumping as required; and the maintenance of traffic for each Work Assignment.
B. The work includes furnishing all plant, labor, tools, equipment and materials and performing all operations necessary to mobilize, bypass pump, and control traffic as specified and directed.
1.2 REQUIREMENTS
A. The Contractor shall conduct his operations in strict accordance with all applicable Federal, State, and Local safety codes and regulations, and shall be responsible to maintain and ensure the safety of the public and work personnel at the project site.
The Contractor shall, at all times, conform to all applicable Occupational Safety and Health Administration (OSHA)Standards.
B. The Contractor shall conform to traffic control and maintenance of traffic (MOT) requirements of the State of Florida Department of Transportation (FDOT), and the Sarasota County Capital Projects, Mobility Standards, when working within public roadways and rights-of-ways.
1.3 MOBILIZATION
A. Mobilization shall conform to Section 01505 of the Technical Specification.
1.4 BY-PASS PUMPING
A. Furnish, operate, and maintain bypass pumping equipment as required. Pump motors shall be equipped with mufflers that conform to the Sarasota County Noise Ordinance, and as specified below.
1.5 MAINTENANCE OF TRAFFIC
A. Maintenance of traffic shall conform to Section 1550 of the Technical Specifications
PART 2 PRODUCTS
2.1 MATERIALS AND EQUIPMENT
A. Materials and equipment may be new or used, suitable for the intended purpose, but must not violate requirements of applicable codes and standards.
B. Any materials or equipment supplied under this Section which is deemed unsuitable by the County shall be removed from the project and replaced by the Contractor at no additional cost to the County.
PART 3 EXECUTION
3.1 HAULING BYPASS WATER
A. The Contractor shall utilize Pumper Trucks, Vac-Trucks and Tanker Trucks as necessary for an approved bypass system to haul bypass wastewater to a proper disposal site designated by the County. This work shall include mobilizing and demobilizing, equipment, and hauling sanitary wastewater bypassing for the time period the vehicles are required on-site, there will be no compensation for idle time. This work shall also include all necessary labor, equipment, tools, material and fuel for an approved bypass system for sanitary wastewater flow around the segments to be cleaned in accordance with the Technical Specifications. The time to mobilize, demobilize and dispose of wastewater will not be paid separately and will be considered incidental to the pay items established.
3.2 BYPASS PUMPING
A. The Contractor shall supply primary and back-up pumps, conduits, fuel and other equipment, including all stand-by equipment, to divert the flow around the facilities in which work is to be performed.
B. The by-pass system shall be of sufficient capacity to handle existing flows plus additional flow that may occur during a rain event. The Contractor shall be responsible for furnishing the necessary labor and supervision to set up and operate the by-pass pumping systems.
C. A float ball type level control and monitoring system shall be implemented. The pump shall be equipped with high level alarm functions with auto-dialer control capable of calling the Contractor and up to four (4) additional phone numbers. One phone number shall be dedicated to a County designee.
D. The design of the temporary by-pass systems shall be the responsibility of the Contractor; however, such systems shall be subject to approval by the County. The Contractor shall submit two (2) sets of detailed drawings, including pump type, make and model, manufacturer’s flow data, hydraulic calculations, curves, specifications, a description of the temporary by-pass equipment and a by-pass plan to the County for approval at least ten (10) days prior to the installation and operation of any temporary by-pass system.
E. The bypass plan must include specific site sketches and diagrams. A sequential order of pumping operation procedures shall include a description of bypass monitoring, maintaining of suction screens, fueling, odor control, and life safety and security. The Contractor shall provide emergency contact(s) and phone number(s), to the County.
F. Noise levels between 7:00 p.m. and 7:30 a.m. shall not exceed 70 dB measured at a distance of 25 feet from the pump motor. All pumps shall be of a quiet pack type unit.
G. If the Contactor’s operations disrupt system flows, except for such brief periods as expressly required and approved by the County, the Contractor shall immediately make all repairs, and do all work necessary to restore flows to the satisfaction of the County, at no additional cost to the County. The bypass operation shall progress continuously on a 24-hour per day, 7-day per week basis, until flow is re-established. The Contractor shall provide the services of emergency repair crews on call 24 hours per day.
H. Any fines or damage caused by not maintaining system flows as specified above shall be the responsibility of the Contractor.
3.3 MAINTENANCE OF TRAFFIC(MOT)
A. Maintenance of Traffic shall conform to Section 01550 of the Technical Specifications.
B. The Contractor shall at all times conduct the work as to ensure the least possible disruption to traffic and inconvenience to the general public, including nearby residents, and to ensure the protection of…