Technical Specifications.docx

DOCX document 35 KB Posted

Attached to
Optical Fiber-Jonesboro DOT (2 Pair)
Solicitation number
RFQ - 18B - 22062800000000000339
Issued by
York County, Maine

About this file

This is a Technical Specifications document issued by the State of Maine Office of Information Technology (OIT) for a Request for Quote (RFQ) regarding dark optical fiber service. The solicitation seeks a lease or rental of unmeasured optical fiber point-to-point connections linking two endpoints: 615 US Route 1 in Jonesboro, Maine, and 85 Court Street in Machias, Maine. The fiber service will consist of either 4 strands (2 pair) or 2 strands (1 pair) of 9/125 micron G.652D-compliant single-mode fiber rated for outdoor aerial and underground applications, with the vendor providing a turnkey solution. The contract term is five years with three one-year renewal options. The vendor is responsible for all fiber maintenance and repair throughout the service period. The project must be completed within five weeks of agreement signature and approval, with preliminary construction work anticipated to be completed prior to service initiation. The cable cut and splice date will be coordinated between OIT and the vendor.

Pricing is structured with one-time startup fees, if any, and level annual service fees due at the beginning of each service year, with first payment occurring after fiber service is tested and accepted by the Department. The vendor must submit complete project status reports and provide comprehensive documentation including fiber splice maps and bidirectional test results at 1310 nm and 1550 nm wavelengths using calibrated optical power meters and OTDR equipment. Acceptable test tolerances include no more than 0.1 dB per splice point, no more than 0.5 dB per connector mating point, and cable loss within manufacturer specifications. OIT will provide and install specific hardware including rack-mounted optical fiber patch panels with LC-APC connectors, indoor-rated single-mode fiber, and Corning-specified splice enclosures and trays. Bidders must confirm agreement to all requirements including the five-week installation timeline and submit fully completed cost tables for both the 4-strand and 2-strand options.

View the file

Other files

File Type Posted
RFQ Specifications.docx DOCX document
HowtoSearchBidsandRespond.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation for Dark Optical Fiber Service – Maine

State of Maine/Office of Information Technology

Summary:

The State of Maine/Office of Information Technology (OIT) is issuing a Request for Quote (RFQ) for lease/rent of a dark/unmeasured optical fiber point-to-point connection in Augusta, Maine. The terminating endpoints for service are: A) 615 US Route 1, Jonesboro, ME, and B) 85 Court Street, Machias, ME. 5-year Service with 3 one-year renewal options. OIT seeks a “turnkey” solution where the fiber is tested and provided. Cost must include fiber maintenance/repair (as needed) over the term of the agreement.

General Technical Requirements:

The optical fiber cable plant will consist of either 4 Strands (2 pair) or 2 strands (1 pair) of 9/125 micron G.652D-compliant single-mode fiber, loose tube, rated for outdoor aerial and underground applications; whichever has most cost advantage for State of Maine.

The 615 US Route 1 endpoint shall be within Maine OIT’s designated Main Distribution Frame (MDF) within the administrative building. The OSP optical fiber cable will be brought into the MDF room, with an adequate slack coil affixed to the backboard per OIT instructions. The end of the cable will then be dressed into the OIT-provided backboard-mounted splice enclosure and fusion-spliced to the OIT-installed interior optical fiber cable within the splice enclosure, using the OIT-provided splice trays. OIT will develop and implement fiber labeling at the terminating patch panels at each endpoint. The Vendor shall be responsible for documenting and providing a complete fiber splice map to OIT immediately upon completion of all splice work.

The 85 Court Street endpoint shall be within Maine OIT’s designated MDF within the court building. The OSP optical fiber cable will be brought into the MDF room, with an adequate slack coil affixed to the backboard per OIT instructions. The end of the cable will then be dressed into the OIT-provided backboard-mounted splice enclosure and fusion-spliced to the OIT-installed interior optical fiber cable within the splice enclosure, using the OIT-provided splice trays. OIT will develop and implement fiber labeling at the terminating patch panels at each endpoint. The Vendor shall be responsible for documenting and providing a complete fiber splice map to OIT immediately upon completion of all splice work.

The OSP cable plant will be delivered in accordance with all applicable telecommunications industry standards and best practices, and in accordance with all applicable laws, regulations, codes and ordinances.

Once the cable build is complete and spliced, the Vendor will test all terminated fibers, bidirectionally, at the endpoint patch panels and correct all deficiencies in that portion of the cable plant installed by the Vendor. Once satisfactory test results on all terminated fibers have been completed, they will be submitted to OIT for review and determination of acceptance. Acceptable test results will be based upon industry recognized tolerances for cable, splice and connector losses. Typically, this will be no more than 0.1 dB per splice point, no more than 0.5 dB per connector mating point, and cable loss within manufacturer material specifications. Testing will be conducted using both calibrated optical power meter/light source and a calibrated OTDR at wavelengths of 1310 nm and 1550 nm. Final test results, including power meter and OTDR traces will be provided to the Customer in both individual .pdf and trace (*.trc/*.sor) files for each fiber.

The specific OIT provided and installed hardware and materials shall include:

· Rack-mounted optical fiber patch panel fitted with LC-APC connectors.

· Indoor-rated 9/125 micron single-mode optical fiber, tight-buffered, pre-terminated in the patch panel, dressed into the backboard-mounted splice enclosure and ready for final splice preparation and splicing by the Vendor. Backboard-mounted optical fiber splice enclosure will be a Corning #WSH-11SPT-F. Splice trays will be Corning #M67-076-C.

It is anticipated that all non-disruptive preliminary construction and preparatory work will be completed prior to service initiation. The cable cut and splice date/time will be determined by OIT and coordinated with the Vendor.

Schedule:

Project must be completed within 5 weeks of agreement signature and approval. Bidder shall supply State of Maine project status reports.

Payment:

Vendor to identify any one-time start-up fees. Level annual (or quarterly/monthly) payments to vendor at beginning of each service-year. Initiation of service and first payment(s) will occur after fiber service is tested and accepted by the Department.

Bid Submission:

Requirement
Bidder Agrees to Requirement (Yes or No)

Dark fiber (two-pair) service with support provided per specifications

5-year level-cost dark fiber service with renewal options

Project statement of work and install timetable with any project assumptions/dependencies document attached

Install/service ready within 5-weeks

SLA for maintenance/support/repair service attached

Cost table fully completed

Cost: Option 1: 4 Strand (2 Pair)

One-time Fee, if-any:______________
Year-1 Service Fee:______________
Year-2 Service Fee:______________
Year-3 Service Fee:______________
Year-4 Service Fee:______________
Year-5 Service Fee:______________
Total One-time Fee___________ (enter value in cost response)
Total All Service Fees:____________ (enter value in cost response)

File details come from the government source that posted it. Updated .