TECHNICAL SPECIFICATIONS.docx
DOCX document 43 KB Posted
- Attached to
- McNary Powerhouse Seals Purchase
- Solicitation number
- W912EF26QA032
About this file
This is a Technical Specifications document for the McNary Lock & Dam Powerhouse Seals Purchase in Fiscal Year 2026. The U.S. Army Corps of Engineers seeks a contractor to manufacture and deliver replacement seals for Station Service Draft Tube Stoplogs and Powerhouse Watertight Doors, along with inspection and repair services for Government-Furnished Property (GFP) seal molds. The contractor must manufacture seal assemblies using GFP molds provided by McNary Dam and utilize contractor-supplied molds for additional seals. Deliverables include two upper rectangular-shaped seals measuring 20'-7" wide by 5'-4 1/8" tall, two lower U-shaped seals with identical dimensions, three rectangular gallery watertight door seals (51" x 80"), and one rectangular J-bulb style repair pit door seal (39-1/2" x 81-1/2"). All seals must be molded (not extruded) with solid bulbs, no reinforcing cloth, and manufactured from natural rubber meeting specific physical specifications including Shore A durometer hardness of 60-70, minimum tensile strength of 3,000 PSI, and minimum elongation of 450%.
The contractor must attend a post-award coordination meeting within seven calendar days of contract award and provide an electronic work schedule for Government review. All GFP seal molds must be inspected for damage, cleaned, and preserved for long-term storage after seal manufacturing, with an inspection and condition report due within five business days of completion in PDF format. The contractor is responsible for all transportation, including pickup at McNary Dam, delivery to refurbishment facilities, and final delivery to McNary Dam with FOB Destination terms. All shipments must arrive within fifteen weeks of contract award and be delivered only during normal business hours (Monday-Thursday, 7:00 AM to 4:00 PM) to McNary Lock & Dam, 82790 Devore Rd., Umatilla, OR 97882. The Contracting Officer's Representative is Krista Timm, Contract Performance Specialist, at (541) 922-1355 or krista.m.timm@usace.army.mil.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Draft Tube Repair Pit Water Tight Door G_2646.pdf | ||
| Gallery Water Tight Door G_2652.pdf | ||
| Station Service Seal Set 1529_3D.pdf | ||
| GFP List.xlsx | XLSX spreadsheet | |
| Solicitation - W912EF26QA032.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATIONS
MCNARY LOCK & DAM
MCNARY FISCAL YEAR 2026 POWERHOUSE SEALS PURCHASE
1.0 INTENT
McNary Lock and Dam will purchase replacement seals for the Station Service Draft Tube Stoplogs and Powerhouse Watertight Doors in Fiscal Year 2026. It is the intent of the US Army Corps of Engineers to award a contract for the seals and service repair of Government supplied seal molds as required. The Contract will also include the shipping of all Government Furnished Property (GFP) known as the seal molds.
2.0 SCOPE OF WORK
The Contractor shall supply McNary Dam with seals to accomplish the work during the extended outage period. The Contractor will manufacture seal assemblies for Paragraph 5.0 using GFP seal molds. Paragraphs 6.0 and 7.0 will be manufactured utilizing the seal manufacturers’ molds. All GFP supplied seal molds will be inspected for damage. A report will be sent to McNary Dam detailing the need for repairs or replacement. No additional work will be accomplished on the seal molds unless approved beforehand by the Government. The Contractor shall also ensure the GFP molds are cleaned and preserved for long term storage after manufacturing the seal in Paragraph 5.0.
3.0 COORDINATION AND CONTRACTOR QUALIFICATIONS
Post-Award Coordination Meeting: The contractor shall attend a post award coordination meeting. The meeting may take place telephonically, shall last no longer than three hours and shall be scheduled within seven calendar days after contract award. The purpose of this meeting is for the Government and Contractor to review the contract requirements, discuss coordination details, and for the Contractor to outline its work schedule. The contractor shall furnish to the Contracting Officer an electronic copy of their schedule for review during the post-award coordination meeting.
Quality Control: The contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with this scope of work.
Government Quality Assurance: The Government will monitor the contractor's performance under this contract using quality assurance procedures developed by the Government. Typical procedures might include random sampling, checklists, customer complaints, and observations.
The Government reserves the right to inspect and test all services called for in the contract, to the extent practicable at all times and places during the term of the contract. The Government will perform inspections and tests in a manner that will not unduly delay the work.
If any of the services do not conform to contract requirements, the Government will request the contractor to perform the services again, where appropriate, in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by re-performance, the Government may (1) require the contractor to take necessary action to ensure future performance conforms to contract requirements and (2) reduce the contract price to reflect the reduced value of the services performed.
If the contractor fails to promptly re-perform the services or to take the necessary action to ensure future performance in conformity with contract requirements, the government may by contract, or otherwise (1) perform the services and charge to the contractor any cost incurred by the government that is directly related to the performance of such service or (2) terminate the contract in whole or in part.
Key Contractor Personnel: The management of contractor activities and any required subcontractors and suppliers is the responsibility of the contractor. The contractor shall provide the name and contact information for a contract manager who will regularly coordinate with the Government representative.
4.0 SEAL COMPOSITION AND MANUFACTURING
4.1 Seal manufacturing
4.1.1 All seals shall be molded, not extruded.
4.1.2 All seal corners shall be molded in one piece and not spliced together.
4.1.3 Rubber shall be free from reclaim, silica and other coarse materials.
4.1.4 Seals shall be compounded of natural rubber and contain carbon black, zinc oxide, accelerators, vulcanizing agents, antioxidants, and plasticizers.
4.1.5 The rubber seal profile shall be properly cured into a homogeneous form and kept free of oils, grease, or other materials that would deteriorate the rubber.
4.1.6 All seals shall be solid bulb with no reinforcing cloth.
4.1.7 The physical characteristics of the rubber compound shall meet or exceed the following specifications:
| Physical Test |
| Test Specifications |
| ASTM Test Method |
| Durometer Hardness, Shore A, Range |
| 60 - 70 |
| ASTM-D2240 |
| Tensile Strength (Ultimate) |
| 3000 PSI min |
| ASTM-D412 |
| Elongation (Ultimate) |
| 450% min |
| ASTM-D412 |
| 300% Modulus |
| 900 PSI |
| ASTM-D412 |
| Compression Set (% Maximum of Original Deflection) Method B, 22hrs. @ 70 Deg C (158 Deg F), 25% deflection, 1/2 hr. recovery |
| 30% |
| ASTM-D395 |
| Water Absorption (Maximum Change in Weight) Age the specimen first at 70 +/-2 for 22, +/-0 hrs. in an air oven, use this weight as W1, then perform the water absorption test. 166 hrs. @ 70 Deg C (158 Deg F), distilled water. |
| 5% |
| D471 |
| Tensile Strength, After Accelerated Aging. 48 Hrs. @ 70 Deg C (158 Deg F) @ 300 PSI O2 in pressure vessel |
| 80% of minimum tensile requirement |
| ASTM-D572 |
| Low Temperature Brittleness Method A, Para. 9.3.2; 5 modified T-50 specimens, 3 min. @ -40 Deg C (-40 Deg F) |
| All Pass w/ no cracks |
| ASTM-D2137 |
| Specific Gravity |
| 1.118 – 1.158 |
| ASTM D297 |
4.1.8 The contractor shall maintain dimensions shown and noted on the drawings for the seals. Irregularities in the form of contour, ridges, or mold marks will be cause for rejection of the seals.
5.0 POWERHOUSE STATION SERVICE DRAFT TUBE STOPLOG SEALS
5.1 Station Service Draft Tube Stoplog Top Seal.
5.1.1 Drawing Number 1529-3D, Draft Tube Stoplog Seal Details.
5.1.2 The dimensions for the top rectangular stoplog seal assembly shall be a two-inch (2") diameter bulb by seven eighths (7/8”) thick tail section by four- and three-quarter inches (4 3/4”) overall width J-Type molded profile top and sides with a seven eighths inch (7/8”) thick by four- and three-quarter inch (4 3/4”) overall width with chamfer flat-style molded profile bottom. The final assembly will be a Rectangular-Shaped seal measuring twenty feet seven inches (20’-7") wide by five feet four and one eighth inches (5’- 4 1/8”) tall.
5.1.3 McNary Seal Molds for Right (1529R) and Left (1529L) Bottom Corners shall be used.
5.1.4 All corners are molded, all splices are joined by hot splicing.
5.1.5 Quantity of TWO (2) each Upper Rectangular Shaped Seals.
5.2 Station Service Draft Tube Stoplog Bottom Seal.
5.2.1 Drawing Number 1529-3D, Draft Tube Stoplog Seal Details.
5.2.2 The dimensions for the bottom U-Shaped stoplog seal assembly shall be a two-inch (2") diameter bulb by seven eighths (7/8”) thick tail section by four- and three-quarter inches (4 3/4”) overall width J-Type molded profile sides with a seven eighths inch (7/8”) thick by four- and three-quarter inch (4 3/4”) overall width with chamfer flat-style molded profile bottom. The final assembly will be a U-Shaped seal measuring twenty feet seven inches (20’-7") wide by five feet four and one eighth inches (5’- 4 1/8”) tall.
5.2.3 McNary Seal Molds for Right (1529R) and Left (1529L) Bottom Corners shall be used.
5.2.4 All corners are molded, all splices are joined by hot splicing.
5.2.5 Quantity of TWO (2) each Bottom U-Shaped Seals.
6.0 POWERHOUSE GALLERY WATERTIGHT DOOR SEALS
6.1 Powerhouse Gallery Door 212A and 212B Watertight Door Seals.
6.1.1 Drawing Number G-2652, Watertight Door Access Gallery.
6.1.2 Dimensions – Rectangular style seal, 5-1/4” Wide x 3/4" Thick Seal. 51” Outside Width x 80” Outside Height.
6.1.3 Corners are molded. All splices are joined by hot splicing.
6.1.4 Quantity of THREE (3) Gallery Watertight Door Seals.
7.0 POWERHOUSE DRAFT TUBE STOPLOG REPAIR PIT WATERTIGHT DOOR SEAL
7.1 Powerhouse Draft Tube Repair Pit Door 212 Watertight Door Seal.
7.1.1 Drawing Number MDP-2.1-5-0/121 and G-2646.
7.1.2 Seal dimension – Rectangular Outside J-Bulb style seal. 1-3/4” J-Bulb x 9/16" Thick Tail x 4” OAW.
7.1.3 Outside Dimensions - 39-1/2” Outside Width x 81-1/2” Outside Height.
7.1.4 Corners are molded. All splices are joined by hot splicing.
7.1.5 Quantity of ONE (1) each Gallery 212 Watertight Door Seal.
8.0 INSPECTION OF SEAL MOLDS
8.1 All seal molds shall be inspected for serviceability prior to the manufacture of seals.
8.2 A report will be provided on each mold and provided to the Government in accordance with paragraph 10.0, Exhibit A, Deliverable Item #2.
8.3 All seal molds shall be cleaned and preserved after completion of seal manufacture with materials appropriate for the base metal of the seal mold.
8.4 A Material Safety data Sheet (MSDS) shall be provided to the government for the type of preservation compound used on the seal molds.
9.0 GOVERNMENT FURNISHED PROPERTY – SEAL MOLD IDENTIFICATION AND WEIGHTS
9.1 Powerhouse Station Service Stoplog Bottom Right Corner -500lbs. Mold number 1529R.
9.1.1 Crate dimension 34-1/2” wide x 28-1/2” deep x 10” tall.
9.1.2 Mold dimension 29” wide x 24” deep x 3-1/2” tall.
9.1.3 Approximate value - $20,000.
9.2 Powerhouse Station Service Stoplog Bottom Left Corner - 500lbs. Mold number 1529L.
9.2.1 Crate dimension 34-1/2” wide x 28-1/2” deep x 10” tall.
9.2.2 Mold dimension 29” wide x 24” deep x 3-1/2” tall.
9.2.3 Approximate value - $20,000.
10.0 DELIVERABLES
TECHNICAL EXHIBIT A
DELIVERABLES
POWERHOUSE STATION SERVICE STOPLOGS AND WATERTIGHT DOOR SEAL MOLDS
Contractor Deliverables
| Deliverable |
| Frequency |
| Due Date |
| Medium / Format |
| Number of Copies |
| Submitted To |
Inspection and Condition Reports (Paragraph 7.0)
Once 5 business days after completion of inspections
Electronic Format (.pdf)
1 electronic copy
COR
11.0 CONTRACTING OFFICERS REPRESENTATIVE (COR)
The COR monitors all technical aspects of the contract and assists in contract administration The COR is authorized to perform the following functions: assure that the Contractor performs the technical requirements of the contract: performs inspections necessary in connection with contract performance: maintains written and oral communications with the Contractor concerning technical aspects of the contract: issues written interpretations of technical requirements, monitors Contractor's performance and notifies both the Contracting Officer and Contractor of any deficiencies; coordinates availability of government furnished property, and provides site entry of Contractor personnel. A letter of designation issued to the COR, a copy of which is sent to the Contractor, states the responsibilities and limitations of the COR, especially regarding changes in cost or price, estimates or changes in delivery dates. The COR is not authorized to change any of the terms and conditions of the resulting order.
Krista Timm
McNary Lock & Dam
Contract Performance Specialist
Contracting Officer’s Representative
P.O. Box 1230
Umatilla, OR 97882
Office: (541) 922 krista.m.timm@usace.army.mil
12.0 TRANSPORTATION - SHIPPING AND DELIVERY
Site Access: The contractor’s pick-up and delivery resource shall comply with the U.S. Army Corps of Engineer’s projects’ security policies. The Government project sites are secured areas and access onto the projects is restricted. The security measures affect all the contractor's vehicles and personnel. There will be delays when entering projects due to locked gates, vehicle inspections, and personnel checks. Inspections and checks may include inspection of toolboxes, briefcases, lunch boxes, and other containers. The Contractor shall be responsible for coordination with each Government Project site prior to arrival. See Paragraph 3.0 of this scope of work for coordination details.
Loading & Unloading Support: The Government can provide equipment support (forklift, crane, etc.) to the contractor for the loading of the seal molds onto the contractor’s transport vehicle at time of initial pick-up at McNary Dam. The Government will provide equipment support (forklift, crane, etc.) to the contractor for the unloading of the seal molds and seal assemblies from the contractor’s transport vehicle at time of final delivery to McNary Dam. The contractor shall provide the COR written notice (email) at least 72-hours prior to the dates requiring the Government loading and unloading support.
Transport of Equipment: The contractor shall furnish the transportation services required for pick-up at McNary Dam, delivery to the refurbishment facilities, and for final delivery to McNary Dam. The contractor shall be responsible for all shoring, blocking, bracing, strapping, dunnage, tarps, etc. required to secure and protect the Government equipment on the transport vehicle. If the contractor intends to use a box van type transport vehicle (equipped with walls and roof), the contractor is responsible for furnishing a pallet jack or similar equipment for maneuvering the seal molds and seal assemblies inside the transport vehicle cargo area.
The Contractor shall be responsible for packing and shipping the components in a manner that will ensure undamaged and complete arrival to McNary Lock and Dam. Seals shall be shipped to minimize distortion. Packaging and shipping shall not cause a permanent set detrimental to the intended use of the seal. Special packaging applies to the following manner:
All items shall be FOB Destination within FIFTEEN (15) weeks of award of contract. Shipments are only allowed during normal business hours of Monday – Thursday 7:00am to 4:00pm.
All shipments shall be delivered to:
McNary Lock and Dam
| 82790 Devore Rd. |
| Umatilla, OR 97882 |