Refurbish the interior and exterior of the CRL VOR building at Carleton, MI.
Solicitation number
6973GH-22-Q-00173
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FEDERAL AVIATION ADMINISTRATION September 2021 CRL-VOR Building Refurbishment (Carleton, MI)

DOCUMENT 00 01 10 – TABLE OF CONTENTS

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS

00 01 10 TABLE OF CONTENTS

DIVISION 01 - GENERAL REQUIREMENTS

01 10 00 SUMMARY OF WORK

DIVISION 09 - FINISHES

090190.52 MAINTENANCE PAINTING

APPENDIX

END OF SECTION 00 01 10

SECTION 01 10 00 – SUMMARY OF WORK

PART 1 - GENERAL

1.1 SCOPE OF WORK

A. Furnish the equipment, labor, material and tools refurbish the VOR facility near Carleton, MI in accordance with this specification.

B. Facility Location: Near 11680 Martinsville Rd, Carleton, MI 48117 (located at coordinates 42°02’ 52.9” North and 83°27’ 27.7” West, and about 3 miles West of Carleton, MI)

C. Google Map Link; http://maps.google.com/maps?q=42.04803%2C-83.45757

D. Under this contract;

1. Make surface repairs, prepare and paint in accordance with this specification, the following areas;

a. Exterior Siding (Aluminum)(Approximately 1440 SF)

b. Soffit (Aluminum)(Approximately 850 SF)

c. Exterior doors and frames (steel)(120 SF)

d. Parking Bollards (steel pipes)(approximately 35 SF)

e. Previously painted ducts, vent hoods, junction boxes, and conduit. (up to 100 SF)

f. Underside of Decking (2x6 wood)(approximately 150 SF)

g. Structural Wood (2x12)(approximately 160 SF)

h. Structural Metal (angle steel, unistrut, various other bracket and support materials)(up to 50 SF)

i. Propane tank conduit, fuel lines, and supports (up to 50 SF)

j. Interior Walls of the Equipment Room, Engine/Generator Room, Storage Closet, and Supply/Storage Room. (approximately 2500 SF)

k. Interior Ceiling of the Supply/Storage Room (approx. 300 SF)

l. Interior Doors and Frames (wood)(120 SF)

2. Provide fluid-applied waterproofing membrane with non-slip surface throughout the building floor at a minimum thickness of 40 mils, such as Tremco Vulkem OC810, or approved equal. Prepare surface in accordance with membrane manufacturer’s instructions and provide compatible primer if needed. Apply in phases, protect and relocate furnishings as needed. Spray application is not permitted. (approximately 1300

SF)

3. Replace weather stripping on door to Engine/Generator Room.

4. Replace or repair broken soffit panel. New material to be of equivalent material, style, thickness, and color.

5. Replace all acoustical ceiling panels throughout building. Match existing style and quality, and provide 10% extra material for later use.

6. Replace two wall heaters with equivalent size heaters.

1.2 OPTION WORK

A. If the existing paint tests positive for lead (testing to be done by FAA), provide pricing to used approved removal methods.

http://maps.google.com/maps?q=42.04803%2C-83.45757

1.3 PRE-CONSTRUCTION CONFERENCE

A. Attend a pre-construction conference if arranged by the FAA Contracting Officer. Conference agenda will include coordination of-

1. safety practices;

2. scheduling;

3. operating procedures; and

4. submittals.

B. Submit a construction work schedule to the Contracting Officer prior to the pre-construction meeting for approval.

1.4 WORK RESTRICTIONS

A. All work must be accomplished by experienced workers in accordance with the highest standards of the various work trades involved. Workers must abide by safety requirements, set forth by OSHA, that correspond to the type of work being performed.

B. The Contractor will not be entitled to additional monetary compensation for labor expended outside of the contract time, unless approved in writing by the Contracting Officer in advance.

1.5 CLEANING

A. Working Area. Keep the working area in a clean and proper condition at all times. All rubbish, waste, equipment, and tools must be removed daily or when directed by the FAA COR.

B. Final Cleanup. Upon completion of work and before final acceptance by the FAA, remove tools, equipment, debris, rubbish, and unused materials from the construction site and prep area.

1.6 INGRESS AND EGRESS TO WORK AREA

A. Workers will be escorted at all times when working inside the secure area.

B. Ingress and egress to the work areas and contractor parking will be discussed at the pre-construction meeting. Security precautions against unauthorized site entrance are maintained at all times. Keep all vehicles, working equipment and materials within the area designated by the COR. Local security and additional badging requirements will be discussed at the pre-construction meeting. The staging area for equipment will be discussed at the pre-construction meeting.

1.7 COORDINATION

A. All correspondence between the contractor, airport authority, and Federal Aviation Administration (FAA) must be through the FAA’s Contracting Officer or the Contracting Officer’s Representative (COR).

B. At no expense to the FAA, procure all construction and working permits required by local and state agencies.

1.8 TEMPORARY FACILITIES AND CONTROLS

A. Provide temporary restroom facilities outside of the building for the duration of the construction for workers.

B. Throughout the duration of the project, supply temporary electricity, air, and water as needed for the completion of the project.

1.9 SAFETY

A. The contractor shall be responsible for safety on the work site. It is the responsibility of the contractor to eliminate hazards, which may result in tripping, electrical shock, fire, falling objects, environmental hazards, vehicular accidents, etc. The contractor must comply with all safety precautions required by OSHA.

B. All work to be done in accordance with EPA Lead Safe requirements.

PART 2 - NOT USED

PART 3 - NOT USED

END OF SECTION 01 00 00

SECTION 090190.52 - MAINTENANCE REPAINTING

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes maintenance repainting as follows:

1. Removing existing paint.

2. Patching substrates.

3. Repainting.

1.3 DEFINITIONS

A. Gloss Level 1: Not more than 5 units at 60 degrees and 10 units at 85 degrees, according to

ASTM D523.

B. Gloss Level 2: Not more than 10 units at 60 degrees and 10 to 35 units at 85 degrees, according to ASTM D523.

C. Gloss Level 3: 10 to 25 units at 60 degrees and 10 to 35 units at 85 degrees, according to

ASTM D523.

D. Gloss Level 4: 20 to 35 units at 60 degrees and not less than 35 units at 85 degrees, according to

ASTM D523.

E. Gloss Level 5: 35 to 70 units at 60 degrees, according to ASTM D523.

F. Gloss Level 6: 70 to 85 units at 60 degrees, according to ASTM D523.

G. Gloss Level 7: More than 85 units at 60 degrees, according to ASTM D523.

H. Low-Pressure Spray: 100 to 400 psi; 4 to 6 gpm.

I. Medium-Pressure Spray: 400 to 800 psi; 4 to 6 gpm.

1.4 SEQUENCING AND SCHEDULING

A. Perform maintenance repainting in the following sequence, which includes work specified in this and other Sections:

1. Dismantle existing surface-mounted objects and hardware except items indicated to remain in place. Tag items with location identification and protect.

2. Verify that temporary protections have been installed.

3. Examine condition of surfaces to be painted.

4. Remove existing paint to the degree required for each substrate and surface condition of existing paint.

5. Apply paint system.

6. Reinstall dismantled surface-mounted objects and hardware unless otherwise indicated.

1.5 ACTION SUBMITTALS

A. Product Data: For each type of product.

1. Include recommendations for product application and use.

2. Include test data substantiating that products comply with requirements.

B. Product List: For each paint product indicated, include the following:

1. Cross-reference to paint system and locations of application areas. Use same designations indicated on Drawings and in schedules.

2. Printout of current "MPI Approved Products List" for each MPI-product category specified in paint systems, with the proposed product highlighted.

3. VOC content.

1.6 MAINTENANCE MATERIAL SUBMITTALS

A. Furnish extra paint materials, from the same production run, that match products applied and that are packaged with protective covering for storage and identified with labels describing contents, including material, finish, source, and location on building.

1. Quantity: Furnish Owner with an additional 5 percent, but not less than 1 gal. or one case, as appropriate, of each material and color applied.

1.7 DELIVERY, STORAGE, AND HANDLING

A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F.

1. Maintain containers in clean condition, free of foreign materials and residue.

2. Remove rags and waste daily.

1.8 FIELD CONDITIONS

A. Weather Limitations: Proceed with maintenance repainting only when existing and forecasted weather conditions are within the environmental limits set by each manufacturer's written instructions and specified requirements.

B. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F.

C. Do not apply paint in snow, rain, fog, or mist; when relative humidity exceeds 85 percent; at temperatures less than 5 deg F above the dew point; or to damp or wet surfaces.

1. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by manufacturer for surface preparation and during paint application and drying periods.

PART 2 - PRODUCTS

2.1 PREPARATORY CLEANING MATERIALS

A. Water: Potable.

B. Detergent Solution: Solution prepared by mixing 2 cups of tetrasodium pyrophosphate (TSPP), 1/2 cup of laundry detergent that contains no ammonia, 5 quarts of 5 percent sodium hypochlorite bleach, and 15 quarts of warm water for every 5 gal. of solution required.

C. Mildewcide: Commercial proprietary mildewcide or a job-mixed solution prepared by mixing 1/3 cup of household detergent that contains no ammonia, 1 quart of 5 percent sodium hypochlorite bleach, and 3 quarts of warm water.

D. Abrasives for Ferrous Metal Cleaning: Aluminum oxide paper, emery paper, fine steel wool, steel scrapers, and steel-wire brushes of various sizes.

E. Rust Remover: Manufacturer's standard phosphoric acid-based gel formulation, also called "naval jelly," for removing corrosion from iron and steel.

2.2 PAINT REMOVERS

A. Alkaline Paste Paint Remover: Manufacturer's standard alkaline paste or gel formulation for removing paint from masonry, stone, wood, plaster, or metal as required to suit Project; and containing no methylene chloride.

B. Covered or Skin-Forming Alkaline Paint Remover: Manufacturer's standard covered or skin-forming alkaline paste or gel formulation for removing paint from masonry, stone, wood, plaster, or metal as required to suit Project; and containing no methylene chloride.

C. Solvent-Type Paste Paint Remover: Manufacturer's standard water-rinsable, solvent-type paste or gel formulation for removing paint from masonry, stone, wood, plaster, or metal as required to suit Project.

D. Low-Odor, Solvent-Type Paste Paint Remover: Manufacturer's standard low-odor, water-rinsable, solvent-type paste, gel, or foamed emulsion formulation for removing paint from masonry, stone, wood, plaster, or metal as required to suit Project; and containing no methanol or methylene chloride.

E. Covered, Solvent-Type Paste Paint Remover: Manufacturer's standard, low-odor, covered, water-rinsable, solvent-type paste or gel formulation for removing paint from masonry, stone, wood, plaster, or metal as required to suit Project; and containing no methanol or methylene chloride.

2.3 PAINT, GENERAL

A. Material Compatibility:

1. Provide materials for use within each paint system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.

2. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.

B. Colors: As indicated with each paint system in maintenance repainting schedule(s) at the end of Part 3.

2.4 PAINT MATERIALS, GENERAL

A. MPI Standards: Provide products that comply with MPI standards indicated and that are listed in its "MPI Approved Products List."

B. Transition Coat: Paint manufacturer's recommended coating for use where a residual existing coating is incompatible with the paint system.

2.5 PAINT MATERIAL MANUFACTURERS

A. Select interior paint from one of the following:

1. Sherwin-Williams Co. (Sherwin-Williams).

2. Benjamin Moore & Co. (Benjamin Moore).

3. Coronado Paint Company (Coronado).

4. ICI Paint Stores, Inc. (Dulux Paint).

5. Kelly-Moore Paint Co. (Kelly-Moore).

6. M. A. Bruder & Sons, Inc. (M. A. B. Paint).

7. PPG Industries, Inc. (Pittsburgh Paints).

8. Tnemec Company, Inc.

2.6 PAINT MATERIALS

A. Primers and Sealers:

1. Primer, Latex, for Interior Wood: MPI #39.

2. Primer, Stain Blocking, Water Based: MPI #137.

B. Metal Primers:

1. Primer, Metal, Surface Tolerant: MPI #23.

2. Primer, Rust-Inhibitive, Water Based: MPI #107.

3. Primer, Epoxy, Anti-Corrosive, for Metal: MPI #101.

C. Wood Primers:

1. Primer, Alkyd for Exterior Wood: MPI #5.

D. Water-Based Paints:

1. Latex, Interior, Institutional Low Odor/VOC, Flat (Gloss Level 1):MPI #143.

a. Basis-of-Design Product: Sherwin Williams Harmony.

2. Latex, Exterior:

a. Basis-of-Design Product: Sherwin Williams Metalatex.

b.

E. Epoxy Coatings:

1. Epoxy, High-Build, Low Gloss: MPI #108.

F. Polyurethane Coatings:

1. Polyurethane, Two-Component, Pigmented, Gloss (Gloss Level 6):MPI #72.

2.7 FLOOR COATING

A. Coating: Manufacturer's standard aliphatic urethane, low-odor, low-VOC, traffic-bearing, seamless, high-solids-content, cold liquid-applied, elastomeric, waterproofing membrane system with integral, non-slip wearing surface for pedestrian traffic.

B. Manufacturers: Subject to compliance with requirements, provide products by one of the following, or approved equal:

1. Tremco Incorporated: Vulkem OC 810

C. Primer: Liquid waterborne primer recommended for substrate and conditions by coating manufacturer.

1. Material: Urethane.

2. TREMPrime Multi Surface Primer

3. Vulkem191 Low VOC Primer

D. One Coat System: Aliphatic Urethane

E. Application: Roller-applied or Self-leveling.

F. Thicknesses: Minimum wet film thickness (35-40 wet mils) as recommended in writing by manufacturer for substrate and service conditions indicated, measured excluding aggregate

G. Aggregate Content: As recommended in writing by coating manufacturer for substrate and service conditions indicated.

H. Color: As selected by COR from manufacturer's standard range.

I. Aggregate: Manufacturer's standard aggregate for each use indicated of particle sizes, shape, and minimum hardness recommended by coating manufacturer for use with coating product.

2.8 PATCHING MATERIALS

A. Wood-Patching Compound: Two-part, epoxy-resin, wood-patching compound; knife-grade formulation as recommended in writing by manufacturer for type of wood repair indicated, tooling time required for the detail of work, and site conditions. Compound shall be designed for filling voids in damaged wood materials that have deteriorated from weathering and decay.

Compound shall be capable of filling deep holes and spreading to feather edge.

B. Metal-Patching Compound: Two-part, polyester-resin, metal-patching compound; knife-grade formulation as recommended in writing by manufacturer for type of metal repair indicated, tooling time required for the detail of work, and site conditions. Compound shall be produced for filling metal that has deteriorated from corrosion. Filler shall be capable of filling deep holes and spreading to feather edge.

C. Cementitious Patching Compounds: Cementitious patching compounds and repair materials specifically manufactured for filling cementitious substrates and for sanding or tooling prior to repainting; formulation as recommended in writing by manufacturer for type of cementitious substrate indicated, exposure to weather and traffic, the detail of work, and site conditions.

PART 3 - EXECUTION

3.1 PROTECTION

A. Comply with each manufacturer's written instructions for protecting building and other surfaces against damage from exposure to its products. Prevent chemical solutions from coming into contact with people, motor vehicles, landscaping, buildings, and other surfaces that could be harmed by such contact.

1. Cover adjacent surfaces with materials that are proven to resist chemical solutions being used unless the solutions will not damage adjacent surfaces. Use protective materials that are UV resistant and waterproof. Apply masking agents to comply with manufacturer's written instructions. Do not apply liquid masking agent to painted or porous surfaces.

When no longer needed, promptly remove masking to prevent adhesive staining.

2. Do not apply chemical solutions during winds of sufficient force to spread them to unprotected surfaces.

3. Neutralize and collect alkaline and acid wastes before disposal.

4. Dispose of runoff from operations by legal means and in a manner that prevents soil erosion, undermining of paving and foundations, damage to landscaping, and water penetration into building interiors.

3.2 MAINTENANCE REPAINTING, GENERAL

A. Maintenance Repainting Appearance Standard: Completed work is to have a uniform appearance as viewed by Architect from building interior at 10 feet away from painted surface and from building exterior at 50 feet away from painted surface.

B. Execution of the Work: In repainting surfaces, disturb them as minimally as possible and as follows:

1. Remove failed coatings and corrosion and repaint.

2. Verify that substrate surface conditions are suitable for repainting.

3. Allow other trades to repair items in place before repainting.

C. Mechanical Abrasion: Where mechanical abrasion is needed for the work, use gentle methods, such as scraping and lightly hand sanding, that will not abrade softer substrates, reducing clarity of detail.

D. Heat Processes: Do not use torches, heat guns, or heat plates.

3.3 EXAMINATION

A. Examine substrates and conditions, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of painting work.

Comply with paint manufacturer's written instructions for inspection.

B. Maximum Moisture Content of Substrates: Do not begin application of coatings unless moisture content of exposed surface is below the maximum value recommended in writing by paint manufacturer and not greater than the following maximum values when measured with an electronic moisture meter appropriate to the substrate material:

1. Concrete: 12 percent.

2. Masonry (Clay and CMU): 12 percent.

3. Portland Cement Plaster: 12 percent.

4. Wood: 15 percent.

C. Alkalinity: Do not begin application of coatings unless surface alkalinity is within range recommended in writing by paint manufacturer. Conduct alkali testing with litmus paper on exposed plaster, cementitious, and masonry surfaces.

D. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.

1. If existing surfaces cannot be prepared to an acceptable condition for proper finishing by using specified surface-preparation methods, notify Architect in writing.

E. Begin coating application only after unsatisfactory conditions have been corrected and surfaces are dry.

1. Beginning coating application constitutes Contractor's acceptance of substrates and conditions.

3.4 PREPARATORY CLEANING

A. General: Use the gentlest, appropriate method necessary to clean surfaces in preparation for painting. Clean all surfaces, corners, contours, and interstices.

B. Detergent Cleaning: Wash surfaces by hand using clean rags, sponges, and bristle brushes.

Scrub surface with detergent solution and bristle brush until soil is thoroughly dislodged and can be removed by rinsing. Use small brushes to remove soil from joints and crevices. Dip brush in solution often to ensure that adequate fresh detergent is used and that surface remains wet. Rinse with water applied by clean rags or sponges.

C. Solvent Cleaning: Use solvent cleaning to remove oil, grease, smoke, tar, and asphalt from painted or unpainted surfaces before other preparation work. Wipe surfaces with solvent using clean rags and sponges. If necessary, spot-solvent cleaning may be employed just prior to commencement of paint application, provided enough time is allowed for complete evaporation.

Use clean solvent and clean rags for the final wash to ensure that all foreign materials have been removed. Do not use solvents, including primer thinner and turpentine, that leave residue.

D. Mildew: Clean off existing mildew, algae, moss, plant material, loose paint, grease, dirt, and other debris by scrubbing with bristle brush or sponge and detergent solution. Scrub mildewed areas with mildewcide. Rinse with water applied by clean rags or sponges.

E. Chemical Rust Removal:

1. Remove loose rust scale with specified abrasives for ferrous-metal cleaning.

2. Apply rust remover with brushes or as recommended in writing by manufacturer.

3. Allow rust remover to remain on surface for period recommended in writing by manufacturer or as determined by preconstruction testing. Do not allow extended dwell time.

4. Wipe off residue with mineral spirits and either steel wool or soft rags, or clean with method recommended in writing by manufacturer to remove residue.

5. Dry immediately with clean, soft cloths. Follow direction of grain in metal.

6. Prime immediately to prevent rust. Do not touch cleaned metal surface until primed.

F. Mechanical Rust Removal:

1. Remove rust with specified abrasives for ferrous-metal cleaning. Clean to bright metal.

2. Wipe off residue with mineral spirits and either steel wool or soft rags.

3. Dry immediately with clean, soft cloths. Follow direction of grain in metal.

4. Prime immediately to prevent rust. Do not touch cleaned metal surface until primed.

3.5 PAINT REMOVAL

A. General: Remove paint where indicated. Where cleaning methods have been attempted and further removal of the paint is required because of incompatible or unsatisfactory surfaces for repainting, remove paint to extent required by conditions.

1. Application: Apply paint removers according to paint-remover manufacturer's written instructions. Do not allow paint removers to remain on surface for periods longer than those indicated or recommended in writing by manufacturer.

a. Apply materials to all surfaces, corners, contours, and interstices, to provide a uniform final appearance without streaks.

b. After work is complete, remove protection no longer required. Remove tape and adhesive marks.

2. Brushes: Use brushes that are resistant to chemicals being used.

a. Metal Substrates: If using wire brushes on metal, use brushes of same metal composition as metal being treated.

b. Wood Substrates: Do not use wire brushes.

3. Spray Equipment: Use spray equipment that provides controlled application at volume and pressure indicated, measured at nozzle. Adjust pressure and volume to ensure that spray methods do not damage surfaces.

a. Equip units with pressure gages.

b. Unless otherwise indicated, hold spray nozzle at least 6 inches from surface and apply material in horizontal, back-and-forth sweeping motion, overlapping previous strokes to produce uniform coverage.

c. For chemical spray application, use low-pressure tank or chemical pump suitable for chemical indicated, equipped with nozzle having a cone-shaped spray.

d. For water-spray application, use fan-shaped spray tip that disperses water at an angle of 25 to 50 degrees.

e. For heated water-spray application, use equipment capable of maintaining temperature between 140 and 160 deg F at flow rates indicated.

B. Paint Removal with Hand Tools: Remove paint manually using hand-held scrapers, wire brushes, sandpaper, and metallic wool as appropriate for the substrate material.

C. Paint Removal with Alkaline Paste Paint Remover:

1. Remove loose and peeling paint using water, scrapers, stiff brushes, or a combination of these. Let surface dry thoroughly.

2. Apply paint remover to dry, painted surface with brushes.

3. Allow paint remover to remain on surface for period recommended in writing by manufacturer or as determined by preconstruction testing.

4. Use mechanical methods recommended in writing by manufacturer to remove chemicals and paint residue.

5. Repeat process if necessary to remove all paint.

D. Paint Removal with Solvent-Type Paste Paint Remover:

1. Remove loose and peeling paint using water, scrapers, stiff brushes, or a combination of these. Let surface dry thoroughly.

2. Apply thick coating of paint remover to dry, painted surface with natural-fiber cleaning brush, deep-nap roller, or large paintbrush. Apply in one or two coats according to manufacturer's written instructions.

3. Allow paint remover to remain on surface for period recommended in writing by manufacturer or as determined by preconstruction testing.

4. Use mechanical methods recommended in writing by manufacturer to remove chemicals and paint residue.

5. Repeat process if necessary to remove all paint.

E. Paint Removal with Covered, Solvent-Type Paste Paint Remover:

1. Remove loose and peeling paint using water, scrapers, stiff brushes, or a combination of these. Let surface dry thoroughly.

2. Apply paint remover to dry, painted surface with natural-fiber cleaning brush, deep-nap roller, or large paint brush or as recommended in writing by manufacturer.

3. Apply cover according to manufacturer's written instructions.

4. Allow paint remover to remain on surface for period recommended in writing by manufacturer or as determined by preconstruction testing.

5. Scrape off paint and remover.

6. Use mechanical methods recommended in writing by manufacturer to remove remaining chemicals and paint residue.

3.6 SUBSTRATE REPAIR

A. General: Repair substrate surface defects that are inconsistent with the surface appearance of adjacent materials and finishes.

B. Wood Substrate:

1. Repair wood defects including dents and gouges more than 1/4 inch in size and all holes and cracks by filling with wood-patching compound and sanding smooth. Reset or remove protruding fasteners.

2. Where existing paint is allowed to remain, sand irregular buildup of paint, runs, and sags to achieve a uniformly smooth surface.

C. Cementitious Material Substrate:

1. General: Repair defects including dents and chips more than 1/2 inch in size and all holes and cracks by filling with cementitious patching compound and sanding smooth. Remove protruding fasteners.

2. New and Bare Plaster: Neutralize surface of plaster with mild acid solution as recommended in writing by paint manufacturer. In lieu of acid neutralization, follow manufacturer's written instruction for primer or transition coat over alkaline plaster surfaces.

3. Concrete, Cement Plaster, and Other Cementitious Products: Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents. If surfaces are too alkaline to paint, correct this condition before painting.

D. Paneling and Gypsum Substrates:

1. Repair defects including dents and chips more than 1/4 inch in size and all holes and cracks by filling with gypsum-plaster patching compound and sanding smooth. Remove protruding fasteners.

2. Rout out surface cracks to remove loose, unsound material; fill with patching compound and sand smooth.

E. Metal Substrate:

1. Preparation: Treat repair locations by wire-brushing and solvent cleaning. Use chemical or mechanical rust removal method to clean off rust.

2. Defects in Metal Surfaces: Repair non-load-bearing defects in existing metal surfaces, including dents and gouges more than 1/8 inch deep or 1 inch across and all holes and cracks by filling with metal-patching compound and sanding smooth. Remove burrs and protruding fasteners.

3. Priming: Prime iron and steel surfaces immediately after repair to prevent flash rusting.

Stripe paint corners, crevices, bolts, welds, and sharp edges. Apply two coats to surfaces that are inaccessible after completion of the Work.

3.7 PAINT APPLICATION, GENERAL

A. Comply with manufacturers' written instructions for application methods unless otherwise indicated in this Section.

B. Prepare surfaces to be painted according to the Surface-Preparation Schedule and with manufacturer's written instructions for each substrate condition.

C. Apply a transition coat over incompatible existing coatings.

D. Metal Substrate: Stripe paint corners, crevices, bolts, welds, and sharp edges before applying full coat. Apply two coats to surfaces that are inaccessible after completion of the Work. Tint stripe coat different than the main coating and apply with brush.

E. Blending Painted Surfaces: When painting new substrates patched into existing surfaces or touching up missing or damaged finishes, apply coating system specified for the specific substrate. Apply final finish coat over entire surface from edge to edge and corner to corner.

3.8 CLEANING AND PROTECTION

A. At end of each workday, remove rubbish, empty cans, rags, and other discarded materials from Project site.

B. After completing paint application, clean spattered surfaces. Remove spattered paints by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces.

C. Protect work of other trades against damage from paint application. Correct damage to work of other trades by cleaning, repairing, replacing, and refinishing, as approved by Architect, and leave in an undamaged condition.

D. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces.

3.9 SURFACE-PREPARATION SCHEDULE

A. General: Before painting, prepare surfaces for painting according to applicable requirements specified in this schedule.

1. Examine surfaces to evaluate each surface condition according to paragraphs below.

2. Where existing degree of soiling prevents examination, preclean surface and allow it to dry before making an evaluation.

3. Repair substrate defects according to "Substrate Repair" Article.

B. Surface Preparation for MPI DSD 1 Degree of Surface Degradation:

1. Surface Condition: Paint film cracked or broken but adhered.

2. Paint Removal: Scrape by hand-tool cleaning methods to remove loose paint until only tightly adhered paint remains.

3. Preparation for Painting: Wash surface by detergent cleaning; use other cleaning methods for small areas of bare substrate if required. Roughen, degloss, and sand the cleaned surfaces to ensure paint adhesion and a smooth finish according to paint manufacturer's written instructions.

C. Surface Preparation for MPI DSD 2 Degree of Surface Degradation:

1. Surface Condition: Paint film loose, flaking, or peeling.

2. Paint Removal: Remove loose, flaking, or peeling paint film by hand-tool or chemical paint-removal methods.

3. Preparation for Painting: Wash surface by detergent cleaning; use solvent cleaning where needed. Use other cleaning methods for small areas of bare substrate if required. Sand surfaces to smooth remaining paint film edges. Prepare bare cleaned surface to be painted according to paint manufacturer's written instructions for substrate construction materials.

D. Surface Preparation for MPI DSD 3 Degree of Surface Degradation:

1. Surface Condition: Paint film severely deteriorated and surface indicated to have paint completely removed.

2. Paint Removal: Completely remove paint film by hand-tool or chemical paint-removal methods. Remove rust.

3. Preparation for Painting: Prepare bare cleaned surface according to paint manufacturer's written instructions for substrate construction materials.

3.10 EXTERIOR MAINTENANCE REPAINTING SCHEDULE

A. Ferrous Metal Substrates: Siding, Doors, Frames, Angle Iron, Support Brackets, Vents, Hoods:

1. High-Performance, Pigmented-Polyurethane-over-Epoxy System: MPI REX 5.1H system over a transition coat.

a. Prime Coat: For MPI DSD 2 degree of surface degradation, spot prime with

Primer, Epoxy, Anti-Corrosive, for Metal, MPI #101.

b. Intermediate Coat in Primed Areas: Epoxy, High Build, Low Gloss, MPI #108.

c. Topcoat: Polyurethane, two-component, pigmented, gloss (Gloss

Level 6), MPI #72.

d. Second Topcoat: Polyurethane, two-component, pigmented, gloss (Gloss

Level 6), MPI #72.

e. Color: Match existing colors.

B. Wood Framing, Deck Underside, and Fasciae:

1. Latex System: MPI REX 6.3A system over a transition coat.

a. Prime Coat: For MPI DSD 3 degree of surface degradation, fully prime coat with Primer, Alkyd for Exterior Wood, MPI #5.

b. Intermediate Coat: Latex, exterior, matching topcoat.

c. Topcoat: Latex, exterior, low sheen (Gloss Levels 3-4), MPI #15.

d. Color: Match existing colors.

3.11 INTERIOR MAINTENANCE REPAINTING SCHEDULE

A. Ferrous Metal Substrates: Doors, Frames:

1. Latex System: MPI RIN 5.1N system.

a. Prime Coat: For MPI DSD 1 degree of surface degradation, touch up with topcoat.

b. Topcoat: Latex, interior, flat (Gloss Level 1)MPI #53.

c. Color: Match existing colors.

B. Wood Paneling (Wall and General Interior Surfaces):

1. Low-Odor Latex System over Latex Primer: MPI RIN 6.4D system.

a. Prime Coat: For MPI DSD 1 degree of surface degradation, touch up with topcoat.

b. Topcoat: Latex, interior, institutional low odor/VOC flat (Gloss

Level 1), MPI #143.

c. Color: Match existing colors.

END OF SECTION 090190.52

APPENDIX A – SUPPORTING DOCUMENTS

Figure 1 – Floor Plan with approximate dimensions

PART 1 - GENERAL
1.1 SCOPE OF WORK
A. Furnish the equipment, labor, material and tools refurbish the VOR facility near Carleton, MI in accordance with this specification.
B. Facility Location: Near 11680 Martinsville Rd, Carleton, MI 48117 (located at coordinates 42 02’ 52.9” North and 83 27’ 27.7” West, and about 3 miles West of Carleton, MI)
C. Google Map Link; http://maps.google.com/maps?q=42.04803%2C-83.45757
D. Under this contract;
1. Make surface repairs, prepare and paint in accordance with this specification, the following areas;
2. Provide fluid-applied waterproofing membrane with non-slip surface throughout the building floor at a minimum thickness of 40 mils, such as Tremco Vulkem OC810, or approved equal. Prepare surface in accordance with membrane manufacturer’s instruct...
3. Replace weather stripping on door to Engine/Generator Room.
4. Replace or repair broken soffit panel. New material to be of equivalent material, style, thickness, and color.
5. Replace all acoustical ceiling panels throughout building. Match existing style and quality, and provide 10% extra material for later use.
6. Replace two wall heaters with equivalent size heaters.
1.2 OPTION WORK
A. If the existing paint tests positive for lead (testing to be done by FAA), provide pricing to used approved removal methods.
1.3 PRE-CONSTRUCTION CONFERENCE
A. Attend a pre-construction conference if arranged by the FAA Contracting Officer. Conference agenda will include coordination of-
1. safety practices;
2. scheduling;
3. operating procedures; and
4. submittals.

B. Submit a construction work schedule to the Contracting Officer prior to the pre-construction meeting for approval.

1.4 WORK RESTRICTIONS
A. All work must be accomplished by experienced workers in accordance with the highest standards of the various work trades involved. Workers must abide by safety requirements, set forth by OSHA, that correspond to the type of work being performed.
B. The Contractor will not be entitled to additional monetary compensation for labor expended outside of the contract time, unless approved in writing by the Contracting Officer in advance.
1.5 CLEANING
A. Working Area. Keep the working area in a clean and proper condition at all times. All rubbish, waste, equipment, and tools must be removed daily or when directed by the FAA COR.
B. Final Cleanup. Upon completion of work and before final acceptance by the FAA, remove tools, equipment, debris, rubbish, and unused materials from the construction site and prep area.
1.6 INGRESS AND EGRESS TO WORK AREA
A. Workers will be escorted at all times when working inside the secure area.
B. Ingress and egress to the work areas and contractor parking will be discussed at the pre-construction meeting. Security precautions against unauthorized site entrance are maintained at all times. Keep all vehicles, working equipment and materials w...
1.7 COORDINATION
A. All correspondence between the contractor, airport authority, and Federal Aviation Administration (FAA) must be through the FAA’s Contracting Officer or the Contracting Officer’s Representative (COR).
B. At no expense to the FAA, procure all construction and working permits required by local and state agencies.
1.8 TEMPORARY FACILITIES AND CONTROLS
A. Provide temporary restroom facilities outside of the building for the duration of the construction for workers.
B. Throughout the duration of the project, supply temporary electricity, air, and water as needed for the completion of the project.
1.9 SAFETY
A. The contractor shall be responsible for safety on the work site. It is the responsibility of the contractor to eliminate hazards, which may result in tripping, electrical shock, fire, falling objects, environmental hazards, vehicular accidents, et...
B. All work to be done in accordance with EPA Lead Safe requirements.
PART 2 - NOT USED
PART 3 - NOT USED
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section includes maintenance repainting as follows:
1. Removing existing paint.
2. Patching substrates.
3. Repainting.
1.3 DEFINITIONS
A. Gloss Level 1: Not more than 5 units at 60 degrees and 10 units at 85 degrees, according to ASTM D523.
B. Gloss Level 2: Not more than 10 units at 60 degrees and 10 to 35 units at 85 degrees, according to ASTM D523.
C. Gloss Level 3: 10 to 25 units at 60 degrees and 10 to 35 units at 85 degrees, according to ASTM D523.
D. Gloss Level 4: 20 to 35 units at 60 degrees and not less than 35 units at 85 degrees, according to ASTM D523.
E. Gloss Level 5: 35 to 70 units at 60 degrees, according to ASTM D523.
F. Gloss Level 6: 70 to 85 units at 60 degrees, according to ASTM D523.
G. Gloss Level 7: More than 85 units at 60 degrees, according to ASTM D523.
H. Low-Pressure Spray: 100 to 400 psi; 4 to 6 gpm.
I. Medium-Pressure Spray: 400 to 800 psi; 4 to 6 gpm.
1.4 SEQUENCING AND SCHEDULING
A. Perform maintenance repainting in the following sequence, which includes work specified in this and other Sections:
1. Dismantle existing surface-mounted objects and hardware except items indicated to remain in place. Tag items with location identification and protect.
2. Verify that temporary protections have been installed.
3. Examine condition of surfaces to be painted.
4. Remove existing paint to the degree required for each substrate and surface condition of existing paint.
5. Apply paint system.
6. Reinstall dismantled surface-mounted objects and hardware unless otherwise indicated.
1.5 ACTION SUBMITTALS
A. Product Data: For each type of product.
1. Include recommendations for product application and use.
2. Include test data substantiating that products comply with requirements.
B. Product List: For each paint product indicated, include the following:
1. Cross-reference to paint system and locations of application areas. Use same designations indicated on Drawings and in schedules.
2. Printout of current "MPI Approved Products List" for each MPI-product category specified in paint systems, with the proposed product highlighted.
3. VOC content.
1.6 MAINTENANCE MATERIAL SUBMITTALS
A. Furnish extra paint materials, from the same production run, that match products applied and that are packaged with protective covering for storage and identified with labels describing contents, including material, finish, source, and location on ...
1. Quantity: Furnish Owner with an additional 5 percent, but not less than 1 gal. or one case, as appropriate, of each material and color applied.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Store materials not in use in tightly covered containers in well-ventilated areas with ambient temperatures continuously maintained at not less than 45 deg F.
1. Maintain containers in clean condition, free of foreign materials and residue.
2. Remove rags and waste daily.
1.8 FIELD CONDITIONS
A. Weather Limitations: Proceed with maintenance repainting only when existing and forecasted weather conditions are within the environmental limits set by each manufacturer's written instructions and specified requirements.
B. Apply paints only when temperature of surfaces to be painted and ambient air temperatures are between 50 and 95 deg F.
C. Do not apply paint in snow, rain, fog, or mist; when relative humidity exceeds 85 percent; at temperatures less than 5 deg F above the dew point; or to damp or wet surfaces.
1. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by manufacturer for surface preparation and during paint application and drying periods.
PART 2 - PRODUCTS
2.1 PREPARATORY CLEANING MATERIALS
A. Water: Potable.
B. Detergent Solution: Solution prepared by mixing 2 cups of tetrasodium pyrophosphate (TSPP), 1/2 cup of laundry detergent that contains no ammonia, 5 quarts of 5 percent sodium hypochlorite bleach, and 15 quarts of warm water for every 5 gal. of sol...
C. Mildewcide: Commercial proprietary mildewcide or a job-mixed solution prepared by mixing 1/3 cup of household detergent that contains no ammonia, 1 quart of 5 percent sodium hypochlorite bleach, and 3 quarts of warm water.
D. Abrasives for Ferrous Metal Cleaning: Aluminum oxide paper, emery paper, fine steel wool, steel scrapers, and steel-wire brushes of various sizes.
E. Rust Remover: Manufacturer's standard phosphoric acid-based gel formulation, also called "naval jelly," for removing corrosion from iron and steel.
2.2 PAINT REMOVERS
A. Alkaline Paste Paint Remover: Manufacturer's standard alkaline paste or gel formulation for removing paint from masonry, stone, wood, plaster, or metal as required to suit Project; and containing no methylene chloride.
B. Covered or Skin-Forming Alkaline Paint Remover: Manufacturer's standard covered or skin-forming alkaline paste or gel formulation for removing paint from masonry, stone, wood, plaster, or metal as required to suit Project; and containing no methyle...
C. Solvent-Type Paste Paint Remover: Manufacturer's standard water-rinsable, solvent-type paste or gel formulation for removing paint from masonry, stone, wood, plaster, or metal as required to suit Project.
D. Low-Odor, Solvent-Type Paste Paint Remover: Manufacturer's standard low-odor, water-rinsable, solvent-type paste, gel, or foamed emulsion formulation for removing paint from masonry, stone, wood, plaster, or metal as required to suit Project; and c...
E. Covered, Solvent-Type Paste Paint Remover: Manufacturer's standard, low-odor, covered, water-rinsable, solvent-type paste or gel formulation for removing paint from masonry, stone, wood, plaster, or metal as required to suit Project; and containing...
2.3 PAINT, GENERAL
A. Material Compatibility:
1. Provide materials for use within each paint system that are compatible with one another and substrates indicated, under conditions of service and application as demonstrated by manufacturer, based on testing and field experience.
2. For each coat in a paint system, provide products recommended in writing by manufacturers of topcoat for use in paint system and on substrate indicated.

B. Colors: As indicated with each paint system in maintenance repainting schedule(s) at the end of Part 3.

2.4 PAINT MATERIALS, GENERAL
A. MPI Standards: Provide products that comply with MPI standards indicated and that are listed in its "MPI Approved Products List."
B. Transition Coat: Paint manufacturer's recommended coating for use where a residual existing coating is incompatible with the paint system.
2.5 PAINT MATERIAL MANUFACTURERS
A. Select interior paint from one of the following:
1. Sherwin-Williams Co. (Sherwin-Williams).
2. Benjamin Moore & Co. (Benjamin Moore).
3. Coronado Paint Company (Coronado).
4. ICI Paint Stores, Inc. (Dulux Paint).
5. Kelly-Moore Paint Co. (Kelly-Moore).
6. M. A. Bruder & Sons, Inc. (M. A. B. Paint).
7. PPG Industries, Inc. (Pittsburgh Paints).
8. Tnemec Company, Inc.
2.6 PAINT MATERIALS
A. Primers and Sealers:
1. Primer, Latex, for Interior Wood: MPI #39.
2. Primer, Stain Blocking, Water Based: MPI #137.
B. Metal Primers:
1. Primer, Metal, Surface Tolerant: MPI #23.
2. Primer, Rust-Inhibitive, Water Based: MPI #107.
3. Primer, Epoxy, Anti-Corrosive, for Metal: MPI #101.
C. Wood Primers:
1. Primer, Alkyd for Exterior Wood: MPI #5.
D. Water-Based Paints:
1. Latex, Interior, Institutional Low Odor/VOC, Flat (Gloss Level 1):MPI #143.
a. Basis-of-Design Product: Sherwin Williams Harmony.

2. Latex, Exterior:

E. Epoxy Coatings:
1. Epoxy, High-Build, Low Gloss: MPI #108.
F. Polyurethane Coatings:
1. Polyurethane, Two-Component, Pigmented, Gloss (Gloss Level 6):MPI #72.
2.7 FLOOR COATING
A. Coating: Manufacturer's standard aliphatic urethane, low-odor, low-VOC, traffic-bearing, seamless, high-solids-content, cold liquid-applied, elastomeric, waterproofing membrane system with integral, non-slip wearing surface for pedestrian traffic.
B. Manufacturers: Subject to compliance with requirements, provide products by one of the following, or approved equal:
1. Tremco Incorporated: Vulkem OC 810
C. Primer: Liquid waterborne primer recommended for substrate and conditions by coating manufacturer.
1. Material: Urethane.
2. TREMPrime Multi Surface Primer
3. Vulkem191 Low VOC Primer
D. One Coat System: Aliphatic Urethane
E. Application: Roller-applied or Self-leveling.
F. Thicknesses: Minimum wet film thickness (35-40 wet mils) as recommended in writing by manufacturer for substrate and service conditions indicated, measured excluding aggregate
G. Aggregate Content: As recommended in writing by coating manufacturer for substrate and service conditions indicated.
H. Color: As selected by COR from manufacturer's standard range.
I. Aggregate: Manufacturer's standard aggregate for each use indicated of particle sizes, shape, and minimum hardness recommended by coating manufacturer for use with coating product.
2.8 PATCHING MATERIALS
A. Wood-Patching Compound: Two-part, epoxy-resin, wood-patching compound; knife-grade formulation as recommended in writing by manufacturer for type of wood repair indicated, tooling time required for the detail of work, and site conditions. Compound ...
B. Metal-Patching Compound: Two-part, polyester-resin, metal-patching compound; knife-grade formulation as recommended in writing by manufacturer for type of metal repair indicated, tooling time required for the detail of work, and site conditions. Co...
C. Cementitious Patching Compounds: Cementitious patching compounds and repair materials specifically manufactured for filling cementitious substrates and for sanding or tooling prior to repainting; formulation as recommended in writing by manufacture...
PART 3 - EXECUTION
3.1 PROTECTION
A. Comply with each manufacturer's written instructions for protecting building and other surfaces against damage from exposure to its products. Prevent chemical solutions from coming into contact with people, motor vehicles, landscaping, buildings, a...
1. Cover adjacent surfaces with materials that are proven to resist chemical solutions being used unless the solutions will not damage adjacent surfaces. Use protective materials that are UV resistant and waterproof. Apply masking agents to comply wit...
2. Do not apply chemical solutions during winds of sufficient force to spread them to unprotected surfaces.
3. Neutralize and collect alkaline and acid wastes before disposal.
4. Dispose of runoff from operations by legal means and in a manner that prevents soil erosion, undermining of paving and foundations, damage to landscaping, and water penetration into building interiors.
3.2 MAINTENANCE REPAINTING, GENERAL
A. Maintenance Repainting Appearance Standard: Completed work is to have a uniform appearance as viewed by Architect from building interior at 10 feet away from painted surface and from building exterior at 50 feet away from painted surface.
B. Execution of the Work: In repainting surfaces, disturb them as minimally as possible and as follows:
1. Remove failed coatings and corrosion and repaint.
2. Verify that substrate surface conditions are suitable for repainting.
3. Allow other trades to repair items in place before repainting.
C. Mechanical Abrasion: Where mechanical abrasion is needed for the work, use gentle methods, such as scraping and lightly hand sanding, that will not abrade softer substrates, reducing clarity of detail.
D. Heat Processes: Do not use torches, heat guns, or heat plates.
3.3 EXAMINATION
A. Examine substrates and conditions, with Installer present, for compliance with requirements for maximum moisture content and other conditions affecting performance of painting work. Comply with paint manufacturer's written instructions for inspection.
B. Maximum Moisture Content of Substrates: Do not begin application of coatings unless moisture content of exposed surface is below the maximum value recommended in writing by paint manufacturer and not greater than the following maximum values when m...
1. Concrete: 12 percent.
2. Masonry (Clay and CMU): 12 percent.
3. Portland Cement Plaster: 12 percent.
4. Wood: 15 percent.
C. Alkalinity: Do not begin application of coatings unless surface alkalinity is within range recommended in writing by paint manufacturer. Conduct alkali testing with litmus paper on exposed plaster, cementitious, and masonry surfaces.
D. Verify suitability of substrates, including surface conditions and compatibility with existing finishes and primers.
1. If existing surfaces cannot be prepared to an acceptable condition for proper finishing by using specified surface-preparation methods, notify Architect in writing.
E. Begin coating application only after unsatisfactory conditions have been corrected and surfaces are dry.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .