Technical Specification - Attachment X.pdf
PDF 1 MB Posted
- Attached to
- MDOT MVA Easton Replacement of Fire Alarm System
- Solicitation number
- BPM035579
- Issued by
- Talbot County, Elkridge CDP, Maryland
About this file
This document is a technical specification for the replacement of the fire alarm system at the MDOT MVA Easton Branch Office in Easton, Maryland. The project is located in Queen Anne County and the solicitation number is VEAS23046C. The work involves replacing the existing fire alarm system, including all necessary electrical work such as conduits, wiring, boxes, and devices. The technical specification outlines the required materials, equipment, performance criteria, and installation procedures for the new fire alarm system. Bidders will be required to perform low-voltage testing, inspections, and training as part of the project. The work must comply with all applicable codes, regulations, and standards.
The contract will be awarded to the lowest responsive and responsible bidder. Pricing terms, set-asides, incumbent information, funding requirements, and other salient commercial details are not provided in the technical specification. The document focuses solely on the technical requirements for the fire alarm system replacement project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| MDOT MVA V-EAS-23046-C_Amendment No.2.pdf | ||
| Prevailing Wage Attachment P.pdf | ||
| MDOT MVA V-EAS-23046-C_Amendment No.1.pdf | ||
| Attachment B-1 BID FORM.xlsx | XLSX spreadsheet | |
| MVA Easton Fire Alarm Replacement IFB.pdf | ||
| Drawings Attachment Y.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TECHNICAL SPECIFICATION
FOR
CONSTRUCTION OF
MDOT MVA REPLACEMENT OF FIRE ALARM SYSTEM AT
EASTON BRANCH
9148 CENTREVILLE ROAD
EASTON, MARYLAND 21601
QUEEN ANNE COUNTY
CLASSIFICATION CLASS
D
SOLICITATION NO. VEAS23046C
Replacement of Fire Alarm System SOLICITATION NO. VEAS23046C Easton, MD
TABLE OF CONTENTS - 1
TABLE OF CONTENTS
DIVISION 0: PROCUREMENT AND CONTRACTING REQUIREMENTS PAGES
To be provided by MVA
TECHNICAL SPECIFICATIONS
DIVISION 1: GENERAL REQUIREMENTS PAGES
To be provided by MVA 010100 Summary of Works ………………………………….. 3
DIVISION 2: EXISTING CONDITIONS
DIVISION 3: CONCRETE N/A
DIVISION 4: MASONRY N/A
DIVISION 5: METALS N/A
DIVISION 6: WOOD AND PLASTICS N/A
DIVISION 7: THERMAL AND MOISTURE PROTECTION
079000 Joint Sealants ……………………………………… 5
DIVISION 8: DOORS AND WINDOWS N/A
DIVISION 9: FINISHES
099000 Painting ……………………………………………… 10
DIVISION 10: SPECIALTIES N/A
DIVISION 11: EQUIPMENT N/A
DIVISION 12: FURNISHING N/A
DIVISION 13: SPECIAL CONSTRUCTION N/A
DIVISION 14: CONVEYING EQUIPMENT N/A
DIVISION 22: PLUMBING N/A
DIVISION 23: MECHANICAL N/A
TABLE OF CONTENTS - 2
DIVISION 26: ELECTRICAL
260500 Basic Electrical Requirements …………………………….. 16 260519 Low Voltage Electrical Power Conductors and Cables …. 7 260523 Control-Voltage Electrical Power Cables …………………. 8 260526 Grounding and Bonding for Electrical Systems ………….. 7 260529 Hangers and Supports for Electrical Systems …………… 5
260533.13 Conduits for Electrical Systems …………………………… 12
260533.16 Boxes and Covers for Electrical Systems ………………... 5
260533.23 Surface Raceways for Electrical Systems ……………….. 5
260544 Sleeves and Sleeve Seals for Electrical Raceways and
Cabling ……………………………………………………… 4 260553 Identification for Electrical Systems ……………………… 12
DIVISION 28: COMMUNICATIONS
284621.11 Addressable Fire-Alarm Systems ………………………… 27
END OF TABLE OF CONTENTS
Replacement of Fire Alarm System
SOLICITATION NO. VEAS23046C
JOINT SEALANTS 079000 - 1
SECTION 079000 – JOINT SEALANTS
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of Contract, including General and Supplementary
Conditions and Division-1 Specification sections, apply to work of this section.
1.2 DESCRIPTION OF WORK
A. The required applications of sealants and caulking include, but are not necessarily limited to, the following general locations:
1. Masonry control joints.
2. Flooring joints.
3. Isolation joints, between structure and other elements.
4. Joints at the penetrations of walls, decks and floors by piping and other services and equipment.
1.3 QUALITY ASSURANCE
A. Obtain elastomeric materials from only manufacturers who will, if required, send a qualified technical representative to the project site, for the purpose of advising the Installer of proper procedures and precautions for the use of the materials.
B. Installer: A firm with a minimum of 5 years’ successful experience in the application of the types of materials required.
1.4 SUBMITTALS
A. Manufacturer's Data, Sealants and Caulking: Submit manufacturer's specifications, recommendations, and installation instructions for each type of sealant, caulking compound and associated miscellaneous material required in accordance with Div 1, Submittals. Include manufacturer's published data, or letter of certification, or certified test laboratory report indicating that each material complies with the requirements and is intended generally for the applications shown. Show by transmittal that one copy of each recommendation and instruction has been distributed to the Installer.
B. Samples, Sealants and Caulking: Submit 3, 12" long samples of each color required (except black) for each type of sealant or caulking compound exposed to view. Install sample between two strips of material like or representative of typical surfaces where sealant or compound will be used, held apart to represent typical joint widths. Samples will be reviewed by Architect for color and texture only. Compliance with all other requirements is the exclusive responsibility of the Contractor.
C. Guarantee, Sealants: Submit in accordance with Div. 1, Submittals copies of written guarantee agreeing to repair or replace sealants which fail to perform as air-tight and water-tight joints; or fail in joint adhesion, cohesion, abrasion resistance, stain resistance, weather resistance, extrusion resistance, migration resistance, or general durability; or appear to deteriorate in any other manner not clearly specified by submitted manufacturer's data, as an inherent quality of the material for the exposure indicated.
Provide a guarantee signed by the Installer and Contractor.
D. The guarantee period is two years.
1.5 JOB CONDITIONS
A. Condition of Other Work: The Installer must examine the joint surfaces, backing, and anchorage of units forming sealant rabbet, and the conditions under which the sealant
SOLICITATION NO. VEAS23046C
JOINT SEALANTS 079000 - 2
work is to be performed, and notify the Contractor in writing of conditions detrimental to the proper and timely completion of the work and performance of the sealants. Do not proceed with the sealant work until unsatisfactory conditions have been corrected in a manner acceptable to the Installer.
B. Weather Conditions: Do not proceed with installation of sealants under adverse weather conditions, or when temperatures are below or above manufacturer's recommended limitations for installation. Proceed with the work only when forecasted weather conditions are favorable for proper cure and development of high early bond strength.
Wherever joint width is affected by ambient temperature variations, install elastomeric sealants only when temperatures are in the lower third of manufacturer's recommended installation temperature range, so that sealant will not be subjected to excessive elongation and bond stress at subsequent low temperatures. Coordinate time schedule with Contractor to avoid delay of project.
PART 2 - PRODUCTS
2.1 MATERIALS, GENERAL
A. Colors: Provide black or other natural color wherever no other color is available.
Wherever compound is not exposed to view, provide manufacturer's standard color which has the best overall performance characteristics for the application shown.
B. Provide color selected by Owner/Architect from manufacturer's standard colors.
C. Hardness: Hardness shown and specified are intended to indicate the general range necessary for overall performance. Consult the manufacturer's technical representative to determine the actual hardness recommended for the conditions of installation and use. Except as otherwise indicated or recommended, provide compounds within the following ranges of hardness (Shore A, fully cured, at 75 degrees F.):
D. 5 to 20 for high percentage of movement and minimum exposure to weather and abrasion (including no exposure to vandalism).
E. 15 to 35 for moderate percentage of movement and moderate exposure to weather and abrasion.
F. 30 to 60 for low percentage of movement and maximum exposure to weather and abrasion (including foot traffic on horizontal joints).
G. Modules of Elasticity: For joints subject to movement, either thermal expansion or dynamic movement, provide elastomeric sealants which have the lowest modules of elasticity which is consistent with the exposure to abrasion or vandalism. For horizontal joints subject to traffic provide sealants with high modules of elasticity, as required to withstand indentation by stiletto heels. Comply with manufacturer's recommendations wherever no other requirements are indicated.
H. Compatibility: Before purchase of each specified sealant, investigate its compatibility with the joint surfaces, joint fillers, and other materials in the joint system. Provide only materials (manufacturer's recommended variation of the specified materials) which are known to be fully compatible with the actual installation condition, as shown by manufacturer`s published data or certification.
2.2 JOINT SEALANT MATERIAL
A. ACRYLIC LATEX (AL): ASTM C834, non-sag; non-staining; non-bleeding.
1. Joint Movement Range without Cohesive/Adhesive failure: Plus 7.5% to minus
7.5% of joint width.
2. Color: Will be selected by A/E from the manufacturer’s full color range.
3. Acceptable Manufacturer and Products:
SOLICITATION NO. VEAS23046C
JOINT SEALANTS 079000 - 3
a. AC-20, Pecora
b. Sonolac, Sonneborn
c. Acrylic Lates 834, Tremco
B. SILICONE – General Purpose (S-GB): ASTM C920, Type S, Grade NS:
1. Class: 25. Joint Movement Range without Cohesive/Adhesive failure: Plus 50% to minus 50% of joint width.
2. Uses: NT, M, G, A, O
3. Low modulus, single component, neutral curing, non-staining; non-bleeding silicone sealant
4. Color: Will be selected by A/E from the manufacturer’s full color range.
5. Acceptable Manufacturer and Products:
a. 864, Pecora
b. 790, Dow Corning
c. Spectrum 1, Tremco
d. Silpruf, General Electric
C. SILICONE – Sanitary (S-S): ASTM C920, Type S, Grade NS:
1. Class: 25.
2. Uses: NT, M, G, A, O
3. Neutral or acid curing, non-staining; non-bleeding, fungicide-containing
4. Color: Will be selected by A/E from the manufacturer’s full color range.
5. Acceptable Manufacturer and Products:
a. 898 Sanitary Silicone, Pecora
b. 786 Mildew-Resistant silicone sealant, Dow Corning
c. Rhodorsil 3B, Rhone Poulenc
d. Sanitary 1700, General Electric
2.3 MISCELLANEOUS MATERIALS
A. Joint Cleaner: Provide the type of joint cleaning compound recommended by the sealant or caulking compound manufacturer, for the joint surfaces to be cleaned.
B. Joint Primer/Sealer: Provide the type of joint primer/sealer recommended by the sealant manufacturer, for the joint surfaces to be primed or sealed.
C. Bond Breaker Tape: Polyethylene tape or other plastic tape as recommended by sealant manufacturer, to be applied to sealant-contact surfaces where bond to the substrate or joint filler must be avoided for proper performance of sealant. Provide self-adhesive tape wherever applicable.
D. Sealant Backer Rod: Compressible rod stock polyethylene foam, polyethylene jacketed polyurethane foam, butyl rubber foam, neoprene foam or other flexible, permanent, durable non-absorptive material as recommended for compatibility with sealant by the sealant manufacturer. Provide size and shape of rod which will control the joint depth for sealant placement, break bond of sealant at bottom of joint, form optimum shape of sealant bead on back side, and provide a highly compressible backer to minimize the possibility of sealant extrusion when joint is compressed.
SOLICITATION NO. VEAS23046C
JOINT SEALANTS 079000 - 4
PART 3 – EXECUTION
3.1 JOINT SURFACE PREPARATION
A. Clean joint surfaces immediately before installation of sealant or caulking compound.
Remove dirt, insecure coatings, moisture, and other substances which would interfere with bond of sealant or caulking compound.
B. For elastomeric sealants, do not proceed with installation of sealant over joint surfaces which have been painted, lacquered, waterproofed, or treated with water repellent or other treatment or coating unless a laboratory test for durability (adhesion), in compliance with Paragraph 4.3.9 of FS TT-S-00227 has successfully demonstrated that sealant bond is not impaired by the coating or treatment. If laboratory test has not been performed, or shows bond interference, remove coating or treatment from joint surfaces before installing sealant.
C. Etch concrete and masonry joint surfaces to remove excess alkalinity unless sealant manufacturer's printed instructions indicate that alkalinity does not interfere with sealant bond and performance. Etch with 5% solution of muriatic acid; neutralize with dilute ammonia solution, rinse thoroughly with water and allow to dry before sealant installation.
D. Roughen joint surfaces on vitreous coated and similar non-porous materials, wherever sealant manufacturer's data indicates lower bond strength than for porous surfaces.
Rub with fine abrasive cloth or wool to produce a dull sheen.
3.2 INSTALLATION
A. Comply with sealant manufacturer's printed instructions except where more stringent requirements are shown or specified and except where manufacturer's technical representative directs otherwise.
B. Prime or seal the joint surfaces wherever shown or recommended by the sealant manufacturer. Do not allow primer/sealer to spill or migrate onto adjoining surfaces.
C. Install sealer backer rod for liquid elastomeric sealants, except where shown to be omitted or recommended to be omitted by sealant manufacturer for the application shown.
D. Install bond backer tape wherever shown and wherever required by manufacturer's recommendations to ensure that elastomeric sealants will perform properly.
E. Employ only proven installation techniques, which will ensure that sealants will be deposited in uniform, continuous ribbons without gaps or air pockets, with complete "wetting" of the joint bond surfaces equally on opposite sides. Except as otherwise indicated, fill sealant rabbet to a slightly concave surface, slightly below adjoining surfaces. Where horizontal joints are between a horizontal surface and a vertical surface, fill joint to form a slight cove, so that joint will not trap moisture and dirt.
F. Install sealants to depths as shown or, if not shown, as recommended by the sealant manufacturer but within the following general limitations, measured at the center (thin) section of the bead.
G. For normal moving joints sealed with elastomeric sealants, but not subject to traffic, fill joints to a depth equal to 50% of joint width, but neither more than 1/2" deep nor less than 1/4" deep.
H. For joints sealed with non-elastomeric sealants and caulking compounds, fill joints to a depth in the range of 75% to 125% of joint width.
I. Spillage: Do not allow sealants or compounds to overflow or spill onto adjoining surfaces, or to migrate into the voids of adjoining surfaces including rough textures such as exposed aggregate panels. Use masking tape or other precautionary devices to
SOLICITATION NO. VEAS23046C
JOINT SEALANTS 079000 - 5
prevent staining of adjoining surfaces, by either the primer/sealer or the sealant/caulking compound.
J. Remove excess and spillage of compounds promptly as the work progresses. Clean the adjoining surfaces by whatever means may be necessary to eliminate evidence of spillage, without damage to the adjoining surfaces or finishes.
3.3 CURE AND PROTECTION
A. Cure sealants and caulking compounds in compliance with manufacturer's instructions and recommendations, to obtain high early bond strength, internal cohesive strength, and surface durability.
END OF SECTION 079000
PAINTING 099000 - 1
SECTION 099000 - PAINTING
PART 1 GENERAL
1.1 SUMMARY
A. Section Includes:
1. Work under this section consists of surface preparation, priming, painting, and finishing work necessary to complete Work indicated or reasonably implied on Drawings.
2. Use coating systems specified in this section. Without restricting volume or generality, work to be performed under this section may include, but is not limited to new and previously painted:
a. Interior & Exterior steel
b. Interior & Exterior CMU
f. Interior gypsum Board
g. Supports
h. Exposed bare pipes (including color coding)
3. Painting or finishing is not needed for following:
a. Items provided with factory finish
b. Equipment nameplates, fire rating labels, and operating parts of equipment
4. Materials and products having factory-applied primer shall not be considered factory finished.
B. Related Sections:
1. Division 26 & 28
1.2 REFERENCES
A. Publications listed herein are part of this specification to the extent referenced.
B. American Society for Testing and Materials:
1. ASTM B 117 Salt Spray (fog) Testing
2. ASTM C 308 Working, Setting & Service Strength Time
3. ASTM C 496 Splitting Tensile Strength
4. ASTM C 531 Linear Shrinkage Strength
5. ASTM C 579 Compressive Strength
6. ASTM C 580 Flexural Strength
7. ASTM C 882 Bond Strength
8. ASTM D 522 Method A & B Conical Mandrel
9. ASTM D 638 Tensile Strength
10. ASTM D 695 Compressive Strength
11. ASTM D 790 Flexural Strength & Modulus of Elasticity
12. ASTM D 870 Immersion
13. ASTM D1014 Exterior Exposure
14. ASTM D1653 Moisture Vapor Transmission
15. ASTM D 2047 Coefficient of Friction
PAINTING 099000 - 2
16. ASTM D 2240 Hardness Shore D Durometer
17. ASTM D 2246 Freeze Thaw
18. ASTM D 2247 Humidity
19. ASTM D 2370 Tensile Strength & Elongation
20. ASTM D 2794 Impact
21. ASTM D 2805 Contrast Ratio (Hiding) & Light Reflectance
22. ASTM D 3273 Fungual Resistance - 900 F (320 C) 95 to 98% R. H.
23. ASTM D 3359 Adhesion - Method B mm Crosshatch
24. ASTM D 3363 Hardness (Pencil)
25. ASTM D 4060 Abrasion (CS-17 Wheel, 1000 grams load)
26. ASTM D 4213 Scrubbability
27. ASTM D 4141 Exterior Exposure - Method C (EMMAQUA)
28. ASTM D 4263 Concrete Moisture Test by the Plastic Sheet Method.
29. ASTM D 4541 Adhesion - Type II Fixed Aligment
30. ASTM D 4541 Adhesion - Type V Self Aligning
31. ASTM D 4585 Humidity
32. ASTM E 84 Surface Burning Characteristics of Building Materials
33. ASTM G 53 QUV – (FS-40 Lamp, 4 Hours UV/600 Con/500 C
C. Federal Test Standard
1. TT-C-555B, 4.4.7.3 – Wind Driven Rain
D. National Fire Protection Association:
1. NFPA 101 Life Safety Code
E. Steel Structures Painting Council:
1. SSPC SP-1 Specification for Solvent Cleaning
2. SSPC SP-2 Specification for Hand Tool Cleaning
3. SSPC SP-3 Specification for Power Tool Cleaning
4. SSPC SP-5 Specification for White Metal Blast Cleaning
5. SSPC SP-6 Specification for Commercial Blast Cleaning
6. SSPC SP-7 Specification for Brush-Off Blast Cleaning
7. SSPC SP-10 Specification for Near White Metal Blast Cleaning
8. SSPC SP-11 Specification for Power Tool Cleaning to Bare Metal
9. SSPC SP-12 Specification for Water Jetting
10. SSPC SP13 Specification for Concrete
11. SSPC PA-1 Painting Application Specification
1.3 DEFINITIONS
A. Terms PAINT or PAINTING shall in a general sense have reference to sealers, primers, oil, alkyd, latex, polyurethane, epoxy, and enamel type coatings and application of these materials.
B. DRY FILM THICKNESS (DFT): Thickness, measured in mills, of a coat of paint in cured state.
C. Conform to ASTM D16 for interpretation of terms used in this section.
1.4 SUBMITTALS
A. Product Data:
PAINTING 099000 - 3
1. Submit manufacturer's literature describing products to be provided, giving manufacturer's name, product name, and product line number for each material.
2. Submit technical data sheets for each coating, giving descriptive data, curing times, mixing, thinning, and application requirements.
a. Provide material analysis, including vehicle type and percentage by weight and by volume of vehicle, resin, and pigment.
3. Submit manufacturer's Material Safety Data Sheets (MSDS) and other safety requirements.
B. Shop Drawings:
1. Submit a complete list of products proposed for use, including identifying product names and catalog numbers.
a. Arrange in same format as Schedule of Paint Finishes below.
b. Include applicable manufacturer's data and recommendations.
C. Quality Assurance Submittals:
1. Test Reports:
a. Provide certified test reports, prepared by an independent testing laboratory, confirming compliance with specified performance criteria.
2. Certificates:
a. Coatings manufacturer shall certify that coating materials utilized are "non-lead" (less than 0.06% lead by weight in dried film) as defined in Part 1303 of Consumer Product Safety Act.
3. Manufacturer's Instructions:
a. Submit manufacturer's installation procedures which shall be basis for accepting or rejecting actual installation procedures.
1.5 QUALITY ASSURANCE
A. Qualifications:
1. Provide products from a company specializing in manufacture of painting with a minimum of 10 years experience.
2. Applicator shall be trained in application techniques and procedures of coating materials and shall demonstrate a minimum of 2 years successful experience in such application.
a. Maintain, throughout duration of application, a crew of painters who are fully qualified to satisfy specified qualifications.
3. Single Source Responsibility:
a. Materials shall be products of a single manufacturer or items standard with manufacturer of specified coating materials.
b. Provide secondary materials which are produced or are specifically recommended by coating system manufacturers to ensure compatibility of system.
B. Regulatory Requirements:
PAINTING 099000 - 4
1. Conform to applicable codes and ordinances for flame, fuel, smoke, and volatile organic compound (VOC) ratings requirements for finishes at time of application.
1.6 DELIVERY, STORAGE, AND HANDLING
A. Packing, Shipping, Handling, and Unloading:
1. Deliver products in manufacturer's original unopened containers. Each container shall have the manufacturer’s label, intact and legible. Containers shall fully identify brand, type, grade, class, and other qualifying information used to describe contents.
2. Include on label for each container:
a. Manufacturer's name
b. Type of paint
c. Manufacturer's stock number
d. Color name and number
e. Instructions for thinning, where applicable
B. Storage and Protection:
1. Store materials in a protected area, away from construction activities. Restrict storage area to paint materials and related equipment.
2. Maintain temperature in area of storage between 40 degrees F and 110 degrees F.
3. Comply with health and fire safety regulations.
4. Remove damaged materials from Site.
1.7 PROJECT CONDITIONS
A. Environmental Requirements:
1. Apply coating materials under conditions as follows:
a. Air temperature shall not be below 35 degrees F or above 110 degrees F.
b. Refer to specific product information sheets for minimum surface temperature requirements. Surface temperatures shall be at least 5 degrees F above dew point and in a rising mode.
c. Relative humidity shall be no higher than 85%.
d. For exterior spray application, wind velocity shall be less than 15 mph.
e. Atmosphere shall be relatively free of airborne dust.
PART 2 PRODUCTS
2.1 MANUFACTURERS
A. Materials specified herein shall not preclude consideration of equivalent or superior materials. Suggested equivalent materials or other substitutions shall be submitted to Architect for review.
2.2 COATING MATERIALS
A. The calculation of VOC (Volatile Organic Compound) shall exclude water and tinting color added at the point of sale:
1. Interior Coatings: VOC weight in grams/liter of product minus water
PAINTING 099000 - 5
a. Non-Flat: 150
b. Flat: 50
2. Exterior Coatings: VOC weight in grams/liter of product minus water
a. Non-Flat: 250
b. Flat: 100
B. Comply with Paint and Coatings – GS-11 as published by 2010 Green Seal, Inc.
C. All products shall be used as non-flat.
PART 3 EXECUTION
3.1 EXAMINATION
A. Site Verification of Conditions:
1. Examine areas and conditions under which application of coating systems shall be performed for conditions that will adversely affect execution, permanence, or quality of coating system application.
2. Measure moisture content of surfaces using an electronic moisture meter. Do not apply finishes until moisture content of surface is verified.
3. Correct conditions detrimental to timely and proper execution of Work.
4. Do not proceed until unsatisfactory conditions have been corrected.
5. Commencement of installation constitutes acceptance of conditions and responsibility for satisfactory performance.
3.2 PREPARATION
A. Protection:
1. Take precautionary measures to prevent fire hazards and spontaneous combustion. Remove empty containers from Site.
2. Place cotton waste, cloths and hazardous materials in containers, and remove from Site daily.
3. Provide drop cloths, shields, and other protective equipment.
4. Protect elements surrounding work of this section from damage or disfiguration.
5. As Work proceeds, promptly remove spilled, splashed, or splattered materials from surfaces.
6. During application of coating materials, post Wet Paint signs.
7. During application of solvent-based materials, post No Smoking signs.
B. Surface Preparation:
1. General Requirements:
a. Prior to application of primer, surfaces shall be prepared to receive specified coating system in compliance with manufacturer's recommendations and specifications of Steel Structures Painting Council as indicated in Schedule below.
b. Clean surfaces of residual deposits of grease, scale, rust, oil, dirt, and other foreign matter, immediately prior to priming. Surfaces to be coated shall be clean, dry, smooth, and free from dust and foreign matter which will adversely affect adhesion or appearance.
2. Ferrous Metal Surfaces:
a. Surfaces shall be free of residual deposits of grease, rust, scale, dirt, dust, and oil.
PAINTING 099000 - 6
b. Field welds and touchups shall be prepared to conform to original surface preparation standards as indicated in the Schedule of Coating Systems below. Shop applied prime coatings which are damaged during transportation, construction or installation shall be thoroughly cleaned and touched up in field per SSPC SP6 Commercial Blast Cleaning or SP11 Power Tool Cleaning to Bare Metal, while achieving a
(1) mil anchor pattern in the steel surface. Feather paint edges to a smooth transition.
c. Use repair procedures which insure complete protection of adjacent primer. To prevent injury to surrounding painted areas, blast cleaning may necessitate use of lower air pressure, small nozzle and abrasive particle sizes, short blast nozzle distance from surface, shielding and masking. If the damage is too extensive to tough-up, item shall be re-cleaned and coated or painted.
d. For surfaces not being shop primed, surfaces shall be cleaned per SSPC SP6 Commerical Blast Cleaning or SP11 Power Tool Cleaning to Bare Metal, while achieving a (1) mil anchor pattern in the steel surface.
3. Galvanized Steel Surfaces:
a. clean metal with a grease-cutting solvent, such as xylene, to remove contamination and oils in compliance with SSPC-SP1.
b. Sand clean and spot prime abraded areas.
c. Uniformly clean & etch the galvanized metal surface using Clean
N’Etch by Great Lakes Laboratories or equal material. Apply in accordance with the manufacturer’s written instructions.
d. Etching can also be achieved per SSPC-SP7 Brush-Off Blast Cleaning. If this method is choosen, clean surface prior to blasting using Extra Muscle be Great Lakes Laboratories or equal material.
4. Masonry Surfaces: (facing brick or concrete masonry units)
a. Allow surfaces to cure for not less than 30 days prior to painting.
b. Remove dirt, loose mortar, scale, efflorescence, or powder.
5. Gypsum Wall Board
a. Clean & Dry.
6. Moisture Emission Test for Concrete and Masonry:
a. Test substrates for moisture prior to application of coating systems.
The test shall be plastic sheet method in compliance with ASTM D4263.
3.3 APPLICATION
A. General Requirements:
1. Apply coating systems in compliance with manufacturer's instructions and use application method best suited for obtaining full, uniform coverage of surfaces to coated.
2. Apply primer, intermediate, and finish coats to comply with wet and dry film thickness and spreading rates for each type of material as recommended by the manufacturer.
a. Application rates more than those recommended and fewer numbers of coats than specified shall not be accepted.
3. Number of coats specified shall be minimum number acceptable. Apply additional coats as needed to provide a smooth, even application.
PAINTING 099000 - 7
a. Closely adhere to re-coat times recommended by manufacturer. Allow each coat to dry thoroughly before applying the next coat. Provide adequate ventilation for tank interior to carry off solvents during drying phase.
4. After surface preparation, interior welding seams shall be brush applied.
5. Make edges of paint adjoining other materials or colors sharp and clean, without overlapping.
3.4 REPAIR/RESTORATION
A. At completion of Work, touchup and restore finishes where damaged.
B. Defects in Finished Surfaces:
1. When stain, dirt, or undercoats show through final coat, correct defects, and cover with additional coats until coating is of uniform finish, color, appearance and coverage.
C. Touchup of minor damage shall be acceptable where result is not visibly different from surrounding surfaces. Where result is visibly different, either in color, sheen, or texture, recoat entire surface.
3.5 CLEANING
A. At completion of the day’s work, remove from Site rubbish and accumulated materials.
B. Clean paint spots and other soiling from prefinished surfaces and surfaces with integral finish. Use solvents which will not damage the finished surface.
C. Leave storage area clean and in same condition indicated for equivalent spaces in
Project.
3.6 PROTECTION
A. Protect work against damage until fully cured. Provide signs identifying wet surfaces until surfaces are adequately cured.
3.7 SCHEDULE OF COATING SYSTEMS
*All coating thickness are expressed in dry film thickness (DFT). The areas which do not have ceilings shall also be painted.
A. Interior Ferrous Metals: Shop primer; field applied finish coats or field applied system
1. Surface Preparation: See surface preparation listed in Part 3, Section 3.2.
2. Shop Primer: McCormick Interlock Interior/Exterior Rust Inhibitive Acrylic metal primre 06449
a. Dry Film Thickness: 3.0 to 4.0 mils
3. First Coat: McCormick Interior Gloss Interior/Exterior Acrylic Urethane DTM 42 Series
a. Dry Film Thickness: 2.0 to 3.0 mils
4. Finish Coat (s): Same as First Coat
a. Dry Film Thickness: 2.0 to 3.0 mils
B. Exterior Ferrous Metals: Shop primer; field applied finish coat or field applied system
1. Surface Preparation: See surface preparation listed in Part 3, Section 3.3
2. Shop Primer: McCormick Interlock Interior/Exterior Rust Inhibitive Acrylic metal primre 06449
PAINTING 099000 - 8
a. Dry Film Thickness: 2.5 to 3.5 mils
3. First Coat: McCormick Interior Gloss Interior/Exterior Acrylic Urethane DTM 42
Series
a. Dry Film Thickness: 3.0 to 4.0 mils
4 Finish Coat (s): Same as First Coat
a. Dry Film Thickness: 2.0 to 3.0 mils
C. Interior Dry Overheads: Structural steel, carbon and galvanzied steel decking, aluminum, wood and concrete decks, beams, joist and HVAC
1. Surface Preparation: See surface preparation listed in Part 3, Section 3.3
2. One Coat: McCormick Interlock eggshell Interior/Exterior Acrylic Urethane DTM
43 Series
a. Dry Film Thickness: 3.0 to 4.0 mils
D. Interior Gypsum Board: Dry areas
1. Surface Preparation: See surface preparation listed in Part 3, Section 3.3.
2. Primer Coat: McCormick 1st Step Interior Latex Enamel Undercoater and
Primer Sealer 06441
a. Dry Film Thickness: 1.5 to 2.5 mils
3. First Coat: McCormick Interior Semi-Gloss Interior/Exterior Acrylic Urethane DTM 45 Series
a. Dry Film Thickness: 2.0 to 3.0 mils
4. Finish Coat: Same as First Coat
a. Dry Film Thickness: 2.0 to 3.0 mils
END OF SECTION 099000
BASIC ELECTRICAL REQUIREMENTS 260500 - 1
SECTION 260500 - BASIC ELECTRICAL REQUIREMENTS
PART 1 - GENERAL
1.1 DESCRIPTION
A. Drawings and general provisions of the Contract, including General and Supplementary condition and General Requirements, and Division 1 specifications apply to the work specified in specifications of Divisions 26 and 28.
B. This section includes general administrative and procedural requirements for electrical installations. The administrative and procedural requirements such as Submittal, Operating and Maintenance Manuals, Handling and storage of equipment, etc. are included in this section to expand the requirements specified in Division 1.
1.2 SCOPE
A. The work of all sections of Divisions 26 and 28 includes furnishing and installing the material, equipment and systems complete as specified therein and indicated on drawings. The electrical installation when finished shall be complete and coordinated, whole and ready for satisfactory use.
B. Specifications are intended to include everything necessary for a first-class installation. If mention has been omitted herein of any items of the work or materials usually furnished for, or necessary, for the complete installation of electrical work or if there are conflicting points in the specifications and/or drawings, the attention of the Owner or their representative should be called to such items in sufficient time for a formal addendum to be issued. Any and all conflicting points in the specifications and/or drawings which are not questioned by the Contractor and clarified by a formal addendum prior to opening of bids shall be subject to the interpretation of the Owner or their designated representative after award of the contract and his/her interpretation shall be binding upon the Contractor.
C. All materials and equipment shall be installed and completed in a first-class and workmanlike manner and in accordance with the best modern methods and practices.
Any materials installed which do not present an orderly and reasonably neat or workmanlike appearance, or are not installed in accordance with these specifications, or the contract drawings, shall be removed and replaced when so directed in writing by the Owner or their designated representative at the Contractor's expense.
D. Should the Contractor discover any discrepancies between actual conditions and those indicated pertaining to the existing work which may prevent following good practice or the intent of the drawings and specifications, the Contractor shall notify the construction manager and shall not proceed with the work until instructions have been received from the Owner or their designated representative.
E. The Contractor shall furnish and install all labor, materials, equipment, tools, and services necessary for and reasonably incidental to furnishing and completing the installation of all electrical work, including the installation of conduits, wires, boxes, devices, etc. as shown
BASIC ELECTRICAL REQUIREMENTS 260500 - 2
on the contract drawings and/or called for in the specifications, and deliver it to the Owner in proper working condition.
F. It is intended that the specifications and drawings include everything requisite and necessary to complete the entire work properly, notwithstanding the fact that every item involved may not be specifically mentioned.
G. The specifications outlines, in general manner, the work required to be performed by the Contractor. The Contractor is responsible for work which may be reasonably interpreted from the specifications and/or drawings as necessary for a complete installation ready for service. The words "install" and/or "installation" shall be interpreted as the inclusion of the following work:
1. Setting, plumbing, aligning, and anchoring of equipment on foundations
2. Placing all mounting bolts, base channels, cable clamps and supports
3. Mounting and connecting of electrical items shipped separately and removing and replacing equipment parts to facilitate handling
4. Making internal connections on equipment which were omitted for shipment.
Provision of jumpers and local temporary interconnections that may not be listed in the cable tabulations at no additional cost to the Owner
5. Cleaning and checking of electrical equipment and connections
6. Repair to damaged surfaces and equipment shall be made to the satisfaction of the construction manager at no additional cost to the Owner.
H. The Contractor shall protect work in progress from physical damage and against the intrusion of dirt. The work area shall be kept clear of debris to prevent interference with other operations. The Contractor will be solely responsible for all refuse, debris, and trash attributable to this work. Removal shall be in accordance with all applicable ordinances and the Contractor shall pay any and all fees associated with the disposal of rubbish.
1.3 RESPONSIBILITY
A. The general Contractor shall be responsible for all work included in Divisions 26, 28, and the delegation of work to subcontractors shall not relieve him of his responsibility. The term "contractor" is used throughout this Division and shall mean the General Contractor, although the actual performance of the work may be by a Subcontractor.
B. The Contractor shall carefully examine all plans, specifications, and documents. After careful examination of all documents, the Contractor shall visit the construction site and thoroughly acquaint himself with the conditions under which the work will be executed.
Lack of knowledge, and the items, which could have been discovered or detected at the time of field visit will not be considered acceptable for extra work compensation.
1.4 REFERENCES AND DEFINITIONS
A. The following are definitions of the terms and expressions used in Division 26 Sections:
Construction Manager: Owner's designated representative Provide: "furnish and install" Directed: "directed by the Engineer or Owner"
BASIC ELECTRICAL REQUIREMENTS 260500 - 3
Indicated: "Indicated in contract drawings" Concealed: "hidden from normal sight; includes items in shafts, duct spaces (chases), and above ceilings.
Exposed: "not concealed"
B. Listed: Equipment or device is listed of a kind mentioned which:
1. is published by a nationally recognized laboratory which makes periodic inspections of production of such equipment.
2. states that such equipment meets nationally recognized standards or has been tested and found safe for use in a specified manner.
C. Labeled: Equipment or device is labeled when:
1. It embodies a valid label, symbol, or other identifying mark of a nationally recognized testing laboratory such as Underwriters Laboratories, Inc.
2. The laboratory makes periodic inspections of the production of such equipment.
3. The labeling indicates compliance with nationally recognized standards or tests to determine the safe use in a specified manner.
D. Certified: Equipment or product is certified which:
1. Has been tested and found by a nationally recognized testing laboratory to meet nationally recognized standards or to be safe for use in a specified manner.
2. Production of equipment or product is periodically inspected by a nationally recognized testing laboratory.
3. Bears a label, tag or other record of certification.
E. Nationally recognized testing laboratory: Is a company, which is approved, in accordance with OSHA regulations, by the Secretary of Labor, Federal Government.
1.5 CODES, REGULATIONS AND PERMITS
A. Give all necessary notices and obtain all required permits. Pay all fees and other costs, including utility connections in connection with the work. File all necessary plans, prepare all documents and obtain all necessary permits and approvals from all governmental agencies having jurisdiction. Obtain all required certificates of inspection and deliver same to the construction manager before request for acceptance and payment for the work.
B. All materials furnished, and all work installed, shall comply with the latest editions in effect at the time and date of invitation of bids, of codes, standards, rules and regulations and recommendations of the bodies, such as:
1. American National Standards Institute (ANSI) 2 American Society of Testing and Materials (ASTM)
3. Insulated Power Cable Engineer Association (IPCEA)
4. National Electrical Code (NEC)
5. National Electrical Manufacturers Association (NEMA)
6. National Fire Protection Association (NFPA)
7. Occupational Safety and Health Agency (OSHA)
8. Underwriters Laboratories, Inc. (UL)
BASIC ELECTRICAL REQUIREMENTS 260500 - 4
9. National Electrical Safety Code (NESC)
10. Institute of Electrical and Electronics Engineers
11. International Building Code (IBC)
12. American Disability Act (ADA)
13. Local Authority Having Jurisdiction
C. Drawings and specifications shall govern in those instances, where the requirements indicated on the construction documents are greater than the requirements required by applicable codes and other standards, rules and regulations.
1.6 SUBMITTALS
A. SUBMITTAL SCHEDULE
Submit, as an action submittal, a list of submittals, arranged in chronological order by dates required by construction schedule. Include time required for review, ordering, manufacturing, fabrication, and delivery when establishing dates. Include additional time required for making corrections or revisions to submittals noted by Engineer and additional time for handling and reviewing submittals required by those corrections.
1. Coordinate submittal schedule with list of subcontracts, the schedule of values, and Contractor's construction schedule.
2. Initial Submittal Schedule: Submit concurrently with startup construction schedule. Include submittals required during the first 60 days of construction. List those submittals required to maintain orderly progress of the Work and those required early because of long lead time for manufacture or fabrication.
3. Final Submittal Schedule: Submit concurrently with the first complete submittal of Contractor's construction schedule.
a. Submit revised submittal schedule as required to reflect changes in current status and timing for submittals.
4. Format: Arrange the following information in a tabular format:
a. Scheduled date for first submittal.
b. Specification Section number and title.
c. Submittal Category: Action; informational.
d. Name of subcontractor.
e. Description of the Work covered.
f. Scheduled date for Engineer final release or approval.
g. Scheduled dates for purchasing.
h. Scheduled date of fabrication.
i. Scheduled dates for installation.
j. Activity or event number.
B. SUBMITTAL FORMATS
1. Submittal Information: Include the following information in each submittal:
a. Project name.
b. Date.
c. Name of Architect.
d. Name of Construction Manager.
e. Name of Contractor.
f. Name of firm or entity that prepared submittal.
g. Names of subcontractor, manufacturer, and supplier.
BASIC ELECTRICAL REQUIREMENTS 260500 - 5
h. Unique submittal number, including revision identifier. Include Specification Section number with sequential alphanumeric identifier and alphanumeric suffix for resubmittals.
i. Category and type of submittal.
j. Submittal purpose and description.
k. Number and title of Specification Section, with paragraph number and generic name for each of multiple items.
l. Drawing number and detail references, as appropriate.
m. Indication of full or partial submittal.
n. Location(s) where product is to be installed, as appropriate.
o. Other necessary identification.
p. Remarks.
q. Signature of transmitter.
2. Options: Identify options requiring selection by Engineer.
3. Deviations and Additional Information: On each submittal, clearly indicate deviations from requirements in the Contract Documents, including minor variations and limitations; include relevant additional information and revisions, other than those requested by Engineer on previous submittals. Indicate by highlighting on each submittal or noting on attached separate sheet.
4. Paper Submittals:
a. Place a permanent label or title block on each submittal item for identification; include name of firm or entity that prepared submittal.
b. Provide a space approximately 6 by 8 inches on label or beside title block to record Contractor's review and approval markings and action taken by Engineer.
c. Action Submittals: Submit three paper copies of each submittal unless otherwise indicated. Engineer will return two copies.
d. Informational Submittals: Submit two paper copies of each submittal unless otherwise indicated. Engineer will not return copies.
e. Additional Copies: Unless additional copies are required for final submittal, and unless Engineer observes noncompliance with provisions in the Contract Documents, initial submittal may serve as final submittal.
f. Transmittal for Submittals: Assemble each submittal individually and appropriately for transmittal and handling. Transmit each submittal using AIA Document G810 transmittal form.
g. Electronic Submittals: Prepare submittals as PDF package, incorporating complete information into each PDF file. Name PDF file with submittal number.
C. SHOP DRAWINGS
1. After receiving approval of the equipment manufacturers, and prior to delivery of any materials to job site, the Contractor shall submit for approval detailed dimensional ship drawings, together with descriptive specifications and engineering data sheets and catalog cuts showing construction size, arrangement, operating clearances, performance characteristics and capacity of all electrical materials, equipment and systems.
2. Shop drawings, catalog cuts etc. submitted for approval shall be properly labeled indicating: specific service for which material or equipment is to be used; section and article number of specific service for which material or equipment is to be used; section and article number of specifications governing; and Contractors name, Owner project name and number, and the date of submittal. Provide a cover sheet with each submittal.
BASIC ELECTRICAL REQUIREMENTS 260500 - 6
3. Shop drawings, catalogs, pamphlets, or other documents submitted to describe items on which approval is being requested shall contain detailed and specific information which will demonstrate fully that the material, equipment or system will conform and perform to the contract documents. Each shop drawing, catalog pamphlet, etc. shall be clearly marked in ink and highlighted to identify the specific item submitted. Data of a general nature will not be accepted.
4. Shop drawings shall include plans, elevations, sections, mounting, details of component parts, point to point interconnection diagrams, elementary diagrams, single line diagrams and any other drawings necessary to show the fabrication and connection of the complete item or system.
5. The acceptance of shop drawings shall not relieve the Contractor from his responsibility to furnish material, equipment and systems and perform work required by the contract documents. Neither the Owner nor the architect nor the engineer will be responsible for errors or omissions on shop drawings furnished by the Contractor even though such shop drawings containing errors or omissions are inadvertently accepted.
6. The Contractor is further advised that the Owner, the architect; and/or the engineer will not act as coordinator between suppliers and subcontractors. All required coordination shall be the responsibility of the Contractor. See other sections of these specifications for additional detailed requirements for wiring diagrams, schematic diagrams, interconnection diagrams and similar shop drawings for systems and equipment.
7. Submit drawings and data sheets giving full information as to dimensions, materials, fitness and other pertinent facts.
8. Obtain approval before apparatus involved is ordered, built, or installed. If material of equipment is installed by the Contractor prior to receipt of pertinent shop drawings marked "No Exceptions Taken" or "Comments Noted", the Contractor shall be liable for its removal and replacement at no extra charge to Owner.
9. See other sections of Division 26, Division 28 and Division 1 for additional detailed requirements of shop drawings.
10. Manufacturer’s model and catalog number change frequently and may not necessarily include specified or required features and may not insure compatibility with supporting systems or intended applications. Contractor shall be responsible to insure that all materials and equipment delivered to the job site is suitable for the intended application and indicated connections.
11. Review of and/or noted comments on the contractor’s submitted shop drawings do not constitute a change order or a waiver of contract requirements. In the event of conflict between submittals or shop drawings and contract documents, the later shall govern. If a waiver of particular requirement is requested by the contractor, a formal written request shall be made to owner as per general conditions.
D. OPERATING AND MAINTENANCE MANUALS
1. Refer to Division 1 Section “Operation and Maintenance Data” for documentation requirements and format of the Building Systems Manuals.
2. Each copy of the Operating and Maintenance Manuals shall be bound in a durable, hardback binder with data sheets individually punched or perforated and entered. Data sheets shall be grouped and separated by dividers. At the Contractor's option, the manual may contain heavy manila tie flap envelopes, punched and bound with data sheets inserted in the envelopes and with a typed label on each envelope to identify its contents.
BASIC ELECTRICAL REQUIREMENTS 260500 - 7
The manual shall have an identifying label on the front cover and shall include the following as a minimum:
a. Index
b. One copy of the approved materials list
c. One copy each approved shop drawing and associated data
d. One copy of each system or equipment manufacturer's recommended preventive maintenance, if any
e. One copy of the nameplate data for each motor and overload protection device
f. One copy of a time-current characteristic curve for each type of fuse, overload device, or protection relay
g. One copy of each system or component operating and recommended preventive maintenance instruction (where applicable)
h. Copy of each final test report
i. Copy of manufacturer's installation instructions
j. List of service locations and local parts suppliers, and spare parts list
k. Wiring diagrams
E. DEMONSTRATION AND TRAINING VIDEO RECORDINGS
1. Submit two copies within seven days of end of each training module.
2. Identification: On each copy, provide an applied label with the following information:
a. Name of Project.
b. Name and address of videographer.
c. Name of Architect.
d. Name of Construction Manager.
e. Name of Contractor.
f. Date of video recording.
g. Transcript: Prepared and bound in format matching operation and maintenance manuals. Mark appropriate identification on front and spine of each binder. Include a cover sheet with same label information as the corresponding video recording. Include name of Project and date of video recording on each page.
h. Transcript: Prepared in PDF electronic format. Include a cover sheet with same label information as the corresponding video recording and a table of contents with links to corresponding training components. Include name of Project and date of video recording on each page.
3. At completion of training, submit complete training manual(s) for Owner's use prepared in same paper and PDF file format required for operation and maintenance manuals.
1.7 WARRANTY
A. All material and equipment provided under this division…