This Request for Proposal solicits offers for two Night Vision Goggle helmet mount National Stock Numbers to be awarded under indefinite delivery indefinite quantity contracts with a maximum five-year period of performance. The solicitation seeks offers for the PASGT helmet mount NSN 5855-01-612-5116 with a best estimated yearly quantity of 16,000 units and the ACH helmet mount NSN 5855-01-610-8704 with a best estimated yearly quantity of 80,000 units. The contracts will be 100% set aside for small businesses. Offers are due by the response date specified in the solicitation and awards will be made following evaluation. Pricing will be firm fixed price for the IDIQ contracts. The Defense Logistics Agency is the issuing agency.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 0001 Page 1 of 30
Issue: June 2021
Solicitation: SPRBL1-21-R-0014
TECHNICAL SPECIFICATIONS AND INSTRUCTIONS
Helmet Mount Assemblies for AN/PVS-7 ( ) and AN/PVS-14
Attachment 0001 Page 2 of 30
SECTION CHANGED CHANGE DATE
Attachment 0001 Page 3 of 30
TABLE OF CONTENTS
SCOPE
APPLICABLE DOCUMENTS
REQUIREMENTS
INTERCHANGEABILITY, INTERFACE, AND PERFORMANCE CHARACTERISTICS
HELMET MOUNT ASSEMBLIES
INTERFACE CONTROL DRAWINGS
PACKAGING
ENGINEERING
PROGRAM MANAGEMENT REQUIREMENTS
QUALITY MANAGEMENT
GOVERNMENT TESTING
BALLISTIC TESTING
FIRST ARTICLE TESTING
CONFIGURATION MANAGEMENT
HUMAN FACTOR ENGINEERING (HFE)
CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1
ENGINEERING CHANGE PROPOSAL
REQUEST FOR VARIANCE
NOTICE OF REVISION
BALLISTICS TEST REPORT
FIRST ARTICLE QUALIFICATION TEST PLAN
FIRST ARTICLE TEST REPORT INSTRUCTIONS
Attachment 0001 Page 4 of 30
SCOPE
This document specifies the tasks and efforts the contractor shall perform during this production contract of the
Helmet Mount Assembly (herein HMA) for the AN/PVS-7( ) and AN/PVS-14 Night Vision Device (NVD) systems. The HMA is a critical safety item that serves as a mechanical device that attaches the AN/PVS-7B, AN/PVS-7D and AN/PVS-14 NVD systems to the Personnel Armor System for Ground Troops (PASGT)
Helmet, and the Advanced Combat Helmet (ACH).
This document provides the technical, safety, and interchangeability requirements for the items being sought under this procurement. The contractor shall ensure that the delivered HMA systems/devices comply with the requirements listed in the Requirements section. The offeror is encouraged to use commercial/industrial processes and practices that will reduce design, production, and operational support costs while meeting the requirements of this contract.
APPLICABLE DOCUMENTS
The documents in the table below can be obtained directly from the publisher. The equipment on contract will be produced in accordance with these documents.
The offeror is responsible for reviewing the entire solicitation/contract to identify all directly cited and subsequently referenced documents. Immediately upon completion of this review, the offeror will notify the
Procuring Contract Officer (PCO) of any conflicts and/or misunderstandings between this provision and other contractual requirements.
Notes for Government-furnished drawings:
The drawings specified in this solicitation are for reference only and shall be used for interchangeability purposes. They do not contain complete details of all intervening processes, from raw material to finished products, which are necessary to fabricate, control, test, adjust, assemble and inspect the items on order.
Attachment 0001 Page 5 of 30
Military and Federal Standards
MIL-STD-129R Military Marking for Shipment and Storage
MIL-STD-2073-1E Standard Practice for Military Packaging
Military and Federal Specifications
PD-HMA Product Description, Helmet Mount Assembly, AN/PVS-7( ) and
AN/PVS-14
Interface Control Drawings
A3256347 Head/Helmet Mount Adapter
A3256371 Front Bracket Assembly
A3260931 Helmet Mount (Reference only)
A3264352 Wired Housing Assembly
A3297308 Front Bracket Assembly, ACH/CVC
Commercial Documents
ISPM Number 15 Regulation of Wood Packaging in International Trade
ISO/9001-2015 Quality Management Systems Requirements
EIA-649-1 Configuration Management Requirements For Defense Contracts
ASME Y14.24-1999 Types and Applications of Engineering Drawings
REQUIREMENTS
The purpose of the HMA is to provide a lightweight and durable interconnection between the Night Vision
Device and the User’s helmet and is intended for worldwide combat and non-combat field use by the U.S.
Military. The Government expects the products to be delivered within the required timeframe, fit for the purpose for which it is intended, and without defects or early life failures (beyond normal wear and tear). In the event of a conflict between the requirements of this document and any other documents specified within, the requirements of this document shall govern.
INTERCHANGEABILITY, INTERFACE, AND PERFORMANCE CHARACTERISTICS
All HMAs delivered under this contract shall be form, fit, and function interchangeable and without degradation of performance with previously fielded helmet mounts of the same kind down to the spare part level, as established by the current maintenance concept of the U.S. Army. The U.S. Army maintenance concepts for the
HMAs are detailed in the following Interface Control Drawings (ICDs): A3256371, A3297308, A3256347 and
A3264352. The Government may independently verify hardware compliance to the ICDs and Product
Description at any time during the life of the contract. The contractor shall be required to justify and/or rectify, Attachment 0001 Page 6 of 30 at no cost to the Government, any identified discrepancies between the hardware performance/configuration and these documents when such discrepancies are identified.
HELMET MOUNT ASSEMBLIES
The Helmet Mount Assembly and components shall meet the requirements of the Product Description (PD), Helmet Mount Assembly, AN/PVS-7( ) and AN/PVS-14, including form, fit and function.
Components. The Helmet Mount Assembly shall consist of the following components:
a. Helmet Mount
b. Front Bracket
INTERFACE CONTROL DRAWINGS
With the exception of requirements specified in this document, the contractor shall meet the form, fit and functional requirements of all spare part components as detailed in the ICDs for each HMA and Front Bracket
Assembly, where appropriate. The Government may independently verify hardware compliance to the Interface
Control Drawings (ICDs) and performance specifications. The contractor shall be required to justify and/or rectify any identified discrepancies between the hardware performance/configuration and these documents when such discrepancies are identified.
PACKAGING
Preservation, packing and marking for shipment shall be in accordance with Section "D" of the contract.
Packaging shall be in accordance with MIL-STD-2073-1E
Marking
All unit packs, intermediate packs, and exterior shipping containers shall be legibly and durably marked in accordance with MIL-STD-129R.
Wood Packing Material
Wood packaging material (WPM) includes but is not limited to pallets, skids, load boards, pallet collars, wooden boxes, reels, dunnage, crates, frame and cleats. This requirement excludes materials that have undergone a manufacturing process, such as corrugated fiberboard, plywood, particleboard, veneer, and oriented strand board (OSB). See DLAD 52.247-9012 Requirements for Treatment of Wood Packaging
Material (WPM).
Attachment 0001 Page 7 of 30
Military Packaging
DS7029 Preservation, Packing and Marking Instructions
The contractor shall establish, maintain, control and be responsible for the handling, storage, preservation, packaging and shipping to protect the quality of the materials and to prevent damage from loss, deterioration, degradation, or substitution of products
LEGEND
Qty Quantity
Prot Req Protection Required
PGE-REF Packaging Reference (Military Standard)
LPK Level of Packing
QUP Quantity per Unit Pack
ICQ Intermediate Container Quantity
Pkg Reqmt Codes Packaging Requirement Codes when PKG-REF cites MIL-STD-2073
The below codes are for special markings:
PC Project Code
WG Warranty/Guarantee
SL Shelf Life
BC Bar Code
FMS Foreign Military Sales
NSN
Prot
Req
PKG-
REF LPK QUP ICQ
Special
Markings
Pkg J. J J J J J J J J J
Reqmt I. II. III. IV. V. VI. VII. VII.a IX X
Codes (MP) (CD) (PM) (WM) (CD) (CT) (UC) (IC) (PK) (SM)
5855-01-
612-
5116 Military
MIL-
STD-
2073-1E B 001 - 10 1 00 DA NA B D4 BC
5855-01-
610-
8704 Military
MIL-
STD-
2073-1E B 001 - 10 1 00 DA NA B D4
ENGINEERING
The contractor shall assign, empower and emplace the engineering and production personnel necessary for successful contract performance. The contractor shall design and implement production processes that ensure successful production of all items required under this solicitation/contract. The contractor shall use commercial products, processes and practices whenever practical, to reduce production and operational costs.
PROGRAM MANAGEMENT REQUIREMENTS
Attachment 0001 Page 8 of 30
The objective of program management is to provide both the contractor and Government with management information and tools required to effectively manage work performed under this contract, minimize system performance risk, and ensure adherence to established program schedule.
Integrated Product and Process Team (IPPT). The Government and contractor shall incorporate an IPPT discipline into the HMA program. The objective of the IPPT is to implement an open shared data/information environment with results oriented objectives of on-schedule delivery of specification- compliant units, continuously improving the various Government/contractor processes, and reducing the system life cycle cost. The IPPT shall also complete the following additional actions throughout the life of the contract:
• Hold IPPT reviews
• Use risk management techniques to document, track, and manage program areas of risk
• Review/concur in program documentation
• Review/concur on all Failed Item Analysis Reports (FIARs), ECPs, Variances, and Trade studies.
The IPPT process as described is solely to facilitate communications between the Government and contractor during contract administration. Responsibility for dealing with issues raised and for meeting all contract requirements remains with the contractor. No communication made during the IPPT process may be construed as a change unless specifically designated by the contracting officer.
Reports, Reviews, Meetings. Reports, reviews and meetings shall be required on an as-needed basis for this contract. Where such reviews occur, the contractor is responsible for generating meeting minutes for the
Government to review and comment if necessary.
Post Award Conference. The Procuring or Administrative Contracting Officer (PCO or ACO) shall schedule a post award orientation to be held NLT 30 days after contract award. The purpose of the orientation is to ensure mutual understanding of the contract and all obligations and responsibilities of the contractor and the Government. Location of this meeting will be at the contractor’s facility or shall be conducted by telephone.
Informal Reviews. The contractor shall be available for informal reviews and Government visits in addition to the IPPT reviews. The contractor shall participate in an informal meeting, to identify, discuss, and resolve issues on an as-needed basis.
Correspondence Transmission. The contractor shall submit, as a minimum, written program correspondence or documentation via electronic submittal. The preferred method of file submission is via e-mail. Deviations from this requirement are allowed on a case by case basis, with Government verbal concurrence (either Government
IPPT chairpersons or Government Contracting Officer).
QUALITY MANAGEMENT
The contractor shall establish, maintain, operate, and continually improve a Quality Management System in accordance with ANSI/ISO/ASQ (E) Q9001-2015.
Attachment 0001 Page 9 of 30
The government shall have access to the contractor's quality manual at the contractor's facility at any time.
The Government has the right to examine the contractor’s quality management system, inspection system and quality management system documentation including documented statements of a quality policy, documented quality objectives, quality manual, documented procedures and records required by the quality management system standard, documents including records determined by the contractor to be necessary to ensure the effective planning, operation and control of its processes. The documentation can be in any form or type of medium and software. Government has the right to examine and test hardware used for quality management, test or inspection. The Government's examination shall be on the premises of the contractor or supplier, to the extent practicable, at all places and times. The Government’s examination of the contractor’s quality management system, inspection system and quality management system documentation will be conducted in a manner that will not unduly delay the contract work. The Government's examination, whether exercised or not, does not relieve the Contractor of the obligations under the contract.
If the Government performs examinations of the contractor’s quality management system, inspection system, quality management system documentation and test hardware used for quality management, test or inspection on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.
The Government’s right to examine the contractor’s quality management system, inspection system and quality management system documentation including documented statements of a quality policy, documented quality objectives, quality manual, documented procedures and records required by the quality management system standard, documents including records determined by the contractor to be necessary to ensure the effective planning, operation and control of its processes will be limited to the contractor’s facility and also to suppliers facilities that provide products and/or services valued over 20% of the contract total cost.
GOVERNMENT TESTING
The Government reserves the right to conduct independent testing at any time during the life of the contract to demonstrate the HMA meets the interchangeability and performance requirements outlined in the associated product description. Additional testing may be performed in an operational environment when operated by
Soldiers under potential battlefield conditions. Testing shall verify the HMA will be form, fit, functional, and
100% interchangeable with the previously fielded Helmet Mount configuration. Failures during Government testing will be brought to the contractor’s attention for root cause analysis and corrective action.
Initial Production Testing (IPT). An IPT is required for any hardware which incorporates design changes, or has not been produced by the contractor within the past 12 months. A waiver can be requested by the contractor.
The Grovernment reserves the right to approve or deny an IPT waiver request. If an IPT is required, the IPT shall be performed to the extent necessary as agreed upon by the contractor and Government to verify compliance to specification requirements for all characteristics of the product.
Attachment 0001 Page 10 of 30
BALLISTIC TESTING
Ballistic Testing (9-mm Resistance to Penetration) will be planned and coordinated with the U.S. Army Test and Evaluation Command (ATEC). The Physical Characteristics subtest is not required as part of the ballistic testing. Requests for coordination and guidleines can be made via https://www.atec.army.mil/rfts.html. Ballistic
Testing will be performed for every lot of bolts. Reports will be delivered in accordance with DI-MISC-80246.
A certificate of conformance for ballistics testing must be provided with each delivery.
SUBTEST OBJECTIVE
9-mm Hardware Resistance To
Penetration (RTP)
To verify the ballistic RTP performance of the NVD hardware meets the requirements, as measured by complete/partial penetrations, when the bolts are subjected to 9-mm full metal jacket (FMJ) round nose
(RN) projectile impacts.
FIRST ARTICLE TESTING
Contractor Performed First Article Testing
Contractor performed first article testing will be required of contractors that have not produced and delivered
HMAs via a Government contract within 12 months of the request. The contractor shall plan, coordinate, and fund first rtile testing. Contractors shall submit request for waivers, when applicable, with documentation showing deliveries within 12 months of the request. 22 helmet mounts will be subjected to the FAT, with an additional 16 in the case of any failures.
FAR 52.209-3 First Article Approval – Contractor Testing
Number of Units: 22 (additional 16 needed if any failures occur)
Lot/Item: 1
The Contractor shall submit the first article test report within 180 calendar days from the date of this contract to the contracting officer and engineer.
Within 30 calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article.
CONFIGURATION MANAGEMENT
This section delineates the configuration management monitoring and reporting requirements for the contract.
Configuration control shall be used to document the proposed changes, evaluate the impact of proposed changes and to update configuration documentation.
CONFIGURATION BASELINE
The Contractor shall establish a Configuration Management Program in accordance with EIA-649-1.
No changes or departures from the CB are acceptable except for changes or departures which are submitted in accordance with EIA-649-1, DI-SESS-80639, DI-SESS-80640, and DI-SESS-80642, and are approved by the https://www.atec.army.mil/rfts.html
Attachment 0001 Page 11 of 30
Government Configuration Manager (C Mgr.) or Configuration Management Officer (CMO) and which are made applicable to the contract by the PCO.
ENGINEERING DRAWINGS
The contractor shall provide Interface Control Drawings (ICDs) in accordance with ASME Y.14.24-1999, Types and Applications of Engineering Drawings, or equivalent. The ICDs shall outline the critical interfacing dimensions to show form/fit/function interchangeability to parts of similar nature, and those previously fielded by the U.S. Army.
PHYSICAL CONFIGURATION AUDIT (PCA)
A PCA shall be required for the interfacing dimension of each component in accordance with Engineering
Drawings section above, or any time the HMA has been changed per Engineering and configuration Control
Documents section below. The purpose of the PCA is to ensure the drawings match the qualified components of the HMA. Any discrepancies noted between the drawings and components shall be rectified by the contractor prior to continued acceptance of product. Upon successful completion of the PCA, the Government reserves the right to conduct a configuration verification item review of the components provided by the contractor at any time during the life of the contract.
ENGINEERING AND CONFIGURATION CONTROL DOCUMENTS
When an engineering change is proposed, the contactor shall be required to submit an Engineering Change
Proposal (ECP) or a Value Engineering Change Proposal (VECP). ECPs shall be used to document any changes made to the original HMA configuration by the contractor including, but not limited to, design, material or manufacturing process changes. This is to ensure configuration management is maintained throughout the life of the contract.
HUMAN FACTOR ENGINEERING (HFE)
If the contractor makes a design change to any component of the HMA that affects the User interface, the contractor shall implement a human factors engineering program to assure that the HMA conforms to the requirements of the PD. The HFE program shall focus on Soldier portability, helmet interface and manipulation of the adjustments on the HMA.
DMSMS/OBSOLESENCE MANAGEMENT
The Contractor shall execute a proactive DMSMS/Obsolescence Management program for the equipment on this contract. The government’s objective in this program is to cost-effectively identify and resolve
DMSMS/Obsolescence issues and maintain—to the maximum practical extent—a minimum five-year interval before any DMSMS/Obsolescence issue is forecasted to occur on any LRU in the system.
Attachment 0001 Page 12 of 30
The program shall address how the Contractor will identify part DMSMS/Obsolescence Issues, assess potential risk, develop a DMSMS/Obsolescence strategy and determine the most cost effective solution to part
DMSMS/Obsolescence Issues.
In accordance with the CDRL A007 for DI-MISC-80508B, Technical Report-Study/Services, DMSMS/Obsolescence Analysis BOM Report and this Technical Requirement Document, the Contractor shall submit a quarterly DMSMS/Obsolescence Analysis BOM Report. The DMSMS/Obsolescence Analysis BOM
Report shall contain the following data elements for each BOM item being monitored for availability:
Manufacturer p/n, Manufacturer, End of Life (EOL) Notice date, Part Status, Criticality, Estimated Part
Availability, Risk and Quantity per LRU. Upon review of the report, the government may request a meeting to discuss issues related to the report.
In the event that the Contractor discovers a DMSMS/Obsolescence issue that requires immediate action by the government, they shall notify the government PCO immediately.
Attachment 0001 Page 13 of 30
CONTRACT DATA REQUIREMENT LIST (CDRL) DD 1423-1
Each CDRL is assigned an Exhibit Number in Section J.
CDRL List
CDRL
Data Line
No. DID Identification Title
A001 DI-SESS- 80639 Engineering Change Proposal
A002 DI-SESS- 80640 Request for Variance
A003 DI-SESS- 80642 Notice of Revision
A004 DI-NDTI- 80809 Ballistic Acceptance Test Report
A005 DI-NDTI- 81307A First Article Qualification Test Plan – Quality Validation Plan
A006 DI-NDTI- 80809 Test/Inspection Report – First Article Test Report
A007 DI-MISC- 80508B DMSMS/Obsolescence Analysis BOM Report
ENGINEERING CHANGE PROPOSAL
An Engineering Change Proposal (ECP) describes the changes to be made to the CI/CSCI and all associated
Government documents and data that are affected by the proposed engineering change.
ECP should be prepared in accordance with EIA-649-1, Section 3.3.1, and DI-SESS-80639.
Attachment 0001 Page 14 of 30
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Original Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A001 TDP X TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
PAGST HELMET MOUNT
ACH HELMET MOUNT
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
Engineering Change Proposal
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-SESS-80639 AMSEL-LCE-INV
INSERT
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
IN
LT
ASREQ SEE ITEM 16
b. COPIES
SECT. B
8. APP CODE
N/A
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
SEE ITEM 16
Reg
Repro
16. REMARKS:
The contractor shall prepare and submit Engineering Change
Proposal in accordance with EIA-649-1 and this DID when a change to a contractual baseline document is deemed necessary.
The Government will have 30 days to review, accept, and/or comment on the draft submission. The contractor shall incorporate changes into the electronic deliverable within 30 days after receipt of Government comments. The Government will have
30 days to review, accept, and/or comment on the final submission.
Data shall be submitted and exchanged electronically in Microsoft
Office suite of applications (MS Word, Excel, Power Point, Access, and Project). Alternate formats may be allowed subject to
Government review and approval.
E-mail notification is required with any electronic submission.
AMSEL-LCE-INV
RDER-PRA-CA
QAR
PCO
ACO
15. TOTAL 0 5 0
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Adedolapo Junaid
RDER-PRA-CA
General Engineer
X
6/29/2021 Daniel Webster
RDER-PRA-CA
Branch Chief
6/29/2021
Attachment 0001 Page 15 of 30
REQUEST FOR VARIANCE
A Request For Variance (RFV) is a specific written authorization to depart from a particular requirement(s) of an item’s approved configuration documentation for a specific number of units or a specified period of time, either as an advance request or after the fact. The contractor shall identify the impact of the RFV on performance, operational readiness and logistics support of the affected CIs. The Government may require consideration for any RFV.
RFV should be prepared in accordance with EIA-649-1, Section 3.3.2, and DI-SESS-80640.
Attachment 0001 Page 16 of 30
Attachment 0001 Page 17 of 30
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A002 TDP X TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Request For Variance
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80640 AMSEL-LCE-INV
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
N/A
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
16. REMARKS: The contractor shall prepare and submit Request
For Variance in accordance with EIA-649-1 and this DID when a departure from a contractual baseline document is deemed necessary.
incorporate changes into the electronic deliverable within 30 days
RDER-PRA-CA
QAR
Adedolapo Junaid
Attachment 0001 Page 18 of 30
NOTICE OF REVISION
A Notice of Revision (NOR) shows the detailed changes that must be made to technical documentation, except specifications, following approval of an ECP. A NOR shall be submitted for each document affected by an
ECP.
NOR should be prepared in accordance with EIA-649-1, Section 3.3.4, and DI-SESS-80642.
Attachment 0001 Page 19 of 30
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A003 TDP X TM OTHER
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Notice of Revision
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-80642 AMSEL-LCE-INV
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
N/A
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
16. REMARKS: The contractor shall prepare and submit Notice of
Revision in accordance with EIA-649-1 and this DID when a change to a contractual baseline document is deemed necessary.
incorporate changes into the electronic deliverable within 30 days
RDER-PRA-CA
QAR
Adedolapo Junaid
Attachment 0001 Page 20 of 30
BALLISTICS TEST REPORT
A Ballistics Test Report shall be prepared and submitted in accordance with FAR 52.209-3 and DI-NDTI-
80809B. The Ballistics Test Report shall be complete, accurate, and readable and shall provide sufficient data to determine that the hardware item meets all the requirements delineated in the contract. The report will include the following:
1) General Data.
a. Contractor's name and address.
b. Contract number.
c. Nomenclature, type number and (if assigned) stock number of item represented by the Ballisics Test.
d. Lot No. and quantity
e. Place and date of performance of tests.
f. Total rounds expended on test (listed by test phases when applicable)
g. One-page summary of test performed, and overall results
h. Detailed results of each applicable phase
Attachment 0001 Page 21 of 30
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A004 TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Test Report Ballistics Acceptance Test
Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80809B AMSEL-LCE-INV
INSER
T
Attachment 0001 Page 22 of 30
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
DD
PER
DELIVERY
SECT.
B
8. APP CODE
N/A
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
16. REMARKS: Submit report of Ballistics testing. Government requires 14 days to provide comments/approval.
Submit revised report within 7 days after receipt of government comments. Government requires 7 days to provide comments/approval.
All deliveries shall be delivered in a format, compatible with
Microsoft Office software delivered by e-mail and by CD-R, CD+R
Compact Disc, DVD-R or DVD+R 4.7GB Digital Versatile Disc.
Alternative delivery media may be discussed with the Contracting
Officer prior to delivery. E-mail notification is required with any electronic submission.
15. TOTAL 4 4 0
Adedolapo Junaid
RDER-PRA-CA
FIRST ARTICLE QUALIFICATION TEST PLAN
The contractor shall prepare and submit a First Article Qualification Test Plan in accordance with DI-NDTI-
81307A. In addition to the information required by DI-NDTI-81307A, this submission shall contain:
a. The delineation and allocation of tests to be performed on each of the First Article units and the order of such tests.
b. The delineation and allocation of tests to be performed as Conformance Inspection on subsequent production lots, to include the order of tests and the sampling plan.
c. Step-by-step test procedures for each test and the data sheets to be employed to document the results of testing.
Attachment 0001 Page 23 of 30
d. Identification of required test facilities, equipment and personnel.
e. Test milestones schedules and the contractor's test readiness posture.
f. A table which cross references the paragraph number of the specification requirement (including a brief description of the requirement) and the associated paragraph number of the Quality Validation
Plan.
Attachment 0001 Page 24 of 30
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Helmet Mount Assembly
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
A005 First Article Qualification Test Plan Quality Validation Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-81307A AMSEL-LCE-INV
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
ONE/P
8. APP CODE
N/A
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft
A
16. REMARKS: Submit draft via LT. Government requires 30 days for review/comments. Submit final within 30 days of receipt of
Government comments, via DD 250.
Each draft and the final submissions shall be delivered in a format, compatible with Microsoft Office software delivered by e-mail and by CD-R, CD+R Compact Disc, DVD-R or DVD+R 4.7GB Digital
Versatile Disc. Alternative delivery media may be discussed with the Contracting Officer prior to delivery. E-mail notification is required with any electronic submission.
Adedolapo Junaid
Engineer
Daniel Webster
RDER-PRA-CA
Attachment 0001 Page 25 of 30
FIRST ARTICLE TEST REPORT INSTRUCTIONS
A FAT Report shall be prepared and submitted in accordance with FAR 52.209-3 and DI-NDTI-80809B. The
FAT Report shall be complete, accurate, and readable and shall provide sufficient data to determine that the hardware item meets all the requirements delineated in the contract. The report will include the following:
1) General Data.
a. Contractor's name and address.
b. Contract number.
c. Nomenclature, type number and (if assigned) stock number of item represented by the First Article.
d. Name and address of plant where First Article was fabricated and assembled.
e. Place and date of performance of tests.
f. Identification (including date) of applicable equipment specifications and associated amendments.
g. Sample size or quantity submitted for test or inspection.
2) Cross Reference. A table which cross-references the paragraph numbers of the specification, the test procedures, and data sheet entry.
3) Test Results. Complete test results showing actual or quantitative observations and all required calculations.
‘GO/NOGO’ data is allowable (under certain circumstances) only with prior Government approval. Allowable tolerances for each parameter shall be presented. Test data should also include the date that the test was performed, name and signature of tester, name and signature of the Government verifier/witness and serial number of the equipment. Test results shall cite detailed qualitative and quantitative data results such as test categories, test conditions, test methods employed, and types of inspection and test equipment used during the test or inspection.
4) FAT Failures. FAT failures shall list all requirements not complied with during FAT. If none, this should be explicitly stated. For each requirement not met, a corrective action to remove the noncompliance will be proposed. This corrective action must include retest or other verification that the corrective action does remedy the problem/failure. The corrective action will address changes in design or manufacturing process which will preclude this deficiency in subsequent production units. Verified corrective action must be implemented prior to contractor entering into production.
5) FAT/Production Discrepancies. Any Government approved difference between the parts, materials and processes used to manufacture FAT samples and production units shall be documented in the FAT report.
Attachment 0001 Page 26 of 30
Attachment 0001 Page 27 of 30
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Helmet Mount Assembly
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A006 Test/Inspection Report
First Article Test Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80809B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
OTIME 180 DAC
8. APP CODE
N/A
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
16. REMARKS: Submit report of First Article Test results via DD 250.
Government requires 30 days to provide comments/approval.
Submit revised report within 20 days after receipt of government comments. Government requires 20 days to provide comments/approval.
All deliveries shall be delivered in a format, compatible with
Microsoft Office software delivered by e-mail and by CD-R, CD+R
Compact Disc, DVD-R or DVD+R 4.7GB Digital Versatile Disc.
Alternative delivery media may be discussed with the Contracting
RDER-PRA-CA
Attachment 0001 Page 28 of 30
Attachment 0001 Page 29 of 30
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
TDP TM OTHER NDTI
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
Helmet Mount Assembly
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE
GROUP
A007 Technical Report-Study/Services
DMSMS/Obsolescence Analysis
BOM Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
QUARTER
LY
180 DAC
8. APP CODE
N/A
11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
16. REMARKS: Submit DMSMS/Obsoleence Analysis BOM report via
DD 250. Government requires 30 days to provide comments/approval.
Submit revised report within 20 days after receipt of government comments. Government requires 20 days to provide comments/approval.
All deliveries shall be delivered in a format, compatible with
Microsoft Office software delivered by e-mail and by CD-R, CD+R
Compact Disc, DVD-R or DVD+R 4.7GB Digital Versatile Disc.
Alternative delivery media may be discussed with the Contracting
RDER-PRA-CA
Attachment 0001 Page 30 of 30